Loading...
HomeMy WebLinkAboutNCC222857_MODIFICATION Supporting Documents_20230308 (3)SON Co Jackson County Office of Permitting & Code Enforcement www.iacksonnc.org/code-enforcement.html Tony, Elders, Director tonyelders(a�iacksonnc.org tips �,,�,���� Sylva Office: 538 Scotts CreekRoad, Suite 205, Phone: 828-586-7560/Fax: 828-586-7563 TM CARS Cashiers Office: 357 FrankAllen Road, Phone: 828-745-6850/Fax: 828-745-6867 Approval Date: 08/04/2022 Erosion Control Plan Review Notes Rodgers Bros Holding LLC Attn: Jim Rodgers 130 Wexford Place Athens, GA 30606 Re: Project Name: Rodgers Bros New Submittal( ) Revision( X ) Modification( ) Please be advised that Article V, Section 5.3.4, b, iii of the Jackson County Unified Development Ordinance requires that a copy of the approved soil erosion control plan be on file at the job site. There were no comments by Jackson County Soil and Water Conservation District. Our office requests a meeting onsite with the contractor before work begins, please can Danny Lewis at 828-226-7678 to schedule a time and date. The revision to this project now includes work on three parcels 7559-46-3580, 7559-46-4579, and 7559-46-5846 and the disturbance has increased to 1.82 ac; this revision has been approved as submitted. Due to the impact on the proper in question, metal backed silt fencing needs to be installed onsite 8' maximum span standard strength fabric with wire fence) and the limits of disturbance must be staked onsite. Project is in an area designated a Class B Trout Stream (B; Tr); a 25-foot Buffer Zone set back is required from the top of the bank of all perennial streams. Approval does not cover areas which require 401 and 404 permits from the US Army Corps of Engineers and NC Department of Environment and Natural Resources, and/or other such governing agencies, until such time as said permits are in place. This approval does not exempt this project from anyr other state or local permits or regulations that rn yT be additionall3� required. Please know that approval of this sedimentation and erosion control plan does not qualify this site for vested rights with regard to the proposed subdivision ordinance and that this development may be subject to the subdivision ordinance when adopted. Note: Should the plan not perform adequately; a revised plan will be required.