Loading...
HomeMy WebLinkAbout20150197 Ver 1_Approval Letter_20150313AMA NCDENR North Carolina Department of Environment and Natural Pat McCrory Governor Mr Eric Smith Pace Development Group 6719 -C Fairview Road Charlotte, NC 28210 Resources Donald van der Vaart Secretary March 13, 2015 DWR# 15 -0197 Union County Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions Oak Grove Estates Dear Mr Smith: You have our approval, in accordance with the general certification and those conditions listed below, for the purpose proposed in your application dated February 12, 2015 and received by the Division of Water Resources (the Division) on February 18, 2015. After reviewing your application, we have determined that this protect is covered by Water Quality General Certification Number 3890 which can be viewed on our web site at http. / /portal.ncdenr.org /web /wo /swp /ws /401 The General Certification allows you to use Nationwide Permit Number 29 once it is issued to you by the U S. Army Corps of Engineers (COE) Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. It is advised that all conditions of the Certification are reviewed prior to initiation of the project In addition to the requirements of the Certification, you must also comply with the following conditions This approval is only valid for the purpose and design that you described in your application If you change your project, you must notify us in writing, and you may be required to send us a new application for a new Certification If the property is sold, the new owner must be given a copy of the Certification and approval letter, and is thereby responsible for complying with all conditions [15A NCAC 02H .0506 and 15A NCAC 02H .0507(c)] 2. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced [15A NCAC 02H.0502 (e)] 3. Approved Impacts: Type of Impact Amount Approved Temporary Impact Amount Approved Permanent Impact Stream relocation 125 linear ft. 0 linear ft. Wetland 0 acre 0 05 acre Mooresville Regional Office, 610 East Center Avenue, Mooresville, North Carolina 28155 Phone, 704 -663 -16W Internet. www nodenr gov M Equal OppaWmry 1 ARumahve Action Employer - Made m pM by recycled paper DWR# 15 -00197 4. Diversion Ditches and other stormwater conveyances as related to the sediment and erosion control measures shall be matted and /or stabilized to reduce sediment loss and turbidity This includes interior /exterior slopes of sediment basins. [15A NCAC 02H .0506 (b)(3) and (c)(3)] 5. Bare /fill slopes in excess of 10 feet in height and within 30 feet of surface waters shall be matted. [15A NCAC 02H.0506 (b)(3) and (c)(3)] 6 A final, written stormwater management is required per condition #12 of the General Certification. Before any permanent building is occupied at the subject site, the stormwater management plan shall be implemented and the facilities shall be constructed and operational No changes to the structural stormwater practices shall be made without written authorization from the Division or local delegated authority 7. Use of native vegetation and other soft stream bank stabilization techniques is recommended where practicable instead of riprap or other bank hardening methods If riprap is necessary, it shall not be placed in the streambed, unless approved by DWR. 8. Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. [15A NCAC 02H 0506(b)(5)] 9. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H 0506(b)(3)] 10. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H 0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 11. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)] 12. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials [15A NCAC 02H.0506(b)(3)] 13. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification [15A NCAC 02H.0506(b)(3)] 14 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H 0506(b)(3)] 15 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification [15A NCAC 02H 0506(b)(2)] 16. The perrnittee shall report any violations of this Certification to the Division of Water Resources within 24 hours of discovery [15A NCAC 02H 0507(c)] This Certification can be contested as provided in Articles 3 and 4 of the General Statute 150B by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http: //www.ncoah.com / or by calling the OAH Clerk's Office at (919) 431 -3000. DWR# 15 -00197 Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday, 8.00 am to 5.00 pm, excluding state holidays). The petitions may be faxed to the OAH at (919) 431 -3100, provided the original and one (1) copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 If sending via delivery service (UPS, FedEx, etc.) Office of Administrative Hearings 1711 New Hope Church Rd. Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served on DENR as follows- Mr. Sam M Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704 - 663 -1699 or Ms. Karen Higgins in the Central Office in Raleigh 919 - 807 -6360. Sincerely, cza- Michael L Parker, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office, DENR Attachments cc Army Corps of Engineers, Asheville Karen Higgins, Wetlands Unit Len Rindner MRO, Land Quality MAR 1 7 2015 CERTIFICATE OF COMPLETION NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: DWR# 15 -00197 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final I, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date