Loading...
HomeMy WebLinkAbout960099_Inspection_20230223,, r ' i - •: iJ�1o'a. of Water RoUfirces -.• . ` r b *�Uton of $off aid Water r. t •.' , : 0 6tii" Agency. Type of visit: 0 Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: 1 Arrival Time: F Departure Time: County: Region: Farm Name Owner Email: Owner Name: /, /c�/,UC,L� Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative:�����s/ ¢ Certified Operator: Back-up Operator: Location of Farm: ' :: t 1 �' CtirlrGut • Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean dd Farrow to Feeder Farrow to Finish Gilts Boars Latitude: Phone: -112ZZ Integrator: Certification Number: Certification Number: Longitude: Del#gii , Corfent wetrovitgy 'Capacity' ' Pop. Layer Non -La er <. Design •Currvo k' • 'i7r��a►nit� � l��ngcit�r Fon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharijes and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ••�ati� Dairy C ow alf y I ❑ Yes 2(No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑NA ❑NE ❑ Yes ❑ o ❑ NA ❑ NE ElYes o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 5/I2/2020 Continued IFaclUty Number: a- Date of Ins ection: - Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ZNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑Yes No ❑ NA ElNE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [Zf No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [%f No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [:]Yes ZNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes En No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑E/No No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E� No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes gNo ❑ NA ❑ NE ElYes No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ENo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [ /) o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [ No ❑ NA ❑ NE Page 2 of 3 5112/2020 Continued Facility Number: 6747 - l Date of Inspection:. - dJ - 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes yNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [:]Yes ZNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EZfNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Ef No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes G�fNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [ I/No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [ZNo permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E!fNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes [?rjNo ❑ NA ❑ NE ❑ Yes E/No ❑ NA ❑ NE Comments (refer to question ff): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ev' Phone: ),6�� Date: ` 5112✓2020