Loading...
HomeMy WebLinkAboutNCC230646_ESC Approval Submitted_20230310ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL Interim Director NORTH CAROLINA Environmental Quality December 15, 2022 LETTER OF APPROVAL Greater Asheville Regional Airport Authority ATTN: Mr. Lew Bleiweis 61 Terminal Drive, Suite 1 Fletcher, NC 28732 RE: Project Name: AIR TRAFFIC CONTROL TOWER PROJECT Acres Approved: 16.12 Project ID: HENDE-2023-011 County: Henderson City: Mills River Address: 146 Westfeldt Rd River Basin: French Broad Stream Classification: B Submitted By: Mr. James Moose, P.E. Date Originally Received by LQS: October 18, 2022 Date Revision Received by LQS: December 14, 2022 Plan Type: Airport Dear Mr. Bleiweis , This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 nOI�ThI C�-4CLI�IA oea,nm,mole,,Iionmenmlam� /� 828.296.4500 Letter of Approval Greater Asheville Regional Airport Authority ATTN: Mr. Lew Bleiweis December 1S, 2022 Page 2 of 3 office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Mic ae Smit Assistant Regional Engineer Land Quality Section Letter of Approval Greater Asheville Regional Airport Authority ATTN: Mr. Lew Bleiweis December 15, 2022 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet ec: Mr. James Moose, P.B. jmoose@avconinc.com cc: Regional Office file dd �� n CD CD y It j� /� T� ~ • .. 5 CD •r' • [ Y IrD CD ol l 1 cm CD CD n wi o ►� n o r� r4- CD CD IrD CD IrD�. CD CD m cn �C REAT 4 ol CD `• CD o CD ° 1�� iOTI Ai p CD o v v � CCD CD CD A� D• 0� y o fD CD CD rD fD � A� • t•-� CD fD ' �+ 7� O Vt '"� r�•� �