HomeMy WebLinkAboutSite inspection_Mar 2023Wetland Inspection Report
Project Num: 20190397 Version: 1 Status: Issued
Project Name: NCDOT - Widen NC 105 and Replace Bridge 5 Project Type: Road
County: Watau 2566, R-256613, R-2566BA) intena c /repair/improveme
Region: nston- ayem
Location: NCDOT - Widen NC 105 and Replace Bridge 5 (R-2566, R-256613, R-2566BA)
Latitude: +360 11' 40" Longitude: -81° 44' 43"
SW Plan Location:
Site Owner Name: NC DOT Division 8
Inspection Date: 3/7/2023
Reason for Inspection: Complaint
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Phone: 336-776-9703
page 1
Site Number: 20190397 Owner: Tippett, Lyndo
Inspection Date: 3/7/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Complaint
Permit (401 WOO Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: I met with Div 11 DEO and project mgr on site (Kevin Hining and Bobby Harmon) to investigatethe
project following a complaint the previous day. The issue was sediment/turbidity discharges to Watauga
River following an storm event on the previous Friday evening. We reveiwed all SDOs and found them
to be well maintained. The ditchline along the westbound lane was under repair including several rock
checks. Sediment discharges from the SDOs were non existent. Some light sediment was noted on the
westbound lane but little if any travelled across NC 105 to the river. One small area along the river bank
appeared to have acculuated some sediment. DOT sent a person to check and there was about 1 . alb
of material of which was likely river sediment from a recent flood event. One portion of a bridge bent
was built. Site 1 was protected from equipment including the culvert inlet. This site would soon be
filled and a new pipe installed. Culvert Sites 3 - 5 were built per the plans.