Chapter 35
TMDLs in the Cape Fear River Basin
35.1 Introduction to TMDLs
A TMDL or Total Maximum Daily Load is a calculation of the maximum amount of a pollutant
that a waterbody can receive and still meet water quality standards, and an allocation of that
amount to the pollutant sources. A TMDL is the sum of the allowable loads of a single pollutant
from all contributing point and nonpoint sources. The calculation must include a margin of
safety to ensure that the waterbody can be used for the purposes the state had designated. The
calculation must also account for seasonal variation and critical conditions in water quality.
For each water quality limited segment Impaired by a pollutant and identified in the 303(d) list, a
TMDL must be developed. TMDLs are not required for waters Impaired by dam operations. A
TMDL includes a water quality assessment that provides the scientific foundation for an
implementation plan. An implementation plan outlines the steps necessary to reduce pollutant
loads in a certain body of water to restore and maintain human uses or aquatic life. For more
information on TMDLs and the 303(d) listing process, refer to Appendix VII or visit the TMDL
website at http://h2o.enr.state.nc.us/tmdl/.
35.2 Approved TMDLs in the Cape Fear River Basin
The following TMDLs have been completed and approved by EPA (Table 38). Refer to the
subbasin chapters for specific reductions called for in the TMDLs and to determine what local
governments may be affected by TMDLs.
Table 38 EPA approved TMDLs in the Cape Fear River Basin
Waterbody
(Subbasin) Pollutant Approval
Date Chapter
Little Troublesome Creek (03-06-01) Fecal coliform bacteria May 17, 2002 1
North Buffalo Creek (03-06-02) Fecal coliform bacteria April 28, 2004 2
Town Branch (03-06-02) Fecal coliform bacteria September 16, 2002 2
Roberson (Robeson) Creek (03-06-04) Chlorophyll a (Total phosphorus) January 13, 2004 4
Northeast Creek (03-06-05) Fecal coliform bacteria September 12, 2003 6
East Fork Deep River (03-06-08) Turbidity, Fecal coliform bacteria March 4, 2004 8
Richland and Muddy Creeks (03-06-08) Fecal coliform bacteria May 17, 2004 8
Several TMDLs are currently in progress at the DWQ. These include a fecal coliform bacteria
and turbidity TMDL for the Haw River (Chapter 1), a fecal coliform TMDL for the Deep River
(Chapter 8), a turbidity TMDL for Third Fork Creek (Chapter 5), a chlorophyll a TMDL for
Chapter 35 – TMDLs in the Cape Fear River Basin 315
Jordan Reservoir (Chapter 36), and a dissolved oxygen TMDL for the Cape Fear Estuary
(Chapter 37).
Two large TMDL efforts underway in the Cape Fear River Basin include the Jordan Reservoir
Chlorophyll a TMDL and the Cape Fear Estuary Dissolved Oxygen TMDL. Information
regarding water quality data and assessment for Jordan Reservoir is discussed in Chapter 5,
while TMDL information is discussed in Chapter 36. Information regarding water quality data
and assessment for the Cape Fear Estuary is discussed in Chapter 17, while TMDL information
is discussed in Chapter 37.
35.3 Scheduled TMDLs in the Cape River Basin
EPA guidance provides a timeline for TMDL development of 8 to 13 years. Thus, the elapsed
time between 303(d) listing and TMDL development should not exceed 8 to 13 years. If the
pace of TMDL development does not comply with this schedule, EPA may elect to develop
TMDLs in order to meet this timeline. Waterbodies that were listed in 1998 should have
TMDLs developed by 2006 to 2011.
35.4 TMDL Implementation Efforts
Point source (i.e., wastewater) implementation plans are included in TMDLs per EPA guidance.
Thus, any point source discharging to an Impaired water will receive an explicit allocation within
the TMDL. In some cases, the allocation may be equal to existing permit limits; thus, no action
is needed by the wastewater permittee. In other cases, the allocation may be associated with a
reduction in loading. Where applicable, the point source allocation may include provisions for
bubble permits and point-to-point trading.
Nonpoint source implementation plans are not included in TMDLs, nor are they required by
federal law. Nonpoint source implementation plans can be developed by DWQ, other agencies
within DENR, COGs or local government offices. For example, the Piedmont Triad Council of
Governments (PTCOG) obtained Section 319 grants to develop implementation plans for Little
Troublesome Creek and Town Branch. Each of these TMDLs has only nonpoint source loadings
contributing to impairment.
EPA has provided guidance regarding TMDLs and NPDES stormwater permits. As a result,
selected NPDES stormwater permits may contain additional language when subject to a TMDL.
Per EPA, MS4s identified in TMDLs as contributors to impairment may be required to develop a
management plan that includes additional monitoring and BMP installation associated with
pollutants of concern.
35.5 Impaired Waters Update
Waters identified as Impaired during this assessment period will be updated in the 2006
Integrated Report. These waters will be considered Impaired upon EMC approval of this basin
plan. TMDLs will be scheduled as appropriate depending upon the classification of the
waterbody and the identified problem parameters.