Loading...
HomeMy WebLinkAboutWQ0000884_Monitoring - 10-2022_20221122Monitoring Report Submittal Permit Number#* WQ0000884 Name of Facility:* Butterball, LLC Month: * October Year: * 2022 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR DMRoct.pdf 4.39MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * jbatchelor@butterball.com Name of Submitter: * josh batchelor Signature: jWIf IW.-A'/1-t Date of submittal: 11/22/2022 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* W00000884 Is the monitoring report accepted?* Yes NO Regional Office* Wilmington Reviewer: _anonymous Review Date: 3/13/2023 FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Did the mass loading rates exceed the limits in Attachment B of your permit? ❑.r Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective art-innk) taken_ Attach additional sheets if necessarv. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification Number: 991798, 987940 signing Official: Jeffry Sharnblln Grade: WW IV, 51 Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMLR? ❑ Yes (y] No Phone No.: 919-658-6743 ext 2267 Permit Exp.: 9130/22 :K,k,1A -4 LO Signature Date Signature Date By this signature, 1 certify that this report is accurrate and complete to the best or my knowledge. I certify, under penally of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? 2] Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? p compliant ❑ Non -compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? [21 Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? Cl Compliant ❑ Nan -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? 121 Compliant ❑ Non-Compliarit If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification No.: 991798, 987940 Signing Official: Jeff Shamblin Grade: WWIV, SI Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant manager FacilitiesMastewater Has the ORC changed since the previous NDARA? ❑ yes 0 No Phone Number: 919-658-6743 ext 2267 Permit Exp.: 9/30122 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance w th a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Sampling Person(s) Certified Laboratories Name: Jefferson Foy Name: Environmental Chemist Name: Josh Batchelor Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 0 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Pormittee: Bill Folk Certification No.: 991798, 987940 Signing Official: Jeffry Shamblin Grade: WW IV, SI Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMR? ❑ Yes R]No Phone Number: 919-658-6743 ext 2267 Permit Expiration: 9/30/2022 Signature Date Signature ate By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I co ify under penalty of law, that this document and all attachments were prepared under my direction or supervision in ace rd nce with a system designed to assure that all qualified personnei properly gathered and evaluated the information sub ' ad. Based on my inquiry of the person or persons who manage the system, or those persons direclly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: October Year: 2022 Field Name- Field Name: 01B Field Name. 01C Field Name: 02A ®ICE It'Clgal011 OCCUI' Area {acres} 26.75 Area (acres): 74.59 Area (acres Area (acres): 18.61 21this facility? Cover Crop: Coastal Cover Crop. Coastal Cover Crop. Coastal Cover Crop. Coastal; Hourly Rate {in}, Hourly Rato {in): Hourly Rate in Hourly Rate (in): 0 YES ❑ No Annual Rate (m}: 50; Annual Rate (in): 50 .An n..ual Rate {in}: 50 Annual Rate {in): 50 Weather Freeboard Fleld Irrigated? YES ❑ No ` Field Irrigated? YES ❑ NO Field lrngated? ❑ YES ❑ No ' Field Irrigated? E] YES ❑ NO w y 'D 'O :. 67 .1= T N '8 N C �` C N a5 ;rn i+ C rn �' G . m a cs 47 ydj rn �+ C 'C7 E rn a C © -' o, i o U 7 .� .g 'iq a i7 m '6 - K o ca 7 Q- o a E i. 'N p ,� K o Q _. o ca : 07 F^ IS' N o a: fl. o a l0� i= 61 Ci o ,E p 0 CD 0-g o �a ° �x ° �a °s ° tea: �,=.r. >¢ CD o CU a L" °F in tk ft gal. min in in gal min in in gal min In in gal min in in 1 PC 72 D 55 2 PC 67 0.5 48 76,674... 395.4 0 11 0.02 107,996 703.2 0.05 0.00 120,800 310 0.39 0.08 61,790 1$2.4 0.12 0.04 3 PC 57 0 54 90,116 395A...0.12 0102 s 111,419 732.6 0.06 0.00 109,082 320 035 0.07 118,232 366A 0.23 0.04 4 C 68 0 56 65,579 335.4... 0 09 D.D2 102,394 703.2 0.05 0.00 128,21.3 363 041 0 07 126,690 365.4 0.25 0.04 5 C 72 0 56 80,806 426 6 0.11 0,02 115,825 733.8 0.06 0,00 118,242 34q 0 38 0 07 :` 120,487 365.4 0.24 0.04 6 C 80 0 57 77,934 396 6A4 0.02 108,322 738 0.05 0,00 108,748 324 0 35 0.06 54,060 183 0.11 0.04 7 C 83 0 60 84001 426.E 0.12 0.02 102,500 672.6 0.05 0.00 84,620 24;1 Q27 0 07 $6,007 274.2 D.17 0.04 8 C 68 0 62 103,771 577.2 0.14 0.02 97,604 642.6 0.05 0.00 160,01,:3 308 0 51 0 10 116,625 334.8 0.23 0.04 9 C 72 0 61 61,227 456.6. 0.11 0.01 106,829 733.8 0.05 0.00 113,685 42.3 0'36 0 05 139,220 426 0,28 0.04 10 C 73 0 64 75;675 396 0.10 0.02 `-. 62,526 426 0.03 0.00 $6,125 325 0;2$.:.0.05.:::125,929 396 0.25 0.04 11 C 76 0 66 79,236. 426 D 11 0.02 .: 107,464 730.8 0.05 0.00 84,075 274.2 0.17 0.04 12 C 78 0 66 68,230 '396 0,09 0.01 100,440 699.6 0.05 0.00 112,581 335.4 0.22 0.04 13 CL 75 0 65 74786 396 0.10 0 02 ..:::' 105,710 669.6 0.05 0.00 108,041 335.4 0.21 OA4 14 C 71 0 66 78,348 426 ..0,11 0.02 99,017 639.6 0,05 0.00 105,412 304.2 0.21 0,04 15 C 78 0 64 74 080 395.4 0 10 0.02 :i 113,884 730.8 O.D6 0.00 126,802 395.4 0.25 0,04 16 C $2 0 66 74614 396.6 010 0.02 113,776 730.8 0.06 0.00 117,068 365.4 0.23 0.04 17 C 81 0.07 70 104,289 700.8 0.05 0.00 115,710 365.4 0.23 0.04 18 C 64 0 72 108,657 731.4 0.05 0.00 131,205 366 0.26 0.04 19 C 58 0 74 110,047 730.8 0.05 0.00 126,524 366.6 0.25 0.04 20 C 65 0 72 106,518 700.8 0.05 0.00 132,720 426.E D.26 0.04 21 C 69 0 74 104,435 669.E 0.05 0.00 122,031 365.4 0.24 0.04 22 C 75 0 68 108,800 730.8 0.05 0.00 125,699 396.E 0.25 0.04 23 C 70 0 66 105,665 700.2 0.05 0.00 118,691 365.4 0.23 0.04 24 C 77 0 66 110,870 730.8 D.05 D.00 125,536 365.8 0,25 0.04 25 PC 69 0 66 110,692 730.8 0.05 OAO 126,693 366 0.25 0.04 26 CL 76 0.03 64 112,433 731.4 0.06 0.00 109,579 335.4 0.22 0.04 27 C 70 0 64 106,545 730.2 0.05 0.00 121,988 365.4 0.24 0,04 28 R 62 0.9 62 96,922 639 0.05 0.00 95,553 274.2 0.19 D.04 2g R 75 0.1 56 30 PC 70 0 56 113,106 730.8 0.06 0.00 130,153 395.4 0.26 Q04 31 C 75 0 56 77777777 109,320 699.6 DA5 D.00 124,413 396 0.25 0.04 70 Monthly Loading: 1185 078.. 1.63 3,064,005 1.51 1,029;528. 3.30 3,309,514 6.55 12 Month Floating Total (in): 39.37 :` 17.28 43 08 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin month: October Year: 2022 Field Name: D2t3 Field Name: 02C Field Name. 03 Field Name: 05 Did irrigation occur Area (acres): 12.01 Area (acres): 9.16 Area (acres): 17 28 ; Area (acres): 18.63 1f this facility? Cover Crop. Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop Coastal': YES ❑ NO Hourly. Rate jin): Hourly Rate (in): Hourly Rate (in) Hourly Rate (in): Annual Rate'(in}: 86,8 Annual Rate (in): 50 Annual Rate (ln) 137.2 Annual Rate (in): 68.8 Weather Freeboard Field Irrigated? QYes . ❑ No Field Irrigated? ❑ YES ❑ No Field irrigated? ,❑� Y� {] NO Field Irrigated? ❑ YES ❑ No 41 ° C ° m y rn w o a , E Eo rn A Usa ma .ib i. 6 N d C b Q Q z E. E C C C E3 ❑ ry o ° a x°° ° V. KZ o at T � � �a °z� � '0 > a r cv °E in ft ft gal. ruin.. in in gal min in in gal min in in gal min in in 1 PC 72 D 1 55 2 PC 67 0.5 48 75,342 359.3 0.23 0.04 68,424 307.3 0.28 0.05 91,568 396 0.20 0,03 3 PC 57 0 54 75,306 3584.:.0.23..:.:..0.04 73,075 330.8 0.29 0.05 90,116.: 3954 0.19 0.03 4 C 68 0 56 65,923 3 L4 4:..0.20:.:= 0.04 79,167 362.6 0.32 0.05 80,882> 334 6 0117 0.03 97,059 329.6 0.19 0.03 5 C 72 0 56 80,961 384.8 :::0.04:.:.72,401 334.7 0.29 0.05 95,551,; 426 0..20 0,03...645,656 6565 1.28 0.01 6 C 80 0 57 78,387 371.3 0 24 0.04 ;' 33,027 154.5 0.13 0.05 133,775 547`8 0 29 0.03 96,249 322.4 0.19 0,04 7 C 83 0 60 85,928. 40D 0.26 0.04 51,491 240.4 0.21 0.05 162,432 669 5 0 35 0.03 70,457 239.3 0.14 0,03 a C 68 0 62 60,583 ..2.86.9.. 0.19..:.. O.D4 - 71,366 322.7 0.29 0.05 75,921 334;8 0.16 `.0.03 95,526 319.9 0.19 0,04 9 C 72 0 61 62,322 297 0,19 0.04 56,420 259 0.23 0.05 102,127 4272. 0,22 0.03 ` 84,982 286.1 0.17 0,04 10 C 73 0 64 731601 342,3 p.23 p p4 y 77,015 354.3 0.31 0.05 89,313, 365 4 D 19 0.03 ;'; 106,842 362.6 0.21 0A3 11 C 76 0 66 81,501 394 0.25 0.04 52,831 229,3 0,21 0.06 99,526 426 021 0 03 + 94,347 307.4 0.19 0.04 121 C 1 78 0 66 67,994 361..2 . 0 21 .0,03 .. 62,467 282.E 0,25 0.05 86,762' 396 0;17 0 03 : 95,875 365.5 0.19 0.03 13 CL 75 0 65 76,678 352 :..::0.23.: ::::.:0.04. 65,520 300.5 0.26 0.05 90,312. 364.`8 019 0,03 90,690 306.4 0.18 0.44 14 C 71 0 66 70,542 333.3 0.22:.0.04..:.50,700 231.9 0,20 0.05 86,260. 365..4 018 0.03 89,638 295.1 0.18 0.04 15 C 78 0 64 73 999 344 8 0,23 0,04 91,471 396 019 0.03... 108,283 363.5 0.21 0.04 16 C 82 0 66 72,074 354,8 ..0.22:..::0,04..::fi 75,632 343.3 0.30 0.05 90,007 .365.4..0!19 0.03 101,244 340.8 0.20 1 0.04 17 C 81 0.07 70 701655 331.8 0.22 0.04 62,025 278.4 0.25 0.05 821509 365 4 018 0.03 :; 97,335 1 329 0.19 0.04 18 C 64 0 72 1 74,581 350.6 023 0.04.::. 22,043 99.4 0.09 0.05 85,303 395 4 008 0.03 . 107,997 357.4 0.21 0.04 19 C 58 0 74 72,261 3465 0122 004 .;; 01,028 365,4 019 0.03 ,` 104,900 349.7 0.21 0.04 20 C 65 0 72 60,703 297.4 0.19 0.04 . 58,081 262,3 0.23 0,05 70J86 304 2 0 16 0.03 109,711 364.5 0.22 0.04 21 C 69 0 74 60,776 30111 019 .:.:0.04:::: 66,003 307.5 0.27 0,05 89A25 365.4 0.19:0.03.:.`' 90,731 301 0.18 0.04 22 C 75 0 68 69,324 342.2 0.21 0.04 56,667 264.3 0.23 0,05 85,047 3654. 0A8 0.03 107,249 356.4 0.21 0.04 23 C 70 0 66 681324 332.9 0.21 .... is 0.04 72,794 328.3 0.29 0.05 52,737 364 8 0..18 0.03 `: 100,353 333A 0.20 0.04 24 C 77 0 66 71,763 _345.8 0.22.. -` 0.04 '. 76,161 339.7 0.31 0.05 83,79.6 366 a18 0,03 104,139 348.1 0.21 0,04 25 PC 69 0 66 73,098 347.6 .0.22 0.04 25,428 113.9 0.10 0.05 89,705 396 0.19 0.03 106,623 351.2 0.21 0.04 26 CL 76 0.03 64 76,004 370,5 p.23 0 04 ); 176,242 335:4 038 0.07 113,280 371.4 0.22 0.04 27 C 70 0 64 65,4. 7$ 951.9. 0.20 0.01 62,714 293.3 0.25 0,05 167,365 730.2 0 36 0 D3 .:' 93,972 343.2 0.19 0.03 28 R 62 0.9 62 68,731 335.8 0.21 0.04.. 1 158.,070 638.4 U4 '0,03 i 103,153 337.3 0.20 0.04 29 R 75 0.1 56 30 PC 1 70 0 56 68,223 334.4 0.21 0.04 = 41,578 188.3 0.17 0.05 86,026. 364 8 0.18. 0,03....: 108,037 357.6 0.21 0.04 311 C 75 0 56 66,410 323,5.. "0.20 0.04 39,853 182 0.16 0.05 125,349 51.7i2 0'27. 0 03 104,409 349 0.21 0.04 Monthly Loading: 2,066492. 6.34 : 1,472,883 5.92 2,938,8.11+? 626 3,228,737 6.38 ME30.82 12 month Floating Total (in}: 64.93 44A9 53.93 ": FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name Mt Olive Turkey Processing Facility County: Dupfin Month: October Year: 2022 Did irrigation occur Field Name; 07 Field Nao: 07A Meld Name 08A Field Name: at this facility Area (acres): 14.89 Area (acres}: 6,12 Area acres , { ) 30 38: g8f3 Area (acres) 34.84 cover Crop: Coastal Cover Crop: Coastal:::... Cover Crop Coastal Cover Crop: Coastaf YES ❑ Np HouNy Ra#e {in). Hourly Rate (in): Hourl Rate m Y { ) Hourly Rate (in): Annual Rate (m} 70.7 Annual Rake in ( ) Annual Rate (in) 111 3; Annual Rate (in): 72.2 Weather Froeboard Field Irrigated? YES"'El NO Field Irrigated? ❑ YES NO Field Irrigated? ❑ YES ❑ NO Field Irrigated? [) YES ❑ NO V La 0 ,��+ of Q f�6 ar •p E Uf :'i7 a1 _ m .?, C LSj . a ?+ C N 'a E 'a dI as r i? E c :_ 7:� �, m a E rn o a ° o- ao ° ocz E° }=:� o°o; E a a oa E ro . ° i pro E ` Xom�'0 E 1; ro,��a E v °a a Eta E .� a. _Ero 7 °E in 0 tt gal' min m :� in gal min in in gal miri in -�n 1 PC 72 0 55 gal min in in 2 PC 67 0.5 48 3 PC 57 0 54 4 C 68 0 56 55,805 378.2 O.q6 0,01 5 C 72 0 56 46,399 316.7 0.05 0,01 S C 80 0 57 54,660. 385.5 0.06 0.01 7 C 83 0 60 54,491 373.1 0,06 0.01 8 C SS 0 62 56,486 403.5 0,06 0.01 9 C 72 0 B1 44,fi62 298.6 0.05 0.01 10 C 73 0 64 60,007 398.5 0.06 0.01 11 C 76 0 66 57,906 374.6 0.06 0.01 12 C 78 0 66 54,444 364.1 0.06 0.01 13 GL 75 0 65 53,100 380.E 0.06 0.01 14 C 71 0 66 53,772 2416 0.13 0.0.3 55,806 363.4 0.06 0.01 15 C 78 0 64 73,842 345 0.18 :0,03 52,627 350A 0.06 0.01 16 C 82 0 66 67,886 340.7 0,17 f b3 49,898 341.6 O.qS 0.01 17 C 81 0.07 70 66,383 327.4 0,16 .0.03 '' 56,654 380.1 0.06 0.01 16 C 64 0 72 72,518 344.4 01$ €0.q3. 48,869 330.4 0.05 0.01 19 C 58 0 74 71,004 344 8 0.18 0.03 . 54,609 355.6 0,06 0.01 20 C 65 0 72 47,887 256.2 .0.12 0.03..: 52,387 337.9 0.06 0.01 21 G 69 0 74 71,761 345.5 018 0.03.:.46,111 301.5 0.05 0.01 22 C 75 0 68 72,621 353 0.18 0.03.. 50,339 343.E 0.05 0.01 23 C 70 0 66 69,630 32U..017 0.03 50,285 336,E 0.05 0.01 24 C 77 0 66 71.450 34.7.2 0:18 :0,03 48,877 330.3 0.05 0,01 25 PC 69 0 66 73,015 350.8 018 D.03..: 53,107 350.1 0.06 0.01 26 CL 76 0.03 64 62,768 302:6 0'16 0.03 49,504 325.5 0,05 0.01 27 C 70 q 64 71,736 346.1 Oft$ 0.03 55,558 372.4 0.06 0.01 28 R 62 0.9 62 56,316 266.:4 0,14 0.03 52,582 384.9 0.06 0.01 29 R 75 0.1 56 50,171 337.2 0.05 OA1 30 PCE7: 0 56 66,804 3308..017 Q.03 `'; 31 C 0 56 108,823 513 0.27..0.03 50,837 328.4 0.05 0.01 Monthly Loading: '1,178,276` 291 0 D.00 49,190 322.7 0.05 0.01 12 Month Floating Total (in): 41.33 0 0,00 1,465,371 1.55 ,, 9.27ME .. 24,05 :' ` 5.62 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDAR-1 08-11 Permit No.: WQ0000884 Did irrigation occur at this facility? In YES ❑ NO Weather Freeboard tz N d 0 m U 12 .2 a as iz 0 y a0s ul m Q a i- a- Loft °F in ft 1 PC 72 0 55 2 PC 67 0.5 48 3 PC 57 0 54 4 C 68 0 56 5 C 72 0 56 6 C 80 0 57 7 C 83 0 60 8 C 68 0 62 9 C 72 0 61 10 C 73 0 64 11 C 76 0 66 12 C 78 0 66 13 CL 75 0 65 14 C 71 0 66 15 C 78 0 64 16 C 82 0 66 17 C 81 0,07 70 18 C 64 0 72 19 C 58 0 74 20 C 65 0 72 21 C 69 0 74 22 C 75 0 68 23 C 70 0 66 24 C 77 0 66 25 PC 69 0 66 26 CL 76 0.03 64 27 C 70 0 64 28 R 62 0.9 62 29 R 75 0.1 56 30 PC 70 0 56 31 C 75 0 56 Monthly Loading: 12 Month Floatinq Total NON -DISCHARGE APPLICATION REPORT (NDAR-11) Facility Name: Mt. Olive Turkey Processing Facility County: Field Name: 098-31 Field Name: 09B-B2 Fields Area {acres): 1 75 Area (acres): 11.01 Area (i Cover Crop: Coastal Gover Crop. Coastal Cover Hourly Rate;(m): Hourly Rate (in): Hourly Ra 4nnual Rate (in); 38,8 Annual Rate (in): 11.5 Annual Ra Field Irri(ated? ❑ YES Field Irrigated? ❑ YES No Field lyric ns o 3 a gal, o E f0 min a� m o in E 3 6. in E ,� j gal m m m i= ' min T c p a in E rn c o o in m o tea: aal .79' C 0.00 10,44 Page of Duplin Month: October Year: 2022 ne: 09C Field Name: 10A ?s) 21.48 ` Area (acres): 15.19 op: Coastal Cover Crop: Coastal in): Hourly Rate (in): in) 25 Annual Rate (in): 79.9 6t? YES ❑ No Field Irrigated? YES ❑ N0 o E rn E ' z V " CDCM E Lu � a E� �w; T 'oC ° E rn 7 ]a, o0 E Co -' :in .. I . ' i.n..... 11 gal I min I in i in 025 0:25 0 03 0.04. 136,850 148,697 391 395.4 0.33 0.36 0.05 0.05 0.25 0,43 0:27 0.03 0.04 0,04 154,302 117,643 114,654 426.6 334.8 335.4 0.37 0.05 0.29 0.05 0,28 0.05 0.23 004 . 137,153 335.4 0.33 0.06 0:: 9 0.1.0 0 25 0 03 , 0.03 0..04. 116,482 131,778 126,843 304.8 335.4 364.8 0.28 0.06 0.32 0.31 0.06 0,05 0.27 0;24 0 29 0 25 0.04 0.04 0.04 0.04 ': 137,113 107,379 139,008 144,120 146,644 116,520 141,386 134,438 129,517 365.4 274.2 335.4 396 364.8 304,2 365.4 364.8 334.8 0.33 0.05 0.26 0.06 0,34 0.06 0.35 0.05 0.36 0.06 0.28 0.34 0.33 0,06 0.06 0A5 0,31 0.06 129,592 114,126 155,607 335.4 304.8 396 0.31 0.06 0.28 0.05 0.38 0.06 4J3 76,656 2,856,508 213 0.19 6.93 50.14 0,05 /. FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Did irrigation occur Freld Name: 13 Field Name: 14 Field Name Area (acres}. 31 42 Area (acres): 12.07 Area (acres} at this faClilt]/? Cover Grop CcasI 1 Cover Crop: Coastal Cover Crop ❑✓ YES ❑ No Hourly Rate',{in): Hourly Rate (in): Hourly. Rate (in): Arin6a I Rate (in):. 31,42 Annual Rate (in): 78.02 Annual Rate. (in), Weather Freeboard Fieltl Irrigated? 0 YES ❑ NO Field Irrigated? PJYEs ❑ NO Field Irrrgateti7 ;0 N U � :° m Q. m an d E O1 zs an d rn 7, E a� ❑ L c m a E 21 o m ?; rn E E ay a T E E °/ ro o v CL p u� 3 is Q E E 3 o p a E ;rn L E N Q > a O O: J O : �-C C N > a � OF in ft ft OF: min in::. rn gal ruin in in gal min 1 PC 72 0 55 2 PC 67 0.5 48 297,366 609.E 0.3.5. 0 03 76,721 313:2 0 3 PC 57 0 54 259,46T 548.4 0.30 0.03 77,017'; 376 0 4 C 68 0 56 316,178 670.8 0 37 0.03 " 79,349 325 0 5 C 72 0 56 310.211 670.8 0,36 0.03 81,901 333 3 0 6 C 80 0 57 78,982> 319,1 `0 7 C 83 0 60 132,724 579,6 0.16. 0,02 57,867. 2385 0 8 C 68 0 62 106,207 548,4 0.12... 0.01 74,797r 301; 0 9 C 72 0 61 141,725 61.0.2. 0.17 0.02 ' 96,282 3934 .0 101 C 1 73 0 64 114,439 488.4 0,13 0.02 09,946. 406.3 0 111 C 1 76 0 66 62,777 335.4 0.07. 0 01 ." 90,523 3675 0 12 C 78 0 66 133,199 578A4 . 0.16 0.02 74;322. 298 5 0 131 CL 1 75 0 65 148,481 610.2 :017 0.02 81,102 332:1 141 C 1 71 0 66 131,437 549 0.15 0 02 i' 17,980 183.6 0.05 0,02 73,801 301 0 151 C 1 78 0 64 121 874 487.8_ 0.14 .0.62 30,148 306 0.09 0.02 95,744: 388.3 C 16 C 82 D 66 156,297 6.79.6 0.18 U: 0.0.2. 47,840 427.8 0.15 0.02 95,023. 363.2 C 17 C 81 0.07 70 107;279 549. 0.13 0.01 `' 59,293 520.8 1 0.18 0.02 93,596. 381.9 C 18 C 64 0 72 86,546, 3447 0 19 C 58 0 74 40,199 366.E 0.12 0.02 89,800 358 C 20 C 65 D 72 31.335 306.6 0.10 0.02 77,914' 315 2 0 211 C 1 69 0 74 30,929 275A 0.09 0,02 74,649: 3054 C 221 C 1 75 0 1 68 42,272 397.8 0.13 0.02 85,633 348.2.1 C 23 G 70 D 66 82,152. 333.5 C 24 C 77 0 66 37,159 337.2 0.11 0.02 88,942 362.2 C 25 PC 69 0 66 39,308 397.8 0.12 0.02 26 CL 76 0,03 64 61,467 550.8 0.19 0.02 27 C 70 D 64 71,347 643.2 0.22 0.02 28 R 62 0.9 62 59,438 550.8 0.18 0,02 29 R 75 0.1 56 30 PC 70 D 56 40,657 367.2 0.12 0.02 31 C 75 0 56 Monthly Loading: 2,539661` '2.9$ 609,342 1.86 1,912,609: 0 12 Month Floating Total (in): 29 54 '' 35.16 3 Month: October Year: 2022 15C Field Name: 16 18 03 Area (acres): 12.95 Coastal Cover Crop: Coastal' Hourly Rate (in): 39.21 ....... Annual Rate (in): 65.38 s ❑ No Field Irrigated? YES ❑ NO n T c xo m ma, Oa Pa m oo EE � ' xbvo in. gal min in in 0,03 s 83,112 349 0.24 0,04 91,642 367.6 0.26 0.04 i 0.03. 88,310 355.8 0.25 0.04 0.03 90,102 390.3 0.26 0.04 0.03 121,290 528.3 0.34 0.04 87,336 401.8 0.25 0.04 :0 03 : 70,441 294.1 0.20 0.04 0,03 55,011 240.3 OA6 0.04 0.03 64,364 289.9 0.18 0.04 3 0.03 77,423 325,7 0.22 0.04 i 0.03 65,280 284.7 0.19 0.04 0.03 75.821 319.4 0,22 0.04 :0 03 :` 77,383 319.2 0.22 0.04 0,03..; 79,601 335.9 0,23 0.04 3 0 03 72,636 302.9 0.21 0.04 3 0.03 ` 79,870 328.3 0.23 0.04 3 0.03 87,876 352.5 0.25 0.04 3 0.03 81,898 330.7 0.23 0.04 3 0,63 88,672 360.8 0.25 0.04 i 0.03 85,209 344.8 0.24 0.04 T 0.03 . 85,226 343.3 0.24 0.04 7 `0.03 90,879 401.7 0.26 0.04 3. 0.03 ' 80,197 323 0.23 0.04 83,262 333 0.24 0.04 169,314 1 674.8 0.48 0.04 162,730 688.4 0.46 1 0.04 150,929 606.3 0.43 0,04 76,003 301.2 0.22 0,04 125,209 493.9 0.36 0.04 1 :' 2,647,026 7.53 9 '` 55.51 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-'I) Page of FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Dupfin Field Name: 01A Field Name 01B Field Name: 01C Field Area (acres): 26.75 Area (acres} 74 59 Area (acres): 11.48 Area Cover Crap; Coastal Cover Crop: Coastal Cover Crop: Coastal Cove Load Type: PAN Load Type PAN Load Type: PAN Loac Field Loaded? ❑ YES ❑ NO Field Loaded Yips ❑ No. Field Loaded? YES ❑ ❑ NO Field:Lb Q 0 Qoa > O Q� Q¢ �L a 10 n mo rL s� o Am �� Ul J Z ¢ �o �-�a7o¢ Z , ¢a �o 0 a� ¢� vc- ��' Ua Month gal 2,939,890 mg1L Ibslac lbslac gal. .:mg!L. gal mg/L lbslac Ibslac gal November 47.69 43.7 43.7 .:660,832: 4769 3.5 315 2,125,827 47.69 73.7 73.7 1648,880 December 3,946,690 64.63 79.5 123.2 5,069,802 64,63 36.6 40.2.? 1,660,732 64.63 78.0 151.6 1',5$5,346 January 3,033,600 55.64 52.6 175.9 `3,333,032 55.64 20.7 609 ;} 1,453,058 55.64 58.7 210.4 13.70.,785 February 4,316,612 58.95 79.3 255.2 .31910 929. 58.95 25.8 8& 7 137,083 58.95 5.9 216.2 1;795,948. March 2,711,977 49.93 42.2 297.4 41182 254 49,93 23 3 110 0 0 49.93 0.0 216.2 2;103,448 April 2,957,081 57.85 53.3 1 350,8 3,699i458..5785 23i9 734 0.; 1,055,424 57.85 44.4 260.6 2;178,228 May 1,745,471 59,88 32.6 383.3 2,279,034 59 8.8 15 3 10.2 294,633 59.88 12.8 273.4 94811M '. June 2,556,643 47.16 37.6 420.9 1,608,871 47.16 815: 7577`` 1,418,806 47.16 48.6 322.0 3,279,0711. July 2,642,006 46.64 38.4 459.3 3,539,855 46.64 18.5 1762;. 1,011,278 46.64 34.3 356.3 0 August 1,229,957 46.98 18.0 477.4 1,5i 1,282..46 98 Tg: 184'r;1 ; 2,763,639 46.98 94.3 450.E 3,555,675 `- September 2,281,386 55.96 39.8 517.2 2,784693 55,96 17,4 201.5; 2,604,030 55.96 105.9 556.5 340,180.` ' October 1,185,078 47.32 17.5 534.6 3,064OQ5 47i32 16;2 217;7`' 1,029,528 47,32 35.4 591.9 3;309,514 12 Month Floating PAN Load 534.E 217,7: 591.9 i Annual PAN Load Lim Month: October 1 Year: 2022 VA Field Name: 02B 8 61 Area (acres): 10,94 iastal Cover Crop: Coastal ?AN Load Type: PAN ❑ NO Field Loaded? C] YES ❑ NO ar ��>` UAV. m Q Z Q o m cu v > o ¢u Z_,� cG O J o m �° J E Z Ua. Ibslac' gal mg/L lbslac lbslac 35.2':' 428,965 47.69 15,6 15.6 1,630,842 64.63 80.4 95.9 175,3];. 2,018,572 55.64 85.6 181.E 162.8 2,043,071 58.95 91,8 273A 209.91 1,334,607 49.93 50.8 324.2 266.3. 1,349,915 57.85 59.5 383.7 2918; 2,479,122 59.88 113.2 496,9 361.1. 1,956,452 47,16 70.3 567.2 361 j . 870,052 46.64 30.9 598.2 1.435.9. 1,930,019 46,98 69.1 667.3 444,5. .1:614.6:11 232,370 1 2,066,492 1 55.96 47.32 1 9.9 74.5 677.2 751.7 751.7 MIMI,. FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: VVQ0000884 Facility Name: Mt Olive Turkey Processing Facility County: Duplin Month: October Year: 2022 Field Name: 08A Fleld Name. fl8B Field Name: 08C F}eld Name: 49A Field Name: 09B Al Area (acres}: 3p,38 Area (acres) 34.84 ' Area (acres): 10.75 Area (acres): 30,38 Cover Crop: Coastal Cover Crop. Coastal Cover Area {acres}: 4.25 Crop: Coastal Cover Crop Coastal ' Cover Crop. Coastal Load Type: PAN Load Type: PAN..Load Field Loaded? ❑YES ❑� NO 1=iel0 LWOW? 0 YES ❑ Ip ' Field Type; Yp PAN Load Type: .PAN Load Type: PAN ❑ YES ❑ NO Fleld Loaded? ,[] YES J] NO.:.. Field Loaded? El YES []✓ NO ° Loaded? °- a� Q >v a ¢ a °ia a Zo z �, z� z v y a) C .,.E Q N ++ � ], tG J Q Q, `" a t6 O. iL #, N _ ry 4 ro E 2 U 3 w J Z 0 ;W N O 3 Z J O7 C p 1 Q CD rz A.� N J �% 3 j 0 ¢V V 4 J Q: O - �u [�.� .� -� l= 7 Q T. .� U •'�.+ J z- } N U o _ Z ? QO j a'� Cia ; �� UQ : o a �a Montfi gal mg/L Ibslac Ibslac gal mglL Ibslac Ibslac: gal November mglL Ibslac Ibslac gal Mgt Ibslac 127,328 47.69 D 64.63 1.7 D.0 17 17 427,322. 455,440: D i.0 0 47.59 64,63 55,64 58.95 49;93 4.9, 4.9 7.l) 11,9:. p.0: 11;9 .' 0.0. 119 :: D,D. 11,9 2,576,950 864,441 0 0 47,69 64.63 55.64 58.95 95.3 43.3 0.0 0.0 95.3 138.7 138.7 138.7 2,582,889 1,005,286 2,698,911 3 p46fi87 47.69 6463 55:64 5895 338 33.8 41.2' 49,3: Ibslac. 33.8' OT6.` 158::1 gal 171,224 0 0 84,516 mglL 47.69 64.63 55,64 58.95 Ibslac 1fi.0 D.0 0,0 9,8 Ibslac 16.0 16.D 16.0 25.8 December January 11529,315 55.64 23.4 25.D February 2,715,153 58.95 43.9 69.0 March 2,585,658 49.93 35.4 104.4 April 3,339,7D5 57.85 53.0 157.4 0 245,962. 5785 59:88 D.D' 11:9 i 3.5! 15,5 0 0 49.93 57.85 DA 0.0 138.7 138.7 2,927,627 4993 40.7' 198!3.r 0 49.93 0.0 25,8 May 3,557,123 59,88 58,5 215,9 2,601,945 5785 41.3 239;6 D 57.85 0.D 25.8 June D 47,16 D,0 215.9 1007,062 `401,868 1,176,073 579,061 47.'16 46.64 9698 55:96 11.4 26:8; 4.5' 31:3 13.2, 44:5 7.8.i 366,824 583,456 194,239 3,412,422 59.88 47.16 46.64 46.98 17.0 21.3 7.0 124.4 155.7 177.1 184.1 308.5 1,120,288 2,746,483 867,481 `= '1,4D6;750 59.88 47.16 46:64 46:98 18.4' 35.6`; 11.1 ' 18.11 258:Oii 293;6> 304 7.> 3228i 0 58,824 929,637 843,728 59.88 47.16 46.64 46.98 0.0 5.4 85.1 77.8 25.8 31.2 116.3 194.1 July 2,369,425 46.64 30,3 246.3 August 3,171,421 46.98 40,9 2872 September 2,111,185 55.96 32.4 319.6 October 0 47.32 0.0 319.6 1,465,371 47.32. 52;3 16.6 68,9 ' 3,590,897 55.96 155.9 464.4 D 55:96 D.D 322;:8.; 103,462 55.96 11.4 2D5.5 D 47 32 O.D s 322;8:' 0 47.32 0.0 205.5 12 Month Floating PAN Load 1,429,511 47.32 52.5 516.9 (I bslaclyr}: 319.6 68.9 , 516.9 322 8..'; Annual PAN Load Limit 205.5 (lbs/aclyr): FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQO000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: October Year: 2022 Field Name: 098-A2 Field Name, D98-B1 Field Name: 0913-132 Field Name. 09C Field Name: 10A Area (acres): 3.85 Area (acres):1 75 Area (acres): 11.01 Area (acres) 21.48 Area (acres): 15.19 Cover Crop: Coastal Cover Crop: Coastal J Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Load Type: PAN Load Type. PAN Load Type: PAN Load Type PAN Load Type: PAN Field Loaded? ❑YES ❑� No Field Loaded? [].YES 0 No ' Field Loaded? ❑ YES ❑ No Field;Loaded? 211YE5 ❑ N6 Field Loaded? YES ❑ No z q > a j o m ZG ao d Z o Za fl ,w m ro : 0. a > > mI a a CC; arn a� p R o 10 � 0 °` �� a) roC tl � a � ro0 ao jU �� j ` ,< - Qd .a -JE�o az 7 a o' Qo Um> U Month gal 0 mglL lbslac Ibslac gal mg1L 11WEIG. Ibslac' gal m 1L 9 Ibslac Ibslac -gal mglL: Ibslac lbslac gal mg/L Ibslac lbslac November 47.69 0.0 0.0 86,914 i 47 69 19 8. 19.8.1 235,199 47.69 8.5 8.5 2,061,227 47.69 38.2.. 38.2 1,316,424 47.69 34.5 34.5 December 0 64.63 0.0 0.0 D 64>63 DA' 198 '` 0 64.63 0.0 8.5 1,473,889 64.63 37.0 75.2.' 1,909,356 64.63 67.8 102.2 January 0 55,64 0.0 0.0 0. .` 55.64 0.0; 19.8 0 55.64 0.0 8.5 640,750'. 55.64 13.8:i 89.0 1,363,178 55.64 41.6 143.9 February 0 58.95 0.0 0.0 94,M6 58,95 26.5. . U 10,000 58.95 0.4 8.9 1,633,508 58.95. 35.1 124..1. 1,985,175 58.95 64.3 208.1 March D 49.93 0.0 0,0 0 49.93 0.0';: 463 `i 0 49.93 0.0 8.9 1,894,205 49.93 36.7> 1608!.: 1,238,664 49,93 34.0 242.1 April 0 57.85 0.0 0.0 0 57185 0,0 46.3 0 57.85 0.0 8.9 804,141: 57.85 1.8.1 178:3 2,624,243 57.85 83.4 325.4 May 0 59.88 0.0 0.0 0 .69.88. D Q i ..4.6.3.. 0 59,88 0.0 8.9 2,078,101 59,88 48.3; 227.2 2,059,178 59.88 67.7 393,1 June 0 47.16 0.0 0.0 24,510`. .:.47.16:5.5' S1,8 63,727 47,16 2.3 11.2 998,728 47;16 181 2455 1,367,243 47.16 35.4 428,5 July 793,645 46.64 80.2 80.2 834,9181 46.64 185.E 237.A 1,413,403 46.64 49.9 61.2 51,263 ` 46,64 0.9 246A. 3,159,3891 46.64 80.9 509.4 August 407,350 46.98 41.5 121.6 645,939' 0,98 144.E 382 0.. 1,635,624 46.98 58.2 119A 0: 46.98 0.0 : 246.4.: 966,251 46.98 24.9 534.4 September 0 55.96 0.0 121.6 " 100,510 55.96 26;8 408.8: 0 55.96 0.0 119.4 638,321 56.06 1 13,9 260 3; 1,149,119 55.96 35.3 569.7 October D 47.32 0.0 121.6 0 .:47.32. 0.0' 408 8. L 0 47.32 1 0.0 119A 2,406 499 47.32: 44,2 304 5': 2,856,508 47.32 74.2 643.9 12 Month Floating PAN Load (lbslaclyr): 121.6 408.8. 119.4 304.5 643.9 Annual PAN Load Limit (I bsla clyr): FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Dup110 Field Name: 10B Field Name: 100 Field Name: 11 Area (acres): 31.42 Area (acres) 19.8 Area (acres): 26.13 Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Load Type: PAN Load Type, PAN Load Type: PAN Field Loaded? 0 YES ❑ No Field Loaded?r Field Loaded? YES ❑ No 0O n a ?o a o a r... _2 z C �¢ z T a m m o _j E z La '0 a m°E m a r z U Month gal mglL Ibslac Ibslac gal mglL Ibslac Ibslac` gal mg1L Ibslac lbslac November 4,134,402 47,69 52.3 52.3 21474,522 4T69. 49,7 49 7 989,660 47.69 15.1 15.1 December 1,416,194 64.63 24.3 76.6 2030578 6463 553 105.0 1,255,650 64.63 25.9 41.0 January 467,526 55.64 6.9 83.5 11221,261 5564 286 133;6: 2,236,514 55.64 39.7 80.7 February 965,697 58.95 15.1 98.6 2,167.460 5895 53:8 1874; 1,519,717 58.95 28.6 109.3 March 1,929,748 49.93 25.6 124.2 2,381247 49.93 50.1 2375. 2,814,916 49.93 44.9 154.1 April 1,513,145 57.85 23.2 147.5 1,248,413 6T85 30.4 207;9.1 3,005,411 57.85 55.5 209.6 May 1,613,042 59.88 25.6 173,1 1,174,39.7 59.88 29.6 267;5) 2,091,397 59.88 40.0 249.6 June 1,864,642 47.16 23.3 196.4 82,254 47.16 16. 2992i: 1,873,618 47.16 28,2 277.8 123,737 46.64 July 1r37 13.9 210.3 866,W2 46 64 16,9 316 1 ` 3,171,609 46.64 47,2 325.0 August 1,19046.98 420 252.4 0 46:98 0.0 316'1:; 1,860,310 46.98 27.9 352.9 September54,035 55,96 454 297.8 3049320 55;9.6 719 3880; 876,211 55.96 15.6 368.E Octobor 8.571 47.32 6.5 304.3 1,112 643.1.47.132 22 2 41.0 1'j 1,249,1591 47.32 18.9 387.4 12 Month Floating PAN Load (lbslac/yr): 304.3 410.1 387A Annual PAN Load Limit (lbslaclyr): J 75.s Page of Month: October Year: 2022 12 Field Name: 13 17.78 Area (acres): 23.26 oasfal Cover Crop: Coastal PAN Load Type: PAN ❑ N b: i Field Loaded? [] YES ❑ No m Q z o �• z ¢ a ,� += o �o a ¢ m a 4b a �, M m `-° _j �z tea a ro ass °j �z 3 U ' ? Q ° U U 0. Ibslac'. gal mg1L Ibslac Ibslac 0A .. 1,584,025 47.69 27.1 27.1 1,145,021 64.63 26.5 53.6 13.8. 1.699,581 55.64 33.9 87.5 216 946,753 58.95 20.0 107,5 42i3 1,817,747 49.93 32.5 140.1 387,042 57.85 8.0 148.1 59,5. 1,657,933 59.88 35.6 183.7 1,873,616 47.16 31.7 215.4 60;4 3,212,506 46,64 53.7 269.1 70,9 - 3,857,697 46.98 65.0 334.1 70.9. 6,067,470 55.96 121.7 455.8 755 ` 2,539,661 47.32 43.1 498.9 498.9 FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: y: Du lin p Field Name: 14 Field Name: 15c Field Name; 16 Field Area (acres): 12.07 Area (acres}: 18.03 Area (acres): 12.95 Area (F Cover Crop: Coastal Cover Crop: Coastal ' Cover Crap: Coastal Cover Load Type: PAN Load TYp� PAN Load Typo: PAN Load Field Loaded? 0 YES ❑ NO Field Loaded? ❑ YES ❑ No Field Loaded? ❑✓ YES ❑ NO ield.Lo', m o Q- Q as a 2 Q ,o z a an d was c z O z a y v �v mo ° aLU �v �.o a n¢ro nQ ?: is 43) 0L° ' Z m ro a a' Q ? ro ro 4 o o ° Ua �;� ova '. Em c �� E¢ E QU O Q.,0 U 6 O Ua. Month November gal mg1L 116447.69 Ibslac lbslac gal mg/L lbslac lbslac gal mglL Ibslac Ibslac gal E December ,,542 1,738,826 64.63 38.4 77.7 38,4 1,11 482,741i 1,304,634 47.69 64,63 10.ia: 10.6 ; 31,700 47.69 1.0 1.D 755,736;, 3.9.0..... 45.1': 49.6 0 64.63 O.D 1 0 255,510 'E January 1,144,128 55.64 44,0 160.0 1,752,595 55.54 February 1,218,135 58.95 49,6 209.6 2,069,793 58.95 94.7; 1,810,299 55.64 64.9 65.8 364,51 91 March 479,056 49.93 16.5 226.2 2 370,320 49;93. 56.4 151:2 2,448,473 58,95 93,0 158.8 232,527 April 418,822 57.85 16.7 242.9 2,206,313 5785.59.0..265,0` 54.7 205 9 2,265,627 49,93 72,9 231 7 279,775.' '9 May 1,568,314 59,88 64.9 307.8 2 177,352 59.88 60.1 2,523,626 57.85 94.0 325.7 291,497 ` `5 June 1,301,264 47,16 42.4 350.2 706,222< 47.16 . 325 1 3,702,6D5 59.88 719.6 445.3 299,568 `, ;.5 July 380,236 46,64 12.3 362.4 2,166,544 46.64' 75,4 46.7 `. 340.5.;:. 1,10 ,605 47.16 41.1 486.4 0 4 August 1,235,351 46.98 40.1 402.6 671,667 46.98 14.6': 387,2, 2,159,077 46.64 64.9 551.2 8621879.:: :4 ieptember 1,097,396 55,96 42.4 445,0 1';360,169. 55.96i 401.8:' 1,976,923 46.98 59.8 611.0 474,048 4 October 609ing 47.32 19.9 464,9 1 912 609' 47.32' 35.2 437.0 360,409 55.96 13.0 624.0 12,395 5 12 Month Floating PAN Load 41.9 478;9 21647,026 47.32 80.7 704.7 0 4 (lbslaclyr): 464.9 478 9 704.7 Annual PAN Load Limit Month: October I Year: 2022 Field Name: 5 Area (acres): ;tal Cover Crop: Load Type: ❑ YES ❑ NO NO . Field Loaded? V W c o m > O.. J [I Q N j ±a E z �� °' v c o E J 0 a�. .En.E s C U j CS � bslac gal mglL lbslac Ibslac 0.0 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of FORM: NDMR03-f2 NON -DISCHARGE MONITORING REPORT (NDMR) Page of__.. FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR1 FORM; NDMR 03 12 NON -DISCHARGE MONITORING REPORT" (NDMR) Page of Permit No.: W(Q0000884 Facility Name: Mt. Olive Turkey Processing Facility county: Duplin Month: October Year: 2022 PPI: 004 Flow Measuring Point ❑ influent D Effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent 0 t (fluent ❑ Groundwater Lowering ❑ Sn face Water Parameter Code -aa 50050 00310 00916 00680 00940' 50060 31616 00927 00630 ' 0061D 00625 ++` O U D0620 00556 00400 WQp9C;: 00931 > a w 3 re p rn o `n a) �a m a d; y 10 'C ° ` ❑ m w Q a m o o `o ur - c10i a- c a o E a r o C7 T :a `° E; o o ;� , Y 0 o az Ua f 24 hr hrs GPD mg1L mg1L mglL mglL mglL #1100 mL mglL mglL mg1L mglL 1 06:00 9.5 0 mglL mglL .. su mg1L. Ratio 2 1,590,000. 0.29 3 06:30 8,5 1,557,000 7,54 0.62 4 06:30 8.5 1,670,000' 7.59 0.23 5 06:30 8.5 1,894,000` 7.59 0.44 6 06:30 8.5 1,663,000 0,43 7.65 7 06:30 8.6 1,794,000` 162 12.3 73.3 0.73 345 7.56 5.53 4 25. 53.4 105 8 06:30 8.5 1,437,000; 10.02 <5,0 7.58 42,67 10.83 9 1,674,000.. 0.57 7.15 ._ 10 06:30 8.5 1;5Z6,000 0.96 7.6 11 06:30 8.5 1,520 000 12 06:30 8.5 1,356,OOfl 0 76 7.67 2.2 13 06:30 8.5 1,367,000' 7.73 14 06.30 8.5 1,458,000. 15 06:00 9 1,741,000'. 0 41 7.61 16 1,7Q4,000.; 0.46 7.59 17 06:30 8.5 1400,000:' 2 2 7.62 18 06:30 8.5 1,256,000 0.28 7.65 19 06:30 8.5 1,258,000 0.52 7.46 0,64 20 06:30 8.5 1,130,000 7 78 21 06:30 8.5 1,135,D00: 0.84 22 06:30 8,5 1,223,000` 7.67 0.67 23 1,038,000: 7.63 0.54 24 06:30 8.5 1,164,000. 7.61 0.66 25 06:30 8.5 1,157,000' 248 112. 201 1.04 �;N20 7.5fi 5.58 0.68' 64.4 128 26 06:30 8.5 1,225,000 0.22 7.8 7.53 51,96' 10.97 27 07:00 8 11306,000 18 7.7 0,6 28 07:00 8 1,099,000': 0.44 7.6 29 06:00 9.5 0 7.67 30 1,021 000; 0.28 31 07:00 8 1,124000:. 7,74 2.2 Average: 1,308;290: 205.0D 11.75 ` 137.15 0.80 1857 5,56 047 ` ` 7.91 Daily Maximum. 1,894;000. 248.00 12.30', ` 201.00 2.20 58,90 .116.60 0.11 3.90 47.32 `' 10.9D Daily Minimum: 0 162.00 11.20 73.30 345.00 :. 5.58 068'.'s:: 64.40 128.00 0.22 7,80 7.91 51.96:: 10.97 Sampling Type Recorder. Grab Grab ': Grab Grab 0.23 345;00 5.53 0.25 :r : 53.40 105.00..0.02 500 7.15 42.67_s`: 10.83 Monthly Limit. Grab Grab Grab Grab Grab Grab :. Grab�Gmb Grab Calculated Calculated Daily Limit: Sample Frequency: Continuous 2 x Month ' 2 x Month 2 x Month 3 x Year `; 5 x Week 2 x Month 2 x Month `2 x Montt. 2 x Month 2 x Month 2 Month x 2 x Month 5 x Week 2 x Month: 2 x Month FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of FORM; NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (N©MR) Page of FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of FORM: N©MR 03-12 NON -DISCHARGE MONITORING REPORT (NC]MR) Page of Permit No.! WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: October ^ - •.- - 11.:1 � li. 1 FF, 11. I IMF • w Mors w • ��. 1 1 // 111 1 •1 1 r.