Loading...
HomeMy WebLinkAboutSW6221202_Supplement-EZ Form_20221214SUPPLEMENT-EZ COVER PAGE }DR LQ DED PROJECT INFORMATION 1 'Project Name 4 2 Project Area ac HIES EASTOVER 6.55 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0.298 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 lWidth of vegetated setbacks provided feet 20 8 lWill the vegetated setback remain vegetated? I Yes 9 :If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? Yes 10 !is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Inflltration System 5 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 5 16 Sand Filter 17 Rainwater Harvesting RWH 18 lGreen Roof 19 Level Spreader -Filter StripLS-FS 20 r2 Disconnected Impervious Surface DIS 1 .Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FCRMSLOADED DESIGNER CERTIFICATION 27 Name and Title: WILLIAM S CLAYTON PE 28 Organization: CLAYTON ENGINEERING & DESIGN 29 Street address: PO BOX 2351 30 City, State, Zip: HICKORY NC 28603 31 Phone numbers : 828-455-3456 WCLAYfON@CLAYTON-ENGINEERING.NET 32 Email: Certification Sla Preen: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Date U) a W Q W a Z �I LII rywq� O m N t} c v q:n D n� �IWlol� a 1717,11 u] 88 88 In ZO�O� N O� N O N O N 8u O < 8N t9 N OUl t0 LL R V}00 O pN O NV Z R a Om § t0 po < N (n f7 000 N N Q� p1 ttTT1 QN m e0 ul N o N py �"pyN i1 c, Z!'m .�YyVy�1, Yi o ftl N rn J r A 0 88w 8w pN y p (/7 JT, 0 a0 0 �1ff77 O (V 8 § O] " fA VJ m O x �r0 O ,Qy 8 �i 9 N U. ,Q8 O� N N N N N O U mm W N o E N p x > O � p C C p N .)= m v a E aci E aci y is $ E E O C a > > O O X = O o 0 g O L m oYc0 Nm U CcC � Q C mL=wIm IIo zm co m-war ' �OMicavmo Qt� W nwa O z"z m d :o :O 0.mC:•, z wnww❑ N w N > INFILTRATION SYSTEM 1 .pralnaga _ 2 3 4 5 2 Minhnum f eed veahnent wOb4ne ar Ft 7 2 d fwcr 2562—Fr. bff39 e 3 is the SCM _W to [real the SW from .ae sMgra ms al pullp�hul? _ Np Nq Yes Ne Yes A _ No Yes _ ► o Yes _1 {1g _ 4 Is the SCM located away from contaminated Soils? Yes Yes :1 6 What am the side slopes of the SCM (H:V or enter' Verllcal'• for .trenbhes 6 Does the SCM have reamingwalls, gabion walls or other engineered side slopes? No No Yes No Yes No Yes 7 Are the inlets, outlets, and receiving stream protecled ffprri erosion 10-fir storm)? Yes a Is theaa6 overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes Yes _5 _ Yes _ Yes _ Pum P.(preferred} _ Yaas Yes _ Yes Pump (preferred) _ _ '�" 9 !ivnl)1 ie the iTW Idrdeaalerina the SCM for melnlendf14e7 lgmlp• (pfH 10 IFapplkalsla, will the SCM be 6 aned wt efler durislruEtlpn9 Ylsd Yes Yae Yes 11 :2L" Ine.maintenance access aampfy with Gener4l Moll Yea 12 DOps lhe•gn, easdRwit ppnply with Eensr�IMbI; i Y9! Yes Yes Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? NIA NIA N/A NIA NIA 14 Is there an 08M Agreement that complies with General MDC (11)? Yes Yes Yes Yes Yes 15 Its there an t7dM Plan 916t rpmpfies wih G4nerel MS]l; {12)T. Yes. Yes Yes Yes Yes 1B :60as the SCMfo4Yv the device specillr.M=7 Yes 17 W as M SOM d - ed an NC licensed olas5rn' P Yes Yes Yes Yes Yes TU Yea Yes. TU 19 Am iprn�eS.Or baFllas prov�gd7 NO NO I 14 NO NO 20 ryyo Dt PNlreatmlht (jlFler �jl p 9r 0m _ 21 Was the sail Epve5f zItftd In the IoWWItl11 and at the elevation of tha —iNplrenun_syslem?___ Yea Yea Yes Yes Ye>s _ 22 :SFIVVTeleva0unifmal 130.09 23 •Dapth 10 SHW 1 ply soli faliodl fkt) 4,67 13OA2 130.OH 130.00 126.6; 498 4.6T 3,00 4.37 24 Ground elewalibn 91 hoNN in soils rspbrl (fnW) 134.75 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feel? NIA 135.40 134.75 133.00 1333 NIA N/A NIA NIA 2r, Sul inflltrahan rAW.(leMr) 0.05 0.05 0.0 0.05 0.05 29 Button elnyahori. (rms0 1W ft I 433 . 1>!$ 131 R 131 n L. ISlorage elevation ffmsl( _ 134:iS 0 135 134.75 133. h 133.0 31 5yPasielpwallon }®msl( 133 133fl 13T'n 13111 catftll Oar 32 EWidm siefacaarea(fill I 906.t1 16M Ct O00 n u(M n 3300 it 33 S!Graae eldbe surtaco errra lOnM h 1625. It 800. It Do- 1400. f1 3300. fl r s Tmene�vallDo 94 •Lengln (fIj =11 3s 01) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 36 Total length of perforated piping 39 $Iona lype, it appbt ble 40 :Slone porosity (% 41 1 Is stone free of fines? 42 Is the stone wrapped in geolextile fabric? 43 Has 31 least litre Ins !LRn por. been peRridpdT Mini? 44 Design volume of 5CM (cu fft _ _ 2250 cf _ 2973df 14" C 258201 drw ctmr51!MIX 65 71ma W Trs 30MONAL INFOPAPI ON — — 46 Please use this spoca to provide any addilmnal Irdormabun about . the Irdiilralion system (yj, Infiltration i S =e au 1 ]MI%N] PERMEABLE PAVEMENT 1 Drainage area number 1 1 2 3 4 5 2i Minimum required treatment volume cu ft 2250 cf 2973 cf 1464 cf 2562 cf 6039 cf 3:Area of permeable pavement to be installed (square feet 966 ft 1625 ft 800 ft 1400 ft 3300 ft 4 Area of screened roof runoff that is directed to pavement (square feet 12000 sf 52000 sf 9150 sf 32000 sf 21350 sf 5 Area of additional built -upon area runoff that is directed to pavement 3000 sf s uare feet I 7200s f 3000 sf 6000 sf 4000 sf 6 Area of incidental, unavoidable runoff from adjacent stable pervious sf areas (square feet sf sf sf sf �uuveruu muL rnum men .mmu. 7' Is the SCM sized to treat the SW from all surfaces at build -out? No No No No No 811s the SCM located away from contaminated soils? Yes Yes Yes Yes Yes 9 What are the side slopes of the SCM (H:V)? N/A N/A N/A N/A N/A 10 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes Yes Yes Yes 11 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? Yes Yes Yes Yes 12'What is the method for clewatering the SCM for maintenance? Pump (preferred) Pump (preferred) Pump referred Pump (preferred).Pump (preferred) 13 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes Yes Yes 14 Does the maintenance access comply with General MDC 8 ? Yes Yes Yes Yes Yes 15 Does the drains a easement comply with General MDC 9 ? Yes Yes Yes Yes Yes 16 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 90? N/A N/A N/A N/A N/A 17 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes Yes Yes 181 Is there an O&M Plan that complies with General MDC 12 ? Yes Yes Yes Yes Yes 19 1 Does the SCM follow the device specific MDC? Yes Yes Yes Yes Yes 201Was the SCM desi ned by an NC licensedprofessional? Yes Yes Yes Yes Yes flT- exnM V8Vtment muL rKwm ozn 4955 21 Is this a detention or infiltration permeable pavement system? Detention Detention Detention Detention Detention 22 Design volume of SCM cu ft Detention Detention Detention Detention Detention 23 Proposed slope of the subgrade surface %) 0% 0% 0% 0% 0% 241Are terraces or baffles provided? Ne Ne Ne NO No 25 SHWT elevation fmsl [ 130.00 130.42 130.00 130.00 128.63 26 Storage elevation of the design rainfall depth fmsl 134.75 135.4 134.75 133 133 27 Will toxic pollutants be stored or handled on or near the permeable pavement? No No No No No 28 Does the proposed pavement surface comply with .1055(6)? Yes Yes Yes Yes Yes 29 Will runoff from pervious surfaces be directed away from the pavement? No No No No No 30 Maximum adjacent area directed to a single point onto the permeable pavement (sq ft 15000 sf 59200 sf 12150 sf 38000 sf 25350 sf 31 Has at least one observation well per terrace been provided at the low oint s ? Yes Yes Yes Yes Yes 32 Have edge restraints beenprovided? Yes Yes Yes Yes Yes 33 Will the subgrade be graded when dry? Yes Yes Yes Yes Yes 34 Will the permeable pavement be protected from sediment during construction? Yes Yes Yes Yes Yes 35 Will an in -situ permeability test be conducted after site stabilization? Yes Yes Yes Yes Yes iror inr7n vnu ravemenr aysmms 36:Was the soll investigated in the footprint and at the elevation of the :subgrade? Yes Yes Yes Yes Yes 37 Soil infiltration rate in/hr .050 in/hr .050 in/hr .050 in/hr .050 in/hr .050 in/hr 38 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? No No No No No 391 Is additional media bein2 added to the soilprofile? I Yes Yes Yes Yes Yes 401Proposed slope of the subgrade surface % 0% 0% 0% 0% 0% 41 Top of the subgrade bottom of the a re ate) fmsl) 132.92 133.57 132.92 131.17 131.17 42, Drawdown time (hours) hrs hrs hrs hrs hrs ror uerennon ravemenr a rems 43. Drawdown time hours 32 hrs 32 hrs 32 hrs 32 hrs 32 hrs Aonreslate 44 A r ate depth in 18 in 19 in 18 in 18 in 18 in 45 Aggregate porosity %) 40 40 40 40 40 46. Size of aggregate to be used in the subbase CLASS 4 CLASS 5 CLASS 6 CLASS 7 CLASS 8 47 WIII the aggregate be washed? Yes Yes Yes Yes Yes ADDMONAL INFORMATION 48 Please use this space to provide any additional information about the permeable pavement cvStamW— Permeable Pavement 1 9:36 AM 12/5/2022