Loading...
HomeMy WebLinkAbout20150180 Ver 1_More Info Received_20150331Engineering Services Department B. Keith Pugh, P.E., Director March 27, 2015 High Point University Attention: Steven Potter 833 Montlieu Avenue High Point, North Carolina 27262 RE: Buffer Authorization Centennial Square, High Point University Dear Mr. Potter: IS- -oti� NORTH CAROLINA'S INTERNATIONAL CITY RECEIVED N.0 Dept of ENR MAR 31 2015 wrtston4elem Regimal Office The City of High Point Technical Review Committee (TRC) has reviewed the stormwater management plans and specifications provided by Dan Pritchett, RE ,_Jamestown Engineering Group, Inc. on behalf of High Point University for the proposed Centennial Square project The TRC has also received a copy of the approved U.S. Army Corps of Engineers General Permit Verification (SAW- 2015- 00413) for this project. We have determined that the proposed project, as depicted by the plans and specifications that were reviewed and approved, is in compliance with the requirements of the Randleman Lake Buffer Rules in 15A NCAC 02B .0250, Randleman Lake Water Supply Watershed- Protection and Maintenance of Existing Riparian Buffers. Sincerely, T `A-At Terry A. Kuneff, P.E., CFM Engineering Services Department (336) 883 -8583 Cc: Dan Pritchett; RE , Jamestown Engineering Group, Inc , 117 E. Main St., Jamestown, NC 27282 , Kevin Martin, Soil & Environmental Consultants, PA, 8412 Falls of Neuse Rd, Raleigh, NC 27615 Sue Homewood, DWR, 450 Y.- Hanes Mill Rd., Suite 300, Winston- Salem, NC, 27105 - City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax: 336.883.4118 Phone: 336.883.3194 TDD:336.883.8517