HomeMy WebLinkAbout19990383 Ver 1_CAMA Application_199904194..
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Somerset Plantation HOA/Michael O'Connor, President
2. LOCATION OF PROJECT SITE: Adjacent to Bogue Sound east of Jumpin' Run Creek, off of Highway
24 in the Newport area of Carteret County, within the common area of the development known as
Somerset Plantation.
Photo Index - 1995: 41-519, grid K-4 1989: 154-36, grid E-3
State Plane Coordinates - X: 2642250 Y:362000
3. INVESTIGATION TYPE: CAMA
INVESTIGATIVE PROCEDURE: Dates of Site Visit - 1/99,3/17/99
11? Was Applicant Present - Yes
c
?ROC ? G PROCEDURE: Application Received -APril 12, 1999
r. Office - Morehead City
IT CRIPTION:
=(A) 3 cal Land Use Plan - Carteret County
and Classification From LUP - Developed/Conservation
(B) AEC(s) Involved: EW, PT
"1 ' 'Water Dependent: Yes
(D) Intended Use: Community
(E) Wastewater Treatment: Existing - Septic
Planned -None
(F) Type of Structures: Existing - Residences, docks, bulkhead, boatramp
Planned - Riprap
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands
(C) Other
Shallow Bottom Area 2500 sf
High Ground 600 sf
(D) Total Area Disturbed: 3100 sf
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: Applicant proposes to place riprap 6' to 10' waterward of a failing bulkhead.
4
FIELD INVESTIGATION REPORT:
Somerset Plantation HOA/Michael O'Connor, President
PAGE #2
---------------------------
9. NARRATIVE DESCRIPTION:
The project site is a 35 acre single family subdivision located off of Highway 24 in the Newport
area of Carteret County. The subdivision lies adjacent to Bogue Sound, east of Jumpin' Run
Creek. The lots average 1/2 acre in size, with an average site elevation of 12' above mean sea
level. The residences are existing, as are finger piers and a community boatramp. The shoreline
has been stabilized by a vertical bulkhead. Residences in the development are serviced by
private wells and septic systems.
The project site is carries a Carteret County Land Use Plan classification of Developed outside of
the CAMA AEC, and Conservation within the CAMA AEC. The Division of Marine Fisheries
has not designated the waters of Bogue Sound at this site as Primary Nursery Area; the area is
closed to the taking of shellfish for consumption; the Division of Water Quality classifies the
waters as SA.
There is a peninsula extending approximately 320' into Bogue Sound which is owned by the
Somerset Plantation HOA. The association docks extend westward from this peninsula, which is
stabilized with a traditional bulkhead. This area is vegetated with typical lawn grasses. There
was a pier to serve the homeowners extending from the point of the peninsula. There is no marsh
grass around the point of the peninsula, nor is there any evidence of shellfish or SAV beds. The
SAV beds to the east side do not extend to within the project area. The substrate in the project
area is very sandy. The applicants have received CAMA General #021193-C to place riprap
waterward of the bulkhead for a distance of 5', and replace the pier. After discussions with their
marine contractor, the applicants have now determined that 5' is not sufficient, and have
consequently applied for a major CAMA permit.
The existing bulkhead is failing. The structure has a low profile construction, and consequently,
storm waters have flowed over the wall, causing stress and resulting in a "bowing" effect.
Portions of the fill behind the wall have washed out as well. The deadmen have pulled forward,
and tiebacks are exposed. The contractor has determined that he cannot construct a sufficient
rock structure to support the failing wall within the 5' area allowed under the General Permit. I
would concur with this assessment. Replacement of the bulkhead is not financially feasible for
the HOA. Therefore, they are requesting to place the rock for a distance of 6' to 10' waterward of
the wall around the point, for a length of 250'. Although the application requests 6' to 10', site
evaluations and discussions with the contractor have led me to believe that the structure will be
constructed to an average overall width of 10'. Additionally, the applicant will perform some
maintenance work to the bulkhead, in the form of tieback and deadman replacement, with the
need for additional fill. The proposal is to fill a 40' x 15' high ground area that has scoured
behind the wall during recent hurricanes.
10. ANTICIPATED IMPACTS:
The project as proposed will require the filling of approximately 600 square feet of high ground,
and approximately 2500 square feet of sandy, shallow bottom area within Bogue Sound.
T. Barrett April 20, 1999 Morehead City
Form DCM-MP-1
APPLICATION °'p, "'°9a
(To be completed by all applicants)
1. APPLICANT
a. Landowner:
Name Somerset Plantation Homeowners's Assoc
Michael O'Connor, President
Address P.O. Box 2338
City Morehead City
State N C
Zip 28557 Day Phone 466-2885 or 2123
Fax 466-2992
b. Authorized Agent:
Name Chuck Bissette, T.D. Eure, Inc
Address P.O. Box 650
City Morehead City State NC
Zip 28557 Day Phone 252- 728-4191
Fa?52-728-4192
c. Project name (if any)
NOTE: Permit will be issued in name of landowner(s), and/or
project name.
2. LOCATION OF PROPOSED
PROJECT
a. County Carteret
b. City, town, community or landmark
Newport
c. Street address or secondary road number
Somerset Way
d. Is proposed work within city limits or planning
jurisdiction? Yes x No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) B o g u e Sound
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities.
Addition of rip rap in front of
existing wooded bulkhead.
b. Is the proposed activity maintenance of an existing
project, new work, or both? b o t h
c. Will the project be for public, private or commercial
use? private
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
additional pages.
_PALA- L~ 21 10 r;? A r-?' 7-c) S i l t_°'
13 Y i nuZ- A::? , P,4AcE RtP /Z A 0'
t0tl-k4 6sCC.4L/A-ro
Revised 03/95
Form DCM-MP-1
4. LAND AND WATER
CHARACTERISTICS
a. Size of entire tract
35 acres
b. Size of individual lot(s)
0.5 acres
Approximate elevation of tract above MHW or
NWL 12 ft.
d. Soil type(s) and texture(s) of tract
sandy loam
e. Vegetation on tract grass, a few l i v e oak,
pine and hickory trees
f. Man padte features now on tract boat ramp,
pave ° ree s, wooden bulk head, rest ences
oc s
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local rand use plan.)
X Conservation Transitional
Developed Community
Rural Other
h. How is the tract zoned by local government?
residential, R-50
Is the proposed project consistent with the applicable
zoning? x Yes No
(Attach zoning compliance cerrificate, if applicable)
j. Has a professional archaeological assessment been
done for the tract? Yes X No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes x No
Are there wetlands on the site? Yes x No
Coastal (marsh) Other
If yes, has a delineation been conducted?
(Attach documentation, if available)
m. Describe existing wastewater treatment facilities.
single family septic tanks
n. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
wastewater, industrial /commercial effluent, "wash
down" and residential discharges.)
overland surface runoff
o. Describe existing drinking water supply source.
private, single family wells
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2' by 11 " white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger .plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Revised 03/95
Form DCM-MP-1
site. Include highway or secondary road (SR)
numbers, landmarks, and the like.
• A Stormwater Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name David Miller
Address 101 Mary Lane, Newport, NC 28570
Phone 726-0023
Name Les Brant
Address 270 Brant Landing Rd., Newport, NC
Phone 726-4004
Name
Address
Phone
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
b.Z 11,7 3 - c SGM 4 a avr -AA vT.4T/o A) .2/&3/.7q
018621, Somerset Plantation H.O.A., 3/98
C-8841, George E. Young et al., 10/91
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
)(• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
X • A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
APR 12 1999
6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
i understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
2 8 5 7 Oproject.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the S- day of P ?L , 194Q.
Print Name C r3. c3/ 5 5 7--,67 Zr OZ
Signature
Landowner o Antlwrized Age
Please indicate attachments pertaining to your proposed
project.
X DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Revised 03/95
Form DCM-MP-2
EXCAVATION
AND -FILL
(Except bridges and culverts)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete. all
other sections of the Joint Application that relate to this
proposed project.
Describe below the purpose of proposed excavation or
fill activities. All values to be given in feet.
Average F-mal
Eristing Project
Length Width Death Death
Access
channel
(MLW) or (NWL)
Canal
Boat
basin
Boat
ramp
Rock
groin
Rock
breakwater
Other
(Excluding
shoreline
stabilization)
'
?k.::FyiOk
St E 5FC•Tl 0 A.) 3
1. EXCAVATION /V
a. Amount of material to be excavated from below
MHW or NWL in cubic yards o
b. Type of material to be excavated
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? Yes No
d. Highground excavation in cubic yards
2. DISPOSAL OF EXCAVATED
MATERIAL A//A
a. Location of disposal area
b. Dimensions of disposal area
c. Do you claim title to disposal area?
Yes No
If no, attach a letter granting permission from the
owner.
d. Will a disposal area be available for future
maintenance? Yes No
If yes, where?
Revised 03/95
Form DCM-MP-2
e. Does the disposal area include any coastal wetlands
(marsh), SAVs or other wetlands?
Yes No
f. Does the disposal include any area in the water?
Yes No
3. SHORELINE STABILIZATION
a. Type of shoreline stabilization
Bulkhead X Riprap
b. Length 250 feet
c. Average distance waterward of MHW or NWL
6 feet
d. Maximum distance waterward of MHW or NWL
10 ft
e. Shoreline erosion during preceding 12 months
none
(Source of information)
f. Type of bulkhead o< Ea material /4A Q L
g. Amount of fill in cubic yards to be placed below
water level
(1) Riprap 3 6
(2) Bulkhead backfill
h. Type of fill material
i. Source of fill material
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
a. Will f)1 material be brought to site?
t Yes No
If yes, APR 12 1995
(1) Amount of material to be place
water 'Vdiv Z5-:
(2) Dimensions of fill area 4o 'y
,.s
(3) Purpose of fill -3 A c K F / L.1-
8/!u,4e 6P a 2ri43
b. Will fill material be placed in coastal
(marsh), SAVs or other wetlands?
Yes X No
If Yes,
(1) Dimensions of fill area
(2) Purpose of fill
15. GENERAL
a. How will excavated or fill material be kel
and erosion controlled?
C'x1sr1AJC ???KfT?.4t7 A
FI -Tt?rZ FAG, rQ
b. What type of construction equipment will
(for example, dragline, backhoe, or
dredge)?
F-xc.,4 L/A4 r a2
c. Will wetlands be crDssed in transporting e
to project site? Yes X No
If yes, explain steps that will be taken
environmental impacts.
Somerset Plantation Home Owners
Applicant or Project Name _
Signature
Z71 AT-
Date
Revised 03/95
ID ui
L- -I Ov veT
?• 00tr
.610 s0,Jf M a1.??;ro j Is pJ a w w LS..Bt_° IQ'Q1 "E_J
C-3
hr+pryrl
"f.' 07JA?"•1 \?; Y ici (????''1???,---4? ,p r3 r r. A?VI Ir :"• RsI O ' !00.00'
b'i ?Iy?-? nw•?????1 4!•I
d-i
O , ??, ? 0 t" \,[ } Q Q4I p r? ,1 •'?' ?71?'' r!„I?a ? y ? I I !A (,? `? ? ' ? ? ` "ORNN [sM T
rJ•o>?? I 1Ob`! I I
1
00
1 [Ay, ?? 'r;` 1 a //J.OG' !14 /O' L`p' I q r 1•
` ` I err' H.t7RRNGcF? /.ve +001'w 0,4/F : ,l. I 8 I ti
g F? 6J' R.'IY _ ' \ I
e1•10' 1"E ! l I ?
1= Ol AV
tr / rS e1•?0'G4°E
,sy2'_ true` 'K r - - - - - - - - --
.. I. ? M.' •?s ?' s?44pp ? }• ? I ti h ? ? ? ho. P o ?o
---b' / lrN, ,`rA''^I*c c4? IIr ?g nI I o O h' ro k o0 i? Y ;"
1% li - L "? 41 0 41 ., J l0
ISer40'Oa"E 'O
'--•-
I ? 1 ? ?rh ?Pp ??, ? 1? •I I°4'?1?? °? I? * /1 • nr yy
10 A?
1
`0(111. 34 d'-iKE wrr ° i b
?
yam. ?., 0?0 Ao ; s ' i ro _ 1;
_ we I ,oa ,+It IIll,p i IS _ e4•40'04 ''.£?_ J
<? Y' 14 ?' I ° (n 100.00' .• I
#0008514 -W !v
r v /
. It 70' / f • 'h /d V I 4L ,1. 7j OI ti I + 144,r/ ^l
m ?: - -- ; $ y?ul Ig /e.rSC?o al "- At.rInlo
LCI
A I '? N r? A b M? 1. i99i 1!_. I -• Iy.5 0' •.-
I o, E51 0
at ? g I i
• :Il , °w' .? L.roKe c 1 I_? ,v. rta4 ; ?,. i r?• ° - -- -
p; l
!0.00 60.00'
ry0 ?[?C ?•? ??
eI•40'01'* Tp• ?? ?? '
4RY LANE •5N
410-
-44 &V - ijeo:j
--?-- } - ?' aq ?•
YsZ
C? b b? l I I I r I? w7 ? I p
91
? B ?kR 3 ai 14
I I 2 A I , ??
? A I
CAI
_ i_ ? - -- _ 'tea'--b-•??"'_ •? E :_ .?_ _ _ _ _ ? ,,--'_' ` ff?
• -.. I, ,,;7•?a'f- •p,. ` r'te' h. !!' •`M a % ? s 77i`f!-iA?f.
° N f•Iy 1 W .. A M cy.1?•a
x .
'b o
BOGUE
S
NK°st . 'h" w O UN D
"So'
ro
T
O
O
co
C/3 m 10
0
Lo 0 -°
0 a 0
a
[D (U a a a
P) co p
CD 0 (A
0
`
V?
N) 0. 13
Lo 7r [a
r ' CL m
Lo
CD
0
r O A
KA
X
N
CQ , z
S 0
0
? C
? m
::n a
-? a
T
W
CD
?
T
_M
CD
U)
X
(A
\' 1 :0 V
0
0
CL
W U)
PD
M
(?(YJ1
k
? O ((
4?
?.
1
n
" cn
I iM1•
ca X
5
O? ^
00 N
r
3 N
CL
CL ca
.
x
0
to
c
CD
0
C
CL
-v
w
f
4 ?
m
O
Tj
ED
3 F
a
S
jolts A ° -g / ^v ?m, ° J m
I? ca
Lj L)
rm)
Ce, - w _ iL \ S Q \ N Ifl
MIA C e i? ?• ?. ?ryr J U rv com
cl In
s LL
en-
? ?r.0 e P Y rn O `D 1
CIO m ? rhI - m
c
(o_ Q _ u 7 F j I? N N
ul 0 rv Fa°._ m? +? b cn s', o In `^ J J o E m u° j .D In
uj
1 : T 198 N?`' i 0? °' 1
.? N p `o N ,n S s .o In
?y N Q II V
clj
or m m _
OLLILLII¢LLLL? aQO ??l BS S `i J ICS
oemoa
¢m?wm a ao??°? y`
vas t3 w as o :? ,, f =
?40? a N ¢ N R
`o w¢x2> y¢¢mN r 0 00
2XOwaOwO ? 0 Q ? ? J H
? LLmx>U o ,
J J ?
w ? D d ? C
J l7 V ' QN r _ Ifl
N Y O LL ??? .? J = to I( C4 c
v ---
1 o
ro 0 _ z R o= h
w
i C7 Y UN O u - - d
• ? N ? II .L m *I J till ? _ - - 1!1
z Q °. it _ _ r o LL
r U e.rw II ?N n ___ __ ,
_ M.i °7 - vJ ° Ifl
J m ?? O N
Lc)
IN co
I _ IN
CIO I
r {E 71 rrv r II 7 .. _ Ln N O
Q7 u+ 2 EP 1973 n
N m _
a ? ^ 11 ? 1 ? ? J h Jl to
F+?
-- 1 h
o „ w a cw 90
jL} cn . I
Q•I 1 Q 1f1 N ?/ I n a 6o \ III I1?1IIIIIIIIIIII:,
Q I?? Z N ?\\1111
H IA W 90 I Q 1
4/j 0
Q U?° ?? to O ??\^ "\ell\1pe?11111111111111111p1bn
6o ?` 1 1 1 1 ?' I
I q
C O ^:
y ? O ii ? ? ' d,3L ?7S 'Itr ? ° m = o
'II Q ? _• i7 ? U
- 0= w
-- - - - -
3 Mill V y t co J ^ N i .,ro
i Q i0 7 N c? n J _ eV
r?
dll ? V J ?p W
Q) u) con
00 o
n Ln J J j / / s t
(1) if
0 nr?unlrnrlunlllullnq'
N
N % F 0
1
•;a, d it ° N /
S 062 08Z 042
Sul - -'IiH`-- --- ry ry-? - - O0'///?i'rlben'nrrlnlllllll,
aa`?, Q ° OLz
M ^? `'' Q o Z£ 1?ey? suio? Ln
M ?'