Loading...
HomeMy WebLinkAbout20210364 Ver 2_More Info Received_20221219Baker, Caroline D From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Thursday, January 12, 2023 3:18 PM To: Morris, Tom E.;john.farmer@eli-llc.com Cc: Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com); Thomas, Zachary T Subject: [External] Provisional NWP 12 and 13 Revised Verification (Site 11): SAW-2021-01288 (Piedmont Natural Gas / Line 142 Gas Line / Garner / Wake and Johnston Counties) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. up This is a provisional notification that your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived and until a final general permit verification has been provided to you. Additional special conditions (e.g. compensatory mitigation) may be added to the final general permit verification. As stated above, this is a provisional notification. This email does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activities requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a permit from the state (e.g., NCDWR) does not preclude the requirement for obtaining DA authorization (e.g., a NWP verification letter) prior to commencing the work. It appears that an Individual 401 Water Quality Certification (WQC) is required from the North Carolina Division of Water Resources (NCDWR) for this project. For NCDWR: Please provide a written response within 14 days from the date of this email, regarding the NCDWR receipt date for this project; otherwise, we will consider our receipt date (12/13/2022) as accurate. Also, within 14 days, please notify me if the certification request does not contain the nine (9) components listed in Section 121.5(b) of the 2020 Clean Water Act Section 401 Certification Rule. As specified in the 9/16/2022, Programmatic Agreement (PA) between the USACE and the NCDWR, the reasonable period of time (RPOT) for DWR to act on a Section 401 certification request is 120 days unless the RPOT is extended per the terms of this PA. As such, unless we receive an email request for an extension of the RPOT, the USACE will consider the Section 401 certification for this project to be waived on 4/12/2023. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Respectfully, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Tuesday, December 13, 2022 11:48 AM To: john.farmer@eli-Ilc.com Cc: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Subject: SAW-2021-01288 (Piedmont Natural Gas / Line 142 Gas Line / Garner / Wake and Johnston Counties) Good morning, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Dave Bailey for further processing. Thank you, Josephine Schaffer From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Tuesday, December 13, 2022 10:37 AM To: RaleighNCREG <RaleighNCREG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Wake - Non -DOT A new project has been received on 12/13/2022 10:35 AM for PNG- Line 142 Mod and Streambank Stabilization. The link below will take you to the project folder. https://edocs.deg.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2608932;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.