HomeMy WebLinkAbout960221_Inspection_20230223Division of Water Resources
Facility Number U� - 7 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: ® Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: �� Departure Time: County: Region: L "'
Farm Name: Owner Email:
Owner Name: %!� �jJ�� Phone: 'J' 1'J/ 3 }
Mailing Address:
Physical Address:
Facility Contact:'�,,1i o�� Title: Phone:
Onsite Re resentative: Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Design Current
Swfne Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Certification Number:
Certification Number:
Latitude:
Design Current
Wet Poultry Capacity Pop.
Layer
Non -La er
Non-L
Pullets
Other
Poults
Design Current
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
,Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (Byes, notify DWR)
❑ Yes
❑ No
❑ NA
0 NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
❑ No
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
es
❑ No
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
Yyes
❑ No
❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3
511212020 Continued
Facili Number: - Date of Inspection: _ -
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
jNo
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier: _
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
T(No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment 1 threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes YZ ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Ey No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [,'No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E�No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes E& ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E�No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
[::]Yes E► No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes E�No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes E2�No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YesgNO
No
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 511212020 Continued
FaciliNumber: - Date of Ins ection: - 9
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes dNo ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes iNo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes YNo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes [ZNo ❑ NA ❑ NE
❑ Yes dNo ❑ NA ❑ NE
❑ Yes E;No ❑ NA ❑ NE
❑ Yes M No ❑ NA ❑ NE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes
34. Does the facility require a follow-up visit by the same agency? ❑ Yes
��o ❑NA ❑NE
�No ❑ NA El NE
o ❑ NA ❑ NE
Comments (refer to question # ): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
0
Reviewer/Inspector Name: Name: SQ �� e✓
Phone:;�-9�fS-j)�'�
Reviewer/Inspector Signature:
Date: � —�J ~ 2:J
Page 3 of 3 5/12/2020