HomeMy WebLinkAboutNCC230451_ESC Approval Submitted_20230309DocuSign Envelope ID: 9D5FF29A-7OD0-4357-BAF8-40DCB28B7CA3
ROY COOPER�'�
'
Governor?:
4�
ELIZABETH S. BISER
Secretary;
J,
BRIAN WRENN
Director
UCik'i H CAROL.INA
Environmental Z,?tdd"Liity
November 14, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Red Apple at Union, LLC
Attention: Jonathan K. Hage, President and CEO
800 Corporate Drive, Suite # 124
Ft. Lauderdale, Florida 33334
RE: Project Name: Union Prep Academy High School Expansion
Acres Approved: 1.83
Project ID: UNION-2023-019
County: Union, City: Indian Trail
Address: Younts Road
River Basin: Catawba
Stream Classification: Other
Submitted By: Kimley -Horn Associates
Date Received by LQS: November 2, 2022
Plan Type: Revised
Dear Mr. Hage:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications
Required for Approval are listed on the attached page. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
General Permit. After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via
email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST
obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.,ov/NCG0L Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
parry must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
11,4EQ 704-663-1699
DocuSign Envelope ID: 9D5FF29A-70D0-4357-BAF8-40DCB28B7CA3
Letter of Approval with Modifications
Red Apple at Union, LLC
November 14, 2022
Page 2 of 3
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this
land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
DocuSigned by:
hW
42CFABFC5B8C459...
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: Inspection Department
Kimley-Horn Associates
Attention: Tim Carter, PE, Project Manager
421 Fayetteville Street, Suite 600
Raleigh, North Carolina 27601
DocuSign Envelope ID: 9D5FF29A-70D0-4357-BAF8-40DCB28B7CA3
Letter of Approval with Modifications
Red Apple at Union, LLC
November 14, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Union Prep Academy High School Expansion
Project ID: UNION-2023-019
County: Union
1. Submit Original Financial Responsibility Form to this office.