HomeMy WebLinkAbout19970506 Ver 2_Corps of Engineer Correspondence_20150326DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
68 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403 -1343
REPLY TO
ATTENTION OF
March 26, 2015
Regulatory Division/1200A
Action ID No. SAW -1997 -00289
Mr. Lenuel Chamberlain
Chairman, Yadkin Soil and Water
Conservation District
Post Office Box 8
Yadkinville, North Carolina 27055
Dear Mr. Chamberlain:
Reference is made to your letter dated November 24, 2014, submitted on your behalf by
Mr. Jason Walker with the Yadkin Soil and Water Conser "�tion District, requesting to be
released from the mitigation requirements associated witli your permit for the construction of
the Deep Creek Watershed Structure 5D. The project involved the discharge of fill material
into South Deep Creek associated with the construction of a dam and subsequent flooding of
Deep Creek and several of its unnamed tributaries, for the purpose of constructing a
municipal /industrial water supply and flood control reservoir, known as 5D. Specifically, the
project is located off SR 1314, approximately 4 miles west of Yadkinville, Yadkin County,
North Carolina.
Reference is also made to the site inspections of April 23, 2014, and November 24, 2014,
by me with your representative, Mr. Jason Walker to conduct final inspections of the work
associated with the referenced DA permit and the mitigation sites associated with the project.
Based on the monitoring reports and our site inspections over the past five years, we have
determined that the site has met the required hydrologic and vegetative success criteria for both
the stream and wetland mitigation components of your mitigation plan. We have determined that
you have satisfied the mitigation requirements for Yadkin County's Deep Creek Watershed
Structure 5D Mitigation Project (Dinkins Bottom Wetland Mitigation Site, Carl Shore Stream
Restoration and Effie G. West Stream Enhancement), and we concur with closing out the
monitoring requirements associated with your permit. In addition, we have determined that the
project has been constructed according to the plans is in compliance with our permit issued on
July 22, 2008.
Printed on Recycled Paper
2
Should you have any questions, please do not hesitate to contact me at (919) 554 -4884,
Extension 24.
Sincerely,
Jean B. Gibby
Chief, Raleigh Regulatory
Field Office