Loading...
HomeMy WebLinkAboutNC0056618_Authorization to Construct_20050712Carolina Water Service, Inc. A to C No. 056618A01 Issued June 13, 2005 Engineer's Certification I, L-1 PN WOO � L-� J �U � u 0 , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Carolina Pines WWTP, located on State Road 1176 in Craven County for Carolina Water Service, Inc., hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of three tablet feed dechlorination units, pursuant to the fast track application received on May 19, 2005, and in conformity with the Minimum Design Criteria for Dechlorination Facilities. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. �C— Date O�— 0 (— fri,,"O Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699- l 633 Rn ,1 U L 1 2 2005VIA' -11Y t I CAg0 ��''. 0 •..........• Z �•: �FES8j� ,�2y'•: PC 5279 •'" P: O`er '•,?'••;;'C�/NEE.' J E. 1nN GRANTA 'A Mr. Jerry Underwood Carolina Water Service, Inc. 5058 Hwy 70 West Westridge Center, N-2 Morehead City, North Carolina 28557 SUBJECT: Dear Mr. Underwood: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources June 13, 2005 Authorization to Construct A to C No. 056618A01 Carolina Water Service, Inc. Carolina Pines WWTP Craven County Alan W. Klimek, P.E. Director Division of Water Quality A fast track application for Authorization to Construct dechlorination facilities was received on May 19, 2005, by the Division. Authorization is hereby granted for the construction of modifications to the existing Carolina Pines WWTP, with discharge of treated wastewater into the Neuse River in the Neuse River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of three tablet feed dechlorination units, pursuant to the fast track application received on May 19, 2005, and in conformity with the Minimum Design Criteria for Dechlorination Facilities. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO056618 issued November 12, 2003, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0056618. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Washington Regional Office, telephone number (252) 946-6481, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site NorthCarolina vVatura!!y North Carolina Division of Water Quality 1617 Mail Service Center Ralei,-h, NC 27699-16 t 7 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Mr. Jerry Underwood June 13, 2005 Page 2 inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Pursuant to 15A NCAC 2H .0140, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted to the address provided on the form. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class Il, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Mr. Jerry Underwood June 13, 2005 Page 3 If you have any questions or need additional information, please do not hesitate to contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. XSincerely,ek, P.E MH/cgm cc: Linwood Stroud, P.E. — Stroud Engineering, P.A. Craven County Health Department Washington Regional Office, Surface Water Protection Section Technical Assistance and Certification Unit Daniel Blaisdell, P.E. Point Source Branch, NPDES Program Cecil G. Madden, Jr., P.E. Mark Hubbard, E.I. A to C File