Loading...
HomeMy WebLinkAbout20140770 Ver 1_Emails_20150309Strickland, Bev From: Devane, Boyd Sent: Friday, March 27, 2015 11:29 AM To: Strickland, Bev Subject: FW: Beaverdam Road 2014 -0770 r From: Wanda Austin [ mai Ito: wandajoyceaustin(ftmail.com] Sent: Monday, March 09, 2015 10:07 PM To: Fox, Tim Cc: Davidson, Landon; Price, Zan (George); Barnett, Kevin; Devane, Boyd; Adam King Subject: Re: Beaverdam Road 2014 -0770 This was a mistake. We received the 404 certification on August 15, 2014 and assumed the 401 certification had been accepted or passed. I know the 404 is typically not issued by the US Army Corp of Engineers until concurrence is received from NCDENR. I thought the permit was accepted. When I received the Request for Additional Information dated September 2, 2014, the culvert had already been installed. I was onsite and have inspected the installation. When it became evident that NCDENR had not pasted on their review, I did request Mr. King not remove the other culverts until the stormwater issue was resolved. On Mon, Mar 9, 2015 at 1:55 PM, Fox, Tim <tim.fox o,ncdenr.gov> wrote: Wanda, Hope you are well. We stopped by the Beaverdam road project last week to have a look at the site. I know that it is currently on hold and we are reviewing the newly submitted stormwater low density information. The culvert impact on the plan appears to have been installed? Do you know why the culvert was installed when the 401 certification has not been approved yet? Thanks, Tim Tim Fox - tim.foxgncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources — Water Quality Programs 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828 - 296 -4500 Fax: 828 - 299 -7043 Notice: Email correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties.