Loading...
HomeMy WebLinkAbout20150245 Ver 1_Riparian Buffer Authorization_20150304Chern Smith NCDENR Division of Water Resources Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699 -1628 Reference Poplar Creek Village Greenway Construction Dear Ms Smith, 03 March 2014 ---1 D MAR 0 4 2015 DENR • WATER RESOURCES Poplar Creek Village is located at 7633 Poole Road in Knightdale The residential subdivision has been designed in three phases Phase I has already been constructed and Phase II and Phase III are currently under Construction Plan Review by the Town of Knightdale A U S Army Corps of Engineering 404 Permit (Nationwide Permit 29) was approved on February 22, 2010 by Jamie Sherri (see attached) The permit was for a road crossing and utility installation related to development of Phase I of the project A Stream Determination was also completed by Michael Horan with the Division of Water Quality on November 11, 2005 (see attached) Both of these documents have since expired As part of the Phase II construction a ten foot wide greenway trail has been designed around the perimeter of the site that will impact a riparian buffer This area of impact is designated as Feature #1 on the DWQ determination letter Feature #1 is subject to Neuse Buffer regulations at the confluence of two non - jurisdictional features The nearest body of water is Poplar Creek (WS -IV, NSW) and is in the Neuse River Basin (see attached USGS Quad Map & NRCS Soils Map) The greenway trail has been designed to minimize impacts to the natural topography of the site by following the existing terrain as close as possible A 250 foot boardwalk has been designed as part of the greenway trail to minimize grading impacts to the surrounding environment The trail will be built with light construction equipment and all temporary impacts will be re- vegetated and returned to pre - construction conditions The riparian buffer impacts are Permanent Zone 1 = 1,576 S F Permanent Zone 2 = 2,222 S F Temporary Zone 1 = 2,777 S F Temporary Zone 2 = 5,872 S F The boardwalk makes up 1,639 square feet of permanent Zone 1 and Zone 2 impacts and the remaining permanent impact is from paved trail The temporary buffer impact will be 10 feet on either side of the greenway trail to allow for construction Once construction of the greenway trail is complete the disturbed area will be planted using native species that are locally adapted to re- establish the original vegetated state The SITE Group 1111 Oberlin Road Raleigh NC 27605 pbarbeau@thesitegroup.net 919 - 835 -4787 (o) 1/2 919 - 839 -2255 (f) I have attached a Riparian Buffer Authorization Form for your review and approval Please feel free to contact me directly if you have any questions concerning this matter Sincerely, A P-6'4� Patrick Barbeau, P E Project Manager The Site Group, PLLC The SITE Group pbarbeau @thesitegroup net 1111 Oberlin Road 919- 835 -4787 (o) Raleigh NC 27605 2/2 919 - 839 -2255 (f) Project Marne Poole Rd. SIte I,oc.atioNDirectrons Looted off of Poole Rd Sublect Stream UT to Neuse River-- -__ - -- - —_ -- --- -___ -- Date of Determination: 11/12/05 I aatule Start Buffer knd 13ufter Stream Appeal Located I 1 o1-atcd on Form Cali on Sr,ll USGS l GPS Points (it y — Survey ro o�ra Inc lovided) i _(� - X— --� X " -�-- -d 1 ^—t Subject (c� (a� Stop >iBR i I I �I _ confluence Fla 2 Not Subject 3 1 Not Subject _� I � _! Not Subject I ` �{ - - - -: - -- — -- _5 — Subject above � X I I confluence l ___ - - - - -- : - - -- -- - x x G Subject (2a. _ - -- — - -- . _Not Subject _ - - - X x 8 - -LNot Subject __ _ -- X- - s*�Y _ T Raleigh Regional Office 1628 Mari Service Center i C) TV, Water Quality Section Raleigh NC 27699 -1628 t phone (919) 791 -4200 Customer Service facsrml{e (919) 571.4718 1- 877 -623 -6748 Michael F Easley Governor VdATF9 William G Ross Jr Secretary Resources R ,DF ""°" �9 I North Carolina Department of Environment and Natural \O\ f r > Alan W Klimek, P E Di�eclor Colleen H Sullins, Deputy Director Division of Water Quality T / ',awa kaPi,t V- T[+tp n Page 1 of 1 N 13RRU#0-5-315 C'ounh : Wake Skelk Loy LLP l 6404 Falls of Neuse Rd Ralclgh NC 27615 ,ttn Mr Keller BASIN � 'Tar - Pamlico (15ANCAC2B 0233) _ (lSANCAC2Ii 02591 t_olnplaint NOV Bolfer Determination _ X — -- - — Appeal Call Project Marne Poole Rd. SIte I,oc.atioNDirectrons Looted off of Poole Rd Sublect Stream UT to Neuse River-- -__ - -- - —_ -- --- -___ -- Date of Determination: 11/12/05 I aatule Start Buffer knd 13ufter Stream Appeal Located I 1 o1-atcd on Form Cali on Sr,ll USGS l GPS Points (it y — Survey ro o�ra Inc lovided) i _(� - X— --� X " -�-- -d 1 ^—t Subject (c� (a� Stop >iBR i I I �I _ confluence Fla 2 Not Subject 3 1 Not Subject _� I � _! Not Subject I ` �{ - - - -: - -- — -- _5 — Subject above � X I I confluence l ___ - - - - -- : - - -- -- - x x G Subject (2a. _ - -- — - -- . _Not Subject _ - - - X x 8 - -LNot Subject __ _ -- X- - s*�Y _ T Raleigh Regional Office 1628 Mari Service Center i C) TV, Water Quality Section Raleigh NC 27699 -1628 t phone (919) 791 -4200 Customer Service facsrml{e (919) 571.4718 1- 877 -623 -6748 Poole Rd Site 11129/2005 Page 2 of 2 1•Ins on -site determination &hull expire five (S) yearn, froth the dale of this letter. Landowners or of fected pa+tte'; that dispute a determination made by the DPV4 ar Delegated Locul.4uthority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Uirector shall be referred to the Director in ivrilntg y!o Cyndt Karuly, DWI Wellu114181401 Utrit, 2321 C+abtree Blvd., Raletgh, NC 276114 -226A Individuals that Apute a determination by the DWQ or Delegated Local Authority that "exempts" a surface waterfrotn the buffer rule may ask for an ad judicatory beating. You milt act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60 -day statutory dppeat time does not start until the affected party (b {eluding downstream and adjacent landownerv) is notified of this derision. D11'Q recommends that the applicant'conduct this notification to o+der to be terrain that tHis t party appeals are made in a timely tnanner. To ask for a hearing, seend a written petition, which corn or to Chapter 150B of the ,North Ca►vhna General Statutes to tire Office o Admintstrattve Hearings, 6 Service Center, Raleigh, N.C. 27699 -6714, This dejierutttnatto» is final and binding rttrless)'ot4 ask for a hearing within 60 days. I 1 he (owner /future owners) should notify the Dii,i fitun of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning anyhture correspondences regarding the sub)ert proper(• (stated (lbove). This project may require a Section 4041401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Offt('e) at (919) -731 -1786, attd the US Army Corp of Et+glneers (Raleigh Regulatory Field Office) at (919)-876-844, 1. Respectfully, Michael Horan E;nvitonmental Spec I CC Morite Matthews, US Army CorPs of Engu�eera, Raleigh Regulatory Office Wetlands/ Storniwaten Brauch, 2321 Crabtree Blvd, State 250, Raleigh, NC 27604 Byron Brady, Wake County Environnientall Services, P O Box 550, Raleigh, INC 27602 File Copy ('entnal Files J Ink I A-1 -A MAW 10 QXR, Sly a IT "j, V�T VIA -4, AS �z' W.N '4-f q. K_! A_ I VIA &&I FC,' Mono, WOV ,,, 11 % ��} ROY Y. "U x Ise' UA & 141;1 - qi4- ;. . . i'll W & "AMR _T A rLr, v� vy 44 �X', &P, MY on nry. Rql S INQ Ajy, - 7", -M �,r& " , - 7, g A, 4 Nit, in was t T1 0, ,a , )N` t , S # xS N 4 Up ?aid 114 -4 , ffirl TAT, Ing 1 AM JIM, q A r A10 x °r .„''° ay M1, "Ib 5. A ft 2�4�T- q .-T 0R'r.,-,i e?.v St ;06�qw­_ -me 4V4 a' IG "24 WN pt 72; N, K K3 01, V bz; xy 41% 'Yr PON v, NO W- a -4 "P 'Est so ;E- _4 A", c L eel , OF 3. On v '4g pi, a xmp 9A .7 p gg-,- WX MINI :4-v 8-i W 4q iu 4N A WE, 7 �,� ,, � J, mw- A"`"`',d,_' f W too M, INA, JOA0 U, - W to IS I P 'out 8 ": s-- lhnk lu: 1"M ww� Ong Wy fit° q _001 ,Y AMy „hk p7­1 .• "„ on&. "'P r —vat, VIM VIM,, 'Di ""' L -�, 1 zv BUD MEMO* 4'if al 9 14, off All 7 .111 k4- IW, A two WEI 60, TIT NN"a"n, MA - 06"t I /A./e U.S. ARMY CORPS OF ENGINEERS' S WILMINGTON DISTRICT `G�b Action ID 200620385 County Wake USGS Quad- Raleigh East 20110 GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICA O I��eqrated DesigQ Property Owner Holly Homes, LLC, g Applicant Address Attn. David Menaker Applicant Agent Trueline Soils, Attn:Neal Floyd 7633 Poole Road 205 W. Main Street. Kniehtdale, NC 27545 Clayton, NC 27520 Telephone No 919- 291 -4717 (919) 422 -6745 Size and location of property (water body, road name /number, town, etc ) Poplar Creek Village Subdivision — Phase 1- The subdivision will be located on an approximately 82 acre parcel, north of the existing trailer park, at 7633 Poole Road. The parcel is immediately adjacent to the eastern bank of an unnamed tributary of the Neuse River, due south of the interchange of I -540 and US 64, in Knightdale, Wake County, North Carolina. Description of projects area and activity The purpose of the project is to construct a residential subdivision. The project includes residential lots, roads, utilities. and stormwater management facilities. This authorization is for the existing fill of an estimated 100 If of intermittent stream channel and an estimated 0.22 acres of wetland that occurred during the first culverted stream crossing of Stony Falls Way. An additional 40 if of temporary impacts were assumed to have been associated with water and sewerline stream crossings installed along the utility easements to serve the subdivision. The existing rill impacts are estimated, as Stony Falls Way fill impacts reportedly occurred in November of 2007. Any additional jurisdictional fill associated with Phase 1 or future Phases of Poplar Creek Village will need to be permitted in advance of any further jurisdictional fill activities. Special Conditions Mitigation in the form of a preservation easement on remaining wetlands and riparian areas (11.5 acres) was proposed by the applicant to offset 0.22 acres of wetland fill. The attached Conservation Easement Map for Poplar Creek (February 17, 2010) is to be recorded with the first lots as part of the subdivision plat. Note that the conservation easement area may be only a subset of the community open space. The following language is to be included in the Declaration of Covenants for the subdivision. "The areas shown on the recorded plat entitled Conservation Easement Poplar Creek February 17, 2010 as conservation easement areas shall be maintained in perpetuity in their natural condition No person or entity shall perform any of the following activities on such conservation area- a. fill, grade, excavate or perform any other land disturbing activities b. cut, mow, burn, remove, or harm any vegetation C. construct or place any roads, trails, walkways, buildings, mobile homes, signs, utility poles or towers, or any other permanent or temporary structures d drain or otherwise disrupt or alter the hydrology or drainage ways of the conservation area e. dump or store soil, trash, or other waste f graze or water animals, or use for any agricultural or horticultural purpose This covenant is intended to ensure continued compliance with the mitigation condition of a Clean Water Act authorization issued by the United States of America, U S. Army Corps of Engineers, Wilmington District, Action ID 200620385, and therefore may be enforced by the United States of America This covenant is to run with the land, and shall be binding on the Owner, and all parties claiming under it " Applicable Law ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authonzation. Regional General Permit Number Nationwide Permit Number 29 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e, are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification You should contact the NC Division of Water Quality (telephone 919- 733 -1786) to determine Section 401 requirements This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /permits If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Mr. Jamie Shern at 919 - 554 -4884 ext. 31. Corps Regulatory Official Date 2/22/10 Expiration Date of Verification 2/12 Determination of Jurisdiction: ® Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331) ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344) Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification ❑ The jurisdictional areas within the above described project area have been identified under a previous action Please reference Jurisdictional determination issued Action ID Basis of Jurisdictional Determination Wetlands were determined using the Corps 1987 delineation manual. Streams were identified utilizing ordinary high water mark as identified in the field on 11/3/09. Appeals Information (This information applies only to approved jurisdictional determinations.) Attached to this verification is an approved Jurisdictional determination If you are not in agreement with that approved Jurisdictional determination, you can make an administrative appeal under 33 CFR 331 Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form If you request to appeal this determination you must submit a completed RFA form to the following address District Engineer, Wilmington Regulatory Division Attn Jean Manuele, Field Office Chief, Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 3315, and that it has been received by the District Office within 60 days of the date of the NAP Should you decide to submit an RFA form, it must be received at the above address by N/A * *It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence ** Corps Regulatory Official —: Date 12/08/09 Expiration Date 12/08/14 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http / /regulatory usacesurvey coin/ to complete the survey online Wilmington District Post Construction Compliance Form Action ID Number: 200620385 Phase 1 - Poplar Creek Village County:Wake Permittee: David ienaker Date Verification Issued: 2/22/10 Project Manager: Jamie Shern Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT RALEIGH REGULATORY FIELD OFFICE 3331 HERITAGE TRADE DRIVE, SUITE 105 WAKE FOREST, NC 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Applicant- David Menaker File Number- 200620385 Date: 2/22/10 Attached is See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of A permission) PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therem, you may request that the permit be modified accordingly You must complete Section II of this form and return the form to the district engineer Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future Upon receipt of your letter, the district engineer will evaluate your objections and may (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below B. PROFFERED PERMIT. You may accept or appeal the permit • ACCEPT If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer This form must be received by the division engineer within 60 days of the date of this notice C PERMIT DENIAL. You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer This form must be received by the division engineer within 60 days of the date of this notice D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information • ACCEPT You do not need to notify the Corps to accept an approved JD Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD • APPEAL If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer This form must be received by the division engineer within 60 days of the date of this notice E: PRELIMINARY JURISDICTIONAmDET JD INot appealable. do if you wish,tyou mayrequest Corps approved regarding the preliminary JD. The Preliminary JD (which may be appealed), by contacting the Corps reevaluate strict o further instruction Also you may provide new information for further consideration by the Corps REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear conci addressed in the admin trat ve re�ord.)nformation to this form to clarify where your reasons or objections are the Corps ADDITIONAL INFORMATION: The appeal e o limited meeting, and any supplementalinformation that the memorandum for the record of the appeal conference review officer has determined is needed to clarify the administrative y P Neither the additional the Corps clarify may add new information or analyses to the record However, Y the location of information that is already in the administrative recor 4 i If you have questions regarding this decision and/or the appeal process you may contact: Jamie Shern Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 If you only have questions regarding the appeal process you may also contact Ms. Jean Manuele Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 1 Wake Forest, NC 27587 RIGHT OF ENTRY. Your signature below grants the right oe t site doing the course of the appeal process. You government consultants, to conduct investigations of the prod to participate o all site will be provided a 15 day notice of any site investigation, and will have the opportunity p P investigations Signature of appellant or Date: Telephone number* For appeals on Initial Proffered Permits and approved Jurisdictional Determinations send this form to: District Engineer, Wilmington Regulatory Division, Attn: Jean Manuele, Project Manager, Raleigh Regulatory Field Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, North Carolina 27587 For Permit denials and Proffered Permits send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Mike Bell, Administrative Appeal Officer, CESAD- ET -CO -R, 60 Forsyth Street, Room 9M15, Atlanta, Georgia 30303 -8801 z n i i I I I b x 9 9 . .c � f L� O � F � ■ c x -ns iV z w M W N i � d r tr � O � N C 7633 Poole Rd - Google Maps https: / /www.google.com/maps/ place /7633 +Poole +Rd, +Raleigh, +NC +2.. r � . Search nearby: (hotels-restaumnts) 7633 Poole Rd, Raleigh, NC 27610 - — -- — - Street View • Search nearby r ' % g A 2oae Knightdale 4 3516 ` 1! at 4 .. 64 +r• 251 s IJ _ 64 ' # t W- . qd • 2691 s err sr *, i Panie Rd 7633 Foie Rtl W 2516 - e*rr . ' 2511 2542 dwtmer Inag w 2510 Bat* "`fie Nd 2555 ;* . 2559 2349 f F25-5-41 L-fl 254 r �Q • 1 2556 f , 1559 2558 171E � Map data ®2015 Google 1 mi I of 1 3/2/2015 12:32 PN v Search nearby: (hotells, restaurants) 7633 Poole • • Knightdale, NC 27545 rf nearby Street View Search i . A' A .r ,k,,t °R k` ,e t ._ 763; Pduieifid_ i 9 ~' C C� r 1 r / I 1 I I !1 ) I� r� it I I , II l' r I f< ' � I rl�r' 'i ,1 r r /' I / / , ' I ) L- r; �1 y Id \i� 1 ALfION REND 200820](5 2 TOTAL AREA %TTHW CONSETNATION EASEMENT - 11 ACRES d OREENWAY EASENEEN EKCLUDED 'ROM 0141E10'"N EASEMENT l CREENWAY CONSTRUCTION WRNIN JURSD07DONAL WETLANDS WILL NOT RESULT IN ANY TILL i to 1�YM� R•) N/MEUSE RIPARIAN W"ER (TIP) 'i����� ' � '!•!•!•!•!•!ilQi!�!•!•!•!J.•'.• •iii00•i'OOi•�O•iw. .••!y� �;�-- _j ~'•`-1` - -_mil I �`��- -mil � - T-- � -_-,� �� �--�- _� �/�, 30 OREINWAY EASWINT TO TARN D MGMALE (TYP) 1 ;� 1 ---1= r lam_ _�__ !`-_ __j__ r- _� -� -�, NIONP ✓• �_ -� IRUSE FI BUFFER - ­—�1'r _ 1 FUTURE PHASES '\ I " I 1 7--' --� PHA E . ? _ 7-7 MNSONAT" 14_ AREA �W� I , T- -T---T 7 - -f - -- REUSE RIPARAN BUFTER (7YP) WETLAND (TTP) J(Y OREEWWAY MWERT TO TOWN OF KMPU ALE (1p) � I ACTION IDS 200620385 CONSERVATION EASEMENT MAP / FOR POPLAR CREEK /!— SCALE 1" - 100' \\ o s NORTH q'1tNC �' �S F w c4� J` w Lu U � � V Q2 W ,V CL 0^ 1 C y L n Y DWG BY AP_ C14K BY TJO 7S Fi DRUARY 2010 2ENISED CONSERVATION EASEMENT NAP FOR POPLAR CREEK J08 COOL PRSN DRAWING NUMBER SITE 800 USDA United States Department of Agriculture NRCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Wake County, North Carolina 7633 POOLE ROAD March 2, 2015 37 4833"N 35" 4510' N Custom Soil Resource Report Soil Map AAODev I nn 10 t", n I k At 1r 3 Map Sole: 1:3,470 f prkit d on A portrat (&5" x 11 ") Meet � Metiers N 0 50 100 200 300 0 150 300 6W 900 Map projection: Web Mercator Corner eoordiotes: WC,.iv84 Edge tics: UN Zane 17N WGSB4 8 35" 6' 33" N 35" 45'1(r N Custom Soil Resource Report Map Unit Legend Wake County Carolina (NC183) ' ,s,Nor C W �M �"�o r Map Umt S v " 'Map Unit Na� Vr i� m a S � AceinAOli� ,°a f ai7�rzP4'1 ' Perc en,of,,A Oh M i r fi�' _ qc ,§ „mtwt i , ApB2 Appling sandy loam, 2 to 6 43 68% percent slopes, moderately eroded ApC2 Appling sandy loam, 6 to 10 74 11 7% percent slopes, moderately eroded CIB3 Cecil clay loam, 2 to 6 percent 1 7 26% slopes, severely eroded CnA Colfax sandy loam, 0 to 3 1 8 28% percent slopes DuB Durham loamy sand, 2 to 6 34 54% percent slopes MeA Mantachie sandy loam, 0 to 2 1 6 25% percent slopes, rarely flooded VaB2 Vance sandy loam, 2 to 6 63 100% percent slopes, moderately eroded W Water 00 01% WmB2 Wedowee sandy loam, 2 to 6 160 251% percent slopes, moderately eroded WmC2 Wedowee sandy loam, 6 to 10 133 210% percent slopes, moderately eroded WnA Wehadkee silt loam, 0 to 2 30 47% percent slopes, frequently flooded WyA Worsham sandy loam, 0 to 3 47 74% percent slopes Totals for Area of Interest 636 1000% Map Unit Descriptions The map units delineated on the detailed sod maps in a soil survey represent the soils or miscellaneous areas in the survey area The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit A map unit delineation on a soil map represents an area dominated by one or more mayor kinds of soil or miscellaneous areas A map unit is Identified and named according to the taxonomic classification of the dominant soils Within a taxonomic class there are precisely defined limits for the properties of the soils On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class Areas of soils of a single taxonomic 10 2 0 1 5 0 2 4 5 State of North Carolina Department of Environment and Natural Resources `f Division of Water Resources 2 _ 1 5 0 2 4 5 Division of Water Resources 15A NCAC 02B 0233 (8)(b), 0243 (8)(b), 0250 (11)(b), .0259 (8)(b), 0267 (11)(c), 0607 (e)(2) — Buffer Authorization FORM BA 10 -2013 Riparian Buffer Authorization Form A Applicant Information 1 Project Information la Name of project Poplar Creek Village Greenway Trail 1 b County Wake 1c Nearest municipality Knightdale 1 d Subdivision name Poplar Creek Village le Is the project located in any of North Carolina's twenty coastal counties If yes, answer 1f below ❑ Yes ®No 1f Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Owner Information 2a Name on Recorded Deed Dogwood Owner LLC 2b Deed Book and Page No BK 015641, PG 01890 -01893 2c Map Book and Page No (include a copy of the recorded map that indicates when the lot was created) BM 2010, PG 217 -220 2d Responsible Party (for Corporations) Dogwood Owners LLC, C/O Hudson Realty Capital, Attn Niko Paliouras 2e Street address 5 -9 Union Square West, 61h Floor 2f City, state, zip New York, NY 10003 2g Telephone no (212) 532 -3553 2h Fax no (212) 532 -7901 21 Email address npaliouras @hudsoncap corn 3 Applicant Information (if different from owner) 3a Applicant is ❑ Agent ❑ Other, specify 3b Name 3c Business name (if applicable) 3d Street address 3e City, state, zip 3f Telephone no inn 3g Fax no 3h Email address 4 Agent/Consultant Information (if applicable) 2015 4a Name Patrick Barbeau, PE The Site Group, PLLC (Consultant) 401 & BUFFER PER r- MITT RC ES 4b Business name applicable) 4c Street address 1111 Oberlin Road 4d City, state, zip Raleigh, NC 27605 4e Telephone no (919) 835 -4787 4f Fax no (919) 839 -2255 4g Email address pbarbeau @thesitegroup net FORM BA 10 -2013 Page 1 of 4 B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 1743 04 -61 -7826 1 b Site coordinates (in decimal degrees) Latitude 350 45' 15 8682" Longitude -780 30'26 0784" 1c Property size 81 88 Acres 2 Surface Waters 2a Name of nearest body of water to proposed project Poplar Creek 2b Water Quality Classification of nearest receiving water WS -IV, NSW 2c River basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site has single family lots and residential land use 3b Attach an 8' /z x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 1,866 Linear Feet 3e Explain the purpose of the proposed project Greenway Trail 3f Describe the overall project in detail, including the type of equipment to be used Install greenway trail using standard light construction equipment, backhoe, bobcat etc 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments Expired ACE 404 permit & Stream Determination by NCDWR 4b If yes, who delineated the jurisdictional areas? Name (if known) Jamie Sherri / Michael Horan Agency/ Consultant Company USACE Other NCDWR 4c If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation USACE 2/22/2010 and NCDWR 11/12/2005 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown 5b If yes, explain and detail according to "help file" instructions Phase 1 of Poplar Creek Village required 404 Permit for a road crossing & utility installation impacts 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain FORM BA 10 -2013 Page 2 of 4 C Proposed Impacts Inventory 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The greenway trail was designed to follow the existing land contours to minimize land disturbing activity as much as possible A boardwalk was used at the location of extreme grade change to create minimal impact to natural surroundings 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Light construction equipment will be used to construct the trail & boardwalk Once complete, any disturbed area will be re- vegetated to grow back as before 1 Buffer Impacts 2a Will the project result In an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b If yes, then identify the square feet of Impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below 1a Project is in which protected basin? Reason for impact ® Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b Individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form Buffer impact number — Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 ® P ❑ T GWAY TRAIL ALLOWABLE POPLAR CRK ❑ Yes ® No 1,576 B2 ® P ❑ T GWAY TRAIL ALLOWABLE POPLAR CRK ❑ Yes ® No 2,222 B3 ❑ P ® T GWAY TRAIL ALLOWABLE POPLAR CRK ❑ Yes ® No 2,777 B4 ❑ P ® T GWAY TRAIL ALLOWABLE POPLAR CRK ❑ Yes ® No 5,872 B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 3,798 8,649 1 c Comments 1,639 S F of the permanent Zone 1 & 2 impact is boardwalk D. Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The greenway trail was designed to follow the existing land contours to minimize land disturbing activity as much as possible A boardwalk was used at the location of extreme grade change to create minimal impact to natural surroundings 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Light construction equipment will be used to construct the trail & boardwalk Once complete, any disturbed area will be re- vegetated to grow back as before 2 Buffer Mitigation 2a Will the project result In an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b If yes, then identify the square feet of Impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1 5 Total buffer mitigation required 2c If buffer mitigation Is required, Is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d If yes, attach the acceptance letter from the mitigation bank or NC EEP 2e If no, then discuss what type of mitigation Is proposed 2f Comments FORM BA 10 -2013 Page 3 of 4 E. Diffuse Flow Plan All buffer Impacts and high ground Impacts require diffuse flow or other form of ® Diffuse flow stormwater treatment Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained If a Level Spreader is proposed, attach a Level Spreader Supplement Form la If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP public (federal /state) land? Manual and attach a BMP Supplement Form lb F. Supplementary Information by First Class Mail via the US Postal Service 1 Environmental Documentation OR NC DWR, Transportation Permitting Unit la Does the project Involve an expenditure of public (federal /state /local) funds or the use of ❑ Yes ® No Raleigh, NC 27604 public (federal /state) land? For all other projects sent by delivery service lb If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No OR Karen Higgins environmental document pursuant to the requirements of the National or State (North NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Carolina) Environmental Policy Act (NEPA/SEPA)? Raleigh, NC 27699 - 1617 1c If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter) Comments 2 Violations 2a Is the site in violation of DWR Wetland Rules (15A NCAC 02H 0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H 1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 1 �L ro ALL C- �Q'�'�� e 1� 3 2 5! 5 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided ) Send this completed form and accompanying documents to the following For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service by delivery service (UPS, FedEx, etc) NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1617 Mail Service Center 512 N Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 For all other projects sent by First Class Marl For all other projects sent by delivery service via the US Postal Service (UPS, FedEx, etc) Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center 512 N Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM BA 10 -2013 Page 4 of 4 SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION. LOT NO PLAN NO. PARCEL ID, 1743 04 -61 -7826 STREET ADDRESS. 7633 Poole Road Knightdale, NC 27545 Please print Property Owner. Property Owner. DOGWOOD OWNER, LLC The undersigned, registered property owners of the above noted property, do hereby authorize Patrick Barbeau, PE (Contractor / Agent) of The Site Group, PLLC (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above)- 5 -9 Union Square West, 6th Floor, New York, NY 10003 Telephone- (212)532-3553 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge 11-)(- w6�- Authorized Signature Date: ►A ZS� Zd i �J Authorized Signature Date: f VICINITY yI O DATE RVEYO DATE No wY 0 t. ^r * Ai 44tlMIASTRA DATE AD NISTRATOR, TOWN OF KNIGHTDALE MINIMUM BUILDING ^r Mi # FRONT . *# ENCROACHMENT YARD. REAR ACCESSORY 5 FEET MINIMUM LOT WIDTH rr AT FRONT YARD SETBACK SET13ACK LINES ON r # NOTES: ANY CONSTRUCTION OR USE WITHIN THE AREAS DELINEATED AS FLOOOWAY FOR ILLUSTRATIVE PURPOSES ONLY AND SHOULD ARE SUBJECT TO THE RESTRICTIONS IMPOSED BY THE KNIGHTDALE FLOOD NOT BE RELIED UPON FOR CONSTRUCTION. DAMAGE PREVENTION ORDINANCE, CONCRETE MONUMENT FOUND EACH SINGLE—FAMILY OR TWO—FAMILY RESIDENTIAL OF OF ONE SHADE FOR #; THOUSAND ## ) SQUARE FEET LOT WIDTH r OF LOT AREA OR FRACTION THEREOF UP TO 20,000 SQUARE FEET IN LOT AREA. THE ENTIRE SETBACK MAY BE ANY PORTION OF THE RESIDENTIAL LOT OCCUPIED BY A RECORDED UTILITY EASEMENT ALLOCATED TO ONE SIDE WITH A $HALL NOT BE # ► AS PART OF # OF OF r REMAINING ON THE LOT AFTER DEVELOPMENT THAT MEET THE ABOVE REQUIREMENTS BUILDING MAY * # *# # r AC CONSISTENT # * ""THIS 71 MAP S # # • ! Mt . .. "'y iM► Ys ASST DEPUTY T1ME: RECORDED IN QOM O G f •i Y f i ±1# sr NiTAMM r # f, w; 0 POPLAR r,.l.AP,,EEK VILDAGE' OWNER: HOLLY HOMES, LLC. 7633 POOLE ROAD KNIGHTDALE, N.C. 27545 ** „ LPF IRON PIPE FOUND Ips IRON PIN SET CW CONCRETE MONUMENT FOUND PKNr PARKER-KALOt4 NAIL FOUND SET RRS i SPIKE rs COMPUTED ^♦ #* M TELEPHONE: 1 -0427 DA SQUARE AC ACRE TM TAX NAP Ds i 9 ps FLAT 0009 PO PACE Y4 WFEWS i P . WE t STREET ADDRESS rW will. # rs # * •+ r # #L # r # f, w; 0 POPLAR r,.l.AP,,EEK VILDAGE' OWNER: HOLLY HOMES, LLC. 7633 POOLE ROAD KNIGHTDALE, N.C. 27545 ** „ LPF IRON PIPE FOUND Ips IRON PIN SET CW CONCRETE MONUMENT FOUND PKNr PARKER-KALOt4 NAIL FOUND SET RRS i SPIKE CP COMPUTED ^♦ P7 POYIER P" TELEPHONE: 1 -0427 DA SQUARE AC ACRE TM TAX NAP Ds i 9 ps FLAT 0009 PO PACE Y4 WFEWS i P . WE t STREET ADDRESS LINES NOT FOR HOLLY HOMES, LLC. MATTHEWS TOWNSHIP, TOWN OF WAKE COUNTY, NORTH CAROLINA FEBRUARY 22, 2' SHEET 1 OF 5 JONES SC.RfIFrIA7C, P. ,i M MIKE tiECKED 6Y. ZO T i G4R( CLAYTON, 7 P EQW NTE; TELEPHONE: 1 -0427 DA 3-1 —OS WwW.truelir surveysn .ccr 09 N0. 517.001 9 SITE LkN E K POOLE ROAD Oct-," miam POPLAR CREEK VILLA GE PHA SE I A FOR r HUL'L'y HrOAVES, LLC, ST. MATTHEWS TOWNSHIF TOWN OF KWGWTl&l F WAKE COUNTY, NORTH CAROLINA N/F J A E REBECCA COLLINS DB 4469 PG 618 PIN 1743-70-4456 ZONING: R-X S02'46'56'E T*S.73' 777-7-5 IPF :2 0' TYPE YffER WE7--ANDS ANO CONSERVATION EASEMENT Je� N PER GS��OJE NWP 29, ACTION ITEM 200620,385 t Q2J Q) X\ UCENSE NUMBER uumazoEc2n= NC GRID NORTH NAD 8,3 N/F JOHN D. LUCAS D9 12506 PG 1840 PIN 1742-79-4889 ZONING: R-30 m KEY NEUSE RIPARIAN F7----I,BUFFER N/F WILLIE E. WALTERS D 8540 PG 1526 PIN 1742-79-4785 ZONING: R-30 N/F ERNEST SCRIVANI DB 6452 PG 177 PIN 1742-79-4682 ZONING: R-30 CONSERVATION AREA IPF � JONES LIM 04 w NOTE: L3 IS A TIE LINE ONLY 20' R/W DEDICATION FILED FOR REGISTRATION O-HORD-TENGfH- 57,35 REGISTER OF DEEDS WAKE COUNTY N/F WILLIE E. WALTERS D 8540 PG 1526 PIN 1742-79-4785 ZONING: R-30 N/F ERNEST SCRIVANI DB 6452 PG 177 PIN 1742-79-4682 ZONING: R-30 CONSERVATION AREA IPF � JONES LIM 04 w NOTE: L3 IS A TIE LINE ONLY 20' R/W DEDICATION sy: ASST/DEPUTY TIME: IPF RECORDED IN BOIV! /o PC_,2(F_ FILED FOR REGISTRATION LAURA M. RIDDICK REGISTER OF DEEDS WAKE COUNTY sy: ASST/DEPUTY TIME: IPF RECORDED IN BOIV! /o PC_,2(F_ lag r- y =1 m I 'IPF -7 I • NC GRID NORTH NAD 83 2.201 AC 0.090 AC 1,-CQR&j-LANf-, DO HEREBY CERTIFY THAT THIS D9 2407 FIG 117 1 �, PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN PIN 1743-50-9445 TO BE KWNTAJNED zo ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED BY HOMEONWERS P4 DESCRIPTION RECORDED IN BOOK-4Y-7, PACE A7$—, ZONING: R-30 SUBDIVISION PLAT ASSOCIATION In ETC.); THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY OF INDICATED AS DRAWN FRO INFORMATION FOUND IN BOOK-ajL4—, PAC ��7; T14AT THE RATIO OF PRECISION AS CALCULATED 0.00+ ; THAT THE POPLAR VILLAGE �--42 GLOBAL POSITIONING ACCURACY (GPS) OBSERVATIONS WERE %C1RvEEK iw r- y =1 m I 'IPF -7 I • NC GRID NORTH NAD 83 =1 I = N 12=1921MA1111121 momvmm By!� ASST EPUTY TIME: RECORDED IN BOA QWPGAO_ iw �C� i ft =1 I = N 12=1921MA1111121 momvmm By!� ASST EPUTY TIME: RECORDED IN BOA QWPGAO_ • • MR NCGS MONUMENT "MORtAH RESET 2" NAD 83 COORDINATES N 7013706215 E 214683& 1112 Z 361 6889 ft • • MR NCGS MONUMENT "MORtAH RESET 2" NAD 83 COORDINATES N 7013706215 E 214683& 1112 Z 361 6889 POOLE ROAD JEEZON, OEM • ST. MATTH EW WAKE] KEY NEUSE RIPARLAN F--IBUFFER 0 ASiT/DEPUTY TIME:- RECORDED i lN BOM_&oLtpG ;2j� NC GRID NORTH NAD 83 N/F MARK STAMPER I DE311024 PIG 1204 I PIN 1743-70-5687 MAMIE T LILES DD ZONING: R-30 ADDIS REBECCA COLLINS DB 10263 PG 753 DB 4469 PG 618 PIN 1743 -81-2136 PIN 1743-70-4456 ZONING: R-30 ZONING: R-30 TIE UNE ONLY NO2'45'51 "W SOr 45'511 9M8' SOZ46'56"E 278.52' S02'415'�01 345.73' 3a3,72' Wit' D ST. MATTH EW WAKE] KEY NEUSE RIPARLAN F--IBUFFER 0 ASiT/DEPUTY TIME:- RECORDED i lN BOM_&oLtpG ;2j� I#] N IA 2 5 4 GEOTEXTILE FABRIC--- 6' ABC CVWPACTED TO A DENSITY OF NO LESS THAN 95% DEKAL_v_QIKK Uffa 1. CROSS SLOPE DIRECTION VARIES, SEE LAY PLANS FOR DIRECTI�114 OF SLOPE. 2. CONTRACTOR IS RESPONSIBLE FOR REESTABLISHING ALL SLOPES DISTURBED BY CONSTRUCTION. I REVISIONS I TOWN OF KNIGHTDALE STANDARD MULTI-USE PATH STD. NO. STANDARD DETAILS GREENWAY 4.09 Note. All hardware to art—dipPed qalvanized(GIB6, stainless sleet or corrosion, resistant polymer ociating PROPOSED PATH BITUMINOUS SURFACE COURSE RIGHT OF WAY 2" 1 ®2 LOT LINE SO PHASE LINE SHOULDER �7TSHOULDER OJZt2' /FT O.02'/FT 0.02' /FT 'FT GEOTEXTILE FABRIC--- 6' ABC CVWPACTED TO A DENSITY OF NO LESS THAN 95% DEKAL_v_QIKK Uffa 1. CROSS SLOPE DIRECTION VARIES, SEE LAY PLANS FOR DIRECTI�114 OF SLOPE. 2. CONTRACTOR IS RESPONSIBLE FOR REESTABLISHING ALL SLOPES DISTURBED BY CONSTRUCTION. I REVISIONS I TOWN OF KNIGHTDALE STANDARD MULTI-USE PATH STD. NO. STANDARD DETAILS GREENWAY 4.09 Note. All hardware to art—dipPed qalvanized(GIB6, stainless sleet or corrosion, resistant polymer ociating 130ARDWALK DETAIL NTS jyp GPI Fining; UP4 X v MCA Handrail 2 x 6 TREX Rails 4 x 4 x 52" PT Post iyW_Cd_1CU_rD_ 4x4 TREX Landscape Timtx-r 2x4 x 12" Length; TREX Blocking 1ARDWALK RAILING DETAIL PROPERTY BOUNDARY 7'4) RIGHT OF WAY LOT LINE SO PHASE LINE UTILITY EASEMENT T_ 8 V4' 5,7 V2" 8 1,4" LD MMUNOW LIMITS OF DISTURBANCE FP - FP 100 YR FLOODPLAIN — FW — Termifial Pow mmjp RD �. RIPARIAN BUFFER 6, _0' DETENTION POND 2 x 6 TELEX _j • n to N N 3 1,2' 0.0 Scr,#ed. 40 Gatv. DOCIMM, Space T_ NI 000D.- • Lj Li o ry c 662 Stool POO 9' I-Aldrigth with 319" Gap, Z 0) 0) (D z LLJ Push min 0 it r ground, or (A 0)0 LLJ 6 jr:v sts EQ Spacing T 76 4- 2 - 314"o Gaiv j,-Bolts 2 x 6 PT (ACQ) or ?'Washei-, Cedar Decking ------- 7 1 2 - 3i4l'o Galv Bolts t> c/w 2'Washer,. 2 x 10 PT (ACQ) Joists 441 Garv. Steei Bearm Equal spacing . ..... . ..... . C 150 x 12 Chatrinel 2 x 10 PT Bloc:ring G. 130ARDWALK DETAIL NTS jyp GPI Fining; UP4 X v MCA Handrail 2 x 6 TREX Rails 4 x 4 x 52" PT Post iyW_Cd_1CU_rD_ 4x4 TREX Landscape Timtx-r 2x4 x 12" Length; TREX Blocking 1ARDWALK RAILING DETAIL 2 5 HATCH—LEGEND FEDERAL WETLANDS USCOE NWP 29, 200620385 MNI* W-0 M111 1W PROPERTY BOUNDARY RIGHT OF WAY LOT LINE SO PHASE LINE UTILITY EASEMENT T_ EXISTING STORM U PROPOSED STORM LD MMUNOW LIMITS OF DISTURBANCE FP - FP 100 YR FLOODPLAIN — FW — FLOODWAY RD �. RIPARIAN BUFFER z < DETENTION POND 2 5 HATCH—LEGEND FEDERAL WETLANDS USCOE NWP 29, 200620385 MNI* W-0 M111 1W Drawn By PJB Checked By EFS F_ DATE: 04 MARCH 2015 RIPARIAN BUFFER IMPACT PLAN RIPARIAN Li BUFFER IMPACT PLAN T_ U Li 0- V) < U E z < U • _j 0• Lo _j • n to N N -0 0'4- N • 0 0 N to • 1") 110 ly- T_ NI 000D.- • Lj Li o ry c 662 Z U) Z 0) 0) (D z LLJ LLJ a t o (A 0)0 LLJ T 76 4- I'_ x 0 LL Ld Drawn By PJB Checked By EFS F_ DATE: 04 MARCH 2015 an cv CNI 0 RIPARIAN BUFFER IMPACT PLAN RIPARIAN BUFFER IMPACT PLAN an cv CNI 0