Loading...
HomeMy WebLinkAbout20141325 Ver 1_DCM/WRC comments_20150227 Ward, Garcy From:Williams, Paul C Sent:Friday, February 27, 2015 9:03 AM To:Tracey.L.Wheeler@usace.army.mil; Ward, Garcy; Daisey, Greg Subject:FW: San Souci Request Please see the email thread below regarding the San Souci Project Request. Thanks, Paul From: Staples, Shane Sent: Friday, February 27, 2015 8:45 AM To: Williams, Paul C Subject: RE: San Souci Request Sorry about taking so long to get back to you, I thought I had replied but apparently I just sent and e-mail to Travis and didn’t CC you. I am fine with the modification and moratorium relief in June. Also I got an e-mail from one of the fisheries guys that there were several messages on the phone in my old office from you. My number is 252-948-3950 Shane From: Williams, Paul C Sent: Friday, February 27, 2015 8:33 AM To: Staples, Shane Subject: RE: San Souci Request Shane, What are your thoughts on the proposal below? Thanks, Paul From: Wilson, Travis W. Sent: Friday, February 20, 2015 8:22 AM To: Williams, Paul C Cc: Staples, Shane Subject: RE: San Souci Request That looks like what we had discussed, I’m fine with it. From: Williams, Paul C \[mailto:pcwilliams2@ncdot.gov\] Sent: Friday, February 20, 2015 8:17 AM To: Wilson, Travis W.; Staples, Shane Subject: RE: San Souci Request 1 Did y’all have any problems with the request below that I will send the agencies? Paul From: Williams, Paul C Sent: Monday, February 16, 2015 4:14 PM To: Wilson, Travis W.; Staples, Shane Cc: Willis, Thomas C Subject: San Souci Request Travis and Shane, The following will be the request I send to the agencies. Please let me know if you find it acceptable or if you have any additional concerns that need to be addressed. NCDOT requests to modify the permits for the San Souci Road Shoreline Stabilization Project on the Cashie River in Bertie County. The project was authorized under USACE General Permit 291 (SAW-2015-00047), 401 Water Quality Certification No. 3900 (DWR project #14-1325), and CAMA Major Permit No. 8-15. NCDOT proposes to use approximately 85 linear feet of sheet piling rather than rip rap in the vicinity of the ferry ramp and the proposed gravel turn around, as shown in the attached permit drawings. This change would result in a decrease of 150 sq. ft. of wetland impact (430 sq. ft. down to 280 sq. ft.), and provide better protection for the ferry ramp and the gravel turnaround. The total length of the shoreline stabilization would remain 240 linear feet. The sheet piling would be installed with a vibratory hammer on an excavator. In addition, both the GP291 and the CAMA Major Permit include a permit condition that enforces an in-water work thth moratorium between February 15 and June 30 of any year. Due to funding availability for this fiscal year, NCDOT requests relief from the moratorium. For the rip rap stabilization part of the project, lifting of the entire moratorium period is requested. For the proposed sheet pile installation, NCDOT requests the end of the moratorium be shortened thst from June 30 to June 1. The roadway approaching the ferry ramp is intermittently flooded during the summer months, and could prevent the sheet pile installation for numerous days. The sheet pile installation optimally should take 3 days to complete, with the majority of it in wetland areas. A 30 day time period before the end of the fiscal year would provide a sufficient window of time to install the sheet piling. This time period would allow for delays due to adverse weather or road conditions. Please let me know if you need any additional information or have any concerns we can discuss. Thanks, Paul C. Williams, Jr. Environmental Specialist NCDOT Division One 113 Airport Dr., Suite 100 Edenton, NC 27932 252-482-1861 office 252-482-8722 fax 252-333-9812 mobile ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2