HomeMy WebLinkAbout20150180 Ver 1_More Info Received_20150331Engineering Services Department
B. Keith Pugh, P.E., Director
March 27, 2015
High Point University
Attention: Steven Potter
833 Montlieu Avenue
High Point, North Carolina 27262
RE: Buffer Authorization
Centennial Square, High Point University
Dear Mr. Potter:
IS- -oti�
NORTH CAROLINA'S INTERNATIONAL CITY
RECEIVED
N.0 Dept of ENR
MAR 31 2015
wrtston4elem
Regimal Office
The City of High Point Technical Review Committee (TRC) has reviewed the stormwater management plans and
specifications provided by Dan Pritchett, RE ,_Jamestown Engineering Group, Inc. on behalf of High Point
University for the proposed Centennial Square project The TRC has also received a copy of the approved U.S.
Army Corps of Engineers General Permit Verification (SAW- 2015- 00413) for this project. We have determined
that the proposed project, as depicted by the plans and specifications that were reviewed and approved, is in
compliance with the requirements of the Randleman Lake Buffer Rules in 15A NCAC 02B .0250, Randleman Lake
Water Supply Watershed- Protection and Maintenance of Existing Riparian Buffers.
Sincerely,
T
`A-At
Terry A. Kuneff, P.E., CFM
Engineering Services Department
(336) 883 -8583
Cc: Dan Pritchett; RE , Jamestown Engineering Group, Inc , 117 E. Main St., Jamestown, NC 27282
, Kevin Martin, Soil & Environmental Consultants, PA, 8412 Falls of Neuse Rd, Raleigh, NC 27615
Sue Homewood, DWR, 450 Y.- Hanes Mill Rd., Suite 300, Winston- Salem, NC, 27105 -
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax: 336.883.4118 Phone: 336.883.3194 TDD:336.883.8517