Loading...
HomeMy WebLinkAboutSite inspection_Mar 2023Wetland Inspection Report Project Num: 20190397 Version: 1 Status: Issued Project Name: NCDOT - Widen NC 105 and Replace Bridge 5 Project Type: Road County: Watau 2566, R-256613, R-2566BA) intena c /repair/improveme Region: nston- ayem Location: NCDOT - Widen NC 105 and Replace Bridge 5 (R-2566, R-256613, R-2566BA) Latitude: +360 11' 40" Longitude: -81° 44' 43" SW Plan Location: Site Owner Name: NC DOT Division 8 Inspection Date: 3/7/2023 Reason for Inspection: Complaint Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Phone: 336-776-9703 page 1 Site Number: 20190397 Owner: Tippett, Lyndo Inspection Date: 3/7/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Complaint Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I met with Div 11 DEO and project mgr on site (Kevin Hining and Bobby Harmon) to investigatethe project following a complaint the previous day. The issue was sediment/turbidity discharges to Watauga River following an storm event on the previous Friday evening. We reveiwed all SDOs and found them to be well maintained. The ditchline along the westbound lane was under repair including several rock checks. Sediment discharges from the SDOs were non existent. Some light sediment was noted on the westbound lane but little if any travelled across NC 105 to the river. One small area along the river bank appeared to have acculuated some sediment. DOT sent a person to check and there was about 1 . alb of material of which was likely river sediment from a recent flood event. One portion of a bridge bent was built. Site 1 was protected from equipment including the culvert inlet. This site would soon be filled and a new pipe installed. Culvert Sites 3 - 5 were built per the plans. page 2