Loading...
HomeMy WebLinkAbout19990383 Ver 2_CAMA Application_20150330w NCDENR North Carolina Department of Environment and Pat McCrory Governor March 24, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Karen Higgins Division of Water Resources Daniel Govoni Major Permits Processing Coordinator HqFa3�3 v)- Natural Resources CAMA/DREDGE & FILL Permit Application Review Somerset Plantation HOA Donald R van der Vaart Secretary Carteret County, adjacent to the north side of Bogue Sound and the Somerset Plantation marina and boat ramp at Somerset Way, Newport. Proposed Project: Proposes maintenance excavation of the existing marina basin and channel, partially restoration of the width of the basin area through excavation of naturalized wetlands, replacement of bulkhead and groin. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 13, 2015 If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808 -2808. Ext 216. When appropriate, in -depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments SIGNED DATE 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone 252 - 808 -2808 \ FAX 252 - 247 -3330 \ Internet www nccoastalmanagement net An Equal Opportunity/ Affirmative Action Employer -\ ' r � �` (` �\ ^��>��� ' /, �_,'� �- .^.~\\ `-� \ \ - ''-' ~'''.\ '' .- .`.� ` ,~- � ` ` .� . �^\ .'~'- `'�. . . .' . - \ . `.. . � � \ ` ' ~ ' K ' ' '' , � �- � \ . ~' ' . \ � _. ,- `. �� . . ��^ .�^ . �� . _- __ DIVISION OF COASTAL MANAGEMENT )FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Somerset Plantation HOA, Newport 2. LOCATION OF PROJECT SITE- Adjacent to the north side of Bogue Sound and the Somerset Plantation HOA marina and boat ramp at Somerset Way, Newport, Carteret County Photo Index - 2000: grids 41 -518 N &O (18 &19) 2006: grids 41 -8044 I, J &K (7) State Plane Coordinates - X: 2641368.10 Y: 362754 9 Longitude: 76'51'54.93 Latitude: 3443'39.99 3. INVESTIGATION TYPE: CAMA/D &F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/12/2015 Was Applicant Present — no 5. PROCESSING PROCEDURE: Application Received and complete — 3/4/2015 Office — Morehead City 6 SITE DESCRIPTION: (A) Local Land Use Plan — Carteret County dated 2010 Land Classification from LUP — Residential (B) AEC(s) Involved: EW, PTA, ES (C) Water Dependent: Yes (D) Intended Use- Private /Community (E) Wastewater Treatment: Existing — N/A Planned — None (F) Type of Structures: Existing — roads, single family homes with associated amenities, bulkhead, marina facilities, boat ramp Planned — groin, bulkhead, basin and channel maintenance excavation (G) Estimated Annual Rate of Erosion- N/A Source — N/A 7. HABITAT DESCRIPTION - DREDGED PILLED OTHER (A) Shallow Bottom (groin) 200 ft2 N/A N/A (B) Shallow bottom (maintenance excavation basin) 7,000 ft2 N/A N/A (C) (B) Shallow bottom (maintenance excavation channel) 42,000 ft2 (D) Coastal Wetland removal 880 ft2 N/A N/A (D) Total Area Disturbed. 50,080 ft2 (E) Primary Nursery Area: No (F) Water Classification: SA, HQW Open: NO Field Investigation Report: Somerset Plantation HOA Somerset Way Page 02 8. PROJECT SUMMARY: The project proposed is for the maintenance excavation of the existing marina basin and channel, partially restoration of the width of the basin area through excavation of naturalized wetlands caused by shoaling, the replacement of a bulkhead, as well as the placement of a groin. Per the applicant, the groin would be placed a minimum of 15' from riparian access lines and would help protect the remaining wetlands as well as prevent future shoaling within the basin. 9. Narrative Description The Somerset Plantation HOA project is located on the north side of Bogue Sound and along Somerset Way, Newport, Carteret County. The project area is found by turning right off of HWY NC 24(approximately 10,400' or 1.97 miles east of the Gales Creek Bridge) in Newport onto Somerset Way. Follow Somerset Way through the subdivision where the marina will be located at the road end The site is located along the north side of Bogue Sound and in- between two single family residences. There where mayor permits issued in 1988 and 1999 for marina development, shoreline stabilization and maintenance excavation of the channel and basin, across Bogue Sound to the AIWW The original permit has been expired for years but authorized a maintenance excavation width of 20' for the 50' wide existing channel and 40' wide for the basin area with a final depth of 4' nlw. Regular maintenance of the entrance channel has occurred through the years via the general permit process (last one issued in 2011 for a channel) The alignment of the channel has always essentially been the same, and the spoil site will be located on the HOA high ground land peninsula. The Somerset Plantation HOA Marina property has approximately 900 feet of shoreline and is an average elevation of 5' above NHW The high ground area for the marina currently has a bulkhead, boat ramp, launch pier, marina with 9 slips and a common area for residents. It is covered with typical grasses and shrubbery There is an 11' x 100' fringe of coastal wetlands within the basin, west of the proposed groin area, which consist of Spartina patens (Salt Meadow Cordgrass) and Spartina alterniflora (Smooth Cordgrass). The proposed development is a private /community project. The substrate within the project location is sand There are residential properties to the east and west of the project area The Carteret County Land Use Plan classifies this property as Residential with all parts of the AEC classified Conservation. Bogue Sound is not designated as Primary Nursery Area, is closed to the taking of shellfish in this area and carries a water classification of SA/HQW. Bogue Sound has a width of approximately 10,400' plus or minus within the Field Investigation Report: Somerset Plantation HOA Somerset Way Page 03 project area and a 70' width within the basin area. Water depths are an average of -2' nlw in the project area. No shellfish were observed within the project area; however there are submerged grass beds to the west of the Somerset Plantation HOA entrance channel. 10. Project Description: The current proposal is to maintenance excavate the existing entrance channel and marina basin. The applicant is proposing to partially widen the existing basin to its original state through the excavation of accreted coastal wetlands and sand shoal as well as excavate the existing entrance channel to a width of 70' (starting from the existing eastern bulkhead and continuing west for 70') The channel maintenance excavation would not extend beyond the existing channel dimensions located to the west. They are also proposing to replace portions of the existing bulkhead as well as place a vinyl groin along the west side of the basin. Per the applicant, the groin placement would help prevent further shoaling as well as protect the remaining wetlands within the basin. The original channel width was a maximum of 50' and has been maintained at a width of 30 to 40' throughout the years; however the applicants are proposing a 70' width. The excavation would start at the existing eastern basin bulkhead and continue west for 70' but would not extend beyond the existing channel dimensions to the west The channel excavation would remain a distance of approximately 90' from any SAV habitat observed to the west of the proposed development site Due to the shoaling of the existing access channel and coastal wetland accretion within the marina basin, the applicants are proposing to maintenance excavate the existing Somerset Plantation HOA entrance channel and marina basin to help provide safer navigation The excavation plans to use a bucket to barge method A total of 3,660 cubic yards of material would be removed below nhw as well as 880 square feet of coastal wetlands (Spartina alterniflora) removed within the basin The excavation dimensions within the basin area would be 70' x 100' and would have a final depth of -4' nlw The channel excavation as proposed would be 70' x 600' with a final depth of -4' nlw The connecting water depths within this area are -4.5' nlw The channel excavation would be a distance of 90' plus from the existing submerged grass beds located to the west and would retain a 3:1 slope. The spoils would be located onsite on the high ground peninsula, which is located along the eastern side of the marina property. The spoils would be located a minimum of 30' above normal high water and would be stabilized with approved erosion control measures. The applicant is proposing to install a 2'wide x 100' long (from nhw)vinyl groin along the west side of the marina basin to help prevent sediment transport and shoaling within the existing basin as well as help protect some naturalized coastal wetlands within this area. It would start at the most southern wing wall of the existing bulkhead located along the west Field Investigation Report: Somerset Plantation HOA Somerset Way Page 4 side of the basin and extend south for 100'. The groin would be located 15' from the western riparian access line and would remain within the basin. It would also mot exceed a height of 1' above NHW. There are no SAV or shellfish beds within this area. The width of Bogue Sound is approximately 11,500' within this area with average water depths of -2' nlw. The final portion of the project would be replacing portions of the depilated bulkhead within two locations. The first location is along the north east side of the existing boat ramp/basin area A total of 70' feet of new vinyl bulkhead would be constructed and would not exceed a maximum of 2' beyond nhw. The final portion of new vinyl bulkhead would be placed along the most southern portion of the high ground peninsula located to the east It would be installed landward of the existing riprap (above nhw) and would not exceed a maximum length of 190'. 11. Anticipated Impacts: The maintenance excavation for the entrance channel would temporarily disturb 49,000 ftz of shallow sandy bottom habitat and remove 3,660 cubic yards of material from the system (which includes 880' of coastal wetlands). The increases in suspended sediment and turbidity levels from the dredging will be temporary and should be minimal given the bottom composition. Maintenance excavation will likely occur as needed to maintain the operation of the channel The proposed groin would fill 200 W of estuarine bottom and would not hinder navigation due to location. The construction of the vinyl groin would result in minor impacts due to turbidity, impacts would not expect to be significant. The purpose of the vinyl groin is to trap long shore sediment transport that the applicant reports is causing shoaling in the existing basin and a portion of the channel. There should be no undue interference to navigation from the groin due to the fact that all work proposed would remain within the manmade basin area The groin also has the potential to protect the remaining coastal wetlands located within the basin as well as stop accretion within the basin which would ensure safer navigation. Future excavation of the channel and basin area is possible. Name: Heather Styron Date: 3/24/15 Morehead City Somerset Waterfront Maintenance Project Request for a Major CAMA Permit with Maintenance 5 PROJECT NARRATIVE ** Somerset Plantation is a 65 lot subdivision on the south side of highway 24 about 3.5 miles west of the intersection of 24 and route 70 in Morehead City. A portion of the deeded common grounds of the plantation includes a boat ramp with boat basin and finger piers for day docking of boats. There is a channel that runs from the boat basin and to the deep water of Bogue Sound. The east side of the ramp area is bounded by a peninsula which is protected by seawalls. The seawall protects the area immediately around the ramp and extends about 70 feet due south on the west side of the boat basin and around the end of the peninsula on the west side. Some of the seawall has been replaced in the past and the old sections have deteriorated to the point that they need to be replaced. In the area of the boat basin along the seawall on the west side, sand has migrated into the area because of the southern winds and is causing the basin to become unusable. The fire department pump truck hookup that exists in the basin is almost unusable and will increase the likely hood of a fire completely burning down homes in the subdivision PROPOSED REPAIR /MAINTENANCE PROJECTS We are proposing four steps of maintenance: 1. Currently there is a channel from the existing boat ramp to the deep water of Bogue Sound. This channel has filled in with sand that has drifted across Bogue Sound due to the south winds. We wish to remove 3,660 cu yrds of mud by dredging it out to the original depth of four feet at low water utilizing a 1:3ft slope around the perimeter. The dredging method we propose to use is a bucket to barge and the dredge spoils will be trucked away by the dredger or deposited on the peninsula that bounds the east side of the basin as noted in drawing sheet 4. If deposited on the peninsula they will be spread out after drying and seeded with grass. The area to be dredged starts on drawing sheet 1 at the boat ramp and is to be dredged to a depth of Oft at NLW (hashed area) to include the 11ft X 80ft area (880 sq. ft.) of coastal wetlands, as detailed on drawing sheet 3, on the west side of the boat basin. The area of the ramp is approx. 45ft wide out to approx. 175ft from the ramp where it widens out to approx 70ft and then, as noted on drawing sheet 2, continues out to a distance of 700ft from the boat ramp where the dredged area will meet the deep water channel of Bogue Sound. 2. We wish to replace the seawall around the ramp area with a vinyl panel seawall. The existing seawall is old and deteriorating to the point that sand and fill are leaking through and into the basin waters. We have been patching this wall since 2002 and continue to find new holes every year. Before the seawall completely deteriorates and falls into the water, we wish to replace it with a new vinyl seawall installed on the water side of the existing seawall to be joined to the existing seawall. RECEIVED AP 047 3. We wish to install a free standing pile and vinyl panel groin that will be 15ft from our property and the Riparian Access Line extending due south 100 feet from the south end of the west side seawall The groin will be on the west side of the channel and parallel to it. The northern end of the groin will turn ninety degrees to butt up against the south end of the sea wall on the west side of the ramp. We expect this groin will protect the ramp area from the buildup of sand into the ramp area 4. We wish to install a new vinyl panel seawall around the south end of the peninsula. This wall would begin at the south end of the wall and continue south and east around the end of the peninsula. This new seawall will be installed on the landward side of the existing old pressure treated wall around the end of the peninsula. Due to age and environmental elements this existing old wall is deteriorating and allowing soil to leak through into Bogue Sound. ANTICIPATED WORK SCHEDULE: We plan to complete numbers 1 and 2 as soon as we can arrange for contractors. We plan to complete number 3 within two years. We plan to begin number 4 within three years. Respectfully submitted, Somerset HOA ** Please see attached drawings. RECEIVED MAR 0 4, 71115 (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT Ap p licin 'VLandowner Mforaa>iti ®n Business Name Business Name Project Name (if applicable) Agent/ Contractor 1 First Name Somerset Plantation Hoa Somerset Waterfront Maintenance Applicant 1 First Name M1 Last Name John W Ellis City Applicant 2 First Name M1 Last Name Gary E Gillikin ext If additional applicants, please attach an additional page(s) with names listed Contractor # Mailing Address PO Box City State City 2338 Morehead City NC ZIP Country Phone No FAX No 28557 us 252 -247 -1116 ext I - - Street Address (if different from above) City State ZIP 402 Somerset Way Newport NC 28570 - Email j w ellis@hotmail com, gillikinge@hotmail com 2., Aaeni1doin&*6ior-1nf6rhiav6n Business Name Agent/ Contractor 1 First Name M1 Last Name Agent/ Contractor 2 First Name M1 Last Name Mailing Address I- PO Box City State ZIP Phone No 1 ext Phone No 2 ext FAX No Contractor # Street Address (if different from above) City State ZIP Email RECEIVED KAR _0 4 6'1� <Form continues on back> '12 Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Pr?j(i& Loi:a'don County (can be multiple) Street Address State Rd # Carteret Somerset Way d Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip Somerset Plantation NC I 28570- Phone No Lot No (s) (if many, attach additional page with list) 252 - 247 - 1116 ext I I I I a In which NC river basin is the project located? b Name of body of water nearest to proposed project White Oak River Bogue Sound c Is the water body identified in (b) above, natural or manmade? d Name the closest major water body to the proposed project site ONatural ❑Manmade ❑Unknown Bogue Sound e Is proposed work within city limits or planning jurisdiction? f If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ONo work falls within 4.- _.$fte-Descfipd6n- a Total length of shoreline on the tract (ft) b Size of entire tract (sq ft 900 48,000 c Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (if man; lot sizes, please attach additional page with a list) 5ft ❑NHW or ZNWL e Vegetation on tract marsh grass and lawn grass f Man-made features and uses now on tract boat ramp, boat basin, 5 finger piers, 220ft pier g Identify and describe the existing land uses adjacent to the proposed project site single family residential homes h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? single family residential (Attach zoning compliance certificate, if applicable) OYes ❑No ❑NA I Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes SNo k Hasa professional archaeological assessment been done for the tract? If yes, attach copy ❑Yes ❑No ONA If yes, by whom? I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No UNA National Register listed or eligible property? RECEIVEE MAR 0 1, 7,r,1 15 <Form continues on next page> !A4R--Wu1Rq PIPY Z 0� 3 ✓ '3 Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m (i) Are there wetlands on the site? ❑Yes ®No (u) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (u) above, has a delineation been conducted? ❑Yes []No (Attach documentation, if available) n Describe existing wastewater treatment facilities none o Describe existing drinking water supply source none p Describe existing storm water management or treatment systems none 5. --Aidkiesand1inpac9i a Will the project be for commercial, public, or private use? ❑Commercial ❑PubliGGovernment ®Pnvate /Community b Give a brief description of purpose, use, and daily operations of the project when complete launching and trailermg boats c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored barge with bucket dredge, piling driver d List all development activities you propose dredge mud, replace seawall, install 1 00f groin e Are the proposed activities maintenance of an existing project, new work, or both? both f What is the approximate total disturbed land area resulting from the proposed project? 20700 ®Sq Ft or ❑Acres g Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state see attached sheet DCM MP -1 5h attachment i Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA I Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal r�crr ,m <Form continues on back> MAR 0 4 7015 Form DCM MP -1 (Page 4 of 4) APPLICATION for Mayor Development Permit In addition to, this completed applicahori.form, (MP -1) the folldwmg "Items below, -if applicable, must be submitted in order for the,application ' package to be complete Items (a) = (t)'are always applicable to'any mayor development application , Please'consult,the application ri - instruction booklet on how to properly prepare the required items below a A project narrative b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e The appropriate application fee Check or money order made payable to DENR f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management -Name,Diane Gnmsley = - == _ r = _ Phone No 252- 240 -5858 4Address 607 Hull Circle, Newport NC 28570 - Name Stephen Vaughn Phone No 919- 781 -4178 Address 2116 Dusky Wing Dr, Raleigh, NC 27613 'Name - _ Phone No' _ Address g A list of previous state or federal permits issued for work on the project tract Include permit numbers, permrttee, and issuing dates 18 -88 Sumerset Plantation HOA 1988 51 -99 Sumerset Plantation HOA 1999 h Signed consultant or agent authorization form, if applicable i Wetland delineation, if necessary j A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner) k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 -10), if necessary If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act .Cert®rcatioh-and- Peri iissiidh to Fattier ®►a:l:��ct9_:; I understand that any permit Issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project I further certify that the information provided in this application is truthful to the best of my knowledge Date 02/16/2015 Print Name Gary E Glllikin , q t Signature /�✓"� - / �. ✓ °''� '"�^—, Please indicate application attachments pertaining to your proposed project ®DCM MP -2 Excavation and FIII Information ❑DCM MP -5 Bridges and Culverts DECEIVED ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information ir?,r7 INN, Somerset Waterfront Maintenance Project DCM MP -1 5. h. 3,660 cu yrds of mud to be dredged. It starts on drawing sheet 1 at the boat ramp and is dredged to a depth of Oft at NLW (hashed area) to include,the 11ft X $Oft area of coastal wetlands, as detailed on drawing sheet 3, on the west side of the boat basin. The area of the ramp is approx. 45ft wide out to approx. 175ft from the ramp where it widens out to approx. 70ft and then, as noted on drawing sheet 2, continues out to a distance of 700ft from the boat ramp where the dredged area will meet the deep water channel of Bogue Sound. The dredge spoils will be either trucked to an inland disposal site owned by the dredging contractor or deposited on the HOA owned peninsula as noted in drawing sheet 4. The proposed groin is noted in drawing sheet 5 as being 16ft from the Riparian Access Line starting at the end of the existing seawall on the west side of the boat basin and continuing out a distance of 100ft. The groin will be constructed of vinyl seawall material and be supported by pilings on both sides at a spacing recommended by the contractor or the material manufacturer. RECENED MAR 01 Y (Except for bridges and cullveurts) Attach this form to Joint Application for CAMA Mayor Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet. 9: == EXC�W!lATI ®ii(__- Access apThis section notapplrcable Other Amount of material to be excavated from below NHW or MAIL in Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline 3,660 NWL) c (i) Does the area to be excavated include coastal wetlandstmarsh d stabilization Length 600 100 20 or other wetlands (WL)? If any boxes are checked, provide the Width 70 70 20 ®CW 880 ❑SAV E]SB Avg. Existing 2 2 2 - NA - s NA Depth remove the buildup back to to the existing bulkhead r Final Project 4 -®ISP ®SAL OF EXCAYl, ,_ { 4 4 NA ' NA b Depth peninsula 230ft X 30ft . - d 9: == EXC�W!lATI ®ii(__- apThis section notapplrcable a Amount of material to be excavated from below NHW or MAIL in b Type of material to be excavated cubic yards mud 3,660 c (i) Does the area to be excavated include coastal wetlandstmarsh d High- ground excavation in cubic yards (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ®CW 880 ❑SAV E]SB OWL ❑None (u) Describe the purpose of the excavation in these areas remove the buildup back to to the existing bulkhead =a. -®ISP ®SAL OF EXCAYl, ,_ { This section`not applicable a Location of disposal area b Dimensions of disposal area peninsula 230ft X 30ft c (i) Do you claim title to disposal area? d (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA ®Yes ❑No ❑NA (►i) If no, attach a letter granting permission from the owner (n) If yes, where? same e (►) Does the disposal area include any coastal wetlands/marsh f (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected (u) If yes, how much water area is affected? ❑CW ❑SAV ❑SB ❑WL ®None (►i) Describe the purpose of disposal in these areas 'RECEIVED retain material until suitable for other uses MAR 0 4 /,std Cl-'V �� :'°�' ___ ;=ae> t_'o�, tk� °. x•"` _. [ - ..= der „_-s�3 A�`'3 ^'e�' _. 'Pri�G�,. $�: .•, >� 3. SHORELINE STABILIZATION, (if development is a wood groin, use MP -4 — Structures) a Type of shoreline stabilization Ikhead ❑R►prap ❑Breakwater /Sill []Other c Average distance waterward of NHW or NWL e Type of stabilization material g Number of square feet of fill to be placed below water level Bulkhead backfill Riprap Breakwater /Sill Other I Source of fill material EM This section not applicable b Length ` Width d Maximum distance waterward of NHW or NWL t' f (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No NNA (u) If yes, state amount of erosion and source of erosion amount information h Type of fill material ^ , -4, OTHER FILL. ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a (i) Will fill material be brought to the site? []Yes ❑No ❑NA b (i) Will fill material be placed in coastal wetlands /marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WQ? If any boxes are checked, provide the u Amount of material to be laced in the water () p number of square feet affected (m) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill ❑WL ❑None (u) Describe the purpose of the fill in these areas 5. GENERAL,' a How will excavated or fill material be kept on site and erosion b What type of construction equipment will be used (e g , dragline, controlled? backhoe, or hydraulic dredge)? approved retaining barrier bucket to barge c (i) Will navigational aids be required as a result of the project? d (i) Will wetlands be crossed in transporting equipment to project []Yes ®No ❑NA site? ❑Yes ®No ❑NA (u) If yes, explain what type and how they will be implemented (u) if yes, explain steps that will be taken to avoid or minimize environmental impacts 02/1612015 Gary E Gdlikin Date - Applicant Name Somerset' Waterfront Maintenance -- Applicant Signature _- Protect Name AR, 4 _$ Ijt- (rry _ ws^ ,,u v � i,..n • ...t �� 7 C�,. _ __ _,4J: 5 "4 �� - � 'cyn_ _ _c.� r, c .� ,_ ��C''_., _ "sa Form DC M HP-4 (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information 'I, DOCKING FAC_ ILI TY /iiqARINA- ,CHARACTER/STIC§','A ®This section not ap'plrcable'. a (i) Is the docking facility /marina b (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government ❑Private /Community ❑Yes ❑No c (i) Dock(s) and /or pier(s) (u) Number (iii) Length (iv) Width (v) Floating ❑Yes []No e (i) Are Platforms included? ❑Yes []No If yes (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes []No Note Roofed areas are calculated from dripline dimensions g (i) Number of slips proposed (u) Number of slips existing i Check the proposed type of siting ❑ Land cut and access channel ❑Open water, dredging for basin and /or channel ❑Open water, no dredging required []Other, please describe k Typical boat length m (i) Will the facility have tie pilings? ❑Yes []No (u) If yes number of tie pilings? 3i d (i) Are Finger Piers included? []Yes ❑No If yes (u) Number (ui) Length (iv) Width (v) Floating ❑Yes ❑No f (i) Are Boatlifts included? []Yes []No If yes (ii) Number (iii) Length (iv) Width h Check all the types of services to be provided ❑ Full service, including travel lift and /or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage (`wet slips ") only, number of slips ❑ Dry storage, number of boats ❑ Boat ramp(s), number of boat ramps ❑ Other, please describe I Describe the typical boats to be served (e g , open runabout, charter boats, sail boats, mixed types) I (i) Will the facility be open to the general public? []Yes []No 2 5;' §n'ua;'S { y '_ av- ..`cy0 -a iA°a'V';__4k+x+37 ,1t "1 cT ECEiVEffD n Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes []No o Is the marina /docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ❑None p Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes El No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease 3: ®A! 1�09JSE; (mcluding covered lifts) - _ ED section not applicable a (i) Is the boathouse structure(s) ❑Commercial ❑Public/Govemment ❑Private /Community (u) Number (uQ Length (iv) Width Note Roofed areas are calculated from dnplrne dimensions �. ,GROIN (e.g ; `wood sheetpile, etc" If a rock -gran, -use MP -2,_ Excavation and Fill) _ _ ❑This section not applicable a (i) Number 1 (u) Length 1 00f (iii) Width 2ft 5: BRE�'dCrl ATER (e g`, wood, sheetp►le, etc) r - _ ®This section not applicable - a Length b Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands 6, MOORING'PILINGS,and- BUYS ® This section not applicable a Is the structure(s) ❑Commercial ❑Public/Government ❑Private /Community c Distance to be placed beyond shoreline Note This should be measured from marsh edge, if present e Arc of the swing % GENERAL b Number d Description of buoy (color, inscription, size, anchor, etc) uC tiI- kE!, 1, ate' -_3'u@ 1r'- - - - `aarw �t _ .a �# - _ -,"r6 a Proximity of structure(s) to adjacent riparian property lines 15ft Note For buoy or moonng piling, use arc of swing including length of vessel c Width of water body 60ft e (i) Will navigational aids be required as a result of the project? ❑Yes ONo ❑NA (it) If yes, explain what type and how they will be implemented b Proximity of structure(s) to adjacent docking facilities 45ft d Water depth at waterward end of structure at NLW or NWL 2ft 8. OTHER 0 This section not applicable a Give complete description 02/16/2015 Date Somerset Waterfront Maintenance Project Name- Gary-E Gillikin Applicant Nanie Applicant Si9pature- �xP i tea �► - vj may) -ul GYM,s 1e NY rd55-�Ia�'G1rii1^ L oe Se e sh -ee�"s 2 *5-�or . Gra F��� I I JO nnetrse`t ! r /� w acroSS� i�rat?. 5rotn_ tb T_Ctz/. t 14-1 43 I 1 _ I - f t ova w p l� 2Ri-- OFEC' 4 m;e ;1 i9 fJ�3.i i+ tJ "d Cie°' LA � i f y \ zs J "S Ix— 12 cl 3t \ a i nk I I Sz RECEIVED too 1 1 -/- � Y J� / f \■ N LIJ 4z m SIC Pro /A - , �y ,�cces� 41 ripe / - � -Sept 2474 RECuva) 14AR 0 4 7fo ib well C- TP el J-1 RECEIVED MAR o'! eITY F- x e. wa f, pyi i rL B64-i- Bas rn -Area pf- "A cl ;K t -q;t. zzzz 30' 3 N TS) /vote Y'C' 5 5 - 0-'r A Li �ie C-c-4 20, ;-0 FY-OPOSC--d py-6 i e-c:l' -cic, 5e-pt. 201� s Ji a e- 6 S 0 ri AAA 4 fie 06j gfo' I-o be-remov'-Od AAA 4 fie