Loading...
HomeMy WebLinkAbout20061223 Ver 3_Riparian Buffer Authorization Request_20230313Buffer Authorization Application Form 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form - Update 10/23/2018 Original Submittal 3/13/2023 A. Owner/Applicant Information General Information Primary Contact Email:* Who is submitting the application?* Istroud@stroudengineer.com Please list the contact person's email for questions or payment on this project if needed. Owner (] Applicant other than Owner (] Agent Is there an agent working on this application but Yes not submitting it? No 1. Property Owner Information: ............................................................................................................. la. Name on Recorded Deed:* 1b. Responsible Party: lc. Mailing Address:* 1 d. Telephone:* 252-746-7628 Kenneth Smith Properties, Inc. Kenneth Smith (for Corporations) Street Address 1588 NC-102 Address Line 2 City State / Province / Region Ayden NC Postal / Zip Code Country 28513-7551 US le. Email Address:* kenneth@jonesandsmith.us B. Project Information and Prior Project History 1. Project Information ........................................................................................................................................................................................................................................................................................ la. Name of Project: * Brookstone Subdivision Phase 2 (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No Id. Subdivision Name: Brookstone Subdivision le. Nearest Municipality: Winterville 1f. Property Size: 27.05 acres 1 g. County (or Counties) where the project is located:* Pitt lh. Property ID# 70650 Tax PIN or Parcel id li. Deed Information Date of Purchase 6/7/2005 Type of Book Book# Page# Deed 1940 846 Map 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document PDF only 1 k. How would you like to provide the Latitude and Longitude information? * Address Lookup Manually Latitude* 35.5058 Longitude* 77.4039 11. Is the project located in any of North Carolina's twenty coastal counties?* 2. Surface Waters 2a. Name of the nearest body of water to proposed project: * Swift Creek 2b. Water Quality Classification of nearest receiving water: c,Sw,Nsw Yes No 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3,520 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently vacant woodland. The property to the west is a developed residential subdivision. All other surrounding properties are vacant woodlands. 3b. Attach an 8 1/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document USGS Topo Map.pdf PDF only 646.88KB 3c. Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document NRCS Soil Map.pdf PDF only 4. Proposed Activity 439.15KB Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: * The activities will be construction of roads, drainage and utilities for development of a residential subdivision using conventional construction equipment; i.e., excavators. graders, etc. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document Site Plan.pdf PDF only 5. Jurisdictional Determinations 7.11MB 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date Attach Corps Emily Thompson (Name if known) 09/24/2021 PJD.pdf 1.81MB pdf only *'* Please include the date of the determination and upload a copy of the determination. Comments: 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * Yes No 7. Future Project Plans 7a. Is this project a phased project?* C. Proposed Impacts Inventory Buffer Impacts Yes Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 026.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 026.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 Map label (e.g. Road Crossing 1) Permanent (P) Allowable 400.00 600.00 Perm or Temp Square Feet Square Feet Total Zone 1 Impacts: 400.00 Total Zone 2 Impacts: 600.00 Total Buffer Impacts: 1,000.00 Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. The stormwater drainage system has been designed to convey all stormwater runoff to a wet detention pond which will reduce nutrients and atenuate flow prior to discharge through the buffer. The stormwater discharge from the wet pond is the only constructon activity planned within the buffer. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. A wet detention pond will be constructed to reduce nutrients and reduce peak flow before discharge through the buffer E. Diffuse Flow Plan la. What type of SCM are you providing? * Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen lb. Describe how diffuse flow will be maintained:* The flow will be concentrated but nutrients will be removed prior to discharge by the wet detention pond. The wet pond has been designed in compliance with the NCDEQ BMP Manual criteria. lc. Diffuse Flow Documentation F. Supplementary Information Environmental Documentation Click the upload button or drag and drop files here to attach document Dffuse Flow mitigation doc.pdf 2.59MB PDF only la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? Yes No 2b. Is this an after -the -fact buffer authorization application? Yes No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Additional Comments: H. Sign and Submit Click the upload button or drag and drop files here to attach document PDF only By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name: * Linwood E. Stroud Signature Submission Date: ,.e/YY.Yertoee t4YfC1 3/13/23 (Auto populated field) Initial Review Is this accepted into the review process? * Yes No Yes No ID#* 20061223 Version:* 1 Select Reviewer: * Robert Tankard:robert.tankard@ncdenr.gov Select Reviewing Office* Washington Regional Office - (252) 946-6481 Is this project a public transportation project? * Has payment been received?* No Payment Needed Fee Received Need Fee - send electronic notification