HomeMy WebLinkAboutSW3230301_Supplement-EZ Form_20230309SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
(PROJECT INFORMATION
Name
Area (ac)
Wetland Area
Water Area (e
Kerns Rii
71.06
1.79
5 1 Is this project High or Low Density? High
6 1 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)
30
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
N/A
10
lis streambank stabilization proposed on this project?
No
NUMBER AND TYPE SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
2
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting (RWH)
18
Green Roof
19
Level Spreader -Filter Strip (LS-FS)
20
Disconnected Impervious Surface (DIS)
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
Bayfilter
26
lFilterra
FORMS LOADED
SIGNER CERTIFICATION
27
Name and Title:
Clayton Blackwell, PE
28
Organization:
McKim & Creed, Inc.
29
Street address:
8020 Tower Point Drive
30
City, State, Zip:
Charlotte, NC 28227
31
1 Phone number(s):
704-945-3345
32
Email:
jlackwell@mckimcreed.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Signature of Designer
Seal
01110/23
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
2
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
Type of SCM
Wet Pond
Wet Pond
5
Total drainage area (sq ft)
416869
1261062
6
Onsite drainage area (sq ft)
416869
1261062
7
Offsite drainage area (sq ft)
0
0
8
Total BUA in project (sq ft)
738340 sf
165350 sf
572990 sf
9
New BUA on subdivided lots (subject to
permitting) (sq ft)
453600 sf
104400 sf
349200 sf
10
New BUA not on subdivided lots (subject to
permitting) (sf)
284740 sf
60950 sf
223790 sf
11
Offsite BUA (sq ft)
12
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft)
18900 sf
4350 sf
14550 sf
- Sidewalk (sq ft)
- Roof (sq ft)
- Roadway (sq ft)
236340 sf
56600 sf
179740 sf
- Future (sq ft)
29500 sf
29500 sf
- Other, please specify in the comment box
below (sq ft)
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
14
New infiltrating permeable pavement not on
subdivided lots (sq ft)
15
Existing BUA that will remain (not subject to
permitting) (sq ft)
16
Existing BUA that is already permitted (sq ft)
17
Existing BUA that will be removed (sq ft)
18
Percent BUA
24 %
40 %
45
19
Design storm (inches)
1.0 in
1.0 in
20
Design volume of SCM (cu ft)
15475 cf
44962 cf
21
ICalculation method for design volume
SA/DA Method
SA/DA Method
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
WET POND
1
Draina a area number
1
2
Minimum required treatmentvolume cu ft
15475 cf
GENERAL
MDC FROM 02H .1050
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
3
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H:V ?
3:1
6
Does the SCM have retaining walls, gabion walls or other
en ines ed side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewaterin the SCM for maintenance?
Pum ref!
erred
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access complywith General MDC 8 ?
Yes
12
Does the drainage easement complywith General MDC 9 ?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10
Yes
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the devicespecific MDC?
Yes
17
Was the SCM desi ned bv an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
19
Has a stage/storage table been provided in the calculations?
20
Elevation of the excavated main pool depth (bottom of sediment0
removal fmsl
21
Elevation of the main pool bottom to of sediment removal fmsl0
22
Elevation of the bottom of the vegetated shelf fmsl
0
23
Elevation of the permanent pool fmsl
0
24
Elevation of the to of the vegetated shelf fmsl
0
F
25
Elevation of the temporary pool fmsl
0
26
Surface area of the main permanent pool (square feet
8
27
Volume of the main permanent pool cubic feet
cf
28
Average depth of the main pool feet
29
Average depth euation used
n 2
30
If usingequation 3 main pool perimeter feet
31
If usingequation 3, width of submerged veg. shelf feet
32
Volume of the foreba cubic feet
9768 cf
33
Is this 15-20 % of the volume in the main pool?
Yes
34
Clean -out depth for foreba inches
12 in
35
Design volume of SCM cu ft
16754 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter inches
2 in
38
If weir, weir height inches
39
If weir, weir length inches
40
Drawdown time for the temporary pool (days)
3.2
41
Are the inlet(s) and outlet located in a manner that avoids short-
cucuitin
Yes
42
Are berms or baffles provided to improve the flowpath?
Yes
43
Depth of forebay at entrance inches
36 in
44
Depth of forebay at exit inches
36 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf feet
6 ft
47
SIo e of ve etated shelf H:V
6:1
48
Does the orifice drawdown from below the top surface of the
ermanentpool.
Yes
49
Does the pond minimize impacts to the receiving channel from the 1
r 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turfgrass?
Yes
53
Species of turf that will be used on the dam and embankment
Fescue
54
Hasa plantinq plan been provided for the ve etated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 1 10:33 AM 1/10/2023
WET POND
1
Draina a area number
i 2
2
Minimum required treatmentvolume cu ft
44962 cf
GENERAL
MDC FROM 02H .1050
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
3
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H:V ?
3:1
6
Does the SCM have retaining walls, gabion walls or other
en ines ed side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewaterin the SCM for maintenance?
Pum ref!
erred
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access complywith General MDC 8 ?
Yes
12
Does the drainage easement complywith General MDC 9 ?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10
Yes
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the devicespecific MDC?
Yes
17
Was the SCM desi ned bv an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
19
Has a stage/storage table been provided in the calculations?
20
Elevation of the excavated main pool depth (bottom of sediment0
removal fmsl
21
Elevation of the main pool bottom to of sediment removal fmsl0
22
Elevation of the bottom of the vegetated shelf fmsl
0
23
Elevation of the permanent pool fmsl
0
24
Elevation of the to of the vegetated shelf fmsl
0
F
25
Elevation of the temporary pool fmsl
0
26
Surface area of the main permanent pool (square feet
0
27
Volume of the main permanent pool cubic feet
cf
28
Average depth of the main pool feet
29
Average depth euation used
n 2
30
If usingequation 3 main pool perimeter feet
31
If usingequation 3, width of submerged veg. shelf feet
32
Volume of the foreba cubic feet
27341 cf
33
Is this 15-20 % of the volume in the main pool?
Yes
34
Clean-outde th forforeba inches
12 in
35
Design volume of SCM cu ft
46706 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter inches
3 in
38
If weir, weir height inches
39
If weir, weir length inches
40
Drawdown time for the temporary pool (days)
3.78
41
Are the inlet(s) and outlet located in a manner that avoids short-
cucuitin
Yes
42
Are berms or baffles provided to improve the flowpath?
Yes
43
Depth of forebay at entrance inches
36 in
44
Depth of forebay at exit inches
36 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf feet
6 ft
47
SIo e of ve etated shelf H:V
6:1
48
Does the orifice drawdown from below the top surface of the
ermanentpool.
Yes
49
Does the pond minimize impacts to the receiving channel from the 1
r 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turfgrass?
Yes
53
Species of turf that will be used on the dam and embankment
Fescue
54
Hasa plantinq plan been provided for the ve etated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond (2) 1 10:32 AM 1/10/2023