Loading...
HomeMy WebLinkAboutNCG510551_site map_20230309CONTROLPANEL 1. PANEL LISTING 508 &698a 2.DEADFRONT NO 3. VOLTAGE 277/480V 4. PHASE 3 5. AUTO RESTART YES 6. BREAKERS IN PANEL NO 7. HOUR METERS YES, HMI 8. AMP METERS YES, VFD 9. HOA AND RESET BUTTON SIEMENS TOUCH SCREEN 10. OXIDIZER INTERLOCK NO 11. PLC SIEMENS 12. 7/24 TIMER SIEMENS 13. SURGE PROTECTOR YES 14. PHASE MONITOR YES 15. FAN IN PANEL NO 16. TELEMETRY SIEMENS 17. T 18. B WATER TREATMENT (QTY 2) 8x40' HIGH CUBE ENCLOSURES ENTIRE SYSTEM IS 3RD PARTY CERTIFIED PROCESS DISCHARGE TELEMETRY SERVICE PRM XP HEATER, CHROMALOX CXH-A-10-43-32-00-20 BACKUP YES 10KW 480V 3PH XP TOP OF BRACKET IS 4" BELOW GENERAL NOTES CEILING LINE SEE NOTE 3 1. ENCLOSURE TO HAVE A PLYWOOD TREATED FLOOR, A FRAMED INTERIOR W/ R-10 VALUE INSULATION ON WALLS AND CEILING. INSULATION WILL ONLY BE MOUNTED ON OUTSIDE WALLS. 2. PROCESS ROOM WILL HAVE (QTY 5) HAZ. LOCATION GLOBE STYLE LIGHTS. COMPRESSOR ROOM TO HAVE (QTY 1) STD. LIGHT. U 3. XP HEATER MOUNTED TO POINT AT THE SE CORNER OF o THE RIGHT SEABOX. 1 O 4. PVC IN DIRECT LINE OF HEATER'S THROW WILL BE 1 z 5 INSULATED. 5. ALL PUMPS CAN BE MOVED TO OPTIMIZE O&M AND 1 0- mj WALKING SPACE. 1 a 6. ALL PROCESS PLUMBING TO BE 304 STAINLESS STEEL I OR SCH80 PVC. ALL COMPRESSED AIR PLUMBING TO BE L GALV. STEEL OR PAINTED CARBON STEEL. 6.1. PRIMER: EPDXY PRIMER - HBE-400 I 8 6.2. FINISH: BATTLESHIP GRAY ACRYLIC URETHANE - AUE-100 7. ALL ELECTRICAL CONNECTIONS BETWEEN SEABOXES WILL BE DONE VIA JUNCTION BOXES. 24x24" VENT 8. COMPRESSOR ROOM HAS A 19' LONG ID. PARTITION WALL WILL BE PLACED NEXT TO REINFORCEMENT ANGLE AT SEABOX CUTS. 9. PROCESS ROOM WILL BE RATED AND WIRED FOR CLASS 1 DIV II. RIGHT NW NE BACK FRONT SW SE LEFT SS 55 GALLON PRODUCT HOLDING TANK PRM PARTS LIST PRM PARTS DESCRIPTION PRM # PI-1 0-150PSI PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPSI PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60 inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT10OPSI316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PSI24VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGE DPGJH2O001OX FT-1 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 32-25OF TEMP GAUGE THERMOBTY760563 LOOSE EQUIPMENT (QTY 100) 50 MICRON #2 BAG FILTERS (QTY 100) 10 MICRON #2 BAG FILTERS (QTY 4) SEABOX CORNER BOLTS ROOFLINE COVER FLOOR COVER AST VENT DISCHARGE\ FF twv0 rulvir x I I L.110u I Mrvn rulwr AMT-4240-98 AMT-3152-98 7.5HP 230V 3PH TEFC 5HP 230V 3PH TEFC OIL DISCHARGE PUMP FLUIMAC #P0018-KCMTTKCT5-AB 'AST PUMP AMT-4240-98 7.5HP 230V 3PH TEFC 3 FLOAT STEM PITOT TUBE DWYER DS-300-6 UMP W/ HIGH LEVEL SWITCH D Dconfidential. so Itration Product Recovery Management Inc. This information is proprietary and, No thout he exp a reproductions oflPoductiRecovery aagemnt, Incnsent CLIENT: NCDEQ 217 WEST JONES ST. RALEIGH, NC 27603 PROJECTTITLE: GROUND WATER RECOVERY AND TREATMENT SYSTEM ITAL DR.DATE: SPRUCE125 PPINE, NC 28777 SHEET TITLE: WATER TREATMENT SYSTEM PLAN DETAIL QUOTE NUMBER: PRM-9101 PROJECT NUMBER: WO-7344 NO. REVISION DATE DRAWINGNUMBER: M 1-POT 1 AS BUILT 01/23/23 01/23/2023 DRAWN BY: LXL COMPRESSOR ROOM LEFT ELEVATION DETAIL 1.5x"' GS RE 1x4" GS REDUCER 19 AUTO -DRAIN 1 MICRON FILTER PRM #AUTODRAIN SULLAIR SXTF020OF AIR DRYER SULLAIR SRB175 OMPRESSOR 1.5HP230V1PH SULLAIR ST3008 460V 3PH TEFC VERTICAL AIR RECIEVER STEEL FAB A10049 VFDs SEE VFD TABLE DUCER 1.5" AIR HOSE TI-1 1.5" SS CHECK VALVE y" GS UNION 1.5" GS UNIO y'REGULATOR W/GAUGE ARO #P39124-600 CARBON FILTER PARTITION WALL \SULLAIR SXTCO200M 0.01 MICRON FILTER SULLAIR SXTH020OF .5xV GS REDUCER COMPRESSOR ROOM PLAN DETAIL GS ELBOW r1.5" GS TEE AIR HOSE 1.5xV GS RE[ 1.5" AIR HOSE .aa■ � �CONNECTION TO DO II • .5" GS ELBOW .5" SS BALL VALVE .5x2" GS REDUCER " GS ELBOW AL INTERIOR DUCT AL EXTERIOR DUCT EXPANDED METAL ON BOTTOM 7.5kW TRANSFORMER CONNECTION TO DD PUMP j1/4" GS KING NIPPLE f1.5" GS KING NIPPLE \`CONNECTION TO AIR FEED MANIFOLD LOW VOLTAGE HIGH VOLTAGE PAN MECF COMPRESSOR ROOM SW ISOMETRIC DETAIL 0 E COMPRESSOR ROOM NW ISOMETRIC DETAIL VFD TABLE # MANUFACTURER P/N HP ASSOCIATED EQUIPMENT 1 SCHNEIDER ATV212HU40N4 5 SETTLING TANK PUMP 1 AMT-3152-98 2 SCHNEIDER ATV212HU40N4 5 SETTLING TANK PUMP 2 AMT-3152-98 3 SCHNEIDER ATV212HU55N4 7.5 OWS PUMP 1 AMT-4240-98 4 SCHNEIDER ATV212HU55N4 7.5 OWS PUMP 2 AMT-4240-98 5 SCHNEIDER ATV212HU55N4 7.5 AST PUMP 1 AMT-4240-98 6 SCHNEIDER ATV212HU55N4 7.5 AS PUMP 2 AMT-4240-98 7 SCHNEIDER ATV212HU75N4 10 AST BLOWER MOTOR TECHTOP GR3-CI-TF-215T-2-B-D-10 8 YASKAWA GA50U4023ABA 15 BACKWASH PUMP AMT-4251-98 PRM PARTS LIST PRM PARTS DESCRIPTION PRM # PI-1 0-150PS1 PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPS1 PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT10OPS1316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PS124VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGEI DPGJH2O001OX FT-1 I 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 I 32-25OF TEMP GAUGE THERMOBTY760563 GENERAL NOTES 1. PARTITION WALL TO BE PUT IN AFTER ALL MAJOR EQUIPMENT IS INSTALLED. 2. COMPRESSOR DUCTS TO BE PLACED LAST. 3. INSULATION WILL ONLY BE MOUNTED ON OUTSIDE WALLS. MMMEIMEMMEI 1 4 Product Recovery Management Inc. CLIENT PROJECTTITLE: SHEET TITLE: QUOTE NUMBER: PROJECT NUMBER: NO. REVISION DATE DRAWING NUMBER: ■ This information is proprietary and, confidential. No NCDEQ 217 WEST JONES ST. GROUND WATER RECOVERY AND TREATMENT SYSTEM COMPRESSOR ROOM DETAILS PRM-9101 WO-7344 DRAWN BV:allowed 1 AS BUILT 01/23/23 M �G 1Filtrat�on thexp e swritten cns without the ex ress written consent RALEIGH, NC 27603 125 HOSPITAL DR. DATE 01/23/2023 LXL of Product Recoverymanagement, Inc. SPRUCE PINE, NC 28777 3" SS BALL VALVE 3" SS UNI OWS & SETTLING TANKS RIGHT ELEVATION DETAIL PROCESS EFFLUENT TO BFH SET 1&2 PRnCFSS INFLUENT FROM BACKWASH MANIFOLD VENT AT ROOFLI 310 GALLON CONE BOTTOM ETTLING TANK 2 AST BLOWER 310 GALLON CONE BOTTOM SETTLING TANK 1 6" PVC SLIDII GATE VALVE PRM #BLYFBCSE560D275L90GT 10HP 230V ' TYP 1 OF 2: SETTLING TANKS PUMP AMT-3152-98 5HP 230v` 3PH l tru STD. 1.5" SS HEADER " SCH80 PVC VENT —1" SCH80 PVC " SS�DRAIN� TYP 1 OF 2: OWS PUMP AMT-4240-98 7.5HP 230V 3PH TEFC STD. 1.5" SS HEADER OWS & SETTLING TANKS LEFT ELEVATION DETAIL OWS & SETTLING TANKS SW ISOMETRIC DETAIL PROCESS INFLUENT FROM PROCESS INFLUENT MANIF SCH80 PVC UNION di ---3 FLOAT STEM 3" SS ELBOW 3" SS BALL VALVE TYP1 OF 2: 6" CLEANOUT /CONNECTION FROM PROCESS INFLUENT MANIFOLD PROCESS EFFLUENT TO BFH SET 1&2 ROCESS INFLUENT FROM BACKWASH MANIFOLD VENTURI INLET TSOLBERG F19P-100 ER VENTURI/BUSHIN - MAZZEI #2081 L CHECK VALVE #SPSA-1.25-A 2.5" TANKER--5x2" S HOSE ,lb PRM PARTS LIST PRM PARTS PI-1 DESCRIPTION 0-150PSI PRESS GAUGE PG PI-2 0-10OPSI PRESS GAUGE PG1 PI-3 0-60 inWC PRESS GAUGE PG( PT-1 0-100 PSI PRESS TRANS PT1 PT-2 0-145 PSI PRESS TRANS TEARDROP FLOAT P LS-1 FI-1 0-10 inWC DIFF PRESS GAUGE FT-1 0-10inWC DIFF PRESS TRANS 32-25OF TEMP GAUGE TI-1 OWS & SETTLING TANKS PLAN DETAIL 0 3 FLOAT STE • 1" SS DRAIN, • �_ 11 2" SCH80 PVC UNION PRM # ONBTY63015115OPSI ;NBTY630251510OPS1 ;N BTY6304526OW C )OPS1316LTR124VDCX -145PS124VDCX FLSLSCF07X7X DPGJH2O001OX PGTLFMI01OWCX HERMOBTY760563 /It TANKER HOSE 3" TANKER HOSE 5" SS�3" a' BRASS SOLENOID VALVE---,Pu UNION PRM #SV025DHSM31302B14NX `SOIL GENERAL NOTES 3" SS TEE DISCHARGE PUMP 1. PUMPS CAN BE MOVED TO OPTIMIZE O&M AND WALKING SPACE. SS 55 GALL O PRESSURE REGULATOR W/ GAE FLUIMAC #P0018-KCMTTKCT5-AB PRODUCT HOLDING TANK ARO #P39124-600 Scale (ft.) 0 4 8 Product Recovery Management Inc. CLIENT: PROJECT TITLE: SHEET TITLE: QUOTE NUMBER: PROJECT NUMBER: NO. REVISION DATE DRAWING NUMBER: � This information is proprietary and confidential. No copiespor reproductions NCDEQ 217 WEST JONES ST. GROUND WATER RECOVERY AND TREATMENT SYSTEM OWS & SETTLING TANK DETAILS PRM-9101 WO-7344 DATE: DRAWN BV 1 AS BUILTS 01/23/23 M-3 FENFUtration written lRecoverythout the eManagement, RALEIGH, NC 27603 ITAL DR. PPINE, 01 /23/2023 LXL oflP oductowed Inress c. SPRUCE125 SPRUCE NC 28777 PRM PARTS LIST BFH SET 1 &2 AND AST SW ISOMETRIC DETAIL PRM PARTS DESCRIPTION PRM # PI-1 0-150PS1 PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPS1 PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60 inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT100PS1316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PS124VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGE DPGJH2O001OX FT-1 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 32-25OF TEMP GAUGE THERMOBTY760563 GENERAL NOTES 1. BFHs WILL HAVE 1" DRAINS WITH A BALL VALVE & 4" VENTS. NOT SHOWN FOR CLARITY. BFH SET 1&2 AND AST LEFT ELEVATION SCALE PRO DETAIL PRM #ELSCALEPR0400 4x2" SCH80) PVC BUSHING 2" WATER TOTALIZERN PRM #WM200P` Nm-`�' I ) 1 �11111111110— PROCESS INFLUENT FROM SETTLING TANK PUMPS 4x2" SCH80 ;REDUCER A JII�11 1� M TYP 1 OF 4 -' `2" SCH80 PVC BALL VAL BAG FILTER HOUSING PRM #BFHBFH2DNPTX " SCH80 PVC UNION AST VENT DISCHARGE S ;6" FERNCO AIR STRIPPER BFH SET 1 &2 AND AST PLAN DETAIL PRM #AST-634 O O 0 0 2/ L ® >® a® ®e 0 0 1/1 L AST PUMP AMT-4240-98 7.5HP 230V 3PH TEFC STD. 2" SS HEADER k—.1PITOT TUBE DWYER DS-300-E 3 CI nAT ITEM " SS DRAIN TANKER HOSE 1 � PRNFUtration Product Recovery Management Inc. This information is proprietary and confidential. No copiesthout the or reproductions oflP oductowed lRecovery express ag Management, Incnsent CLIENT: NCDEQ 217 WEST JONES ST. RALEIGH, INC 27603 PROJECT TITLE: GROUND WATER RECOVERY AND TREATMENT SYSTEM ITAL DR.DATE: SPRUCE 125 PPINE, NC 28777 SHEET TITLE: BFH SET 1&2 AND AIR STRIPPER DETAILS QUOTE NUMBER: PRM-9101 PROJECT NUMBER: WO-7344 NO. REVISION DATE DRAWING NUMBER: 1 AS BUILT 01/23/23 01/23/2023 DRAWN BY:- LXL PRM PARTS LIST PRM PARTS DESCRIPTION FIRM # PI-1 0-150PSI PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPSI PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60 inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT100PS1316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PS124VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGEI DPGJH2O001OX FT-1 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 32-25OF TEMP GAUGE THERMOBTY760563 GENERALNOTES 1. BFHs WILL HAVE 1" DRAINS WITH A BALL VALVE &" 4 VENTS. NOT SHOWN FOR CLARITY. 2. GACs WILL HAVE 1" DRAINS WITH A BALL VALVE &" 4 VENTS. NOT SHOWN FOR CLARITY. BFH SET 3&4 AND GAC LEFT ELEVATION DETAIL BONOMI #8P0133-2 .. 1 . — — BAG FILTER HOUSING FIRM #BFHBFH2DNPTX PROCESS INFLUENT FROM -- AST BFH SET 3&4 AND GAC PLAN DETAIL BFH SET 3&4 AND GAC NW ISOMETRIC DETAIL INFLUENT BFH SET 3&4 AND GAC RIGHT ELEVATION DETAIL PROCESS EFFLUENT TO BACKWASH TANK Product Recovery Management Inc. CLIENT: PROJECT TITLE: SHEETTITLE: QUOTE NUMBER: PROJECT NUMBER: NO. REVISION DATE DRAWING NUMBER: � This information is proprietary and confidential. No copiesppor reproductions NCDEQ 217 WEST JONES ST. GROUND WATER RECOVERY AND TREATMENT SYSTEM BFH SET 3&4 AND GAC PRM-9101 WO-7344 1 AS BUILT 01/23/23 DRAWN 6Y:-on PHNFUtrati nsent RALEIGH, NC 27603 ITAL DR.DATE: LXL oflP oductlRecovery management, Incitten SPRU125 CEPINE,01/23/2023 PINE, NC 28777 GAC MANIFOLD RIGHT DETAIL PROCESS INFLUENT CONNECTION FROM BFH SET 3&4 r.nNNFr.TION TO GAC 1 2" SCH80 PVC UNION PRM PARTS LIST PRM PARTS DESCRIPTION PRM # PI-1 0-150PSI PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPSI PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60 inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT10OPS1316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PS124VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGE DPGJH2O001OX FT-1 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 32-25OF TEMP GAUGE THERMOBTY760563 PI-2 CONNECTION FROM GAC 1 DISCHARGE BACKWASH INFLUENT CONNECTION FROM BACKWASH PUM GENERAL NOTES 1. ALL PLUMBING TO BE 2" SCH80 PVC ACKWASH EFFLUENT CONNECTION TO SETTLING TANKS CONNECTION TO GAC' 9 INI FT PROCESS EFFLUENT CONNECTION TO BACKWASH TANK CONNECTION FROM GAC 2 DISCHARGE PIRMFUtration CLIENT: NCDEQ 217 WEST JONES ST. RALEIGH, NC 27603 PROJECT TITLE: GROUND WATER RECOVERY AND TREATMENT SYSTEM 125 HOSPITAL DR. SPRUCE PINE, NC 28777 DRAWING NUMBER: M-6 AIR FEED & WATER PUMP INLET MANIFOLDS FRONT ELEVATION DETAIL ffiA/irr-1 ,11-1M■1y\INN TYP 1 OF 28: 4" SCH80 PVC MALE ADAPTER TYP 1 OF 28: 3., SCH80 PVC UNION TYP 1 OF 28: 3., WATER TOTALIZER PRM #WM075SSVX TYP 1 OF 28: 4" SS CHECK VALVE TYP 1 OF 28: 3" SS BALL VALVE TYP 1 OF 28: 3., SCH80 PVC UNION AIR FEED & WATER PUMP INLET MANIFOLDS RIGHT ELEVATION DETAIL CUSTOM 3" SS BUTTWELD TEE LEG PROTRUSION ASSEMBLIES SENT LOOSEI WILL BE IN THE VERTICAL ORIENTATION WHEN INSTALLED. SHOWN IN HORIZONTAL FOR CLARITY TYP 1 OF 28: 1x4" SCH80 PVC REDUCER TYP 1 OF 28:, -TYP 1 OF 28: 2" GS NIPPLE - 6" 4" PRESS REGULATOR SPEEDAIR #4ZM08 -TYP 1 OF 28: 2x4" GS REDUCER -1.5" PAINTED CS MANIFOLD -CONNECTION FROM COMPRESSOR TYP 1 OF 28: PUMP AIR DISTRIBUTION MANIFOLD 2" SS BALL VALVE -TYP 1 OF 28: 2" GS UNION Scale (ft.) 0 2 4 GENERALNOTES 1. LEGS WILL ALL PROTRUDE THROUGH THE WALL VIA A SCUSSION RING ONSITE. TYP 1 OF 28: 1" SHARKBITE FITTING CONNECTION FROM WELL PUMP CONNECTION TO WELL PUM' TYP 1 OF 28. Z" SHARKBITE FITTING 1.5" CS BUTTWELD' TEE -3" SS BUTTWELD II ELBOW -I `(QTY 14) LEGS IN FRONT QTY 14) LEGS IN BACK -1.5" CS BUTTWELD ELBOW -(QTY 14) LEGS IN FRONT QTY 14) LEGS IN BACK PRM PARTS LIST PRIM PARTS DESCRIPTION PRIM # PI-1 0-15OPS1 PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPS1 PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60 inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT100PS1316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PS124VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGE DPGJH2O001OX FT-1 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 32-25OF TEMP GAUGE THERMOBTY760563 CLIENT: NCDEQ 217 WEST JONES ST. RALEIGH, NC 27603 AIR DISTRIBUTION PLAN DETAIL PRM PARTS LIST PRM PARTS DESCRIPTION PRM # PI-1 0-150PS1 PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPS1 PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60 inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT100PS1316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PS124VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGE DPGJH2O001OX FT-1 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 32-25OF TEMP GAUGE THERMOBTY760563 Tx/ n 01 n C 01 t= . TYP 1 OF 2: 1.5" CONNECTION TO AIR MANIFOL SOLENOID VALVE PRM #SV1502W21 B120V 1.5x1 " GS REDUCER CONNECTION �Qr"M COMPRESSOR - PRESSURE REGULATOR W/ GAUGE ARO 4iP39124-600 -TYP 1OF 16: "' GS BALL VALVE TYP 1 OF 2: "' GS UNION -TYP 1OF15: CONNECTION TO PNEUMATIC VALVES 2" BRASS SILENCER 1 x"' GS REDUCER Scale (ft.) 0 1 2 DRAWING NUMBER: M-8 BACKWASH TANK ASSEMBLY BACK ELEVATION DETAIL E 2" ELECTROMAG FLOWMETER PRM #FMPHILHTLD50031 11 1GCBX 2" SCH80 PVC FLANGE SS BALL VALVE SCH80 PVC UNION TYP 1 OF 14: PNEUMATIC BALL VALVE BONOMI #8P0133-2 JJJ iIIAIIIIIIIIIIIIIIIII�TANKER HOSE BACKWASH PUMP I" DRAIN \ AMT-4251-98 "1500 GALLON BACKWASH TANK 15HP 230V 3PH TEFC STD. 2" SS HEADER BACKWASH TANK ASSEMBLY FRONT ELEVATION DETAIL BACKWASH TANK ASSEMBLY NW ISOMETRIC DETAIL PRM PARTS LIST PRM PARTS DESCRIPTION PRM # PI-1 0-150PS1 PRESS GAUGE PGCNBTY63015115OPSI PI-2 0-10OPS1 PRESS GAUGE PGCNBTY630251510OPSI PI-3 0-60 inWC PRESS GAUGE PGCNBTY6304526OWC PT-1 0-100 PSI PRESS TRANS PT100PS1316LTRI24VDCX PT-2 0-145 PSI PRESS TRANS PT145PS124VDCX LS-1 TEARDROP FLOAT FLSLSCF07X7X FI-1 0-10 inWC DIFF PRESS GAUGE DPGJH2O001OX FT-1 0-10inWC DIFF PRESS TRANS PGTLFMI01OWCX TI-1 32-25OF TEMP GAUGE I THERMOBTY760563 Am�ilFlitratlon DRAWING NUMBER: M-9 LINE IDENTIFICATION CODES VALVE AND PIPING SYMBOLS INSTRUMENT IDENTIFICATION LINE NUMBERING PROCESS PIPE W"-XXX-YY-ZZ L�PIPSIF APPLICABLE ECHEDULE ING MATERIAL PROCESS LINE ABBREVIATION LINE SIZE (INCHES) PIPING MATERIAL IDENTIFICATION AL ALUMINUM CPVC CHLORINATED POLYVINYL CHLORIDE CS CARBON STEEL COP COPPER CPP CORRUGATED PLASTIC PIPE CIP CAST IRON PIPE DIP DUCTILE IRON PIPE FH FLEXIBLE HOSE GAL GALVANIZED STEEL PIPE NYL NYLON PE POLYETHYLENE PIPE PP POLYPROPYLENE PIPE PVC POLYVINYL PIPE RUB RUBBER HOSE SS STAINLESS STEEL TEF TEFLON TUBING AIR AIR, ATMOSPHERIC PRESSURE BW BACKWASH CA COMPRESSED AIR CD CONDENSATE CF CHEMICAL FEED CGW CONTAMINATED GROUNDWATER D DRAIN EFF EFFLUENT EXH EXHAUST GW GROUNDWATER LFG LANDFILL GAS NPW NON -POTABLE WATER P PRODUCT PR PROCESS FLOW PROP PROPANE PW POTABLE WATER S SANITARY SL SLUDGE SP SAMPLE PORT STS STORM SEWER TF TOTAL FLUIDS V VENT VAP VAPOR LINE CODING PROCESS FLOW PNEUMATIC SIGNAL WIRELESS SIGNAL ELECTRICAL SIGNALS 4-20mA / LOW VOLTAGE LINE VOLTAGE IS GLOBE VALVE GATE VALVE BUTTERFLY VALVE N CHECKVALVE PLUG VALVE 3-WAY VALVE ANGLEVALVE RELIEF VALVENACUUM BREAKER BALL VALVE GLOBE VALVE SELF -CONTAINING PRESSURE REGULATING VALVE NEEDLE VALVE Bp BACKFLOW PREVENTER NO NORMALLYOPEN NC NORMALLYCLOSED FLEXIBLE HOSE FLEXIBLE COUPLING MOTOR DRIVEN 0 BASKET TYPE STRAINER Y-TYPE STRAINER �{ DUPLEXSTRAINER SLEEVE COUPLING (SC) FLOOR DRAIN EQUIPMENT DRAIN CLEANOUT(CO) REMOVABLE PLUG REMOVABLE CAP I EXHAUST TO ATMOSPHERE (INSIDE) t EXHAUST TO ATMOSPHERE (OUTSIDE) C:�d REDUCER UNION QUICK DISCONNECT COUPLING BF BLIND FLANGE FLANGE f— DAMPER g TEST PORT WITH STOP COCK VALVE VALVE OPERATOR SYMBOLS 4 SOLENOID T DIAPHRAGM WITH POSITIONER 4 MOTOR, ELECTRIC T HANDWHEEL OR LEVER q 4 PNEUMATIC II CHAINWHEEL PRIMARY ELEMENT SYMBOLS - FLOW ORIFICE PLATE j FLUME PITOTTUBE WEIR THERMAL MASS FLOW METER TURBINE PROPELLOR TYPE METER ROTOMETER MAGNETIC FLOW METER TOTALING FLOW METER EQUIPMENT SYMBOLS V PUMP BLOWER PNEUMATIC DIAPHRAGM AIR COMPRESSOR PUMP In^\ LIQUID RING VACUUM PUMP POSITIVE DISPLACEMENT PUMP SCREW COMPRESSOR DO FC FI FL FO HOA /I I/P LEL LR FIT FIT-100A 100 7 L SUFFIX (NOT NORMALLY USED) `LOOP NUMBER SUCCEEDING LETTERS FIRST LETTER FUNCTIONAL ABBREVIATIONS DISSOLVED OXYGEN OC OPEN -CLOSE FAIL CLOSED 00 ON -OFF (MAINTAINED) FAIL INTERMINATE ORP OXIDATION REDUCTION POTENTIAL FAIL LOCKED OSC OPEN -STOP -CLOSE (MOMENTARY) FAIL OPEN SS START -STOP (MONENTARY) HAND -OFF -AUTOMATIC HIGH SELECT CURRENT -TO -CURRENT < LOW SELECT CURRENT -TO -PNEUMATIC LOWER EXPLOSIVE LIMIT LOCAL -REMOTE SAMPLE PORT GENERAL INSTRUMENT SYMBOLS OLOCALLY MOUNTED eFRONT -OF PANEL MOUNTED eBACK -OF -PANEL MOUNTED OINTERLOCK OPURGE PLC FUNCTION BLOCK INSTRUMENT IDENTIFICATION TABLE FIRST LETTER SUCCEEDING LETTERS MEASURED OR INITIATING VARIABLE MODIFIER READOUT OR PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER A ANALYSIS ALARM B BURNER FLAME C CONDUCTIVITY CONTROL CLOSE D DENSITY(SP, GR) DIFFERENTIAL DRIVE E VOLTAGE PRIMARY ELEMENT F FLOW RATE RATIO G GAUGING (DIMENSIONAL) GLASS H HAND (MANUAL) HIGH I CURRENT INDICATE J POWER SCAN K TIME OR SCHEDULE CONTROL STATION L LEVEL LIGHT (PILOT) LOW M MOISTURE OR HUMIDITY MIDDLE N O ORIFICE OPEN P PRESSURE POINT(TEST) Q QUANT. OR EVENT INTEGRATE R RADIOACTIVITY RECORD OR PRINT S SPEED OR FREQ. SAFETY SWITCH T TEMPERATURE TRANSMIT U ULTRAVIOLET MULTIFUNCTION V VACUUM VISCOSITY VALVE OR DAMPER W WEIGHT OR FORCE WELL X THERMOCOUPLE UNCLASSIFIED y VIBRATION RELAY OR COMPUTE Z POSITION DRIVE, ACTUATE IOO 1im Product Recovery Management Inc. CLIENT: This information is proprietary and NCDEQ confidential. No copies or reproductions 217 WEST JONES ST. allowed without the express written consent RALEIGH, NC 27603 of PRM Inc. PROJECT TITLE: GROUND WATER RECOVERY AND TREATMENT SYSTEM 125 HOSPITAL DR. SPRUCE PINE, NC 28777 SHEET TITLE: PROCESS & INSTRUMENTATION DIAGRAM LEGEND QUOTE#: PROJECT NUMBER: PRM-9101 WO-7344 DATE: DRAWN BY: 01 /23/23 LXL REVISION (DATE I DRAWING NUMBER: AS BUILT 1/23/23 PLC PT HO HOA PI S 1/4"-CA-RUB I —I 1/4"-CA-GAL --I 1/4"-CA-RUB CONNECTION TO DD PUMP. SEE P&ID-4 E LISCHARGI TO ATMOSPHERE AIR CONNECTION FOR O&M a V AIR CONNECTION FOR O&M S v PT i�A�H .5"-CA-GAL H 1.5"-CA-RUB H 1.5"-CA-GAL I —I 1.5"-CA-RUB 3/4"-CA-GAL �--I 1"-CA-GAL III CARBON 0.01 MICRON FILTER FILTER PI 1 "-CA-RUB I —I 1 "-CA-GAL 'r 1 /4"-CA-GAL m m m m m m m In m m m m m m m > > > > > > > > > > > > > > > Q Q Q ¢ a a a a ¢ Q a ¢ ¢ Q Q 06 06 06 06 06 o6 06 06 a a a a a a a 0- LU UJ LU LU W W W W LU w w w w w w LU U) U U U U U U U W W W W W W W W J J J J J J J J U U U U U U U U Q Q Q Q Q Q Q Q UJ LU LU LU LU LU LU UJ z z z z z z z z a a a a a a a 0- 0 0 0 0 0 0 0 0 z z z z z z z z U O O O O O O o U U U U U U U U w w w w w w w w z z z z z z z z O O O o O O O O U U U U U U U U ENCLOSURE EXTENTS HI IH DRIER 1.5"-CA-GAL H HOA -94- U 1 MICRON U FILTER in COMPRESSOR I SULLAIR I 40HP 1.5"-CA-RUB I—H 1"-CA-GAL H 1.5"-CA-G S AUTO -DRAIN 1/4"-D DRAIN AIR TANK J -�� FRATFUtra Lion Product Recovery Management Inc. This information is proprietary and confidential. No copies or reproductions allowed without the of PRM Inc. written consent CLIENT: NCDEQ 217 WEST JONES ST. RALEIGH, NC 27603 PROJECT TITLE: GROUND WATER RECOVERY AND TREATMENT SYSTEM 125 HOSPITAL DR. NC 28777 SHEET TITLE: PROCESS & INSTRUMENTATION DIAGRAM - COMPRESSOR ROOM& AIR DISTRIBUTION QUOTE#: PRM-9101 DATE: 01/23/2023 PROJECT NUMBER: WO-7344 NO. REVISION DATE DRAWING NUMBER: ID-2 1 AS BUILT 01/23/23 DRAWN BY:P LXL PLC F_ ENCLOSURE EXTENTS LSHH LSHH TT FLOOR SUMPS ^' (CITY 1) PER SEABOX 0 D r 0\ n 0\ n n n n 0 0 O n n 0 n 0 0 0 n n 0 0 0 n n 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O 0 z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z m m m m m m m m m m m m m m m m m m m m m m m m m m m j OO OOOO OOOO OO pOOOOOOOOOOO aD zzzzzz zzzz zz zzzzzzzzzzzzn D O O O O O O O O O O O O O O O 0 O O O O O O O O O O O r 0 -0 v v v -0 v v v v -0 v v v v v m v v v v -0 v v v v C C C C C C C C C C C C C C C C C C C C C C C C C C _0 _0 _0 _0 _U _0 _0 _ v v v v v v v v v v v v v v v v v v v v v v v v v v v N N N N N N N N CO Co V W W ? W N OD V O) Q1 ? W N O (O OD V M 0 ? W N O -0 _0 -0 -0 -0 -0 -0 -0 -0 -0 -0 -0 -0 -0 -0 -0 _3 -0 -0 -0 -0 _0 N N N N N N N N N CO J W V1 A W N N 00 J D7 M 41 W IN) C)(D W J D7 CJi A W N O n O O O O O O O O O O O O O O O O O O O O O O O O O O O y TI TI TI TI TI TI TI TI TI TI TI TI TI TI TI TI TI TI TI N N N N N N N N N N N N N N N N N N N N N N N N N N N W N W 00 00 W N W D 00 W 00 00 00 00 00 W 00 00 00 W 00 00 00 W W 00 00 1.5'-CA-CS CONNECTION FROM COMPRESSOR. SEE P&ID-2 O O O O O O O O O O O O O O O O O O O O O O O O O O O z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z M m m m m m m m m m m m m m m m m m m m m m m m m m m 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 z z z z z z z z z z z z z z z z z z z z z z z z z z z -n -n -n T T T T -n T T -n -n T T T T T T -n -n T T -n -n T T T O O O O O O O O O O O O O O O O O O O O O O O O O O O C C C C C C C C C C C C C C C C C C C C C C C C C C C N N N N N N N N N — — — — — — — — — — - O V - O A W N ? W N _ O N N N N N N N N N CO CO J O CIi A W N 00J rn Mw N CDco oD �I rn cn w Iv o O O O O O O O O O O O O O O O O O O O O O O O O O O O n TI TI TI TI TI TI TI n TI _n 11 TI 11 11 _n M TI TI TI _n M TI TI 11 TI TI N N N N N N N N N N N N N N N N N N N N N N N N N N N W W 00 00 W W W 00 00 W N W OD 00 OD W 00 OD OD W W 00 W W W OD 00 CONNECTION TO OWS. SEE P&ID-4 G n a CD I I w v T in co y w .Z1 n 00 I W co Cn WELL CFAI m z O Product Recovery Management Inc. CLIENT: PROJECT TITLE: SHEET TITLE: OTE#: PROJECT NUMBER: NO. REVISION DATE DRAWING NUMBER: FENRItrat�on This information is proprietary and confidential. t t copies reproductions the NCDEQ 217 WEST JONES GROUND WATER RECOVERY AND TREATMENT SYSTEM 125 HOSPITAL DR. PROCESS & INSTRUMENTATION DIAGRAM -WELL PUMP RM-9101 WO-7344 1 AS BUILT 01/23/23 [TE' DRAWN R /K� P&I D-3 allowed without express written consent s RALEIGH, NC 27603 276 3 CONNECTIONS 1/23/2023 LXL of PRM Inc. SPRUCE PINE, NC 28777 PLC LS LS PT HOA HOA VENT TO ATMOSPHERE �--I 2"-PR-PVC-80 CONNECTION FROM WATER INFLUENT MANIFOLD. SEE P&ID 3. H � ENCLOSURE EXTENTS CROSSING BOXES 1"-V-PVC-80 H H 1"-V-PVC-80 10 1"-D-SS DRAIN 1"-AIR-GAL INTAKE FROM ROOM LSHH FILTER PI LSH Z O O 1.5"-PR-SS H S 2"-PR-PVC-80 H 0 LSL CLEANOUT CLEANOUT 3"-PR-SS �� 3"-PR-RUB � 3"-PR-SS 2"-PR-SS H IF VENTURI 1 PT OWS-100 1"-D-SS DRAIN OWS TRANSFER PUMP 1 MAZZEI 2081 " AMT 4240-98 2"-PR-SS CONNECTION TO SETTLING y� 2.5-P-GAL TANKS. SEE P&ID 5. lj PI VENTURI 2 MAZZEI 2081 00 2"-PR-SS H 1.5"-PR-SS H S 2"-PR-PVC-80 H a r OWS TRANSFER PUMP 2 N AMT 4240-98 r 1"-AIR-GAL INTAKE FROM ROOM FILTER PRODUCT HOLDING TANK 1"-V-SS VENT TO ATMOSPHERE LSHH', OIL TRANSFER PUMP PI i DD PUMP LSH ill-P-SS 1"-P-RUB ' —I 1"-P-SS I —I 3/8"-P-SS �-- 3/8"-P-SS H S OIL DISCHARGE LSL CONNECTION FROM COMPRESSOR. SEE P&ID-2 IH 6mm-CA-GAL Product Recovery Management Inc. CLIENT: PROJECT TITLE: SHEET TITLE: QUOTE I. PROJECTNUMBER: NO. REVISION DATE DRAWING NUMBER: This information is proprietary and NCDEQ GROUND WATER RECOVERY AND PROCESS & INSTRUMENTATION PRM-9101 WO-7344 1 AS BUILT 01/23/23 FENRItration confidential. No copies or reproductions 217 WEST JONES ST. TREATMENT SYSTEM DIAGRAM - WATER INTAKE, & DATE: DRAWN BY:VC ID-T allowed without of PRMrincs written consent RALEIGH, INC 27603 125 HOSPITAL DR. INC 28777 OWS 01/23/2023 LXL PLC 2"-PR-PVC-80 It 06 (L W W U) N Uj 0 06 0 0- 0 ry LU U �LL z Z0 _O ~ �U) U LU W Z Z Z O 00 U 00 VENT TO ATMOSPHERE 1"-V-PVC-80 310 GAL CONE BOTTOM \ TANK 1 AN II U U _T 6"-PR-PVC-80 ENCLOSURE EXTENTS Product Recovery Management Inc. FEBTFiffitration This informationtut thexpress propTess entrytary and confidential. No copies or reproductions allowed without the express written consent of PRM Inc. Ls YHOA 1 "-V-PVC-80 LSHHI LSH N LSL 310 GAL CONE BOTTOM \ TANK 2 , T AN II U U FS PT HOA PI PI S z S N z z LU ; J C� C� Q Q m m 1 "-D-SS 1 "-D-SS z 0 qZIF 0 LC IF 0" fli mILL N W U) LLJ Q0 0 0 CD 0 m m O U 1 "-D-SS PI 1 "-D-SS Z S PI 0 U S CROSSING BOXES PI 1.5"-PR-SS H S 2"-PR-PVC PT 2"-PR-SS SETTLING TANK TRANSFER PUMP 1 AMT 315298 PI 2"-PR-SS 1.5"-PR-SS S 2"-PR-PVC SETTLING TANK TRANSFER PUMP 2 AMT 3152-98 CLIENT: NCDEQ 217 WEST JONES ST. RALEIGH, NC 27603 PROJECT TITLE: GROUND WATER RECOVERY AND TREATMENT SYSTEM 125 HOSPITAL DR. SPRUCE PINE, INC 28777 SHEET TITLE: PROCESS & INSTRUMENTATION DIAGRAM - SETTLING TANKS & BFH SET 1 AND 2 QUOTEM PRM-9101 PROJECTNUMBER: WO-7344 NO. REVISION DATE DRAWING NUMBER: P Q I D-rJ 1 AS BUILT 1/23/23 -DATE: 01/23/2023 DRAWN BY: LXL PLC FT PT HO HO HO HO FT T LS HOA HO PT HO ENCLOSURE EXTENTS CONNECTION FROM BFH SET 1&2. SEE P&ID-5 4"-PR-PVC-80 1 2"-PR-PVC-80 SCALEPRO 400 H 2"-PR-PVC-80 L M � S � z w W < m 1 "-D-SS 1 "-D-SS Z m n F w z w > J Z U 0 m 1 "-D-SS 1 "-D-SS z z UJ W W U) 0 O Z z O U O z _O H U W z z O U RECIRCULATION LINE i PI PI AIR INLET 6"-AIR-GAL O 1"-CA-PVC-40 H AST BLOWER CROSSING BOXES 2"-PR-SS--III 1.5"-PR-SS H 2"-PR-SS 3"-PR-SS H 3"-PR-RUB �—� 3"-PR-SS EXHAUST TO ATMOSPHERE s 0 U a SHJ LSH LSL 1"-D-SS DRAIN AST TRANSFER PUMP 1 AMT 4240-98 AIR STRIPPER-6,3,4 2"-PR-SS III 1.5"-PR-SS IH 2"-PR-SS t AST TRANSFER PUMP 2 AMT 4240-98 CONNECTION FROM COMPRESSOR. SEE P&ID-2 I-- 2"-PR-SS HI CONNECTION 4"-PR-SS H WATER DISCHARGE o I 13 O O O O O O O CLEANOUT O CLEANOUT LSHH, LSH BACKWASH LSL TANK PT CONNECTION FROM COMPRESSOR. SEE P&ID-2 PI P 4,1 3"-PR-SS 3"-PR-RUB 3"-PR-SS 2"-PR-SS H S CONNECTION TO BACKWASH INFLUENT. SEE P&ID-7 BACKWASH TANK 14 TRANSFER PUMP 1"-D-SS I AMT 4251-98 U U w z z L O 0 Product Recovery Management Inc. CLIENT: PROJECTTITLE: SHEET TITLE: QUOTEM PROJECT NUMBER: NO. REVISION DATE DRAWING NUMBER: This information is proprietary. and confidential. No copies or reproductions p p NCDEQ 217 WEST JONES ST. GROUND WATER RECOVERY AND TREATMENT SYSTEM PROCESS & INSTRUMENTATION DIAGRAM - AST, BFH SET 3 AND PRM-9101 WO-7344 1 AS BUILT 01/23/23 P& I D-6 DATE: DRAWN BY: FRIMFUtration allowed without the express written consent RALEIGH, NC 27603 125 HOSPITAL DR. 4, & BACKWASH TANK 01/23/2023 LXL of PRIM Inc. SPRUCE PINE, NC 28777 PLC HO HO CONNECTION FROM COMPRESSOR. SEE P&ID-2 CONNECTION FROM COMPRESSOR. SEE P&ID-2 CONNECTION FROM COMPRESSOR. SEE P&ID-2 CONNECTION FROM COMPRESSOR. SEE P&ID-2 GAC 1 HP-1000—RDL V-D-SSCONNECTION FROM COMPRESSOR. SEE P&ID-2CONNECTION FROM COMPRESSOR. SEE P&ID-2 CONNECTION FROM COMPRESSOR. SEE P&IDCONNECTION FROM COMPRESSOR. SEE P&ID-2Product Recovery Management Inc. CLIENT: �%� This information is proprietary and NCDEQ raLion confidential. No copies s reproductions 217 WEST C 276 3 allowed without the express written consent RALEIGH, NC 27603 of PRM Inc. PI HO HOA PT HO HO �T PT PI HO HO PT HO HO PT PI P P g 10 PJ�—EF 7 8 5 F P VP P s 3 1 2 PI HO It ENCLOSURE EXTENTS CONNECTION TO SETTLING TANKS. SEE P&ID-5 CONNECTION FROM COMPRESSOR. SEE P&ID-2 CONNECTION FROM BFH SET 3&4. SEE P&ID-6 CONNECTION FROM COMPRESSOR. SEE P&ID-2 GAC 2 HP-1000—RDL � 1"-D-SS DRAIN CONNECTION FROM COMPRESSOR. SEE P&ID-2 �--��- 2"-PR-PVC-80 CONNECTION FROM BACKWASH INFLUENT. SEE P&ID-6 CONNECTION FROM COMPRESSOR. SEE P&ID-2 PROCESS EFFLUENT CONNECTION TO BACKWASH TANK. SEE P&ID-6 PROJECT TITLE: SHEET TITLE: QUOTE#: PROJECTNUMBER: NO. I REVISION DATE I DRAWING NUMBER: GROUND WATER RECOVERY AND PROCESS & INSTRUMENTATION PRM-9101 WO-7344 1 AS BUILT 01/23/23 TREATMENT SYSTEM DIAGRAM - GAC 125 HOSPITAL DR. DATE: DRAWN BY: P& � D_7 SPRUCE PINE, NC 28777 1/23/2023 L SERIES 1, 2 1 CLOSED OPEN GAC VALVE SCHEDULE 3 4 - 6 7 8 CLOSED CLOSED OPEN CLOSED CLOSED OPEN - 10 11 OPEN CLOSED CLOSED 12 CLOSED 13 OPEN 14 CLOSED 15 SET�TLNGTANK SERIES 2, 1 OPEN CLOSED CLOSED CLOSED CLOSED OPEN OPEN CLOSED CLOSED OPEN CLOSED CLOSED OPEN CLOSED SETOTL EN NGTTANK 1 ONLY OPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED OPEN CLOSED CLOSED CLOSED OPEN CLOSED SETOTP EN NGTTOANK 2 ONLY CLOSED OPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED OPEN CLOSED CLOSED OPEN CLOSED SETOTP NGTTOANK PARALLEL OPEN OPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED OPEN OPEN CLOSED CLOSED OPEN CLOSED SETOTL EN NGTTANK BACKWASH 1 CLOSED OPEN OPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED OPEN OPEN CLOSED CLOSED OPEN SETTLING TANK BACKWASH 2 OPEN CLOSED CLOSED OPEN CLOSED CLOSED CLOSED CLOSED OPEN CLOSED CLOSED OPEN CLOSED OPEN SET�TL EN NGTTANK POST -BACKWASH 1 POST -BACKWASH 2 CLOSED OPEN OPEN CLOSED OPEN CLOSED CLOSED OPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED OPEN OPEN CLOSED OPEN CLOSED CLOSED OPEN CLOSED CLOSED OPEN OPEN OPESET T 1 BFH OPEN TO BFH SET 1 FRINFIltration Product Recovery Management Inc. This information is proprietary and confidential. No copies s reproductions allowed without the express written consent of PRM Inc. CLIENT: NCDEQ 217 WEST C 276 3 RALEIGH, NC 27603 PROJECT TITLE: GROUND WATER RECOVERY AND TREATMENT SYSTEM 125 HOSPITAL DR. SPRUCE PINE, INC 28777 SHEET TITLE: VALVE SCHEDULE QUOTE#: PRM-9101 DATE: 1/23/2023 PROJECTNUMBER: WO-7344 DRAWN BY: LXL NO. REVISION DATE DRAWING NUMBER: P VC I D�8 1 AS BUILT 01/23/23