Loading...
HomeMy WebLinkAbout20040182 Ver 1_Approval Letter_20040308of W ArFR Michael F. Easley, Governor William G. Ross Jr., Secretary \OC QG North Carolina Department of Environment and Natural Resources ? r Alan W. Klimek, P.E. Director > t Coleen H. Sullins, Deputy Director p Division of Water Quality March 8, 2004 Macon County DWQ Project No. 040182 SR 1104 (Mulberry Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. R. G. Watson, P.E. Division Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 WETLANDS r 411 MAR 6 4 nm WATER QUALITY Dear Mr. Watson: You have our approval, in accordance with the attached conditions and those listed below, to impact 80 linear feet of five (5) unnamed tributaries to Barkers Creek and an unnamed tributary to Commissioner Creek (80 linear feet of new pipe) in order to make improvements to NCSR 1104 (Mulberry Road) in Macon County. The project must be constructed in accordance with the application dated January 24, 2004 (received February 6, 2004), including the environmental commitments made in the application letter. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3404, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 Permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to he valid, you must follow the conditions listed in the attached certification and any additional conditions listed helow. Erosion and sediment control practices must be in frill compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Any reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 59 Woodfin Place Asheville, N.C. 28801 Telephone: 828/251-6208 Fax: 828/251-6452 Customer Service: 1-877/623-6748 Mr. R. G. Watson, P.E. March 8, 2004 Page Two 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Noticc Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Quality has released the project. 4. In-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning season of October 15 through April 15, to protect the egg and fry stages of trout from off-site sedimentation during construction. NCDOT shall comply with any other recommendations requested by the NC Wildlife Resources Commission. 5. 'This Certification does not authorize any instream work to be performed at Station 78+05. 6. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 7. NCDOT must submit a plan for written DWQ approval to address any head cutting that will occur as a result of this project. Any repair designs must be submitted to and receive written approval from the NCDWQ before the repair work is performed. 8. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site or the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow. 9. Culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. 10. Removal of vegetation at the stream crossing and adjacent to streams should be minimized. Native trees and shrubs (e.g. Rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) should be planted along the streambank to reestablish the riparian zone and to provide long-term erosion control in the vicinity of the road crossing and along the streams within dedicated rights of way. 11. Riprap placed for bank stabilization should be limited to the streambank below the high water mark, and vegetation should be used for stabilization above the high water elevation. 12. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 14. Excavation of the stream crossings and relocations should be conducted in the dry, if possible. Sandbags, cofferdams, flexible pipe or other diversion structures should be used to minimize excavation in flowing water. 15. If concrete is used during culvert installation (e.g., headwalls), a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH. 16. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is strictly prohibited. 17. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. Instream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel will likely cause downstream erosion problems, possible affecting other landowners. Mr. R. G. Watson, P.E. March 8, 2004 Page Three 18. Rock check dams at culvert outlets should be removed at project completion to avoid blocking movement of aquatic life. 19. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for permitted areas associated with culvert conditions. 20. All work shall be performed during low flow conditions. 21. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. NCDOT is strongly advised to send in photographs upstream and downstream of each structure to document correct installation. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208. Sincerely, r2_ gz" It- Alan W. Klimek, P.E. Attachment cc: Wilmington District Corps of Engineers Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Steve Lund, USACE Asheville Field Office Wetlands/401 Unit Mike Parker, NCDWQ Asheville Regional Office