HomeMy WebLinkAboutNCC230625_NOI Application_20230309Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 3/3/2023 3:26:39 PM (NCG01 NOI Submission)
Approve by Penny Markle 3/8/2023 10:20:21 AM (Review - NOI 130799 NC 150 Phase I Relocation Project)
0 A7/A8. The provided coordinates do not match the location shown on the uploaded site map or
the provided address.
Please submit a new NOI. To auto -populate the new NOI, select'Yes' for the first question & enter
NOI number. Contact penny.markle@ncdenr.gov or 919-218-5490 with questions. Thank you.
• The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 8, 2023 5:00 PM.
The priority is: High 3/3/2023 3:26:49 PM
• The task was assigned to Penny Markle by round robin distribution 3/3/2023 3:26:49 PM
Submit by Tev.Holloman 3/9/2023 9:48:42 AM (Payment Verification for NCC230625)
• BRANDON M WALKER
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 19, 2023 5:00 PM. The
priority is: High 3/8/2023 10:20:38 AM
• Tev.Holloman assigned the task to Tev.Holloman 3/9/2023 9:46:31 AM
R
�o
NORTH:AROJNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting an NOI that was rejected before?
No
Yes
1a. Project Name*
NC 150 Phase I Relocation Project
1b. Specific Lot Numbers
This field may be used to list specifc lot numbers.
1c. Parcel ID Number(s) (PIN)
List all PINs associated with this project.
4647463977
4647472504
4647476784
4647573428
4647477111
4647466973
4647560716
4647565960
4647564666
4647567600
4647569654
4647661557
4647664108
4647665180
4647661255
4647569333
4647566375
4647564430
4647563054
4647467496
4647466200
4647466523
4647462565
4647361333
4647369671
4647366574
2. County*
Iredell
U
3. Highway or Street Address*
NC 150 (River Highway)
Street name only is acceptable if no address number assigned yet
4. City or Township*
Mooresville
5. State*
NC
6. Zip Code*
28117
7. Latitude*
Enter the latitude in decimal degrees
38.5951
8. Longitude*
Enter the longitude in decimal degrees (MUST be negative)
-80.8707
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
04/03/2023
Estimated Construction Project Start Date
10. Date to End*
07/04/2023
Estimated Construction Project End Date
11. SIC (Primary)*
Other (9999)
Standard Industrial Classification for Development
12. Acres to be 7.60
disturbed* (including off -site borrow and waste areas)
13. Total site area 7.60
(acres) *
14. Post -construction 0.00
impervious area (Estimated)
(acres) *
Project Tracking ID NCC-IREDE-2023-NC 150 Phase I Relocation Project
Assigned automatically (not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a. Receiving Waterbody*
Catawba River/Lake Norman
Name of waterbody into which stormwater runoff will discharge
15b. Waterbody Index No.*
11-(75)
NC Waterbody Index Number
Stormwater discharges will flow to additional waters
No
Yes
16a. Is this project subject to the NC Sediment Pollution Control Act? *
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA (American Rescue Plan Act) grant funds?
No
Yes
This question was added to the eNOl on 1/26/2023 and will not be answered in applications submitted prior to that date. Reviewer may update if status is
known.
B. Permittee Information
Part B.
Permittee Information - Legally Responsible Entity and Individual
......................................................................................................................................................................
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as
a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
1. Permittee* Legally Responsible Entity
Public Service Company of North Carolina, Inc.
If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name.
Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the
registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership (FRO) Form.
2. First Name* Andrew
If Corporation, enter Registered Agent First Name
3. Last Name* Moore
If Corporation, enter Registered Agent Last Name
3b. Title Director of Engineering and Construction
4. Permitee E-mail andrewmoore@dominionenergy.com
Address *
5. Permittee 704-718-4114
Telephone No.*
6. Permittee Mailing Street Address
Address * 800 Gaston Road
Address Line 2
City State / Province / Region
Gastonia NC
Postal / Zip Code Country
28056-9486 United States
Check box if the Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 800 Gaston Road, Building A
Address Line 2
City
State / Province / Region
Gastonia
NC
Postal / Zip Code
Country
28056-9486
United States
8. Type of Ownership is only individual if an individual is named in B.1. above.
Ownership* Non -Government
C. Site Contact Information
Part C.
Proiect Site Contact Information
1. Primary Site Robert
Contact - First
Name*
2. Primary Site Lepsic
Contact - Last Name*
3. Title Environmental Scientist
4. Site Contact E-mail robert.lepsic@dominionenergy.com
Address *
5. Site Contact
Telephone No.*
6. Organization Name
7. Site Contact
Mailing Address*
919-810-7883
Street Address
20220 Energy Drive
Address Line 2
City
Apex
Postal / Zip Code
27502
8. Consultant Name (Optional)
Evan Williamson
First and Last name
9. Consultant E-mail Evan.Williamson@hdrinc.com
This person will be copied on all correspondence.
10. Consultant 412-497-6216
Telephone No.
11. Billing E-mail (For Annual Fee correspondence)
andrewmoore@dominionenergy.com
Default is legally responsible person e-mail
12. Billing Telephone (For Annual Fee correspondence)
704-718-4114
Default is legally responsible person telephone
State / Province / Region
NC
Country
US
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 03/01/2023
Approved *
2. E&SC Plan Project IREDE-2023-010
Number/ID * Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4. State DEQ Office* Mooresville (MRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan I REDE-2023-01 0 NC 150 Gas Line Project Approval
Approval letter or 1.8MB
with Mods.pdf
Grading Permit
Must be PDF format
6. Signed FRO Financial Responsibility/Ownership Form
FRO - Signed.pdf 202.19KB
Must be PDF format
7. Site Location Map Must be PDF format (limit 20 MB)
Site Location Map.pdf 1.59MB
Please do not upload entire set of E&SC plans.
8. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application. Include additional waterbodies if necessary.
9. NOI Certification NOI Cert. Form - Signed .pdf 105.91 KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project, for satisfying
the requirements of this permit, and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is, to the best of my knowledge and belief, true,
accurate, and complete based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person' (signing on behalf of Legally Responsible Person
named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
o' .y.—Imiri lwwte
Type Name* Andrew Moore
Title Director - Engineering & Construction
Organization Legally Responsible Entity
Public Service Company of North Carolina, Inc.
Date * 03/03/2023
F. Tracking and COC Info
NOI Tracking No. 130799
NC Reference No. NCG01-2023-0625
Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SIP (passed
from workflow if eNOI approved)
Certificate of NCC230625
Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SIP (formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC230625-2023
Invoice Due Date 4/7/2023
Initial Fee $ 100.00
Invoice Status OPEN