HomeMy WebLinkAbout20141169 Ver 1_DCM Permit_20150406X -,c-s-x o-ss-n m�uw.rrosa�
r
�
� !li.(Y1�1:t �1%�3
x i'�d� `>� �
f--- ----
�
L
� �1 �ti: ��'�. �� i�"�`� j �1 �;_`����:�i4��-'�.
'��J�'.7�i';i��vii; CJi �ii�I:tG�=:�'?:°.±i: � ;_ia7`'laii.liyli �it,at�:�:!";;�5
. ���
t
�.�J�:i':.�?: ��.�S��i.'•.r�•°�'�.�!_���ii1��5i+�f1
Y
_ � �
�a_r
� i�lajor De�elopment in an �r�� of Eni-iro_�,rnPr_tal Co�c��•r�
— �1r,,,� �
pu�-su�n� i� i�:�-�� 1 ��A-118
Ex�ca��atio� a?�?�/or �iiling pursuant to N�G� 113-229
�er;���± i'�1amb�r
������
Iss�z�� to �.�> �����°����� ��°�'r���������3��, ���� I���� ����v��� ����=.�, ?��l�a��9 �?� �`�fs9��1��-��
Authorizin� d�velopment in Onsla�v a,1d Cra�-•en �'o�anty at ne�v drossin6 of `�Ihit� Oak F'ci��er ancl
i�n�-ro�����Y_ts tc U� 1"7 (i -2�1�) as rec�u°sti��� in th� perr�i�t��'s applicati�_r� �ai�d ? 1/3/l�', Iv��-1q
1��1�'-2, an� MP-5 and r�,�ei�-ec? as complet� on 2/20/15.
This permit, issu€d on �/��?/flS , is subject to cor,:piianc� �l�it:; tne ap; licaiion (�vhere consistent
�,�ith �h� permit), all a�pii<r�l�i� regiiiations, special co�sdiiior.s and r_otes set foi-ti1 be;o�=�. �,.y vicia��ion o�� i�i�sm terms i77ay
b� subjeci to fines, imprisonmen� or civil action; or may cause the permit to be null and voi�.
?�d�`� C�-�����a� ��' ��Ih��� ��� �3���r a�� �J� 17 Ir,����v��a����
1) In accflrd�r�cP �v�th commitments mac'e b�� ti�i permi*_te� and irl order t� pY�t�ct an�dromous fish
during sp�wnir�g �etiods a.nd throu�l: embr� �nic, lar��al or juvenile lif� stages in the �,Vhite �ak_
River, no in-��ater �vorlc shail be condu�t�d from Febru�ry 1� through Se�tember 30, �✓ithout prio-r
approj��al of the NC Division of Coastal M�nag�inent (DCM), in consult�tion �vith the appropriate
resource agencies. �
2) The installation of bridge piles shall be accomplished by pile drivi��� and/or the use of a vibratoiy
hammer. Sh�uld the permittee and;'o� its�contractor desire to utilize another type of pile installation,
such as drilled shaft construction ar jetting, additional authorization from DC�1 shall be requi�ed.
(�ee ����che� s�e��� f�r Ac�c�iti��a� ��nc�itio�s)
This pzimit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This pern�it must be accessible on-site to Deparnnent
personnel �vhen the project is inspected for compliance.
Any maintenance �vork or project modification not covered
hereun�3er requires further Didision appro��al.
�! 11 ��ork must cease when the peimit e.cpires o;i
��� �.�=�ii�°���fl� ����, ��a�°s�a��� �a �� �3��4�07�
In issuing this permit, the State oi �Iorth Carolina a�i-e�s
t'r:ar vour project is consistent with the North Carolina Coastal
N�ana�ement Program.
Si�ned by the authority of the Secretary oi DEi�IR and ihe
Chairman of the Coastal Resources Commission.
-� -- .- :�r',
,. . _y. �
BraYton C. Davis, Director
Division of Coastal �anagement
This permit and its conditians a�e hereby accept�d.
Signature of Permitte�
. . �r�v,��t���aa�:��;�;�r,-��,sn:-c�r�_�za ;-��fiasa�r-=rr�>�„��.r, z :., z :ur,ao-;rn �a-� rr�n� -,-� z rN-,7�a�z }.s<rr��;.r���.�; .-�v-rr.a-;a-r-���a ;
�v_ ;
X
�
j�-,,�• e' ^�'
� ;�l��o �i�Q�'� r°��Yn`�5���:� �i�3 �1 71'tJl L i i:i �'�::3
; i����-� ��°•��s��3� ��''�'���w ��1� �;�v��° ��� �� � %
� ���I 11��i�Y�`��, ����� �'��i'`��
x
��.� ��� � ����� �
���� � 1i� �3
3 j Turbic�:ty c���tai�s sral_i b� u��a te isol�im �l� i�-�,v��:�r y��orl� ar°�.s ti�,ithin th�, ��I'_nit� fla�� �.ive�, in�tu�'is�g
��t not lirriiiecl_ t� t.�� prrmu_r,_�ni a�,�l t��npor�ry ��;�i•?� �ricige insiall�i:on and �•�rnc��al. �'he tur'r�idity
curt�i_n_s shai_1_ e:?cir�i� ti�� i;rim�diate z,��a_r'_.c ar�z; �^otivP=,-��=, thPy shall not imp�c�P n��riga�ior!. Th�
rurbidity cur:.ains shall be prflloerly sna�r:�aineu a��d retained in the w�ter urstil c��sstruction is ccrr��le��.
Th� tur'ni�ity curtains shall be removed ���hen tur'oidity d�Titl?in the curtains reaches ambient levels.
4) Placement of riprap shal l'oe limited to the areas as depicted on tne attached �voi-�plan d�•awir�gs. The
riprap material shall be free frorr� loose dirt or any pollutant. The riprap material shall consist of clean
_rock o_r rnasonry materials, such as but not limited to, granite, ma��l, or brolcen coneret�.
j) Any debris resulting fr�m the c��emelition of the existir�g bridge or construction of the ne�v 'orid�e shall
not enter �vetlands or �vaters of the �tate, even temporarily.
6) A��y �vaste materials and dPbris associat�d «ith construction, demolition, or other activities shall be
disposed cf at an appro��ed upland site or sha11_ be recycled in an er.vironmentally apprapriafe m�nner
provided appropriate authorizafions are obtained fr��n any relevant state, federal, ar local authoriti�s.
7)
Q�
��
1 O;
Ti�e permittee �nd/or his contractor shall ex�rcise all available precautions ir1 day-to-day operations to
prevent w-ast� frorri entering the adj acent w�ters.
The permittee and/or his contractor shall pro=✓ide for prop�r storage and handling of all oils, chemicals,
etc., necessary to carry oui the project.
Uncured concrete shall not be allowed to contact waters of the State or water that w-i1� enter waters of the
�tate. �
�onstruciion staging areas shall be located only in upland areas, ancl noi in wetlarids or tivaters of the
State.
Tl j There shali be no clearing o-r grubbing ot wetlands outside ot the areas inciieateci on the attaeneci
wor:cplan dra��-�ings �vithcut prior approval from DCM.
12)
1 �)
The permittee shall minimize the need to cross wetlands to the ma�imum eYtent practicable.
Construction mats sha11 be utilized to suppoi-t equipment ti�-ithin �vetla_��d areas to minim�ze temporary
wetland impacts: .These mats shall be removed immediatelv following project cempletion.
1�) The temporary w-ork bridges shall be removed in their enti_rety within 90 days after they are no lonae-r
needed. However, if this timeframe occurs �vhile the moratorium referenced in Condition No. 1 of this
permit is in �ffPet, then ihe temporar5� work bridg�s shall be removed in th�ir entirety within 9C day s of
ihe maratorium end date.
"� A_. P �`
�T.•Le �.;�uc � .-11�t�t �: t � �' �d=iu�.�1 ��li.',��:f, ��.r�.= �3]3"� �f G�f�''°�' �
i���y� �������� o# ��'���� ��� �?s��� ��s�1 �� ? � ���� j �� �
=���3��'-��im'_���s ���-i�1������`��;
���������� ���� �a1�
��� 1�T0 �X�aVaI�Ji1 Oi i1111I1a S�l�.�� �a�° ��ci�e �t �Y1V �1�11� t_i? c'�T':� V�,.c���c1Ci� `�zi�t�2I1dS G� SU3`f�LlY?C�li1b L�iG�s,TS
outsid� of the ali;nrr��nt o� t�?e arLas in�i�atec: �n th� a�ta�:hed wor���la� cirativi��!:`s, ��ith�tit pri�r I���
authori_ati�r.
i 6) Mat�rial excavat�°d �ay be us�J �r iill ���e�_s ass��.iat��� tit�it'r_ th� p.�jeet on�e �rc�erly de=,��a�e�e� o� sn�11
be removed from the site and ta'ce.� t� an approved r.igh ground location.
17) The tempo��x� pl���m°?�� ar�d �o�a�le han�?irb �f a �y e<��a��ated or f 11 material wi�hi�� waiLrs os
vegetat�d wetlan�s is not authorized.
1�) �11 f 11 materia� shall be clean and fre° cf any pellutants e�ce�t in trace �ua�titi�s.
i���������s�/������ Z'a°��� �1����
i;�) �u� in.� bridge constrt�c�?oi1, �h� rerr_Zi_ttee s�a11 make eveYy attempt to maintain traditianal navigation in
the �tir;ite Oak River. �f this is n�� possible, then adequatP notice shall'oe provid�d t� th� public ihat
navigation will be lirnited during cc�nstruction. The notice shall include an esiimat� of the arnfluni of
iime that the limited navigation �v?li occur.
����a����ati�� ��� E������ C�a���°��
2�) This project shall conform to all requirements of ih� N� 5edimentation Poliution Control Act and 1�1�'
DOT's i��Iemoi•andum cf �greement with the Division of Energy, �l"ineral and Land Resources.
C'omp�nsaiorv i�'Iit��at�on
�O"I'E: The Ecosystem Enhancement Pro6ram (EEP) agreed to provide compensatory mitigation for
impacts in accordance �vith the EEP acceptance letter dated 2/2�/15.
IJiil�ii�s IZ�lacati��
21) Any relocation of utility lin�s that has not been previouslv permitted by DCM or is not already depicted
on the aitached �vork plan dravvings, or described within the attached permit application, shall requir�
approval by �CI�I, eith�r und�r th� autilorit�� of this permit, or �y the utility com�any obiain?ng separat�
authorizati�il.
�}S
b
ny
4
�
;
a
;
u
5
$
Y,
�
�
�
:r
x
-,•T ,t „
a-
� o ��'� ;'�:��'.f���:�a ��:t �� � %i _ � �:, r`? r3�:P
i"a:v�� ���s�3�� �� �,i��:�s ��� ��v�z �.��1 �1� �7
�' ��m 1 i�i'a �'�i. �. � 31-� _�?� x 3'�1 i:�
�a�±.��°���� ar�� �'����a.�r�� �����.r�� �'��3��������
� 1'i(3'?"� f� �,�.�� �
��v� � �� ��
i� j T��p p�rm�tt�e sh211 ati��r� to stipu?ations cflntain�� -fviihin t�� 1�.P�nor�r�r1�.��� of �gr��n?ert bet���e�n tne
�JS tirrny Corp of Engineers and the i�Torth Caroiina �iistoric Pres�r�,��tion Gff�ce dated 5/2/11 e which
l,TCDJT con�ui�r�d �vith b� signatt.r� on 5/25/11,
�er�e���
2�� �11� 1+1L 1�1V1SIGi1 L7� i%1j2�e,F ��C:SG:1ia;d., �i��T�'� j ui:L:1i)_°i��C� i�"i° �.i�:y�=��v'� ��:i�j:C'< <p1'0�.�,Ci �T;�. �.�l��r] l�>J1�
on 3/2/1�. Any violation of the Certification approv�d b;� the DWR shall be considered a violation of
this CA�A permit.
2�) 1 h� permiitee and/or contractor shall contact the �CiVI Transportation F?eld Repres�ntative in the
P�IoYehead City Distri�t Office at (252) 808-2�0� to schedul� a pr�-construction conference prior to
projeet i�i�3�t�cn.
1��'�'�: Tnis p�rmit c�nvey�s I3C��'s deter_mination tnat t'_n° �ortion of the proje�t not located withiri a
C��� ArPa of Fnvironm�ntal Conc�rn (AEC), in�luding the exte��t of the linear project lo�at�d
outside of the co�stal zone, ��vill be unc_lertaken in a manr�er that to the maximum e�tent
practicabl� is not e�pected to have an effe�t on a caastal use or resources within the coastal zone
and therefore is consist�nt with the enfor�eable p�l?cies c,f the N� Coastal iVlanagemPnt Pro�r�m
in ac�ardance �vith the provisions of Fede_ral Consistency (15�FR930).
�1��'�'�: If ii is det�rmined ihat additional per�rlanent and/or �emporary irripacts are necessary that a�e not
� shown on the attached perinit drawings or described in the authorized permit application, permit
modification or additional autharization from DCi�/I may be required.
I� ��'�o Pl:�ns and specifications for thP reloc:ation an�'or replacement of ��-ater mains mi�st be s�ab��itted
to the i�'C rJivision of Water iZesources, 1�ublic �va[er Supp�y rian iZevietiv �ection tor appr�vai
prior to censtruct�on. Final approval must be issued before water mains are placed itlto service.
i � �'�'�:
i�d�'I'�:
This permit does not eliminate the need to obtair. any additional state, federal, or local permits,
approvals, or authorizations that m.ay be required.
An application processinQ fee of �475 was received by D�Y� for this pr�ject. This fee also
satisfied tne Section 401 application processin� fee requirements of the Division of Water
Resources.