Loading...
HomeMy WebLinkAbout20140770 Ver 1_Emails_20141007Strickland, Bev From: Devane, Boyd Sent: Friday, March 27, 2015 11:10 AM To: Strickland, Bev Subject: please file this with Beaverdam From: Wanda Austin [ mai Ito: wandajoyceaustin(d)amail.com] Sent: Tuesday, October 07, 2014 6:34 PM To: Devane, Boyd Subject: Re: Can you send me an electronic version? Oh. I failed to mention that we have received permission from the US Army Corps. Your comments are the only outstanding approval. Any efforts to expedite the approval is appreciated. Thank you. On Tue, Oct 7, 2014 at 6:32 PM, Wanda Austin <wandajoyceaustinggmail.com> wrote: Good evening. I wanted to get a status update on the permit. The lessee on the property is bringing his building in November. We would like to be able to construct the new entrance before the building is set. On Wed, Sep 24, 2014 at 12:58 PM, Devane, Boyd <boyd.devanegncdenr.gov> wrote: H: From: Wanda Austin [ mai Ito: wandajoyceaustin(d)amail.com] Sent: Tuesday, September 23, 2014 9:47 PM To: Devane, Boyd Subject: Re: Can you send me an electronic version? Good evening. I have attached the revised sheets. Let me know if you need any additional information. Wanda Austin On Tue, Sep 23, 2014 at 2:38 PM, Devane, Boyd <boyd.devanegncdenr.gov> wrote: ONESEW From: Wanda Austin [mai Ito: wa ndajoycea usti n(d)a ma il.com] Sent: Saturday, August 23, 2014 9:12 AM To: Devane, Boyd; Adam King Subject: Storm Water Good morning. I have addressed the concerns that we discussed yesterday for the Beaverdam Road project. The pdf version of the storm water 41 and permit drawing 41 are attached. The entire drainage area for the phase 1 can be best viewed from the permit drawing. Phase 1 includes the buildings shown. The supplemental flow directional arrows have been added along with more detail on the detention outlet pipe and the by pass flow channel. Thank you for your review and let me know if you have any other questions. Wanda Austin