Loading...
HomeMy WebLinkAbout20100842 Ver 2_Design/Maps/Site Plans Revised_20230308opth-- rive 0.11 Ac. Wetlands Impact #2 (Fill) [See Sheet 3 of 3] V LaL rive Wetlands Delineation Per Approved Jurisdictional Determination Dated February 22, 2022 SAW-2008-03044 GRAPHIC SCALE:1"=200' 0 100 200 400 60 FEET .• 1 • • • 0.08 Ac. Wetlands Impact #1 (Fill) [See Sheet 2 of 3] Existing Boyington Place Phase I Seueee$tI+ Overall Wetlands Map - Sheet 1 of 3 / Notes: North Per M.B. 78, Pg. 187 Vicinity Sketch Not to Scale o 4 / / / 1. Wetlands crossings: initial disturbance of these areas shall be limited to only that area minimally needed to allow passage of construction equipment to prepare for the installation of the crossing and to execute upland construction on the opposing side of the crossing. Grubbing or land disturbance of the subject area shall not be performed until the culverts, backfill material, erosion and sediment control materials or devices sufficient to substantially complete the construction and stabilization of the crossing are staged or stockpiled at the location. Due consideration shall be given to impending inclement weather conditions that may adversely affect the completion of the crossing in the minimum time necessary. 2. Drainage work shall be completed in the minimum time necessary. Construction Sequence: 3. No construction of the fill for the wetland impact shall commence until all materials needed for the impact are staged on site, Install silt fence at limits of impact area before starting work. 4. Establish clearing limits per approved plans. Clear and grub impact area as needed. Install temporary 24" drainage pipe buried 8" min. for initial access for timbering/clearing until site work ready to commence. Do not clear or disturb any unpermitted areas. 5. Install minimum 12" fill over temporary drainage then install temporary construction entrance for clearing access. 6. After timbering, install sewer, then final drainage with double 24" piping. Fill crossing area, compact and finish road grade area. 7. Install permanent ground cover (sod) on slopes. 8. Install silt fence at toe of fill slope and as needed to prevent erosion. 9. See the construction plans for additional details. 10. See wetlands permit for additional requirements. Project: BOYINGTON PLACE PHASE II White OakTownshipr, Onslow County, North Carolina Developer: D&E Development, LLC 2409 Grace Avenue New Bern, North Carolina 28562 (252) 638-8223 Rev. Date: 02/13/2023 Add utility notes, 3/8/23 Reduce #2 Date: 10/05/2022 Scale: 1"=200' COGO: n/a File Name: BoyingtonPlace2-Impact.dwg Project: 22.454 Drawn: JJS Job No.: S220311-8047 TIDEWATER ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners Cedar Point, North Carolina 604E Cedar Point Boulevard Phone (252) 393-6101 - www.TidewaterENC.com Firm License Number: F-0108 North Per M.8. 78, Pg. 187 q, 4 • : \ 6 sY ' N,, sY sl, \ •P •Y •Y * • \ '4, 4, •4, • 4, I 4'• \ . ---J * 4, 4, 4, 4, .. „.....- • 4, 4, 4, 4, 4, 4, 4, 4, 4, 4, 4, 4, 4' 4, '4, 4, Wetlands 4, 4, 4, 4, 4, '4' 44' 4, 4, 4, 4, 4, 4, 4, 11 4, 36" Pipe 15From Wetlands Fill Limits 4, 4, \ 4, \ 4, '4, 4, 4' sk '4' • • N Plan View Project: BOYINGTON PLACE PHASE II White OakTownshipr, Onslow County, North Carolina • • : • 404 Wetlands Impact #2 Fill 4,835 S.F. (0.11 Ac.) • 4, 4, ,V5 4, 4, 4, 4, ', '4, 4, 44. 4, 4, 4, '., 4, 4, 4, 4, 4, 4, 4, 4, 4, 4, 4, *Wetlands 4, 4, 44, 4, 4, 4, * 4, 4, 4, '4, 4, 4, 4, Open Space Mail box Kiosk Area 4, 4, • 4, 4, si, sl, 4, • 4, ‘4, 4, 4, 4, 4, 4, 4' 4, 4, 4, 4, •I, 4, 4, 4, 4, 4, 4, • • • 4, • 4, • • • 4, • • • • • • • • 4, 4, 4, 4, 4, v. • 4' 4, 4, 4, . s = 37928 : c.. Legend: 0 - Unit Number F--• , - W et lands • - • • - • • - • • - • • - • • - - Wetlands Line 0.08 Ac. Wetlands Impact #1 (Fill) [See Sheet 2 of 3] o : t. 0% ito 3/g L. 4, 4, 4, 4, 4, 4, • GRAPHIC SCALE: 1"=60' 4. '4' 4, '4' '4' '4' * 0 30 60 4, 4, 4, 4, 4, 4, 4, • Scale: 1"=60' Wetlands Impact Area #2 - Sheet 3 of 3 Developer: D&E Development, LLC 2409 &race Avenue New Bern, North Carolina 28562 (252) 638-8223 Rev. Date: 3/08/2023 - Reduce area, revise stormwater Date: 10/05/2022 Scale: 1..60' COGO: n/a File Name: BoyingtonPlace2-Impact.dwg Project: 22.454 Drawn: JJS Job No.: S220311-8047 120 180 FEET TIDEWATER ASSOCIATES, INC. Consulting Engineers Land Surveyors - Land Planners Cedar Point, North Carolina 604E Cedar Point Boulevard Phone (252) 393-6101 - www.TidewaterENC.com Firm License Number: F-0108