HomeMy WebLinkAboutSigned Certification of Completion_DWR 22-0897, Individual Certification # WQC005133ROY COOPER
EUZABETH S. BISER ON
samy
RICHARD E. ROGERS, JR NORTH CAROLINA
eavlroraa WQaattrr
WRProject No.: a -OMCounty: EIlfKe-
Applicant: Gfi n� -L 'SjdcKnrf
Project Name: N A Seavc.r ri ✓n Ao RA,olan (,vnaA,&A Irib4,y
Date of Issuance of 401 Water Quality Certification: [S. 13, 12627 0't (i VXne
I Lf c c�,
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and
Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh,
INC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
1, i;,'�t�k ` C , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans a9d specifications, and other supporting materials.
Signature: Date: 6;)6 2d7
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to
the best of my abilities, due cue and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date
Registration No.
DEQ Nw CaoiI Dept/ tofEpNro mtel Quabl IDMionorWeta Resoueccs
Aahev Hl Rr,-W Otfi. 12W U.S. Highw, 70 l Swa ,NOM Cemlin 2521E
o„� '"' �yy� 828196.43Po