Loading...
HomeMy WebLinkAbout20111022 Ver 1_SAW-2011-01930 As Built YR1 Release_20150326REPLY TO A TrENT! ON OF R egulato ry Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM208 ASHEVILLE, NORTH CAROLINA 28801-5006 March 18 , 2015 Act ion ID: SA W-2011-01930 Ms. Kri sty U rquhart AFFP ,LLC 34 Wall Street, Suite 502 Asheville, North Carolin a 28801 Dear Ms. Urquhart: Please reference the As-Built Report, dated August 20 14 , and the Annual Monitoring Report (Year 1), dated February 2015, for the Anderson Farm Mitigation Bank. Also , reference the Mitigation Plan for the Anderson Farm Mitigation Bank and our s ubsequent acceptance letter of the final s igned mitigation banking ins trument (MBI) entitled the "Agreement to Estab li s h the Anderson Farm Stream Mitigation Bank in Buncombe County, North Caro lina" da ted June 25, 2013 , and rev ised February 21,2014. This plan proposed enhancement and restoration to approximately 3,455 linear feet of s tream channels gene rating approx im ately 3,822 stream mitigation units (SMU's). The As-Bu ilt Report documents the completed construction of s tream channel re storation/enhancement activities on the site . Due to changes in constructed length, the As-Bui lt Report details the adjustments to th e total stream length res tored/enhanced and th erefore the total SMU's generated by thi s project. The adjusted figures were reduced by 25 SMU's and would generate a total of3,688 SMU's. We have reviewed the submitted plan s and determined that the propo sed credit releas es are in accordance with guideline s set forth in the MBI, the Interagency Stream Mitigation Guidelines (April 2003) and the recently publi s hed federal rule entitl ed Compensatory Mitigation for Losses of Aquatic Resources (33 CFR Part 332). Based upon the information submitted in the se reports and observations made during our January 29,20 15 , site visit, we authorize the rel ease of89 1.9 SMU 's to be incorporated into th e Bank and used for future compensatory mitigation . This cred it rel ease wi ll reflect the subtraction of23.9 credits due to overestimation of total credits in the mitigation plan and thereby authorized in th e initial credit release as detailed in the As-Built -2 - Report received August 14, 2105. If you have any questions, please contact me at (828) 271-7980 extension 234. · cc (via email): Sincerely, Steve Kichefski Project Manager Asheville Regulatory Field Office Headwaters Restoration, LLC -: Mr. Brent Manning NCDENR, Division of Water Resources-Ms. V:irginia Baker NCDENR, Division of Water Resources-Mr. Kevin Barnett U.S. Environmental Protection Agency -Mr. Todd Bowers U.S. Fish & Wildlife Service -·Mr. Bryan ~ompkins N.C. Wildlife Resources Commission-Ms. Andrea Leslie