Loading...
HomeMy WebLinkAboutNCC204161_MODIFICATION Supporting Doc ADDL LOTS_20230309Date: March 8"' 2023 Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 LETTER OF APPROVAL Rvan Kozusko NVR. Inc. (dba Ryan Homes) 13924 Professional Center Dr. Ste. 100 Huntersville. NC 28078 RE: Project Name: `Veather's Creek Subdivision — Ryan Homes Acres Approved: 1.68 Project ID: TRTMN-202 1-0 18 Project Location: 4750128664,000 Submitted BY: Harris Engineering Date Received: March 1'` 2023 Plan Type: Revised/Additional Acrea0re Dear Mr. Kozusko: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years follov,Ing the date of approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 13 A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County- Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Letter of Approval Weather's Creek Subdivision -- R�,an Homes March 8"' 2023 Page 2 of 2 Carolina General Statute 1 13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State -,xater quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of March 1, 2019, all new- construction activities are required to complete and submit an electronic Notice of Intent (N701) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq,nc,gov'NCGO1. Please direct questions about the N0I form to Annette Lucas at Artnette.lucas a ncdenr.gov or Paul Clark at Paul.clark a.ncdenr.goy. After \°ou submit a complete and correct NOT Form. a COC ,vill be entailed to you within three business days. As of May 1. 2019. a $100 fee h ill be charged annually. This fee is to be sent to the DEMLR Stormv,,ater Central Office staff in Raleigh. Please note that this approval is based in pant on the accuracy of the information provided in the Financial Responsibility Form. -,1-hich you provided. You are requested to file an amended form if there is anv change in the information included on the form. In addition. it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing. please schedule a preconstruction conference with our staff prior to land disturbin(, aCtl1'it�'. L Your cooperation is appreciated. Sincerely. Jonathan Williams. CESSIKI Erosion Control Coordinator Enclosures: Fact Sheet on the NeN\ NCGO1 Permit