Loading...
HomeMy WebLinkAbout20210903 Ver 2_2023-03-02 Piedmont Innovation Park Sanitary Sewer_20230303o. LEGEND 00. pJU a0¢ z~ � wwo �J U= oom w ozw m .o WUo I U zz 0Om wY =UQ ems= OY� w�a �0 0 ,wa 0 .� ,0a ozz owe w�Q �3:z .mo w1z w�a z <3 odo °zw -o� °2 z°w :�:2 ozD U-U zzO o wU Og= y U ti U p°O 0 Ym §2z 00¢ �No moo= Q F F 00¢ 2 z Y 0 0 EXISTING -2 - - R/W INS rl OA 110 04 0, r O DI X FM --- ss --- TPED 0 EB FOWP O -B —T— E OE DUKE - --fOC--- U W Wv N —G— — N PNG — PROPERTY BOUNDARY RIGHT—OF—WAY PERMANENT EASEMENT CONSTRUCTION EASEMENT PERMANENT EASEMENT/ LIMITS OF DISTURBANCE CONSTRUCTION EASEMENT/ LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE UTILITY EASEMENT (G.P.U.E.) IRON ROD/PIPE INDEX CONTOUR INTERVAL CONTOUR STORM DRAINAGE PIPE STORM DRAINAGE STRUCTURE STORM DRAINAGE MANHOLE DROP INLET PROPERTY IRON FENCE SIGN CONCRETE GRAVEL FORCE MAIN SANITARY SEWER SANITARY SEWER MANHOLE SANITARY SEWER CLEANOUT EXISTING IRON ROD TELEPHONE PEDESTAL ELECTRIC BOX FIBER OPTIC WITNESS POST JUNCTION BOX UNDERGROUND TELEPHONE LINE UNDERGROUND ELECTRIC LINE OVERHEAD WIRE DUKE POWER R/W UNDERGROUND FIBER OPTIC LINE UNIDENTIFIED LINE POWER POLE (P.P.) LIGHT POLE GUY WIRE TREE LINE TREE SHRUB WATER LINE WATER VALVE UNDERGROUND GAS LINE GAS VALVE PIEDMONT NATURAL GAS (PNG) R/W SPOT ELEVATION BENCHMARK ELEVATION TEMPORARY SEEDING PERMANENT SEEDING TEMPORARY MULCHING RIP —RAP BUILDING WETLANDS 100YR —FLOOD 100 YEAR FLOOD PLAIN STREAM ---TB----TB— TOP OF BANK BB---- BB— BOTTOM OF BANK BORE PIT RIP RAP AT PIPE OUTLET TEMPORARY CHECK DAM TEMPORARY STONE OUTLET TEMPORARY SILT FENCE PROPOSED E PIEDMONT INNOVATION CE/LOD ; 0 1 a -I 1�1 hki irk LOD SANITARY SEWER Em— CITY OF MONROE PROJECT # 22-62 SS— MH O CO N L---J + Know what's below. V Call before you dig MAR 2023 WK DICKSON NO.: 20190522.00-CL VICINITY MAP_ NOT TO SCALE 9,Mk0MWK WDICKSON community infrastructure consultants SHEET INDEX Sheet Number Sheet Title GENERAL G.1 COVER SHEET G.2 OVERALL PROJECT MAP GRAVITY SEWER PLAN AND PROFILE C.1 EXISTING MH 1 TO PROPOSED SSMH-7 C.2 PROPOSED SSMH-7 TO PROPOSED SSMH-10 C.3 PROPOSED SSMH-10 TO PROPOSED SSMH-13 CA PROPOSED SSMH-13 TO PROPOSED SSMH-15 C.5 PROPOSED SSMH-15 TO PROPOSED SSMH-18 C.6 PROPOSED SSMH-18 TO PROPOSED SSMH-22 C.7 PROPOSED SSMH-22 TO PROPOSED SSMH-24 C.8 PROPOSED SSMH-24 TO PROPOSED SSMH-27 DETAILS D.1 EROSION CONTROL NOTES D.2 EROSION CONTROL DETAILS D.3 EROSION CONTROL DETAILS DA GENERAL NOTES AND DETAILS D.5 SEWER DETAILS D.6 GROUND STABILIZATION D.7 SELF INSPECTION nl (1TIZ ALL WORK SHALL CONFORM TO THE CURRENT CITY OF MONROE'S WATER RESOURCES DEPARTMENT STANDARD SPECIFICATIONS AND DETAILS. ANY DISCREPANCIES BETWEEN THE PLANS AND SPECIFICATIONS SHALL BE SUBJECT TO THE DECISION OF THE WATER RESOURCES ENGINEERING MANAGER OR THEIR AUTHORIZED REPRESENTATIVE. STREAM CROSSING STATION IMPACT LENGTH (FT) AREA (FT2) AREA (ACRES) 25+82 TEMPORARY 20 180 0.004 30+79 TEMPORARY 20 120 0.003 37+49 TEMPORARY 20 220 0.005 48+31 TEMPORARY 20 240 0.006 52+60 TEMPORARY 20 100 0.002 TOTAL: 860 0.020 WETLAND CROSSING - PERMANENT IMPACT STATION START STATION END IMPACT AREA (FT 2) AREA (ACRES) 30+27 - 31+33 PERMANENT 1059 0.024 36+65 - 36+98 PERMANENT 1360 0.031 52+89 - 53+26 PERMANENT 362 0.008 TOTAL: 2782 0.064 WETLAND CROSSING - TEMPORARY IMPACT STATION START STATION END IMPACT AREA (FT 2) AREA (ACRES) 30+27 - 31+33 TEMPORARY 1063 0.024 36+65 - 36+98 TEMPORARY 1315 0.030 52+89 - 53+26 TEMPORARY 271 0.006 TOTAL: 2649 0.061 z O FZ U D U) z O U O L.L 0 LU W Q L LI J L LI O z LU U) z_ F- L LI n PaWK WDICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO. F-0374 PROFESSIONAL SEAL ko Q z o 0 U Cc W U w z o O W LU w a 0 �z N Y N d z oC U O w LULU Q LU 0 LU O 0- U) } LU W Z O z z zp U 0 cn 2i 0 LL LU O U 6 i Ii.i 2i J Q ~ z i= U z LU O Q 0 PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: G-1 OF 2 WKD PROJ. NO.: 20190559.00. C L i O ,/ Z�w pJU pZW ¢o¢ zo� 0 00. poo w oZw rn-p Eo. woz " Z U QZom wYJ =U¢ OY< w�¢ n w p LL N 0' z °wa o.w Z Do< ozz ow0 w�Q �3:z �HU woo 0 wa Q3 S D_p �Zw �o< ape z°w oz D D U-o ZZw c= Og Y U F U po0 Yco< 3:2z H � 00¢ �No �o= oJo Ow¢ Up PNG \ PNG PNG:: \ \ PN \ \ \ / - .�1 PNG\ PNG NG No TM+v\ \ a P&G / NG\ G PNG \ PN \ \\\ \ / ..fit, :;j3 :a�:.:'.,•� / /Q= \PNG PNG ^\\ \•.1-� t��: :::'.'-.` \ P l \ PNG\ NG\N / Q=G PNG PNG ,a,� 't. '1 /�\\�,,:--' •' '�, PN PNG / \ G\ \ \\\�� r••� •�' Q=� PNG\ NG •"'" �� `•�� ?� "G 've PNG /PNG PNG PNG 'Rp - PNGEwa i MANE R P" GOV f• ^Ole Q �e L \ al l lop/ Ile 0 'L 1 SSMH-27 �µ 7J� 1 A :a f / SSMH-26 ` y p rNa / •' M /` /µa rHn/µ `� `� ``�•• :�1 � I /µa C I co A:x .: `:::..:::;: a / 1 PNG PNG = ------ ' I 1 I PNG � PNG PNG r Q D _ PNG_ IN _PNG_ PNG r �- / j= G� PNG_ PING /?_GqS �1PNG_ �E� U I l PNG A/Iw. PNG _R Z w PNG_ PNG �I I/ PNG _ PNG PNG ��R� OHE �. PNG ING yPNG PNG- `- E 7N _ PNG G PNG PN _PNG_ PNG r 1^= _ G :•.:•. PNG_ P PNG_ PNG i �i. :'.;.�' NG PNG_ PNG_ _PNG_ PNG_ / PNG _PNG _ ,! �• • :+I PNG PNG (� /:.' .•.•y •V PNG_ In PNG PNG _ PNG J SHEET C.6 SSMH-25 � r SSMH-21 r,- •es.pp' per_ 1 a . sz.po 50-00 49, SHEET C.7 I �' ssMH-2o �— —y--� ----t— �� --� SSMH-18 / s`o SSMH-24---4-------- I \00, / SSMH-22 I I SSMH-23 �0 6" I L---------------------J kq _U 111—I1� �J \ 3�� F ' op SSMH-15 \ C 4 / / \ }•:. .�.... p9 3 NH-19 4 ` I 4S+pp�) Fj. SSMH-17 ♦ r X V I I 1 l 4 J .J 5N7 :_X X 631 69 a ` siy 29rpp N L� ` 28xpp 2�.pp ' 1 It SSMH-13 26o0 Y� I v^a—�wa —u.e arr anv �— I b :•\ I `r A 0 SSMH-12 r----- `\` I SSMH-5 SSMH-11 SHEET C.2 I SSMH-7 r--- ��---------r----- a II II I I I I SHEET C.1--- �V/OLA LqNE MH #1 ' SSMH-3 i ` / I z* ° /1� o _ SSMH-2 I SSMH-4 — — — �--J -- � `, 18 00 O ,6.p0 15.pp ,4+00° 13.00 SSMH-10 z.00 11.00 I / \ I SSMH-9 SSMH-8 1 —J j0U/ 1-------------------- N GRAPHIC SCALE 250' 0 250' 500' z O I— CU VJ z O CU O LL 0 w Q W J w O z FL w U) z_ FZ I- W 0— WK DICKSON comminitV infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO. F-0374 PROFESSIONAL SEAL m Z LL O O w cr U) LLJ VJ w uJ Q IIIIIII10 N w Y N O w w C) Q W CC 0 w O U)a O } w z Q O o- ~ Z J z z O Q 0 U Ir w w 0 0 w U lit I ij J Q ~ z U z w O Q I IL o PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: G.2 OF 2 WKD PROJ. NO.: 20190559.00. C L 21 o. Z iw pJU pZW <o¢ zoci o=w , � m 0 � p =gip w C) z .p oz " o U z o 00m WYJ =U< OY< uw�w O O to o,z zz< 0Nm z ,oQ ozz ow0 w�a �3z a-(r) w=a 0 w < < =dp c7zw �o< °2 Z°w ozD U-U Zzc w� °�_ Y U F U po0 Y z 3?� oo� �No �o= _1 �.w° o Up 2 630 625 620 615 610 605 PID 09345027A LON_GBTt0QKKF`OMEOWNERS \- ASSOC. �INL._ DB. 1831, PG. 832 \ PROPOSED WIRE AND STONE REINFORCED OUTLET TYP`00 �C SEE DETAIL / �0p J 'l, / \ O 7 �0); I > EXIST. MH #1 / RIM: 614.53 / INV. IN: 609.41 �' a d / / PROP. 4-0 SSMH-2 / STA. 0+74.05 / N:460098.79 / E:1518211.80 24" CASING _stir, _0 / ClTILITY EASEMENT x PID 09372006 MICHAEL G. WILLIAMS DB. 554, PG. 521 / CV PROPOSED TEMPORARY GRAVEL , / U CONSTRUCTION ENTRANCE, TYP. SEE DETAIL SHT. D.1 LLI LLI C)' BEARSKIN CREEK \w - UCW UTILITY EASEMENT PROPOSED TEMPORARY -CHECK DAM, TYP PROPOSED TEMPORARY SEE DETAIL SHT. D.3 SILT FENCE, TYP TSEE DETAIL SHT. D1 496', -2+00 - / EXTEND 16" STEEL CASING 10' /WITH SAME MATERIAL AND THICKNESS AS EXISTING CASING PROP. 4-0 SSMH-3 STA. 1 +68.90 N :460117.30 %� E:1518118.77 UCW UTILITY EASEMENT PROPOSED 36" WATER TRANSMISSION LINE BY OTHERS - PROJECT #186110 f�0 3+00 0 6g N °2245„E;240. 47, EX. 12"\ TER INC— \ � � � ,� 4+00 �� �� PID 0937 00�K \ \ \ \ \ MARGARET JEAN HUf�BARD \ \ \ \ LIVING TRUST \ DB. 4007, PG. 675 \ \ \ PC. J, FILE 738 \ \ \ PC. K, FILE 970 (NOW OR FORMERLY) 10 STA.5+54± \ PROPOSED ANTI -SEEP COLLAR I SEE DETAIL DWG. D.6 EX. 16" CASII NG I (60'±) TO BE REMOVED �I PROPOSED 30 LF 24"0 x t=0.250 STEEL CASING W/ 12" RJ DIP (INSTALLED BY OPEN CUT)�� S51 °06'30"E - 40.17' 1 . . TEMPORARY BRIDGE MAT FOR TEMPORARY CONSTRUCTION ACCESS - SEE DETAIL SHEET DA PROPOSED SEWER LINE TO BE INSTALLED BY OPEN CUT (SEE STREAM STABILIZATION DETAILS SHEET D.3-D.4) STA. 5+84± PROPOSED ANTI -SEEP COLLAR SEE DETAIL DWG. D.6 I PROP. 4`0 SSMH-4 STA. 4+09.37 PROP. 4`0 SSMH-7 N:460032.62 STA. 8+21.92 E:1517893.71 N:459938.51 S� Q E:1517765.55 7 v � Q<u N N 00 Q 07 LLI z J U Q / O � W PE -'�� +00 o :al • .C. 1 • �E�11N�, • �' c7 ■ N � 1 PROP. 4-0 SSMH-5 m � STA. 5+89.00 N :460145.40 E:1517753.89 S51'06'30"E - 19.80' PROP. 8" DIP @ 2.88% SLOPE EX. 24" CASING (40'±) / o I PROP.4Y0:SSMH-6 STA. 6+27. 7 P N:460127. 1 00 E:1517719.8 PROPOSED 30' PERMANEN EASEMENT (15EACH SIDE OF SEWER CENTERLINE) s PE SOIL BORE B-01 \ SS, �C / N: 460132.0 \ YLOD/ E: 1517721.4 // N62'17'15"E - 38.47' / /EXIST�`tv>AN'HOLE / RIM:/613.�s2 / / IN I N: /612 INV. ObT: 61 (TO REMAIN) \ss✓ // / // i� X. 12" DIP W/AiER­UI E REMOVE AND REPLACE FEENCE TO ORIGINAL OR BETTER CONDITION, AS NECESSARY, FOR SEWER PIPE INSTALLATION, TYP. PIPE LEGEND: FUSIBLE PVC SDR 35 or C900 (DR-25): >3'; <12' C900 (DR-25): >12'; <20' - DIP: >20'; <3' RESTRAINED JOINT DIP GRAPHIC SCALE 40 0 40 80 HORIZONTAL 4 0 4 8 VERTICAL ■■■■■■■■■ ■■■■■■■■■ NOON■■■ ' :. . • A■■■■ : _ NONE■ _ • • MEMO MEN■ - : - _ • - .. • - • ' ■■■■■■■■■■E■M\■■■■■■■■■■■■■■■■■■ MM■N■N ■■■■■■■■■■■■■■■■■■■ • • • .• . - _ • . • • ■■■■■■■■ ■ ' ' " . .: • .. I■■ .o I _ ■ - .. • • - • - - - • . • BEFORE ANY I - . ON AND SLOPE = Z� r-: AND CONDITION TO BE CONFIRMED _ - Lq • . • BEFORE • - PROCEEDING •� o = D' • PIPE ,�.,,,�,.,.; . NONE ■■■■■mNOR IIIII Ill��i i ■■■■■■■■■MM■11■■■l■■■■■■ NONE■■ ■■■■■■■■■■E■■■■■■■■■ ■■■NONE■ , • ■ :. a. - " • NONE ■■■ ■E■■E■ENE■E■E■E■E■E■ NONE . _ ' • MEN MENEM MENOMONEE • - - MEMEMEMEME MEMEMEMEMEMEMEMEMEM - . NONE MENEM MEN MEN■M■EE MENEMMM ■ ■■■ NONE _ ■ ./�..,,,,,,,,, NONE ��.�_� - • • MMMMMMMMMMM WOMEN MI l_IE's'� - � ". _1110MMMMMMMMMM pm:I■■EMMUMME■ - •' MEMEMEMMEMENIMMEME • • Eiii�Eiifi'ii'Oiii�zE �i'�iiE■�I■lid'ir`'il■■EIIIIii'�I1111111111 OWN ■Miil�iiliiMMEMY�i�iiillM�11■ILElili■MS'1ii a-- Olommum- NOMMEMMI.P.Mom moot - 1■■■MMEMM.E, Ci■■■II Wool �����ON- II■■■■■■■■■■■■■■■■■■■■■\Q■II■s■E■MMM■■■■■_■E■■■IIIJIMEII IIIII ■MM■■■■ii111il1iillli■�I�■E■■1�E■■MM ■■ENiiii■■iii`'illlI■■r I II■■■■■■■■■■■■■■■■■■■■■■■III■■■■■■■■■■■■\m7M,�1111■■1111111111 ■■■■■■■■■■■■M■■■■11■■■■■ ■■■■1�■■■■■■141EIN■■■■I■■■11■■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■■■■■■■■■1!M■111111■■1111111111 ■■■■■■■■■■■■■■■■■11■■■■■ ■■■It■■■■■RI11■fIMMM■1M■■11■■■■■■■■■■■■■ ■■■M■■■M■II■■■ME■■■M■■■■■1 ■11 II■■1111111111 IIII ■■■■■■■■■■■■■■M■■11■■■■ ■■M1■■�NMTiMIII■■1■■■■►■ ■11■■■ ■■■■■■■■ ■■ NOON ■II■■■ ■■ ■■■ MEMO PROP. 24, .. - • 1 �' • MMMMMMEmII■Ill - _ .,�_� ��■■■i■ - ■■ii�I �ri`i ■II 'm .. .: ■II _ .. , - - • .. , :. • . - . 1 • _ _ III - - • ■ ; - - • : , . , • : - ■ ., . - . - - . . - . - ■■■ - . - • 1 . - . 1 • ' . ■ ■■■ NONE NOON■■ ■■■■■■■■ - . 1 :• • ■1 ■ ■1 IIIIIIIIIIIIIIIIII ,�■ -PROP. . , , - • 1 : • • Emmllm■■ ■E ■■L■OM■■■■Ill■Nm■■■E I■■ - -.. . 7' ■IIO���i� ■■■II■■■■■■■III■Ii1■■■■I■m■II■■■■ Fill W, &FA ■M■II.-- --,.,., NOON■■■■I/N ■■ -. , ■■■MENEM - -.. :.. - .1 ' - ■■■ : • •TYPESNOON■ ■■■IIm m�z,�z I In I ISm LZ�L��� ■II ■■■■■■■■■■III/,MOON■ ,,,,,,°,,,,,,,,,,,,,,,,,, ,i, iiii , � .:..: WEATHERED. ROCK ■■■MM■■■■MMM ■II■■■ TRANSITION , :' _ ME■■■■■■■■■■■■■■■■■ STEEL.�■ - ' -'' / DIP ,%I■■■■■■■■OEM■■■■■■ BY • • 1 . 1 . • • ■■■■■■■■■■■■■■■■■■■■■ M/I ■MEMO ■■■ ■■■■■■■■■EMMEMM■■■■II NINON■ I/,MOON■■ ■■■ ■■E■■■■E■\■■■\\■■■■II ■■■ MEMEMEMEME■EMEM ■■■ MEN■M■NEE ■■ NMM ■■■■■■■■■■■■■■■■■ No MEMMEMEME - ■■PROP. MEMMEMEMEMEMEM■■MEN ■■■■■■MEMO ■■■■■■■■■■■■■■■■■ ■■■ ■■■■■■■■■■ ■■■ 1 1 1/ 1 1 11 1 11 1 11 1 11 1 11 1 . 11 . 1 11 1 • 11 1 11 630 I 625 V U) z 620 O CU O LL 0 615 W U) Lij J L1J 610 O z L1 U) 605 z 600 W 0- WK DICKSON comminitV infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO. F-0374 PROFESSIONAL SEAL m p z O O wQ °C w O U) W w a 0 IIIIIIII° P` c\I _ N N Z Ir U cii O w Lu >U)° o 0 > w d z a 0 0 Z Z Z r 0 U) Lu 0 0 ILL Z U N X W Ill w J H z w Z 0 PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: CA OF 8- WKID PROJ. NO.: 20190559.00. C L on Z�w pJU pZw aU� zoo �< o=w omm N�o w oZw z .o oz " o Z U °Zom WYJ em=Um s= OY< w�a �oW zwa omw z °a oZZ ow0 w�a m�z a,(r) wmE 0 w < mom= =moo oZw �o< <2 zow 3D oz0 U-U 'z co, w Y U F U po0 Y o Q 3imzz oo� �No Egm 1.o o °o' >- IQ N IPROPOSED WIRE AND STONE �O� REINFORCED OUTLET TYP SEE DETAIL SHT. D1 PROPOSED TEMPORARY �DOYR SILT FENCE, TYP PROPOSED TEMPORARY CONSTRUCTION FLOOD PROP. 4'!Zi SSMH-8 STA. 10+60.51 N :459785.70 � SEE DETAIL SHT. D1 EASEMENT, TYP. (WIDTH AS NOTED) / E:1517581.73 SOIL BORE B-03 N: 459812.8 / �OY� / E: 1517225.9 � 1 �NI� _SOIL BORE B-04 0 �:�59863.8 o 0 0 — — OD 0 0 / PE � P PE IIPE 0 PE _ 15168�2� / � p / IPE °�t12+00 PE PE 14+00 15+00 p P — — — — .c� 11+00 13+00 '116+00 _ SOIL BORE B-02 S8s°00'57"E - 411.72' PE \ P\E1-S81°42'46"E _ � 17+00_ — - 420.12' 18+00 .O\ N:459812.9 E: 1517s13.9 CE LOD CE/LO CE/LOD CE/LOD � CE/LOD CE/LOD � CE/LO T CE,� D / C�/'COD—LE/-E9� / �E/LODE— CE/L — — — — — — _ — 9x \ \ O\.o — -- — — � O \ �, �DOQ � / 20 PROP. 4'0 SSMH-9 / STA. 14+72.24 N:459814.30 PROP. 4'f1� SSMH-10 PROPOSED 30' PERMANENT EASEMENT � E:1517171.00 STA.18+92.36 PROPOSED TEMPORARY CONSTRUCTION (15 EACH SIDE OF SEWER CENTERLINE) N:459874.86 E:1516755.26 EASEMENT, TYP. AS NOTED) ��. (WIDTH REMOVE ORIGINAL AND REPLACE FEENCE TO OR BETTER CONDITION, AS \ \ p, ,71101 '°� F, x0 NECESSARY, FOR SEWER PIPE INSTALLATION, TYP. m \ \ \� I�� o�/i D + PROP. 4'QJ SSMH-7 STA.8+21.92 QF. � (D N:459938.51 E:1517765.55 �Q IVIATCHLINE STA. 8+21.92 SEE SHEET C.1 EX. SEDIMENT POND � � � � Cn PIPE LEGEND: fll GRAPHIC SCALE � FUSIBLE PVC 40 0 40 80 C� SDR 35 or C900 (DR-25): >3'; <12' W HORIZONTAL C900 (DR-25): >12; <20' 4 0 4 8 — DIP: >20'; <3' RESTRAINED JOINT DIP VERTICAL 640 s4o 635 � � � _ � 635 \ N O O � / (� II N O N� II � �? O \ dr l�z O Z H c4 � \ a� ? O d� �Z Z / B-4 631 IYH �> > 630 N ti � � = o> 0O \ IiL CO s3o �— — — — � N_ � co II II �> � + Nam~ � ML � + � � � d � C.0 Z p -03 s2� � a°0 II z O � Z �H a y � z z — EXISTING GRADE YEAR FLOOD ELEVATION 625.5 625 I!L � �' Z 625 _ / ML F O D 1 OY 0 F 0 Y — 1 0 -FLOOD 100Y FL 0 620 s20 — � ML — 619 PROP. 420.12' OF 12" PVC @ 0.28% PwR PROP. 411.72' OF 12" PVC @ 0.28% ML (SILTY SAND) 615 PROP. 239.05' OF 12" PVC @ 0.28% s15 s� . SOIL TYPES 613.5 TOPSOIL 614 CH -FAT CLAY m � /�� � � t MH PWR 611 U) C/) � m � (SANDY SILT) ® CL -LEAN CLAY = co = ITI + r mD� mcoz 610 SM -SILTY SAND N ITI' 61 O = + mN Z MH -ELASTIC SILT `! w (� � � N R1 60 .5 ® ML -SILT NOTE: ALL DUCTILE IRON PIPE - PARTIALLY TO HAVE PROTECTO 401 COATING ®PWR WEATHERED ROCK I 605 soy 8 15 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 1s+00 1s+50 17+00 17+50 18+00 18+50 19+0019 15 WK DDICKSON \X, communit infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO. F-0374 QFL OC PROFESSIONAL SEAL m p z O O w°C U) O� U) w w I-_ 0 IIIIIIII°CNI 0 T co 2 CD CO CD CNI Z w cnco cm co O N �' w U z or U o O w a O 0 � � cwn a a } w O --Pi non 1 00YE z z Q O ~ z = O zz U ��� cn OLu D _77v m 77 77�77H \FT:= \7 77FT7]77\\\ 7 �L W a Q w J W ~ J z � LLJ w z O Q O o Z PROJ. MGR.: JRB W DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: Z C.2 OF 8 WKD PROJ. NO.: Lu 20190559.00-CL W O u, Zaw wz , pow Qo11 z0 2- ,m< p=�w p 6] Nao 1-p -w ozw F.o oZ " o U Z om wYJ =UQ moo= w < n�w �o� °wQ p.m 01 OZZ 0WO wF� wF.Q ¢3z WMEog w 0 WIZ I xanap 7Zw max¢ °2 Z O w 2 oZD ZU-ZOC, w Y U F U pp0 YmQ 3:_Z-U oo� �No �o= 00o °oLL � / \ \ \ / � /�' _ / \ _ — —a . — _ _ \ \ _ / \ i� " � " / �ir �,/� / • . • : F F F F F F r � F F 1 ,,\ „/%// ----_�-_'''=-��_%//I ••:�\_F-� \ / W K DICKSON __ F F F F ---ram--• �\ \\ \ \ \ /� �j/ \� ,• commu nit infrastructure consultants \ , ----------- \ F F F F F Ir www- / i \\• — J/ — /% �- F- F F F F F F \F\ F F (/ /\ \\\ \/� l I / s/-► F F F F F F F F F Fl I J (( — \ �� /! PROP. 4'0 SSMH-13 I 'F F F F F F F F / \\\ \ / STA. 29+04.13 / 1213 W. MO SUITE 3A STREET CHARLOTTE, NC 28208 (t) (704) 334-5348 / % i — — — G/�I� / F F F \ \\ ✓ \ \ 1 I III / I F F / \ \ — \ " ! — �—�*/ J / F F F F F F F I F F F F F F F '� \ I \ \ \ \ I / N:460494.90 / / I / WWW.WKDICKSON.COM \ — / E:1516098.70 / —\ ✓F / F F F F F F F F F IF F F F F �-1• I I \ \ O / / �(�� � / \ I NC LICENSE NO. F-0374 \\\�\ J•-- —� I / / \ •PROPOSED TEMPORARY CONSTRUCTION \ �� \ \ \ \ \ \ \ (� / / EASEMENT, TYP. AS NOTED) �� F F F F # i — �� _ _ _-___.••' (WIDTH F F F F F �, I — \\✓/ I / �f1Q.� \ ^ \ \ \ / III, / �♦ F F F Ic F F F }� F F F F F F F l F F F H F —FLOOD F F F F F F F F/ (� --``�1 O < —\ \\ PROPOSED TEMPORARY F F F F F F F F F F F F F F F F F / F F F F F s' i F % \\ 1-1 �E}BD- —_ \ \ SILT FENCE, TYP F;; F F F F / �SEE DETAIL SHT.D1 F F F F F F FI F F • —��- Is F / S �iLy --- •F F F F / \\ \ � \ �--•\� — `•• F F / F \F F F F F F F F/---J 1� F—vb /F, / / Q Q� / G�I __ PROP. 4'O SSMH-11 F F F F F// ( FLOOD / D / / a — — — \ E 19+00' — — C — — F F \_ — -- _ __� \ o \ \ I V / / — — — — — — —'7� F F STA. 22+86.85 F F 19 F F F F F F \ F F F F F ; J \ / F%696 '� — — — — -- \ `� N:460187.22 F F F F \ F FSOkL B,�I B-0/ - - -- - _ , -P PE E \ \ / — — _ — — — _ — — — — •: E:1516514.32 ,� F F F F F F F F �` N: 46SY420.6 11 20+00 - \\ \PE Pt PE -4 Y - FLO \ \ �`: , �•••• F F F F F F F F I JI IF F FE: IS161�38r�.� / / / / Q� OO/ / 21+�� \\�\w \ \i / PE/-� P — \ •�\F F F F F ••• / 1 1 F �F F I / / 0�`3 F.I . / / F F / 7r Z m PROFESSIONAL SEAL — —•��` F F F F / 1 I/ O�� / , / ��+ A 9_ F F— F I I �� cn > i— �_ CUD/ID — — I1 394.49 \ F \\\\\\ \ 7\-- I \. 1 1 F F / �" / / C(/ .� — , GF I — PROP. 4'0 SSMH-10 --- STA. 18+92.36_--_ — - _ ,o� ——/L9LL�L \\ \ // / _ \ uO /O / / / PROPOSED WIRE AND STONE x / / , --� \\\ /�1L0�\ \ \`L� CO + --- C)- _ -- N:459874.86 --- r E:1516755.26 � �_--_ --_—_— - \\ OD —_ \ REINFORCED OUTLET TYP \ \ --_ E/LOD \ \ �� \ \ — �--'--- -- \ SEE DETAIL Sc$iT.D1\l / �� -, --- ������ \ \ \ F 1 C� �� \\ I / i m 1 s \ \\\ \ I / GPI`' // — 2QX \ / / / m Cn NOTE: D � GO Q� x , \ /CFj �O\ , (, PROPOSED 30' PERMANENT EASEMENT � � \ \ F� \\\ \ � ��� (\ G x0� I\e \� � / / // m 1. ONCE THE CREEK BYPASS HAS BEEN INSTALLED, THE SILT FENCE DIRECTLY IN \ \\ \ \ F I .p(— — — (15' EACH SIDE OF SEWER CENTERLINE) \ 220 \ TRENCH PATH IS TO BE REMOVED FOR OPEN + N \ C \ \ \ \ �\ Fj 2Q, \ , / 1�O I / \ \ \ \\ 00 \ \ <C G \ \ \ / / CUT INSTALLATION OF THE SEWER LINE AND THEN IMMEDIATELY REINSTALLED ONCE THE I INSTALLATION IS COMPLETE.cr Q z0 U) �� \ \ \ \ \ \ \ \�00 \ I \ I / / / / / \\ \\ PIPE LEGEND: O a m m \ — \ \ \ \ �\ \ 2'sx p (STA. 25+93± / / O� 0 FUSIBLE PVC Cc w U cr w _ m \ \ PROPOSED ANTI -SEEP COLLAR / / — \ \ \ F,I \ \ \ \ \ \ \\ o�q \ G �' / / / / \ \ \ \ \\ \ ,• I I EE DETAIL DWG. D 6 I \ / SDR 35 or C900 (DR-25): >3'; <12' z o O m ` \ \ \ \ PROP. 4 0 SSMH-12 c \ �� \ \` I I �/ / \ \ \ �J \ \ I I STA. 25+07.09 �F I 1 I C900 (DR-25): >12'; <20' > w oC N \ \ � \ `� 1 / PROPOSED 20 LF 24 Q1 x t=0.250 / �( - \ \ N:460405.58 \ \ \ �\\ \ / 1 ~ \ CASING W/ 12 RJ DIP / / DIP: >20'; <3' \ \ \ \ E:1516485.56 \ �°'(INSTALLED (INSTALLED BY OPEN CUT) / / \S76 59 40 E - 61.11 \ \ \ I �I --+ \ SEE NOTE 1 REGARDING SILT FENCE RESTRAINED JOINT DIP STA. 25+73± \ 1 �\ INSTALLATION SEQUENCING. \ \ \ \ \ PROPOSED ANTI -SEEP COLLAR —\ \ \ I i % \ ` \ I I / \ \ \ \ / \ SEE DETAIL DWG. D.6\ \\ \ F F �S1: \ \ \ \ \ \ \ \ —F�:� PERMANENT STREAM IMPACT (20 LF) J / \ \ \ \ \ \ \ \ \ \S77°00'22"E \ 30\00\ i l•Ilc F FI F TION FORCUT \ i ( 40 GRAPHIC SCALE 0 40 80 IEN \ \ // \ , INSTEXCAVALLATION SHAOLL BE LIMITED TO THE \\ \ \\ \\ \ \ \\ \\ \\ \ \ \• F F F F WIDE PERMANENT EASEMENT WIDTH i / / \ \ \ At (30' \ \ \ \ \RID \ \ \ \ \\ ••• F F I I I I II I HORIZONTAL Lu \ 09372003 \ \\ \ \ �•\ F F , 1 I I / \ \ UNION-OUNTY \\ \ \ I I \ \\ \ \ D.B. 7287, PSG. 799\ � \\ \ \\\\ \ \\ \ l � F F F / j F 4 0 4 8 H Q VERTICAL o 635 N r CD m N x � N � 7 r = pp L(� _ _ - M Ln O Lf) O _ � � L17 N � 635 in C.0O �M 0> CO —4 ��p> II co G O CD II0 J J coO cn LO (.0 + Oj 11 J J cn°OO II O �0 > O O O 00 ID+ O� � \ � + MZ X) O Z p d II �� -'� U 0 �(D G7 N (0 O Q II Z W W aN II Z O w H_ \ \ II OQ 2> > a II — O 0 > > LU UJ Oaf>> acn�zz cn cn� Z Z acn w— — c_ 630 0. cn \ -' - - - - a U)) z Z XISTING GRADE z =__Z = _ — 630 r _ \ — a(n av, /— -- — — — _ — cl) _ B-05 co '' — z can N O sea / in W LO O W _ __ \ _ Na0 Na❑ -- -- — N Q cn a co cn a cn Z U O U 625 _100 YEAR FLOOD ELEVATION _ \ / oL \ \ B 06 s2s 1 O Y LO D 625 2 O cc \ / L Q w � a O D 1 0 R I O>_ a O O R / z z ¢ O o � Z Z O U r = cn ML PROP. 305.93' OF 12" PVC @ 0.28% O V 620 PROP. 220.24' OF 12" PVC @ 0.28% - 620 O N a 619. — PROP. 394.49' OF 12 PVC @ 0.28% w CL p N O LL U O PROP. 61.11'OF 12" PVC @ 0.28% Q PWR (SANDY SILT) 1 1 1 L.LI 616 TRANSITION FROM U) m D a 615 j'jj m > D PVC TO DIP I m 615 Q w � SOIL TYPES — � n PWR PROPOSED 20 LF 24"0 x t=0.250" = 2 r z TOPSOIL J = m 2 r SILT) STEEL CASING W/ 12" RJ DIP (INSTALLED (INSTALLED BY OPEN CUT) 613 CH - FAT CLAY m m m U w Z j >� LLI m ^ z � PROP. 30.00' OF 12" DIP @ 0.28% ® CL-LEAN CLAY n (n 0 � Q H 610 IV � D TRANSITION FROM PVC TO DIP SM-SILTY SAND N 610 O s09.s � NOTE: 1 w CID + MH -ELASTIC SILT ® ML - SILT ® + � PROJ. MGR.: JRB DESIGN BY: CH � z N _ ALL DUCTILE TO HAVE IRON PIPE PROTECTO 401 COATING PWR-PARTIALLY ® WEATHERED ROCK W DRAWN BY: CH PROJ. DATE: MAR 2023 Z_ DRAWING NUMBER: 605 605 50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29 18 50 C-3 OF 8 WKD PROJ. NO.: 20190559.00. C L W o� Zaw °-°°o w ,z pow Qo11 z oci 2w oow p � 6] omp 1No -w ozw F.o oz " o U oz Qom wYJ =UQ ~ O = w < �w .00 zwQ p.m Z °Q ozz ow(D wFQ ¢3z o,(r) w=g 0 wl< �a� xap 7zw max¢ o2 Q Z°w zD oZL) U-O z 'w w Y U F U pp0 Tz YTQ oo� �No =o= �.o °o, A. T A-m A. A-/ ♦ ♦ T A,m Al Al A` T 1+� _ _ _ • • T A. n` - DDICKSON C A` T A` A` Al T A` T A` N. 9' ♦�♦ A. Al A--m A' ^' A-m A` A- A- A` T T A` n, A` T m A` Al ;\ A. m A. A''l` / A. A' m m A` < Al A. m m A` T / n` .�,� A. m �, ♦T A' \ A- m A- T ♦ ''' \ . A- T �0 T A, m A- A. A' m A- A- A' l A. WETLAND IMPACT. m m m A- A- / PERM. IMPACT (W3)_ 0.031 AC. Al A- ,� m m it m A' T A, 1 T A communit infrastructure consultants A. ♦ A m ♦ Al A` T m ♦ A- A' WETLAND IMPACT: m A' m �♦ / .� Al ^' -"� \ A. A- J .� A, r `•. � '`` A' A` A� ��'~� '� A- A` A' .•• ♦ A. A' S� TEMP. IMPACT (W4) - 0.030 AC. '� ` '� '� T '� T � '� m A. Al'� T '� 1213 W. MOREHEAD STREET ♦ AlA m PERM. IMPACT (W1) = 0.024 AC. m T A �T T--_ __--•' �' ••@ T _ A �� �C� �. A m m A A' 1 SUITE 300 ♦� / m TEMP. IMPACT W2 0.024 AC. T T '� ( ) `►� A' A '�� 1 '� CHARLOTTE, NC 28208 ♦ '� m '� �.. / T /`` / '- PROPOSED 115 LF 24"0 x t=0.250" m PROPOSED TEMPORARY CONSTRUCTION m A A 10' WIDE PERMANENT A- Al \ m ,� T '� (t)(704) 334 5348 \'� ♦ \ T S2 PERMANENT STREAM IMPACT 20 LF m m ( ) A. A' m A STEEL CASING W/ 12" RJ DIP i EASEMENT, TYP. (WIDTH AS NOTED) A' 'MAINTENANCE CORRIDOR / '� A' ,' A- A. / A- / EXCAVATION FOR OPEN CUT A• A- T (INSTALLED BY OPEN CUT) .� A. A- A- A' '� '� A / WWW.WKDICKSON.COM A ♦ '' - ♦ m INSTALLATION SHALL BE LIMITED TO THE A` '- A- ,� �' A T THROUGH WETLANDS m A- \ A T '� m ,� m A. T • / `• A- 20 WIDE LIMITS OF DISTURBANCE ,� A• - - Al Al T m 10' WIDE PERMANENT A` ^ MAINTENANCE CORRIDOR _ � A` A- A- A PROPOSED TEMPORARY �� T A- T m '� / A INC LICENSE NO. F-0374 . .. T 'r "� m A. m / m \� A, \ '� A. Al \ � STA. 35+58±''� AlA' m A` n` '� '� % m • A' `• A- m A- T A THROUGH WETLANDS SILT FENCE, TYP �� 'PROPOSED m A- A' A- A- /m PROPOSED WIRE AND STONES m / '•:• T '� ,- \ _ _ - ANTI -SEEP COLLAR SEE DETAIL SHT. D1 A` A- T T '� m A' \ / REINFORCED OUTLET TYP Al A. A- / -�' - DETAIL DWG. D.6 A- A- T A' �/,� m M � � / PROP. 4'0 SSMH-13 SEE DETAIL SHT. D1 A- A- � A` A' ��♦ T m T ♦ PID 09372003E _SEE — — \ — — — � ``�� m\ S m / ��,,A c A- T A' A m y A- m m m r T1 m STA. 29+04.13 A- A. A- A- A- A. GOLDMINE GENERATION,-LLe ♦ A- m - ` - T D.B. 4492, RG-. 7T8 _ — — \ A, — �. T T A' T A- A- A, A' /c ♦ A T T T N:460494.90 M�[D ♦ / T \ m - _♦♦ n�� AlTRAe`r 3 `— p / A !� O v, A'\ C.0 A �� T A " A m� ,� m / E:1516098.?u _ _�� l7V I l� A` �\ m — — _ 100YR ��� �- �� ^ '� A m m ^ '� Im ♦♦ T m — — ,� A C T 1 m> / — _ m— m�\ r—icc�cccN�PE --777 sc\\RE\\m�,e— PE WW33+00 - ' PE RSA T }�"?�„ 35+00 - — — 0 �\ P 32 +00 ---•- — — —' — I =._- — — — — ..... -_ ._ PE 29+ 0 30+00 — — ' - — ;- = —_ — = _ _ -_ _ T - °18'07"E - 125.32' P- = S71 ° 18'07"E - 146.03'V. L ��lU� — -, -.._ _ _- - ;— — ,- ♦r Jl/� JJ U29 L i 11 J.4Z7' D CLOD " A - -S71 40� A il1U11 P �E PA --t E \ aD� T \ P mP � k PE A-j I C { / CE LOD CE/LOD \ CE/LO CE/LOD SCE/LO CE/L D CE/LOD CE/LOD \ ♦ m ♦ ♦`\ m A- m i m m T A A- � � D— PROFESSIONAL SEAL / E LOD , A CE/LqD / \ A T �, T 1 — -� / i - SOIL BQRE B-08 \ PROP. 4 0 SSMH-14 '��` ♦ ♦' A- J# STA. 37+03± CE/LOD �� -1E/LODE jh /� ' \ m A, ; 'STA. 31+37± 0 N: 460674.0� STA. 32+88.42 PROPOSED ANTI COLLAR_ , D o cn- \ \ ; m A. 1 1 E: 1515611.4 \ -SEEP �� n- � / PROPOSED ANTI -SEEP COLLAR _ - N:460618.10 _ SEE DETAIL DWG. D.6 Z \\ A- A' \m / SEE DETAIL DWG. D.6 ,� E:1515734.69 -------��- \ ` m ♦♦..�' A •�'•- m / r I�\ �,� STA. 30+22± \ \ T A- '� \ i / / y PROPOSED SEWER LINE TO BE „ „ PROPOSED 145 LF 24 0 x t=0.250 \ \ PROP. 4'O SSMH-15 STA. 37+13.42 / Z PROPOSED ANTI -SEEP COLLAR \ \ SO L13©RE'B-Or T 1 INSTALLED BY OPEN CUT PROPOSED 30' PERMANENT EASEMENT _ , - STEEL CASING W/ 12 RJ DIP \ N:460766.57 m SEE DETAIL DWG. D.6 \ N: 4 0 47.3 \A _ 1� // r (SEE STREAM STABILIZATION (15' INSTALLED BY OPEN CUT EACH SIDE OF SEWER CENTERLINE) (` - ) \\ \ E:1515336.47 /' \ \ \151\5�9R1.4m �` PID 09372003E DETAILS SHEET �� O > \ \ 1 A- A' UNION COUNTY \ �\ AI 1% _ MAX. 20' WIDE LIMITS OF DISTURBANCE \ \ N DB. 7331,AC- 3. 530 \ \ \ '- T A - MAX. 20' WIDE LIMITS OF DISTURBANCE \ i " THROUGH WETLAND AREA. CONTRACTOR \ '� A- A- 1 THROUGH WETLAND AREA. CONTRACTOR SHALL STOCKPILE THE TOP LAYER OF NATIVE N \ A, A� ( / SHALL STOCKPILE THE TOP LAYER OF NATIVE _ _,_ WETLAND SOIL AND REPLACE IMMEDIATELY �� / \ \ \i A' A' m T WETLAND SOIL AND REPLACE IMMEDIATELY A. �' \ � AFTER CONSTRUCTION IS COMPLETE � �m ( /AFTER CONSTRUCTION IS COMPLETE A- �% ' THROUGH WETLAND AREA. \ ` \ \� m/ / A- A- I \ �\ \\ ( 1 THROUGH WETLAND AREA. _ \� \\ ID 09372003E COUNTY \� W z 0 m / \ ) `m A m m�� (�/ / / \ . \ \ D�73331'��5 0 TRACT 3 / m O d m I \ . n �/ i — \ ` m w OC U) 77 0 Z w m L„ o_ m co > n Lu cc W PIPE LEGEND: FUSIBLE PVC GRAPHIC SCALE 40 0 40 80 SDR 35 or C900 (DR-25): >T; <12' C900 (DR-25): >12'; <20' HORIZONTAL — DIP: >20'; <3' 4 0 4 8 0 RESTRAINED JOINT DIP VERTICAL IIIIII110 640 640 J O J co O J J 0 J = 0 co = v �� ti CD LO a Lu ° a Lu ° N� � � co � aLu co LU 0. W � = d' N LLO Ln 635 x _ o cn p� CO � � - I I +C) p� M � c� C° N Nay'o^N 635 r _ cn ��coo� `,� Qc= Qccn IiM�z 00 Qc= ZCCO co �0Z II CV � N O Q �_> > 00 ° J M° J w~� Z 1 U) O N w Q cM w Q acV �Z O co+H +COH a. co Z +fnla- +f�H 0< M II Z N `�'a° Ma° Maw° MOw a° aw ��>> z Q W N <2>> a N Z_ Z QOw aOw aScn IL co a cwn co m co 100 YEAR FLOOD ELEVATION w a cco ~ m w �' a �' U D Z pE U O Lu w a O 630 B-07 629 WETLANDS - EXISTING GRADE g_pg 62 — 0 YR WETLANDS 630 � Q W d _ — — - �, —_ \ > Cn O > w O F Z Cr 1 0 R z z a p r L Z Z _ ML ML O O 0 625 — 625 � o ILL N s23.56215- - -PROP- 163.48- OF 12'DJP-@D2B%_ Lu O C a N O PROP. 261.52' OF 12" PVC @ 0.28% LL ��� �r 29E� �P_�2B%_ PROP. 146.03' OF 12" PVC @ 0.28% PWR U O PROP. 112.93' OF 12" PVC @ 0.28% - - (SANDY - - - - - - - - 621 SILT) - - a W p e s2o.5 620 - _TRANSITION FROM 620 w w PVC TO DIP SOIL TYPES Q PWR PROPOSED 145 LF 2 "0 x t=0.250" W z J (SILTY TOPSOIL STEEL CASING W/ 12 C/) �jj z W SAND) TRANSITION FROM (INSTALLED BY OPE (m D Z Cn U) PVC TO DIP CH -FAT CLAY m > IU m > 4® CL-LEAN CLAY = _ cc C� 615 2 CO 2 615.5 — SM - SILTY SAND r m ± Z 615 O m+ r PROPOSED 115 LF 24"0 x t=0.250" W m z m O Z m TRANSITION FROM STEEL CASING W/ 12" RJ DIP ® MH-ELASTIC SILT N PROJ. MGR.: JRB ' PVC TO DIP (INSTALLED BY OPEN CUT) ® ML-SILT4 V1 FL W DESIGN BY: CH W W NOTE: ALL DUCTILE IRON PIPE PWR - PARTIALLY DRAWN BY: CH PROJ. DATE: MAR 2023 TO HAVE PROTECTO 401 COATING WEATHERED ROCK DRAWING NUMBER: I 610 610 z 28 50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37 50 CA OF QF— (� WKD PROJ. NO.: w 20190559.00-CL W a� Zaw 00. ,z Zoo 2- ,m< Q= ohwm Ndo 1No -w ozw z.o oz " o U Z Qom wYJ =UQ w < �w .00 ,wQ ovum z 01 ozz ow(D wF� wF.Q ¢3z o,(r) w=E 0 w1z �a� xap 7Zw �o< w2 Z°w ozD U-O ZZo w Y U F U pp0 §mz oo� �No (so= H H �.o °or \ \ STA. 40+87.34 / \\ & LINDA S. HARGETT N:460927.19 / \\ \\.\ \\\ \� Q00�/ iA�/ E.1514998.80 / / ^ PROPOSED TEMPORARY CONSTRUCTION - EASEMENT, TYP. (WIDTH AS NOTED) \\\ 0 -- - SOIL 4,REB--1 ��`/ QOYR \ f \ N: 46N4 / \ E:151429 LOOD SOILBOREB 11 \\ \ 1 \( \I\ ����yG�I�O� /F�O� /�/ \42*0 \�\ \ v /�-/ ^�/ N:461325.0 \% E / / E:1514682.7 P `, J \vou 11 / \ 39k00 33,3g.. \3g%P OY OE/ /// ////// /// /%o\e ctZ40 2 ° \ \\ (`� E��m\ o s o l P ((;. (I - - / \ S6�\\���\\\\�\ �E CE /y� / / / / / / c - 3 Sj22l. �-- �F ..�� rz F ;�2SS6, 43nu ,�� p\ \----- / PID 09372015C \ \ 1\ ROY PAYNE YOW' \ \ & DORIS M. YOW uj _ ///..--W PID 09372016 J / / / / / / i /•'" / / \ \\ \ --DAME D. ROW L j / / / // / / — PID 09372017 \ D.B. 5M P . 382 / / / / / / i %f / / — / \ �� �— 1 I 0 / KERI ELISE HUTCHINS STA. 37+38± / / / //_ / / / / / / _ __ O 1\ \ \ & RICHARD LEE MENDLER, III -PROPOSED ANTI -SEEP COLLAR \ \ ` / / / / / ij / / i / / (/ \ �\\ �\ \ i 11 V- / I DB. 6685, PG. 773 ,SEE DETAIL DWG. D.6/- \�\ PROPOSED SEWER LINE TO BE\ \ // j jj � J / / \ \ \`� \� \ 1 \ I OEM INSTALLED BY OPEN CUT \ e�- -� �!�/ / / \ \ E \ \ OEM F(SEE STREAM STABILIZATION /ice J-\ i i % / I \ \\ `� ( \ \ \OE / DETAILS SHEET D.3-D.4) i// •: \ r- -- - / _ ) S3: PERMANENT STREAM IMPACT (20 LF) / � \ I \ \\ \ \ \ pp`\ � L / EXCAVATION FOR OPEN CUT INSTALLATION SHALL BE LIMITED TO THE / / / 1 I ( \ \\'" \ I \ \ \ / / / \ \ \\\ III\ 30' WIDE PERMANENT EASEMENT WIDTH = - ' � ''',, / PROPOSED TEMPORARY PROP. 4'0 SSMH-16 �. PID 09372017A — ���� / / \ \ DONALD RAY HARGETT SILT FENCE, TYP / / SEE DETAIL SHT. D1 / PROPOSED WIRE AND STONE ' \ REINFORCED OUTLET TYP / SEE DETAIL SHT. D1 / 06 i, _ \ STA. 37+58± PROPOSED ANTI -SEEP COLLAR SEE DETAIL DWG. D.6 0_ La PID 09372003E 0W. 00 1 / vE/�0� ����� OE/` -OD / 0 PROP 4'0 SSMH-18 N: 460819.4 \\\\ / CE/ �,, / �:• \ . RE 00 o STA. 46+87.79 PROPOSED 30'PERMANENT EASEMENT / r / \ CFZ4 \ PE / CE/ �' N:461358.82 \ E: 1515241./2 / / TEMPORARY BRIDGE MAT �(15 EACH SIDE OF SEWER CENTERLINE) / / P •\\ \ � � / / � � � � o � CE/�p0 � E:1514626.66 ,� �(:, ( \�\ \ FOR TEMPORARY / -\ 1 PROP. 4'0 SSMH-17 T // ��qI I n �\ \ CONSTRUCTION ACCESS �p0 / // // / / (/ // / / \ \ \ - - \ _ - - STA. 44+12.90 STA. 37+03± 1pl I \ \ SEE DETAIL SHEET DA I \ / / � _ \ N:461224.71 PROPOSED ANTI -SEEP COLLAR - I 1 1 \ �\ \ _ \ E:1514866.61 SEE DETAIL DWG. D.6/ �I I/ \� �\ PROPOSED 20 LF 24"0 x t=0 250" \ I I- _� PROP. 4'0 SSMH-15 \\_ -= �\ STEEL CASING W/ 12" RJ DI F F F F F F F f STA. 37+13.42 \ ri - � INSTALLED BY OPEN CUT \ \ \ \ ( ( \ N:460766.57 ) E:1515336.4770 je 645 m 635 630 625 620 615 PIPE LEGEND: FUSIBLE PVC SDR 35 or C900 (DR-25): >3'; <12' C900 (DR-25): >12'; <20' DIP: >20'; <3' RESTRAINED JOINT DIP \ - \ ►c9 GRAPHIC SCALE 40 0 40 80 HORIZONTAL 4 0 4 8 VERTICAL NO ■■■■■■■■■■■■■■ ■E■■E■E■■E■E■EE ■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■ EMEMEMEEMMEMEEOSl� ,.�..•�■ENE■E■E■E■E ;-.•■ENE■E■E■■■■E■E■E■ !�' ....; : ; _ ■■ ■ ■ . --.. .. - :.. ■• NOON0MEMEMEMEME■E■■■■■■■■■ ■■■■■■ ■■■■■■■■■■■E■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■ ■ ■ - - .■■■■■■■■■■■■■■■■■■■■■■■NEE ... ... mw ■■NOON ■■■■■■■■■■■■■■■■ ■■N■■■ NONE ■■■■■E■■■■■■■■■ NOON■■■ E■E■E■E■E ■E■EN■E■ENEE■ENE ■E■ENEE■ENEE■E■ ■E■ENE■ ■ ■■■■■■■■■■■■■■■■■■■■■■■■■■ -•.■ENEE ■ ■■■■■■■■■■■■■■■■■PA NEE ■■■ ■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■- EQiiEi'�iEEiE■■■N ...::........ / E■EE EE■EMEM■■ ■■ NOON ■■■ NOON NOON ■ EE■E■■E■ENE . ,.:.,�...:. z NEEENN . • - • •. ■ 11■■E■E■E■E■E■E■E■E■ ■■■ MEN ■■■ NEON MEN NONE NONE EE■■■■■■■s■■EEEI,■EEEE■■EEEEEEEEE 11■E■■E■E■E■■E■E■E■E IMEN -MCL _ no-0 ! .. ! , - �ECEE'�iiiEEii'E■■■■■■■■■■■■■■■■■IIEE■■■■■■■■■ / e • i • : NOON ���� • NOON ���� , �� •. NOON ■ ■■■■■■■■■■E.NEEEEEE• • 5�����T�E■■��■ED�■■■■El�iil� ���� • • .. ��il� 11 C ��� • 11 ' - i iirWN■■■EWE■■■■EEN11■■■■■■■■■■■■■■■■■■ i D :: ---- ---�� ■■■ ■■■■ -- -- PANES — NOON■■■■■■■■■■■■11■■■■■■■■■■■■■■■■■■ = NOON NOON ■■�■■I■■ NE,rsEN ■I■dIEEEE 1■■IE■I■■■■ ■I �!_.EM■E■ ,.., �.� .. NOON■■■■■■■■■■EEEEEEEEiiI■■■■■■■■■■■ ■■■■■■■■■■■■■■■■11■■■■■■■■■■■■■■■■■■ - . 1 : • . ■■■■■ ■■■■■ i■■■■i ■■■■ EENENEN==O=E■■■■■■■■■■■11■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■11■■■■■ ■■■ . - • .. ;. • NONE = _NOON■ ■■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■■■■■■ 6. NOON■ - . 1 :• • ■■■■■11■■■ SEE: ■■■ NOON ---- _ — — _ _���� ■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■■■■■■ = ... ��---iiii��11EEEE .. ■■■■■IIEEE ■■■■i ...�����■ �s■■■ ■I■■■■ 1 .1. - . 1 : • ■■■■■■■■■■■■��11■■■SEE_____ -:iiii� — �� . ____����■■.....SIN■■N■■N■■■■�_ ____�■■■■■■■■■■■.1■■■■�■■I - , " ■ENNEN EMENEEM- NOON NOON oo MINI 'm •• ■■ (D —im ■■_ ��, �. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i DIP TO PVC ■ .:. - UCT- -. . • 1 ■■■■■■■■■■■■■■■■■■■■■■■■NOW■■■■■■■■■■■■■■■■■■ ■� NOON■■■ 11 1 11 1 • 11 • 1 •1 11 •1 1 11 1 11 1 11 1 •11 •1 • 11 1 •. 11 •. 1 11 645 640 635 630 625 620 615 z O CU D U) z O CU cc O LL 0 w Q J w cc O z w U) 0 z_ W 0- WK DICKSON comminitV infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, INC 28208 (t) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO. F-0374 PROFESSIONAL SEAL m p z O O a w III °C W LLJ w w a IIIIII110 co r 2 N N N � N Q W IL ~ 0 Ow Ir w a0 � U) LL cc a LL O � w O Z H O r zzZ = 0 U) LL W o O o U O cc a 6i 6i J H Z H w z O Q PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: C-5 OF 8 WKD PROJ. NO.: 20190559.00.0tL o� Zaw Oo pJU 62w o zll0 0 -mo=w Na0 �No -w Ozw �-p dZ 0 ZZU °Om w Y J =UQ LL p = O x' maw mow zz< °z, o0Z ow(D w¢< °C3z o'g >ox 0 wcc,§< Sap R7 <w� zmz -3 w2 0z= U-U z 'w U�-0 pp0 y fn< 3FZ oo¢ wo �o= QP; o aw .•1 655 650 645 635 630 625 620 4 x,_ e�E-�G ,5 STA. 48+21 ± \ \ \ g JE S� \ \ \ \\ PROPOSED ANTI -SEEP COLLAR \ \ 46+$7.% \ \ \ SEE DETAIL DWG. D.6 STA _ J 1 S PROPOSED 20 LF 24"0x t=0.250" � I STEEL CASING W/ 12" RJ DIP 1 O Y.\\ 11 (INSTALLED BY OPEN CUT) PROP. 4'0 SSMH-18 1 PROPOSED WIRE AND STONE STA. 46+87.79 \ �.� ) I REINFORCED OUTLET TYP PROPOSED 45 LF 24" O x t=0.250" N:461358.82 \ oF �S) o — /J / SEE DETAIL SHT. D1 A STEEL CASING W/ 12" RJ DIP E:1514626.66 \ `�O �I 20��Q. �/ / I ` I RICPID HA 9 F LEMKE (INSTALLED BY JACK AND BORE) & DEBO H A. LEMKE D 33, PG. 383 I 200 ��� S• 8x to �� �� STA. 48+41 ± ` �� 1 \09372003 \UN QN T \ C i \ PROPOSED ANTI -SEEP COLLAR i \ \ \ DB TRACTG. 530 F 40 SEE DETAIL DWG. D.6�� I� PROP. 4'0 SSMH-19 S4: PERMANENT STREAM IMPACT (20 LF) / // F STA. 49+54.66 I / 1 EXCAVATION FOR OPEN CUT _ / l/l \ N:461440.64 I ( \ \ INSTALLATION SHALL BE LIMITED TO THq f 'V S, / ° \ E:11514372.64 \ o 30 WIDE PERMANENT EASEMENT WIDT / <0 �- I j 25 I \ TEMPORARY BRIDGE MAT 1 / O /�!�' ��" F I \ S ID 09372019 FOR TEMPORARY (// >> JANE FORBIS TYSON \ \ cFi�O . I / PROPOSED 10 x10 / 1 \ CONSTRUCTION ACCESS\\ 1 (0 2 O / RECEIVING PIT SEE DETAIL SHEET D.4 -A L +� � / BORE B-12 S72'08'44"E - 20.00' '� /� — - \� \ <00 — � � 614\30.8 E: 15142$8;9 \o PROPOSED 10 LF 24"0 x t=0.250" / PROPOSED SEWER LINE TO BE ` O / r /m STEEL CASING W/ 12" RJ DIP INSTALLED BY OPEN CUT \ PROPOSED 12'x30', `1..�\ o / S (INSTALLED BY OPEN CUT) \ (SEE STREAM STABILIZATION \ BORE PIT1,c \ DETAILS SHEET D.3-D.4) r PROPOSED TEMPORARY CONSTRUCTION EASEMENT, TYP. (WIDTH AS NOTED) / j� 1 �l \ (\ _ v \ \ I PROPOSED 30' PERMANENT EASEMENT O C4 / I^ I — \ el� \ I \ 1 / (15' EACH SIDE OF SEWER CENTERLINE) ) /� // \ / �\ \ \ \ PROPOSED TEMPORARY GRAVEL ��� y � / PROP. 4'0 SSMH-20 �Q CONSTRUCTION ENTRANCE, TYP. `-' I� y/ \ STA. 50+29.42 SEE DETAIL SHT. D.1 / / ` /�I y N:461434.22 / 1 L E 514298.16 \ 01 )) l STA. 52+55- PROPOSED ANTI -SEEP COLLAR /'� SEE DETAIL DWG. D.6 S5: PERMANENT STREAM IMPACT (20 LF) PIPE LEGEND: FUSIBLE PVC SDR 35 or C900 (DR-25): >3'; <12' C900 (DR-25): >12'; <20' - DIP: >20'; <3' RESTRAINED JOINT DIP PI 09372021 B JANET F. TYSON GRAPHIC SCALE 40 0 40 80 HORIZONTAL 4 0 4 8 VERTICAL PROPOSED TEMPORARY SILT FENCE, TYP SEE DETAIL SHT. D1 ROKE B-13 N: 46144�44 7 STA. 52+65± -PROPOSED ANTI -SEEP COLLAR\ SEE DETAIL DWG. D.6 PROP. 4-0 SSMH-21 STA. 53+08.68 N O PROP. 4'0 SSMH-22 STA. 57+33.68 O 6,���o \ O / IE:1514028.90 / \ / /� j Q \ � \�\ \ \ PROPOSED 30' PERMANENT EASEME� (15 EACH SIDE OF SEWER CENTERLIN PROPOSED TEMPORARY CONSTRUCTION \ - �.��� 1 EASEMENT, TYP. (WIDTH AS NOTED) J _ 'y o,� STA. 53+32± • . - �'- T T PROPOSED ANTI -SEEP COLLAR SEE DETAIL DWG. D.6 \ N'. EXCAVATION FOR OPENI rl1T _ / �� ' WETLAND IMPACT:\ ` / I� �y INSTALLATION SHALL BE LIMITED TO T�I-E��. v �� n \\ / i / I PID09372003D 30' WIDE PERMANENT EASEMENT WIDTH e�\� �` P T T r PERM. IMPACT (W5) = 0.008 AC. \ 1 1 \ \ I UNION COUNTY _ \� - ♦ T .� TEMP. IMPACT W6 = 0.006 AC. DB. 7331, PG. TEMPORARY BRIDGE MAT 9 TRACT 2 T •'� / ( ) ;� \ Q ♦ l T i \ \ FOR TEMPORARY CONSTRUCTION ACCESS ��� �-- — — — —_,-------/ MAX. 20' WIDE LIMITS OF DISTURBANCE \ SEE DETAIL SHEET D.4 `�` <l / THROUGH WETLAND AREA. CONTRACTOR �\ PROPOSED SEWER LINE TO BE � ��\ \ SHALL STOCKPILE THE TOP LAYER OF NATIVE \ \ _ _ �.'_: \ WETLAND SOIL AND REPLACE IMMEDIATELY \ INSTALLED BY OPEN CUT ._ 10' WIDE PERMANENT \ \ \ \k N r__ N „ • ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ A■■■■■■■■■■■A■ NOON■■■ ■■■■■■■■■■■■■■■■■ • ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■III■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■' ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■' ■' - --■„=• . lmmm ■■■■■ = • _ . • ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■E■iNlll■ MEN ■■■■■■■■■■■■NOON■■■■Si■■■■■■■■■■■■■■■■■I11■ ■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I11■ . • ': • . , , • ' ■ _. - = = ' • - • ■■■■■■■■■■u■■■■■E ■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■ ■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ �OO�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ �OO�■■■■■■■■■■■■■_■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■�I■■■■■■■■■■■■■■■■■■■■■■■■■■I11■ ■■■■■■■■ „ - ■■■■ _ _ �. . ' .. ■■■ N■■■ ■■■■■■■■■■■■■■■■ , • • - - ■ ■■■■■■■■■■�I■■■■■■■■■■■■■■■■■■■■■■■■■■■I11■ NOON ■■ NONE 1MM ■ 1MMmMMM1mM■ ■■III■ ....: ■ ■■ - _ • • ■■■ ■■■■■■■■ ■ .. - ■■ ■■■ ■■ ■ ■ ■ ■■ ■■■■■■■■ ■E■E■E■E No ■ ■ ■■ ■■ ■ ■ NONE ■■N ■■ ■■■ ■■■ ■■■■■ ■I11 E■■ ■■■ ■E■ NEE ■ENE■ ■ENE■ MEN ■■NI ■IE■ENE ■IEEE■■■ :,,:::: ■EN■■■■■■■■■■■■■■■■■ ■i■1 ■■■■MOON ■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■I■■■■1■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■III■ ■■■■■■■■ ■■■■■■■■ ■■■■■■■■■■■■■■■■■■■�1■1'■■'■■■■1�■■■■�l■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■III■ ■■■■■■■■ ■■■■■■■■■11■■■■■■ . _ ' •- ' _. E■■■■■■■E - E■■E■■■E�i��s�■■■■■■IEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEiI ■■■■i■ ■■■■■■■■■■■■■■■■■■■■■■■■ ■EN■■■NEE ■■■E■EEEEEEEE■■E■EdEE','ii�■EEEEEE■IEEEEEEEEEEEEEEEEEEEEEEEEEEE_E_EE il � ���, �� �:� ■■\\O■� INN -Mole MEMO �_ Ij1MENOMONEE \\NI_�a■N'�i� NOON TRANSITION FROM PVC TO. ■■■■■■■■■■11■■■■■■■■ . ■■■■■■SEE----_"_` � � � � � �„_"_..� INN - , mmmmwmMmMMMMmMMM EE�i1■■I■■■■■■■■■■■■■■■■■ iil■■1i111II{■■■■■■■■■■ ■ ■■■■/�11'— ■■■■�/////�■■■■■■■NEE■■EEE■■■■■■■■■■■■■■I ■■■■■■■■�i ■■■11■■■■■■■■■■■■i■■■ ■■�1 ■■II ■■■■EEEESE■■■■■■E■i■■■■Nip.\■IdI:III.�IIII Mon .. - -. ' . , .. ■■■■■■■■■■ _.�//.��k9■I�■■■■■■\NOON ■■■■■'i0- '...�■■■►�■\\NOON ■■■■■■■■ ■■■■■■■■■■I ■■■■■■■■■I - ���■���_ •' . I�■■■■Ni�iiii■�1■■■ii ���— • u -- .. ■■ENi1l■■ill - - . -. � - - �- Nall ice% NOON■■■ ■■■■■■■■ALL !■■IIII■�11 Njj1 ���,_■■■ • _��I ■■■I■■■■II ■■■■■�I ■■■NOON ■■■■■■■■ ■■■■■■■■MINE ■I it % ----■■■■■■■■■�■■■■■ - SOIL TYPES ".TOPSOIL iiii CL LEAN CLAY IIIIIIIIIIIIIIII ������������������������ — . _ PARTIALLY —_.... ---- _�� �m■i ,.��� .�.,►..�.®-►.-.►�.111-_ __ BY OPEN CUT) ' • - .:. • . - . N■E■■■■IN■■■■■■■ ■■■■■■■■■■■ ■■■■■■■■■■■I '.4 M ■■■■��1►.. _� PROP.(INSTALLED • 1, . 1-1 • : ' . 7-1 M_ I MENOMONEE .. IN MEN ■■■__■■■■■■■■ ■F1■■■■■IM■■■■■\1■ ,', E■■■■E■EEEEEE■■�%I■■■■■■■■■■■ l■■■■■■■■■■■ ■■■■■■■■■■■I . I■■ NOON■ PROPOSED , - NG / .:. ■ , 0. - ■■EEEEE PROPOSED : G • •- ..:.- STEEL CASING W/ 12" RJ ... . - . r■■ri■■■ ■■■■■■■■■ ■■■■■■■■■■■I ■■■■■■■■■■■I I■ ■�■■■■■■��■■■- == ... .. DIP .. i■■■■■■■�� �/ ■■■■■■■■■■ _ -' -' DIP ' -■■■■■■■■■■■ENE■ IE J■■■■■ ■■�■■■■--�■■■■■■■■■■■■■■■ _ ■■■■■■■\ ■■■■■■■■ ■■■■■■■■■■■I IE NOON■■PROP.■■■ ■■■■■■■■ , :. = ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■ ■■■■■■■■■■■ ■■ ■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ NOON■■■ � ������■■■■■■■■■■■■ I- M cD �30 O z 655 650 z 645 O F_ U D Cn 640 z O U O LL 635 Q w U) a J 630 w O z 625 w U) z 620 W I0- PaWK WDICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO. F-0374 PROFESSIONAL SEAL m p z pC O O a- U a LU °C cr_ U) Lu LU W Q OR N C4 2 N cn N � N � w O z Ir C) a O w O 0 > U a O } w O z Q O 00 IY r GH z z _ G N ILLLu o cn 0- >_ w cn U a a 6i w 2i J z LU z o � o PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: C.6OF8 WKD PROJ. NO.: 20190559.00. C L Ow Uo Zaw UJU 62w zo~ 0 M 5m* o x W oom w=0 �No -W Ozw -o °zo 0 Ozw $0m W`1J xUQ O le , =)Ow zz< °z¢ o0Z OWO w¢a x3z d�c3_ >ox 0 w3< x xap c7zw -0,2 Q awe ddFZ zmz 0zD U-U zws °2_ Uoo� po0 Y f/1Q 3=z r� OOO¢ UO (DOx Qi:5. LLw0 Onn � PROP. 4'fl� SSMH-23 I ) STA. 61 +58.68 PROPOSED WIRE AND STONE / � N:460931.81 ( REINFORCED OUTLET TYP E:1513404.28 / SEE DETAIL SHT. D1 PROPOSED TEMPORARY SILT FENCE, TYP SEE DETAIL SHT. D1- ° � � XO� \ SOIL BORE B-15 N: 460975.9 Op PID 09372003D UNION COUNTY \ �� DB 530 I I PID 09372021A YURY KOMLEZ E: 1513368.E TRACT 2 I & NATALYA KOMLEV DB. 6860, PG. 417/ j � \ G 5 o��`=�o PROP. 4 fly SSMH-22 PROPOSED TEMPORARY CONSTRUCTION�� EASEMENT, TYP. (WIDTH AS NOTED) STA. 57+33.68 N:461220.13 E:1513716.52 ��` tsXllllll PIPE LEGEND: �Op X� FUSIBLE PVC PROPOSED 30' PERMANENT EASEMENT / �•`Q'' � SDR 35 or C900 (DR-25): >3'; <12' \ (15' EACH SIDE / OF SEWER CENTERLINE) \ / �'F. \ � BOO C900 (DR-25): >12'; <20' SOIL BOf/tE B-'�4 DIP: >20` <3' � N: 46117�.3 / E: 1513g57.4 PID 09372003D I I UNION COUNTY I RESTRAINED JOINT DIP DB. 7331, PG. 530 PROP. 4'0 SSMH-24 � S TRACT 2 STA. 65+83.68 l 6'6, x0 I GRAPHIC SCALE \ N:461244.00 E:1513115.90 1 � 40 0 40 80 �� HORIZONTAL 4 0 4 8 0 SOIL BORE B-16 1 -c VERTICAL N:461269.4 E: 1513098.0 \ Boa 2 c� � (n � II M •� 660 � � � � ? 660 `� o z I I /dy L� > > � `� � a cn T _ � CO � M � � II � M N > II 655 o z � 655 M d I I � g � a; � a��? Z � II M � N> � so.s � XISTING GRADE � � � z � � co Z O 650 � > > z B-16 650 � acne — _ ML 645 B-�' 645 s 5 645 J ML 12 ' vc P 1.00% PROP. 425.00' OF D PWR (SANDY ^ SILT) 640 PROP. 425.00' OF 12" PVC @ 0.28% 2 r 640 s3s - 639.5 z PWR (SANDY SILT PWR (SANDY (n 638 SILT) 6 7 D 636 Cal 635 - m D CIO 635 - SOIL TYPES - J w TOPSOIL 2 = 00 CL m r mz CH -FAT CLAY m ® CL - LEAN CLAY m m 630 � SM -SILTY SAND 630 Cn - � D (q = m (n MH -ELASTIC SILT 6 8 ® ML -SILT l J W W PWR -PARTIALLY ® WEATHERED ROCK NOTE: ALL DUCTILE IRON PIPE ML _ ao TO HAVE PROTECTO 401 COATING I 625 625 625 57 00 57+50 58+00 58+50 59+00 59+50 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50 65+00 65+50 66+00 66+50 67 00 pa �DICKSON communityinfrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO. F-0374 10 PROFESSIONAL SEAL tx 6-1 rn Ci 03 '0 CIO 0 z O cc O w°C U) Lu w cc w04 IIIIII11cn to CID 0Goo N C2 G cn Z (Q N O `� N Q ~ O U zccU la O � a Z z CE N O zzz = U ccn 2i cn CCD 0 w N U O O W °C a 77— Q w J W ~ J z W w z 0 < 0- o O cn Z PROJ. MGR.: JRB W DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: 4— Z �_ C.7 OF 8 WKD PROJ. NO.: 20190559.00.CL W o. z�w pJU pZW ao¢ Zoo o=w 'mm 0d0 w C) n .p oz " o U z o °°m WYJ =tea �px OY< w C)to zwa °Nm Z °a ozz ow0 w�a =3:z o,(r) wmE 0 w < a� =dp �Zw z°w �:2 ozD U-U ZZ� w Og= Y U F U po0 Y m Q 3=zi oo� �No �o= ow'o °oLL ' DICKSON i iDll/i communit infrastructure consultants 1213 W. MO SUITE 3A STREET \ \ \ \ PID 09372003D 1 UNION COUNTY l / / �/ / / ( / / / / ` / / / \ CHARLOTTE, NC 28208 DB. 7331, PG. 530 TRACT 2 // / � /// �/ / ^1 (t)(704) 334-5348 PROP. 4'0 SSMH-26 STA. 73+42.87 / l m / / I / WWW.WKDICKSON.COM \ N:461876.53 E:1512696.05 I��\PROPOSEDTEMPORARY / /�//� /,//,/ / / NC LICENSE NO. F-0374 _ SILT FENCE, TYP / SEE DETAIL SHT. D1 \ \ SOIL BORE B-17 l ~ I / I UNION COUNTY \ \ \ \ \ \ \ \ \ \ �s\ N: 461600� I SOIL BORE B-18 i / I // ,ti m 1� I / / q ^� ///% \\ DB. 7331, TRACT 2. 530 o ow \ \ \ \ E: 1512874.E / / / / I N: 461834.1 / /tr/ O o / // / / / \ C D LO L \ C \ \ \ \ E: 1512704.5 / / / o o / / / Q� / / \ E PE PE- PE C —� P /�— — c� / C OD CE C / / /pt /� I \ / PROPOSED 50 LF 24"QJ x t=0.250" 67+0 68+00 51 69+00 �70+00 \ PE �_ \ I / / / STEEL CASING W/ 12 RJ DIP \65 +00 \\\\\\ S33°3631 "E - 424.69 71+00 \ 72+00 \, 73+00 / CDC INSTALLED BY JACK AND BORE ( ) E `p� \\\\\ S33°3151 "E 334.50' / — PE CEO CE/LOD \ 1 \ P� E - Z �� �O6� \ PROPOSED 10 x10 RECEIVING PIT E \ �— C /LOD CE/LODE CE/LOD CE�LOD CE/LOD CE/LOD CE LOD / C�/LOD CE/CQ\ CE/LOD 1 \ �/LOD \ P PE E - \ /� E LOD U-' I 1 \ \ — o SOIL BORE B-16\ N: 461269.4 \ / ` / \ \ \ \ CE/LOD �- CE/LODE— \ PROP. 4'0 SSMH-25 ``_o STA. 70+08.37 CE/LOD CE/LOD C /LOD CE/LODE \ F / — �rC \ — / / \ \ PROFESSIONAL SEAL \ \ / � UNION COUNTY PROP. 4'0 SSMH-24 E: 1513098.0 \ 1 \ / / \ \ \ N:461597.69 E:1512880.82 � _DB. 7331, PG. 530 � � PROPOSED 12x30 TRACT 2 / � 1 I /// / ( -� } m STA. 65+83.68 � � / / PROPOSED 30' PERMANENT EASEMENT \ (15' EACH SIDE OF SEWER CENTERLINE) \ � \ -- — _ — — � BORE PIT ) I/ N:461244.00 N:461115.90 \ � , / \ \ PROPOSED TEMPORARY GRAVELE1513 / \ \ / \ / \ \ _ CONSTRUCTION ENTRANCE, TYP. \✓ SEE DETAIL SHT. D.1 \ / \ PROP. 4'0 SSMH-27 ) � \ STA. 74+10.95 N :461940.53 / E:1512672.84 p z o PIPE LEGEND: OU FUSIBLE PVC GRAPHIC SCALE Lu cr w 40 0 40 80 z0 0 SDR 35 or C900 (DR-25): >3'; <12' U) C900 (DR-25): >12'; <20' HORIZONTAL Lu W 4 0 4 8 — DIP: >20'; <3' RESTRAINED JOINT DIP VERTICAL 670 670 _ = LID w a o ch 10 ' CD �� cn + z�� 11 (� L� 665 --Iur) C)d~ M m ::) I I Z p O Q 11 665 N x I- CD vo �'H�>> a- cneZ — aco ~�Z N co C6 N cn00 � 11 � M � � �� II 2 'IT 00 � CD (0 Z H OQ coZ 660 c') � � II M N ?] II 00 °+° � Z j j Z 660 EXISTING GRADE GOLDMINE RD _ B-1a 659 THEORETICAL �'O a: w0 a Z — — ASPH ( ) _ — — — _ — — t'—_ 7 z 0 5'+2:1 - I C= a cn IY — — ML I z N C w N cn Y N 0 THEORETICAL 1:1 O 655 656 655 Q w UaZ B-1 —6 5 I V I I Ir O W W I I ML a w 0 a 652 EXISTING > U) ZO W In PWR 24" WATER LINE Z Z Q O Z Z N I O 650 B-16 60 — — — (SSILT)Y_ / I I —PROPOSED 10'x10' 650 Z Z O = — PROP. 334.50 , „ OF 12 PVC @ 6.28 o /o RECEIVING PIT v 0�� N 0 O N W Q I 1 O Lu 424.69' OF 12" PILL VC @ 6,7rjC/p PWR (SANDY 647 PROPOSED 12'x30' U)PROP. U a SILT) BORE PIT, 0 W 645 PROP. 68.08' OF 12" DIP @ 0.28% - 645 cc 644.5 — SOIL TYPES C^ VJ TOPSOIL Q W W _j PROPOSED 50 LF 24" 0 x t=0.250' W Q 642.5 J STEEL CASING W/ 12" RJ DIP CH - FAT CLAY z PWR m (SANDY SILT) (INSTALLED BY JACK AND BORE) ® CL -LEAN CLAY W U Z W j m � 640 = SM -SILTY SAND 640 o _ mCCIIZ r MH -ELASTIC SILT Co m C7 � �l 638 NOTE: ALL DUCTILE IRON PIPE ® ML-SILT ® PWR-PARTIALLY WEATHERED ROCK PROJ. MGR.: JRB DESIGN BY: CH W TO HAVE PROTECTO401 COATING DRAWN BY: CH 635 635 PROJ. DATE: MAR 2023 65 50 66+00 66+50 67+00 67+50 68+00 68+50 69+00 69+50 70+00 70+50 71+00 71+50 72+00 72+50 73+00 73+50 74+00 74+50 75+00 75+50 76 00 z DRAWING NUMBER: C-8 OF 8 F- WKD PROJ. NO.: Lu 20190559.00-CL W o. Z�w pJU pZw ao¢ zo� 0 g=w ohm N�o =-o w ozw .o oz " o U z o °om WYJ =tea OY� now zwa o.w Z O,z owl w�a ��z w=a >0o w�a ,a§ =mo �oZw o< Z$w zD ozD U-U ZZE . °2_w Y U F U sg0 Y o Q 3j_ oo� �No �o= 20 Uo EROSION CONTROL SEQUENCE OF CONSTRUCTION NOTES 1. SCHEDULE A PRECONSTRUCTION CONFERENCE ON -SITE WITH THE EROSION CONTROL INSPECTOR FROM THE REGIONAL OFFICE OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT QUALITY (NCDEQ), AND THE ENGINEER'S REPRESENTATIVE. 2. BEFORE INITIATION OF CONSTRUCTION, INSTALL PERIMETER EROSION CONTROL MEASURES SHOWN ON THE PLANS INCLUDING SILT FENCE AND STONE OUTLETS ALONG WITH ANY REQUESTED BY THE NCDEQ INSPECTOR RESULTING FROM THE PRECONSTRUCTION MEETING, CLEARING AREAS ONLY AS NEEDED TO INSTALL THE DEVICES. 3. INSTALL SEWER SERVICE. EROSION CONTROL DETAILS ARE SHOWN ON THE DRAWINGS AND STRUCTURE LOCATIONS ARE DEFINED IN THE PLAN VIEWS. 4. MAINTENANCE OF EROSION CONTROL DEVICES IS THE CONTRACTOR'S RESPONSIBILITY. AFTER EACH RAIN STORM THE DEVICES SHALL BE INSPECTED FOR DAMAGE AND REPAIRS MADE AS NEEDED. ANY SILT ACCUMULATION SHALL BE REMOVED IMMEDIATEDLY AND DISPOSED OF PROPERLY. 5. RESEED AND MULCH DISTURBED AREAS AS GRADING IS COMPLETED ALONG ALL CONSTRUCTION. ALL DISTURBED AREAS MUST BE VEGETATED OR OTHERWISE STABILIZED WITHIN THE NUMBER OF DAYS NOTED IN THE GROUND COVER SCHEDULE AFTER BEING DISTURBED. THE CONTRACTOR SHALL UTILIZE THE SEEDING AND MULCHING SCHEDULES NOTED ON THE DRAWINGS. 6. ALL LOCATIONS DISTURBED DURING CONSTRUCTION WILL BE RESTORED ACCORDING TO THE PERMANENT SEEDING SCHEDULE AS SHOWN ON THE PLANS. 7. AFTER COMPLETE STABILIZATION OF DISTURBED AREAS AND AS DIRECTED BY THE ENGINEER, REMOVE EROSION CONTROL DEVICES FROM THE SITE. EROSION CONTROL DEVICE MAINTENANCE NOTES: 1. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE AND REPAIR OF THE EROSION CONTROL DEVICES UNTIL CONSTRUCTION IS COMPLETE. 2. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE PER WEEK. 3. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 4. SEDIMENT IS TO BE BE REMOVED FROM THE SEDIMENT TRAPS, BASINS AND INLET PROTECTION DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. 5. GRAVEL IS TO BE CLEANED AND/OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. 6. SEDIMENT IS TO BE REMOVED FROM BEHIND SILT FENCE WHEN IT BECOMES APPROXIMATELY 0.50' DEEP AT THE FENCE. THE SILT FENCE IS TO BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 7. PERMANENT GROUND COVER MUST BE ESTABLISHED WITHIN THE PROPOSED DITCHES AND CHANNELS. 8. ALL DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED AS NEEDED IN ACCORDANCE WITH THE SPECIFICATIONS. 9. ADDITIONAL MECHANICAL MEASURES WILL BE REQUIRED IF VEGETATIVE COVER CANNOT BE ESTABLISHED AS PROPOSED. a 10. CONTRACTOR SHALL MAINTAIN A RAIN GAUGE ON SITE AND PROVIDE WEEKLY/POST RAINFALL INSPECTION REPORTS TO THE OWNER IN ACCORDANCE WITH NCDLR z REQUIREMENTS. Y Y a a 0 0 ° TOTAL PROJECT/DISTURBED AREA 8.12 ACRES TEMPORARY SEEDING SCHEDULE - SUMMER Seeding mixture Species Rate (lb/acre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding dates Mountains - May 15-Aug. 15 Piedmont - May 1-Aug. 15 Coastal Plain - Apr. 15-Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as an anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, fertilize and mulch immediately following erosion or other damage. TEMPORARY SEEDING SCHEDULE - FALL Seeding mixture Species Rye (grain) Rate (lb/acre) 120 Seeding dates Mountains - Aug. 15-Dec. 15 Coastal Plain and Piedmont - Aug. 15-Dec. 30 Soil amendments Follow soil tests or apply 2,000 Ib/acre ground agricultural lime- stone and 1,000 Ib/acre 10-10-10 fertilizer.BOTTOM TOPAND STRAND Mulch MIN. 10 Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, I GA.,TYP netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with w �,50 Ib/acre of nitrogen in March. If it is necessary to extend ci L temporary cover beyond June 15, overseed with 50 Ib/acre Kobe(Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in Zlate February or early March. PERMANENT SEEDING SCHEDULE -MIXTURE Seeding Mixture Species Rate (lb/acre) Tall fescue 100 Sericea lespedeza 20 Korean lespedeza 10 Redtop 5 Kentucky bluegrass 5 Seeding note After Aug. 1, use unscarified seed for sericea lespedeza. Nurse plants Between May 1 and Aug. 15 add 10 Ib/acre German millet or 15 Ib/acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 Ib/acre rye (grain). it may be beneficial to plant the grasses in late summer and overseed the lespedezas in March. Seeding dates Best Possible Below 2500 ft: Aug. 15-Sept. 1 July 25-Sept. 15 Mar. 1-Apr. 1 Mar. 1-May 10 Above 2500 ft: July 25-Aug. 15 July 15-Aug. 30 Mar. 20-Apr. 20 Mar. 5-May 15 Complete seeding earlier in the fall, and start later in spring on north and east facing slopes. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 Ib/acre ground agricultural limestone and 1,000 Ib/acre 5-10-10 fertilizer. Mulch Apply 4,000-5,000 Ib/acre grain straw or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Mow no more than once a year. Refertilize in the second year unless growth is fully adequate. Reseed, fertilize and mulch damaged areas immediately. 1. GROUND COVER - WHEREVER LAND DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE (1) ACRE, A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN ON THIS SHEET. 2. GRADED SLOPES AND FILLS - PER THE GROUND COVER SCHEDULE SHOWN HERE, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. WWO� 2 STEEL POST WIRE FABRIC FILTER FABRIC IoU Z2i, Q �Q p�0`N =III-IEXISTING wGROUND o ILINE 4" ANCHOR FABRIC AHWN SECTION VARIABLE AS DIRECTED BY THE ENGINEER (8'MAX.) STAY WIRES, ANCHOR WIRE FABRIC TO 12" SPACING STEEL POST WITH MIN. 4 MIN. 14 GA. FENCING STAPLES PER POST MAX. WIRE J FILTER FABRIC TO BE�}�FABRIC MESH POLYPROPYLENE NYLON, IIOPENING SIZE POLYESTER OR POLY-U36 SQ. IN. ETHYLENE YARN OFMANUFACTURER TO BE APPROVED BY ENGINEER ELEVATION NOTES: 1. THE CONTRACTOR SHALL MAINTAIN ALL SILT FENCING BY REMOVING AND DISPOSING OF SILT ACCUMULATIONS AS DIRECTED BY THE ENGINEER. FILTER FABRIC SHALL BE REPLACED WHEN IT HAS DETERIORATED TO SUCH EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SILT FENCE. 2. FILTER FABRIC SHALL HAVE A MINIMUM TENSILE STRENGTH (@ 20% MAX. ELONGATION) OF 30lbs/LIN. IN., WIRE FABRIC REQUIRED. 3. IF EXTRA STRENGTH FABRIC IS UTILIZED (MIN. TENSILE STRENGTH = 50 Ibs/LIN. IN. @ MAX. 20% ELONGATION), WIRE FABRIC IS OPTIONAL, MAXIMUM POST SPACING = 6 FEET. 4. POSTS SHALL BE 1.33 Ib/LF STEEL UNLESS OTHERWISE APPROVED BY ENGINEER. GROUND COVER SCHEDULE SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE SLOPES STEEPER THAN 3:1 7 DAYS NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7 DAYS FOR SLOPES GREATER SLOPES 3:1 OR FLATTER 14 DAYS THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH NONE (EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 14 DAYS FAND HWQ ZONES) 1. PER THE GROUND COVER SCHEDULE SHOWN HERE, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, DISTURBED AREAS SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. TEMPORARY SILT FENCE NOT TO SCALE 18" MIN. Z 00 SECURELY ANCHOR FABRIC TO WIRE WITH WIRE TIES PONDING HEIGHT 2 RUNOFF 311 G N - I711i 19 GAUGE HARDWARE I CLOTH W/4MESH OPENING ROCK SECTION DETAIL TRENCH WITH GRAVEL STEEL POST FILTER FABRIC 36" MIN. WIDTH * SILT FENCE 5' MIN. EXISTING GRADE 7 * SILT FENCE �r' �3 TYP.) 31 TOPSOIL/DEBRIS STOCyCPILE \ 5' MIN. SEE DETAIL 2/G0.6 FOR INSTALLATION OF SILT FENCE NOTES: 1. STOCK PILE HEIGHTS SHALL NOT EXCEED 35 FEET. 2. STOCK PILE SLOPES SHALL BE 3:1 OR FLATTER. 3. STOCK PILES SHALL BE LOCATED SUCH THAT THEY DO NOT INTERFERE WITH ROADWAY SIGHT DISTANCES. MAINTENANCE:SEE DETAIL 2/G0.6 FOR MAINTENANCE NOTES oN SILT FENCES. TYPICAL STOCK PILE DETAIL NOT TO SCALE so, COARSE AGGREGATE - STONE SIZE = 2"-3" 6" THICK MINIMUM GEOTEXTILE FABRIC INSTALLED MAINTENANCE: UNDER CONSTRUCTION ENTRANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE CLASS B STONE 18" MIN. HEIGHT, 1 FT BEYOND EDGES 19 GAUGE HARDWARE 2' MIN. CLOTH W/4" MESH OPENING STEEL POST 35'ABOVEGRADE (MAX.) F� COMPACTED SOIL8' I 11111=r 9" MAX V Z III;I(RECOMMENDED) 4 III=11 STORAGE HEIGHT 8 FT. MAX. SPACING WITH II=111WIRE SUPPORT FENCE mir>! II I II I IIIII II;= I f II II=111=1' =III,=„III=„IIIF; I' NOTES: POST 1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SUPPORT SEDIMENT WHEN DEPOSITS REACH 30% OF FENCE HEIGHT. I- =III II1=III- 2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. 3. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. SILT FENCE - WIRE & STONE REINFORCED OUTLET NOT TO SCALE Z O Z O O LL Q Q Ljj LU O Z FL L1J U) Z 75 M LU DWK DICKSON communityinfrastructure consultants 1213 W. MOREHEAD STREET CHARLOTTE, NC 28208 (t)(704) 334-5348 (flOFFICE FAX NO. WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL OLUcr Z O U) ZpO U) Lu cc � NN W W � O Z Ir U Z O J> cw aZO WZ O Z a o U ZZ O O UC0 ILL 0 O cr w wLU FL LU JZwZ oo PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ.DATE: MAR 2023 DRAWING NUMBER: DA OF 7 WKD PROJ. NO.: 20190559.00.CL o. zF. 00. pJU pZW aU� Zoe �< o=w pom Nd0 =�o w ozw m .p zo. woz " Z U °zom T. =U¢ ~p= OY� w�a w nLL� 0 zwa o.W z o < o pZz ow0 w�Q m3z o'o w=o w0 =z w;ia m'= Ian =d �pZw lmx <o2 zow oD z U-U zzw' Y U F U po0 Ym 3:2z oo� "o '3o= 1J6 0 °oLL Y 3 w a o 0 MAINTENANCE: 1.6 LBS/SF MIN. SHEAR STRESS STRAW DURING THE ESTABLISHMENT PERIOD, CHECK GRASS —LINED CHANNELS AFTER BLANKET OR APPROVED EQUAL, INSTALL EVERY RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE PER MANUFACTURER'S RECOMMENDATION CHANNEL; CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY IMPORTANT TO CHECK THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION FOR THE CHANNEL. S•� 1.5'± 1.5'± G� 1 INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS \\ AND MAKE REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. II CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. MAINTAIN ALL VEGETATION ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR DURING OUT —OF —BANK FLOW. 7.5' 10.0' 7.5' LENGTH DITCH "A" (TRAPEZlz X: OIDAL) STORM DRAIN PIPE RIP -RAP o APRON 1.6 LBS/SF MIN. SHEAR STRESS STRAW BLANKET OR APPROVED EQUAL, INSTALL PLAN PER MANUFACTURER'S RECOMMENDATION 6.5' 6.5' DITCH "B" W-DITCH DITCH SECTIONS W/ MATTING NOT TO SCALE 1'41 CURB OPTION "A" PLAN DRAIN INLET- PLAN 8" FILTE STORM GRATE 8" FILTER SOCK EXCESS SOCK MATERIAL DRAWN IN AND TIED OFF TO 2"x2" WOODEN STAKE, (TYP.) CURB FLOW Em CULVERT PIPE OPTION "B" PLAN WIRE TIES, (TYP.) STORM GRATE 8" FILTER SOCK DRAIN INLET- SECTION EXESS SOCK MATERIAL TO BE DRAWN IN AND TIED OFF 2"x2" WOODEN STAKE SLOPE = 0% STORM DRAIN PIPE FILTER FABRIC, J MIRAFI 700x OR EQUAL SECTION TAILWATER FLOW N.C.D.O.T. CLASS I RIPRAP, MINIMUM 18" THICK, TYPICAL RIP -RAP SCHEDULE PIPE DIA. (IN.) LENGTH (FT.) WIDTH (FT.) RIP RAP (CLASS) APRON THICKNESS (IN.) 18" (STA. 14+20) 20 21.5 B 9 18" (STA. 16+30) 28 29.5 B 9 21" (STA. 20+80) 85 36 (EACH) 1 22 EXCESS SOCK MATERIAL DRAWN IN AND TIED OFF TO 2"x2" WOODEN STAKE, (TYP.) FILTER SOCK CULVERT INLET- PLAN 8" FILTER SOCK SECURE TO GRATE WITH RUBBER TIE DOWNS CATCH BASIN CURBSIDE SECTION NOTES: 1. ALL MATERIAL TO MEET SPECIFICATIONS. 2. FILTER MEDIA FILL TO MEET APPLICATIONS REQUIREMENTS. 3. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER. 4. SEDIMENT SHOULD BE REMOVED FROM BEHIND CHECK DAM ONCE THE ACCUMULATED HEIGHT HAS REACHED 1/2 THE HEIGHT OF THE CHECK DAM. INLET PROTECTION NOT TO SCALE RIP -RAP APRON NOT TO SCALE SANITARY SEWER (DRAWINGS C.1 - C.8) STATION START STATION END STABILIZATION MAT TYPE 0+00 - 1 +00 STRAW NETTING 1 +30 - 1 +48 STRAW/GRASS 1+48 - 3+50 STRAW NETTING 3+50 - 4+50 STRAW/GRASS 4+50 - 6+70 STRAW NETTING 6+70 - 10+80 STRAW/GRASS 10+80 - 15+00 STRAW NETTING 15+00 - 20+30 STRAW/GRASS 20+30 - 21+35 STRAW NETTING 21+35 - 22+65 STRAW/GRASS 22+65 - 23+50 STRAW NETTING 23+50 - 25+00 STRAW/GRASS 25+00 - 26+90 STRAW NETTING 26+90 - 29+50 STRAW/GRASS 29+50 - 30+40 STRAW NETTING 30+40 - 31+40 STRAW/GRASS 31 +40 - 33+00 STRAW NETTING FIGURE 1 INTITIAL ANCHOR TRENCH FIGURE 3 TOP OF BANK TERMINATION SANITARY SEWER (DRAWINGS C.1 - C.8) STAKE AT V INTERVALS STAKE AT V INTEF 12" START NEW ROLL IN CHECK SLOT, OVERLAP OINIMUM 1' FIGURE 2 INTERMITTENT CHECK SLOT / BEGINING OF NEW ROLL UPSTREAM STAKE AT EMBANKMENT V INTERVALST DIRECT/0,VOF FLO! �� � ITROL MATTING MUST 111-ll...l II IVILL 1 %..Fx L-....,EED THE FOLLOWING REQUIREMENTS: I=III �IIII II IIII 100 % COCONUT FIBER (COIR) TWINE WOVEN INTO A HIGH STRENGTH MATRIX. 6„ THICKNESS - 0.35 IN. MINIMUM. TENSILE STRENGTH - 1740 LB/FT MINIMUM SHEAR STRESS - 4.5 LBS/SQFT FIGURE 4 FLOW VELOCITY- OBSERVED 12 FT/SEC WEIGHT 230Z/SY TERMINAL ANCHOR TRENCH SIZE - 9.84FT X 165 FT (180 SY) "C" FACTOR - 0.002 OPEN AREA (MEASURED) - 48% SLOPES - UP TO A MAXIMUM OF 1:1 EROSION CONTROL MATTING INSTALLATION STATION START STATION END STABILIZATION MAT TYPE 33+00 - 37+35 STRAW/GRASS 37+35 - 39+00 STRAW NETTING 39+00 - 41+00 STRAW/GRASS 41 +00 - 42+00 STRAW NETTING 42+00 - 48+00 STRAW/GRASS 48+00 - 51+50 STRAW NETTING 51 +50 - 53+30 STRAW/GRASS 54+00 - 56+00 STRAW NETTING 56+00 - 58+20 STRAW/GRASS 58+20 - 63+50 STRAW NETTING 63+50 - 67+50 STRAW/GRASS 67+50 - 69+50 STRAW NETTING 69+50 - 70+50 STRAW/GRASS 70+50 - 73+45 STRAW NETTING 73+45 - 74+05 STRAW/GRASS 74+05 - 74+13 STRAW NETTING EROSION MATTING TABLES NOT TO SCALE INSTALLATION NOTES: SITE PREPARATION GRADE AND COMPACT AREA. REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL HAVE DIRECT CONTACT WITH THE SOIL PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE. TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THE CITY. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. DO NOT MULCH AREAS WHERE MAT IS TO BE INSTALLED. SEEDING APPLY SEED TO SOIL BEFORE PLACING MATTING. WHEN USING PERMANENT LINER, APPLY ADDITIONAL SEED AFTER INSTALLATION AND FILL MAT WITH SOIL. OVERLAP ADJACENT MATS 3" AND ANCHOR EVERY 18" ACROSS THE OVERLAP. THE HIGHER ELEVATION MAT SHOULD BE PLACED OVER THE LOWER ELEVATION MAT. EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. DO NOT STRETCH TIGHT. ANCHOR MAT USING BIODEGRADABLE STAKES OR PINS. EXCAVATE INITIAL ANCHOR TRENCH 12"X6" ACROSS THE EMBANKMENT AT THE LOWER END OF THE PROJECT AS SHOWN ON SHEET 5. SEE FIGURE 1 FOR INITIAL ANCHOR TRENCH. PLACE 6" x 6" CHECK SLOTS AT 30' INTERVALS ALONG THE EMBANKMENT AND WEIR. SEE FIGURE 2. CUT 4" x 4" TRENCH ALONG TOP OF BANK FOR MAT TERMINATION. EXTEND MAT TO THE EDGE OF THE ASPHALT OR 2 TO 3 FEET ABOVE THE CREST IF POSSIBLE. BEGINNING AT THE CENTER OF THE EMBANKMENT AT THE DOWNSTREAM END OF THE AREA TO BE LINED, PLACE THE END OF THE ROLL IN ANCHOR TRENCH AND SECURE WITH BIODEGRADABLE STAKES OR PINS. SEE FIGURE 1. PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 3" OVERLAP. SECURE WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, AND COMPACT SOIL. UNROLL MAT OVER COMPACTED ANCHOR TRENCH, STOP AT NEXT CHECK SLOT OR TERMINAL ANCHOR. UNROLL ADJACENT ROLLS IN SAME MANNER, WITH A MINIMUM OF 3" OF OVERLAP. STAPLE AT 18" INTERVALS ALONG OVERLAP. FOLD AND SECURE MAT ROLLS TIGHTLY INTO CHECK SLOTS. LAY MAT IN CHECK SLOT, FOLD BACK AGAINST ITSELF, ANCHOR THROUGH BOTH LAYERS, BACKFILL AND COMPACT SOIL, CONTINUE ROLLING MAP UPSTREAM. SEE FIGURE 2. BEGIN NEW ROLLS IN CHECK SLOT, AND OVERLAP ENDS MINIMUM OF 1'. SEE FIGURE 4 FOR TERMINATION AT UPSTREAM END. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY) GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. z O U cr U) z O CU O u- Q W U) Q Lu UJ O z FL LLI U) z Lu 0- DWK DICKSON comminitv infrastructure consultants 1213 W. MOREHEAD STREET CHARLOTTE, NC 28208 (t) (704) 334-5348 (flOFFICE FAX NO. WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m p z cc O O W cc U) o > W G= w 0 0 N Y N N W J Q Z Ir U w O W W J O > U) a � O } w z z Q O OO Z O � ILL. cn 0 O 0 E-L W U LLI LLj g J z U Z W O Q cr cr 0 PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: I MAR 2023 DRAWING NUMBER: D.2 OF 7 WKD PROJ. NO.: 20190559.00. C L pJU 00. Q°� Zoe wwe o> Uf p0m w oZw .o zoU wUO " ZZU °Om wY =UQ ~O= OY� w�Q �0 0 'wa o.W °a OZZ Ow0 .1a11, w m3:z o10 W00 w1Z w3Q =moo c�Zw a0< �� Z°w oz� U- ZZO � w Og= 3 U ti ORO Y M Q §2Z �No oo= 1w2 owoU❑ 2 CHECK CONDIT TYPICA 2"X2"X36"V STAKES PLAC O.C.CROSS P ABOVE SOCK NOTES: 1. ALL MATERIAL TO MEET SPECIFICATIONS. 2. INSTALL SEDIMENT TUBES BY LAYING THEM FLAT ON THE GROUND. EXCESS MULCH CAN BE PLACED AT THE UPSTREAM SEDIMENT TUBE SOIL INTERFACE. 3. INSTALL SEDIMENT TUBES SO NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE SEDIMENT TUBES. LAP THE ENDS OF ADJACENT SEDIMENT TUBES A MINIMUM OF 2 FEET TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. 4. INSTALL ENDS OF CHECK DAM POINTING SLIGHTLY UP THE SLOPE TO PREVENT RUNOFF FROM FLOWING AROUND THE FILTER SOCK. 5. INSTALL SEDIMENT TUBES IN SWALES OR DRAINAGE DITCHES PERPENDICULAR TO THE WATER FLOW AND EXTEND THEM UP THE SIDE SLOPES A MINIMUM OF 1-FOOT ABOVE THE DESIGN FLOW DEPTH. 6. CHECK DAMS SHALL BE INSTALLED AT LOCATIONS INDICATED ON DRAWINGS. 7. SEDIMENT SHOULD BE REMOVED FROM BEHIND CHECK DAM ONCE THE ACCUMULATED HEIGHT HAS REACHED 1/2 THE HEIGHT OF THE CHECK DAM. 8. LOOSE FILTER MEDIA MAY BE BACKFILLED ON THE UPSLOPE SIDE OF THE SOCK TO ENHANCE PERFORMANCE. 9. CHECK DAM CAN BE DIRECT SEEDED AT THE TIME OF INSTALLATION. FILTER SOCK CHECK DAM NOT TO SCALE PLANT LIST LIVE STAKE SPECIES SCIENTIFIC NAME COMMON NAME PERCENT Corpus amomum Silky Dogwood 50% Viburnum dentatum Arrowwood 25% Sambucus Canadenis Elderberry 25% K•]I:a�l 3�:7 ROLL 0.75" TO 2" �{ FLAT TOP END o �? O H LATERAL BUD SIDE BRANCH III00 REMOVED AT z SLIGHT ANGLE I 45 DEGREE TAPERED BUTT END SECTION VIEW LIVE STAKE X� X N 2' IX LIVE STAKE NOT TO SCALE DETAIL LIVE STAKES SHOULD BE 2-3 FEET LONG. ADDITIONALLY, THE STAKES SHOULD HAVE A DIAMETER OF 0.75 TO 2 INCHES. "71R FIBER )LL ALL PLANTING AREAS COIR FIBER FABRIC MAT NOT BE CUT WITH PLANTING IMPLEMENTS. THE SMALLEST OPENING NECESSARY TO ACCOMMODATE EACH PLANT SHALL BE CUT INTO THE FABRIC USING A SHARP KNIFE OR SHEARS. PLANT SPACING PLANTS SHALL BE INSTALLED IN STAGGERED ROWS. PLANT SPACING SHALL BE APPROXIMATELY TWO FEET (2.0') BETWEEN PLANTS IN THE SAME ROW. ROWS SHALL BE STAGGERED SUCH THAT ROWS ARE APPROXIMATELY TWO FEET (2.0') APART. CONTRACTOR REQUIRED TO USE COMBINATION OF ALL PLANT SPECIES. COIR FIBER ROLL N.C.D.O.T. CLASS B EROSION CONTROL STONE VARIES 2 DEPTH OFITH DITCH -1 (2' MAX.) 1' VARIES WITH FILTER FABRIC MINI DEPTH OF DITCH SECTION B-B :. 2' MIN. 2 _ 3I �l SECTION A -A STONE CHECK DAM MAINTENANCE FOR ALL CHECK DAMS N.C.D.O.T. CLASS B EROSION CONTROL STONE FILTER FABRIC REPLACE EXISTING STREAM BED COBBLE STONE AND EXISTING STREAM BED MATERIAL AFTER PIPE INSTALL TOP OF BANK BOTTOM OF BANK i FLOW - B INSPECT CHECK DAMS AND CHANNELS FOR DAMAGE AFTER EACH RUNOFF EVENT. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A PROTECTIVE RIP -RAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE FIBER CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. CHECK DAM SHALL BE CLEANED OUT WHEN 50% OF STORAGE CAPACITY HAS BEEN FILLED IN WITH SEDIMENT. 12" MI KEY IN MATTING PER MANUFACTURERS INSTRUCTIONS SOCK STAKING NOT TO SCALE ow A GRADE CONTROL ROCK 50 / 50 MIX CLASS B / 1 RIP RAP zo N BOTTOM OF `J U LJ U LU LJ U� U U LJ BANK TOP OF BANK 0 00 0 0 MAXIMUM N LENGTH OF DISTURBANCE LIMITED TO 15' A CREEK BED CONTROL - PLAN VIEW SEE CREEK CROSSING STABILIZATION DETAIL, THIS SHEET CED 10' RESTORE TO EXIST. )CK BANK ANGLE LIVE STAKE PLANTINGS SEE DETAIL SHEET D.8 - COIR FIBER MATTING (400g/m2) 9"-12" DIAMETER COIR FIBER ROLL COIR FIBER ROLL TO BE HELD IN PLACE WITH WOODEN STAKES PER MANUFACTURERS INSTRUCTIONS EXIST BANK SEE STREAM BED CONTROL DETAIL, THIS SHEET MATCH EXISTING STREAM BED GRADE CREEK CROSSING STABILIZATION NOT TO SCALE FILTER FABRIC MATCH EXISTING CHANNEL BANKFULL WIDTH BANKFULL ELEVATION 1.5' MIN. INVERT SET AT EXIST. PROFILE GRADE`S FILTER FABRIC f v 2.5' TYP. REPLACE EXISTING STREAM GRADE CONTROL ROCK 50 / BED COBBLE STONE AND 50 MIX CLASS B / 1 RIP RAP. EXISTING STREAM BED SEE NOTE 1. MATERIAL AFTER PIPE INSTALL CREEK BED CONTROL - SECTION A -A Y r�U7�ly ]Iyy�y REPLACE EXISTING STREAM BED COBBLE STONE AND EXISTING STREAM BED MATERIAL AFTER PIPE INSTALL BANKFULL ELEVATION PknTTnKA nP RIFFI F GRADE CONTROL ROCK 50 / 50 MIX CLASS B / 1 RIP RAP. SEE NOTE 1. NOTE: CREEK BED CONTROL -SECTION B-B 1. RIP RAP SHALL NOT EXCEED EXISTING CREEK BED ELEVATION CREEK BED CONTROL DETAIL NOT TO SCALE NOTES: 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM CREEK FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 200 FEET MAY BE DISTURBED AT ANY ONE TIME. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING PUMP SIZE SUFFICIENT TO PUMP BASE FLOW. 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS SANDBAGS. 6. BAG SHALL BE SIZED CORRECTLY FOR FLOW RATE OF PUMP. 7. CONTENTS COLLECTED BY SEDIMENT BAG SHALL BE DISPOSED OF AT AN ACCEPTABLE LOCATION ONSITE AS DIRECTED BY THE CONSTRUCTION OBSERVATION REPRESENTATIVE. SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR SHALL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED OUTFALL. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR CREEK DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP RAP. 5. THE CONTRACTOR SHALL PERFORM CULVERT WORK IN ACCORDANCE WITH THE PLAN. 6. THE CONTRACTOR SHALL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WITH SEED AND STRAW. 8. ALL WORK IN CHANNEL MUST BE COMPLETED AND STREAMBED STABILIZED BEFORE REMOVING IMPERVIOUS DIKE. z O U D z O U O LL LLJ Q LLJ J LLJ O z �W V ) z_ C�_ G M LLJ n 5WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET CHARLOTTE, NC 28208 (t) (704) 334-5348 (f)OFFICE FAX NO. WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m p OC z O O 0- U W Cc U w z p O > Lu w 0 �z N Y N N U) J_ d Q Z pr U LU O LU LU 0 J O > U) O >_ LUz Z H O O z z O U) O o 2i LL LU O � LU H U u i li.i J Q z U Z Lu � p PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: D.3OF7 WKD PROD. NO.: 20190559.00. C L p0o E,o 0Z-, Qo� zol wwo =J o> Uf gym N�o =gip w ozw .o zo. wUo " ZZU oom wY� =UQ ems= 0 .o`er ,wa one °a ozz ow'D w=Q wiz alo wl, w0 1Z w3Q _ 1I =d3:p oZw ¢0< z°w �:2 ozD Uz-O zp w� 02= .0 00, Y m Q 2i = 3 oo¢ ,No oo= >w� ow°U❑ 2 TEMPORARY BRIDGE NOTES 1. A PRE -FABRICATED BRIDGE OR FLATBED RAILCAR MAY BE SUBSTITUTED FOR THE TEMPORARY CONSTRUCTION BRIDGE. 2. INSTALL THE BRIDGE IN A MANNER THAT WILL MINIMIZE SEDIMENT FROM ENTERING THE WATER. 3. BRIDGE MUST BE DESIGNED BY CONTRACTOR'S ENGINEER TO SUPPORT EXPECTED LOADS. 4. SECURELY ANCHOR BRIDGE AT ONE (1) END USING STEEL CABLE OR CHAIN. 5. ABUTMENTS SHOULD BE PLACED PARALLEL TO, AND ON, STABLE BANKS SUCH THAT THE STRUCTURE IS AT OR ABOVE BANKFULL DEPTH TO PREVENT ENTRAPMENT OF FLOATING MATERIALS AND DEBRIS. 6. PLACE SAND BAGS IN DECK OPENINGS AS NECESSARY TO PREVENT ACCUMULATION OF SEDIMENT ON NON -WOVEN GEOTEXTILE. PROVIDE SUPPORT FOR SAND BAGS IF NECESSARY. TEMPORARY BRIDGE MAINTENANCE 1. INSPECT TEMPORARY BRIDGE AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAIN EVENT GREATER THAN OR EQUAL TO 1.0-IN. IN 24 HOURS. INSPECT MORE FREQUENTLY DURING PERIODS OF HEAVY USE. 2. TEMPORARY CONSTRUCTION BRIDGE WILL BE MAINTAINED IN A CONDITION THAT WILL PREVENT SEDIMENT FROM ENTERING THE WATER. 3. CLEAR EXCESSIVE SEDIMENT DEPOSITED ON BRIDGE AS NECESSARY. IMPERVIOUS POLYETHYLENE MEMBRANE ON FACE 20 MIL THICK WSE U) W N a� >o �z x C7 w wU) x SANDBAGS, CLASS 1 RIP RAP OR OTHER NON -ERODIBLE MATERIAL DE -WATERING PUMP IMPERVIOUS DIKE SILT BAG LOCATION STABILIZED OUTFALL CLASS A STONE FLOW DIRECTION T- 0" LEVEL WITH TOP OF BANK OR AS NECESSARY TO TIE INTO EXISTING GRADE CLASS 1 RIP RAP, JERSEY BARRIER OR OTHER APPROVED MATERIAL (IF USING RIP RAP DOWNSTREAM, SLOPE NO GREATER THAN 2:1) TYPE 2 FILTER FABRIC NOTE: 1. CONTRACTOR SHALL FOLLOW CONSTRUCTION SEQUENCE AS NOTED ON CONTRACT DRAWINGS. 2. HEIGHT OF DIKE VARIES. REFER TO PLAN VIEW FOR HEIGHT OF DIKE. IMPERVIOUS DIKE STABILIZED OUTFALL CLASS A STONE EXISTING CHANNEL NOT TO SCALE FLOW FILTER FABRIC INTAKE HOSE PUMP AROUND PUMP IMPERVIOUS DIKE DISCHARGE HOSE NOTE: HOSE SHOULD BE KEPT OUTSIDE OF WORK AREA CREEK BYPASS DETAIL NOT TO SCALE EXISTING GROUND 16 TO 20' FILTER FABRIC SILT BAG PROFILE WOVEN GEOTEXTILE (TYP.) DISCHARGE HOSE 8" OF CLASS A STONE 12-IN. COMPOST FILTER SOCK (TYP. -I UNDISTURBED - CITY OF MONROE GENERAL NOTES: GENERAL NOTES: 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF MONROE STANDARD WATER 1. THE ENGINEER HAS MADE ALL POSSIBLE ATTEMPTS TO LOCATE EXISTING UTILITIES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD -VERIFY THE LOCATIONS OF ALL UTILITIES PRIOR TO AND SEWER SPECIFICATIONS, LATEST REVISION. CONSTRUCTION AND TO NOTE ANY CONFLICTS. ANY DAMAGE TO UTILITIES INCURRED DURING 2. ALL MATERIALS INCORPORATED INTO THE WORK SHALL CONFORM TO THE CITY OF MONROE CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED AT THE STANDARD WATER AND SEWER SPECIFICATIONS AND DETAILS, LATEST REVISION. CONTRACTOR'S EXPENSE. NCONE CALL TELEPHONE NUMBER IS 1-800-632-4949. -_ 3. UTILITY COMPANIES MUST BE NOTIFIED A MINIMUM OF 72 HOURS IN ADVANCE OF 2. MINIMUM SEPARATION DISTANCES FOR WATER LINES FROM: CONSTRUCTION. CALL: ONE -CALL @ 811 OR 1-800-632-4949. Lo A. SANITARY SEWER LINES OR FORCE MAINS - 18" VERTICAL OR 4. UNDERGROUND UTILITIES SHOWN ARE BASED ON INFORMATION OBTAINED FROM AVAILABLE 10' HORIZONTAL RESOURCES. THE CONTRACTOR IS CAUTIONED THAT THESE LOCATIONS ARE NOT GUARANTEED NOR IS STREAM BANK I w - TIMBER MATS B STORM SEWERS 24" VERTICAL �w (SEE NOTE 3) ORDINARY HIGHP (TYP.) WATER MARK (OHWM) 2-LAYERS 8-OZ. NON -WOVEN GEOTEXTILE (TYP.) BRIDGE SECTION VIEW Y � Y m = m O LL O w0 12-IN. COMPOST w TIMBER MATS O O FILTER SOCK (SEE NOTE 3) A (TYP.) (TYP.) INSTALL STABLE WOVEN GEOTEXTILE APPROACH (TYP.) RAMP/TIMBER MAT (IF NECESSARY) w� O ­- U) PLAN VIEW 3. PAVEMENT PATCHING AND RESURFACING MUST BE COMPLETED WITHIN FIVE DAYS AFTER COMPLETION OF TRENCHING ACTIVITIES. SMALL PATCH AREAS CAN BE MAINTAINED WITH TEMPORARY PAVEMENT PATCHING OR CABC STONE UNTIL PERMANENT PATCHING IS COMPLETE. 4. THE CONTRACTOR SHALL SAW CUT EXISTING ASPHALT AND/OR CONCRETE SURFACES PRIOR TO REMOVAL, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. DISTURBED PAVEMENT IN ROADWAYS SHALL BE TEMPORARILY OR PERMANENTLY REPAIRED/REPLACED THE SAME DAY THEY ARE DISTURBED. 5. ACCESS TO PRIVATE PROPERTY FROM THE PROJECT AREA SHALL BE MAINTAINED AT ALL TIMES. 6. TRAFFIC CONTROL IS REQUIRED FOR ALL CONSTRUCTION ACTIVITIES WITHIN 15, OF THE EDGE OF ANY ROADWAY. TRAFFIC CONTROL DEVICES, PRACTICES, AND PROCEDURES SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) MILLENNIUM EDITION BY THE FEDERAL HIGHWAY ADMINISTRATION. 7. CONTRACTOR SHALL KEEP AND MAINTAIN A SET OF PLANS WITH ACCURATE LOCATIONS, MEASUREMENTS AND OTHER DATA NOT READILY AVAILABLE FROM ABOVE GROUNDS ASBUILT EFFORTS. A COPY OF THESE PLANS SHALL BE SUBMITTED TO THE OWNER AT THE COMPLETION OF THE PROJECT. 8. CONTRACTOR TO REPAIR ALL GRAVEL AND ASPHALT DRIVEWAYS ALONG PROJECT WITHIN TWO (2) WEEKS OF DISTURBANCE. ALL DRIVES (CONCRETE, ASPHALT, GRAVEL, SOIL) SHALL BE PREPARED WITH SIMILAR MATERIALS. 9. ALL DISTURBED DITCH LINES SHALL BE STABILIZED WITH EROSION CONTROL MATTING. GROUND COVER IN DITCHES TO BE PROVIDED WITHIN 7 DAYS. 10. CONTRACTOR SHALL REPLACE ANY LANDSCAPED AREA OR PLANTERS CONTAINING BUT NOT LIMITED TO SHRUBS, BUSHES, OR ORNAMENTAL TREES THAT ARE DISTURBED OR DESTROYED DURING CONSTRUCTION TO A CONDITION EQUIVALENT OR BETTER THAN IT PREVIOUSLY EXISTED. 11. ALL EROSION CONTROL DEVICES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MOST CURRENT STANDARDS OF THE LAND QUALITY SECTION OF NCDENR. 12. STABILIZATION STONE IS REQUIRED UNDER PIPING WHEN CONDITIONS WARRANT OR AS REQUIRED BY THE ENGINEER. 13. FOLLOW NCDEQ EROSION REQUIREMENTS FOR ALL GRADED AREAS NOT UNDER PAVEMENT / APPROVED DEVICES (FLASHERS, CONES, BARRICADES, FENCING, ETC.). AND WITHIN THE RIGHT-OF-WAY AND/OR EASEMENTS. DECK WIDTH VARIES BASED ON EQUIPMENT WIDTH I 14. CONTRACTORS SHALL INSTALL WITH PVC AND DIP WATER MAIN, A PLASTIC COATED #12 GAUGE, 14. BEYOND SELECT BACKFILL, ALL BACKFILL SHALL BE NON -PLASTIC IN NATURE, FREE FROM STRANDED COPPER TRACING WIRE. WIRES SHALL BE DUCT TAPED TO THE PIPE DURING INSTALLATION. ROOTS, VEGETATIVE MATTER, WASTE, CONSTRUCTION MATERIAL OR OTHER OBJECTIONABLE INSTALLATION OF WIRES SHALL BE CONTINUOUS WITH THE WATER MAIN, INCLUDING FIRE HYDRANT MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS LEGS AND INTERSECTIONS. SPLIT BOLTS SHALL BE REQUIRED TO ATTACH WIRE AT THESE AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING INTER E TI N AND LE BLOWS. MATERIALS UNSUITABLE FOR BACKFILL PURPOSES OR AS REQUIRED BY THE OWNER FILTER SOCK (TYP.) 2-LAYERS w NON -WOVEN ~ O GEOTEXTILE (TYP.) z w w U) t - CROSS-SECTION A -A THERE GUARANTEE THAT ALL SUCH LINES IN EXISTENCE ARE SHOWN ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE TO PERFORM ALL WORK CAREFULLY AND PROTECT EXISTING UTILITIES FROM DAMAGE. 5. THE CONTRACTOR SHALL CONSTRUCT TEST PITS AT ALL UTILITY CROSSINGS TO DETERMINE EXACT LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES BEFORE COMMENCING CONSTRUCTION. 6. WHENEVER IT IS NECESSARY FOR A SEWER MAIN TO CROSS UNDER A WATER MAIN WITH LESS THAN 18-INCHES OF VERTICAL SEPARATION, THE WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE FOR A DISTANCE OF 10-FEET ON EACH SIDE OF THE POINT OF CROSSING BY USE OF A SINGLE PIECE OF PIPE, UNLESS AN EXCEPTION IS GRANTED BY THE WATER RESOURCES ENGINEERING MANAGER OR THEIR AUTHORIZED REPRESENTATIVE. SHOULD THE SEWER MAIN CROSS OVER A WATER MAIN, BOTH MAINS SHALL BE CONSTRUCTED OF DUTILE IRON PIPE WITH ONE FULL LENGTH OF PIPE (MIN. OF 20-FEET) INSTALLED SO BOTH JOINTS WILL BE EQUIDISTANT FROM THE UTILITY. 7. THE WORK SITE AND EQUIPMENT SHALL BE SECURED AT THE END OF EACH DAY AND ALL OTHER TIMES WHEN CONSTRUCTION PERSONNEL ARE NOT ON -SITE. EQUIPMENT SHALL BE PLACED IN LINEAR FASHION ALONG THE EDGE OF THE VEHICLE TRAVEL AREA AND SHALL BE DELINEATED WITH APPROVED WARNING SIGN(S)/DEVICE(S). EMERGENCY VEHICLE ACCESS SHALL BE MAINTAINED THROUGHOUT THE PROJECT SITE AT ALL TIMES. ACCESS FOR LOCAL TRAFFIC SHALL BE AFFORDED TO THE RESIDENTS AND NORMAL COLLECTION OF GARBAGE, COMMERCIAL DELIVERIES, AND SCHOOL BUS TRAFFIC IS TO BE PROVIDED. EQUIPMENT SHALL BE LOCKED AND INCAPABLE OF OPERATION. 8. ONLY CITY EMPLOYEES ARE AUTHORIZED (UNLESS APPROVED BY THE CITY OF MONROE WATER RESOURCES DEPARTMENT) TO OPERATE LINE VALVES. 9. ALL FIELD REVISIONS (DURING CONSTRUCTION) TO THE PROPOSED ALIGNMENT OF THE SYSTEM IMPROVEMENTS SHALL BE COORDINATED WITH THE CITY OF MONROE WATER RESOURCES ENGINEER. 10. ALL ROADWAY REPAIR WORK WITHIN THE STATE AND CITY RIGHT-OF-WAYS SHALL CONFORM TO CITY STANDARD SPECIFICATIONS AND DETAILS MANUAL OR THE NCDOT LATEST SPECIFICATIONS AND DETAILS MANUAL. 11. FOR WORK WITHIN PAVEMENT AREAS, TRENCH EXCAVATION SHALL NOT EXCEED THE LENGTH OF THE MAIN INSTALLATION THAT CAN BE PROPERLY BACKFILLED AND COMPACTED WITHIN THE WORK PERIOD. PAVEMENT REPAIR SHALL BE REQUIRED TO BE COMPLETED WITHIN A 24-HOUR PERIOD OR THE SAME DAY IF RAIN IS IMMINENT. 12. ALL ROADWAY SIGNS WHICH ARE REMOVED TO FACILITATE INSTALLATION SHALL BE REINSTALLED IMMEDIATELY. 13. EXCAVATIONS SHALL BE FILLED OR PLATED AND DELINEATED/SECURED AS REQUIRED, WITH J sc os Gs. REPRESENTATIVE SHALL BE REMOVED AND REPLACED WITH SELECT BACKFILL MATERIAL. 15. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY HIM DURING THE COURSE OF THE CONSTRUCTION. 15. ALL MANHOLE RIM ELEVATIONS ARE APPROXIMATE. MANHOLE COVERS IN ROAD R/W SHALL BE "FLUSH", SLIGHTLY ABOVE FINISH GRADE, ALL OTHER MANHOLE COVERS SHALL BE AS NOTED ON 16. THE CONTRACTOR SHALL BE RESPONSIBLE TO SECURE ALL WORK PERMIT(S) FOR WORK WITHIN THE DRAWINGS. MANHOLE COVERS THAT ARE "FLUSH" SHALL HAVE THE SURROUNDING GRADE NCDOT AND CITY RIGHT-OF-WAYS. THE CONTRACTOR SHALL CONSTRUCT THE PROPOSED SLOPED GENTLY AWAY FROM THE COVER TO PROVIDE POSITIVE SURFACE DRAINAGE AWAY FROM TIMBER MATS (SEE IMPROVEMENTS SET FORTH AS CONDITIONS OF THE PERMIT(S). THE MANHOLE COVER. THIS MUST BE PROVIDED ON ALL INSTALLATIONS UNLESS NOTED ON THE NOTE 3) (TYP.) PLANS OR DIRECTED BY THE ENGINEER. TEMPORARY BRIDGE MAT NOT TO SCALE SEWER LINE 17. A PERMITTED (CITY OF MONROE WATER/SANITARY SEWER, NCDOT, AND/OR OTHER AGENCY HAVING JURISDICTION) SET OF PLANS SHALL BE ON -SITE AT ALL TIMES DURING CONSTRUCTION. 16. DE -WATERING: THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER 18. THE CROSS -SLOPE AND PARALLEL SLOPE IN GENERAL PUBLIC UTILITY EASEMENTS OR RIGHTS -OF -WA ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATIONS DRY WHEN PIPES ARE OUTSIDE PAVED ROADWAYS SHALL MEET THE FOLLOWING: PARALLEL SLOPE 1:5 UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED AND STRUCTURES TO BE BUILT AND CROSS -SLOPE 1:10. THEREIN ARE COMPLETED. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE 19. ANY ON -SITE OR OFF -SITE GRADING ACTIVITIES WHICH RESULTS IN GRADE CHANGES OUTSIDE OF CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OF DRAINED FROM THE ALLOWABLE COVER AT EXISTING WATER OR SANITARY SEWER MAINS OR WHICH RESULTS IN THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION CHANGES AROUND EXISTING MANHOLES, FIRE HYDRANTS, VALVES, BLOW -OFFS, ETC. SHALL REQUIRE TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. WRITTEN APPROVAL FROM THE WATER RESOURCES ENGINEER. 10' MIN. SILT FENCE W/ STONE OUTLET ANTI -SEEP COLLAR, TYP. SEE DETAIL, SHEET D.5 LIMITS OF CREEK CROSSING - SEE CREEK CROSSING - STABILIZATION DETAIL AND LIVE STAKING DETAIL ON SHEET D.3 FILTER FABRIC TYPICAL CREEK BED 10' MIN. �z SEE CREEK BED CONTROL DETAIL, SHEET D.3 STEEL PIPE ENCASEMENT, SEE PLANS FOR LENGTH. SEE DETAIL 12.10.00, SHEET D.5, FOR DIAMETER AND THICKNESS. NOTES: 1. ONLY FULL 18' OR 20' JOINTS OF PIPE SHALL BE USED UNLESS OTHERWISE APPROVED. 2. PIPE UNDER CREEK AND BETWEEN BENDS TO BE D.I.P. 3. SEAL CASING ENDS WITH TYPE II CONCRETE GROUT AND CONCRETE BRICKS, SO AS TO PREVENT THE ENTRANCE OF SOIL. LEAVE A GAP TO ALLOW LEAKAGE TO PASS IN THE CASE OF A MAIN LINE BREAK. CREEK CROSSING BY OPEN CUT DETAIL NOT TO SCALE SILT FENCE W/ STONE OUTLET EXISTING GRADE PROPOSED SEWER LINE z O U D U) z O U O LL 0 ui U) Q Lu J Lu O z FL W U) z_ G Lu n rpa wDICKSON community infrastructure consultants 1213 W. MOREHEAD STREET CHARLOTTE, NC 28208 (t) (704) 334-5348 (f)OFFICE FAX NO. WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m p z O O 0- U Cc w U w z p O W > w 0= w 0 IIIIII110 N Y NCcJ_ Q Lu Z oC U 0 O w w Q w O z > U) Q O } U) W w Z O ~ O Z Z Z 0 IL w LuO w 0 U ui lii 5 J Q ~ z U Z w O Q c a PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: DA OF 7 WKD PROJ. NO.: 20190559.00. C L 21 0 1/ Z�w 00. pJU pZW ¢o¢ zo� W W 00. 0 S, y D-O W 00" -o zo. w00 " U Z z 00m <,U = OY� w�¢ m w CS N 0=C 0 zwa OUm Z ,OQ C1 Z Z Ow0 S- 2 W�Q WIZ CS , O w0E O w= z I 2 1< MO-E, CDZw wx¢ < O J F °w Z D OZD U-U ZZo W Og= Y U F U po0 Y VJQ �_Cz-7 oo� NO U0 E- �J0 Ow¢ U tJ STUD ANc1loR srsLT TEM JOINT UTYL SEA CI RINGS ANDL GRADEGS(APN) NOTES: MANHOLE INSERT IN PAVED AREAS 1. MANHOLE TO CONFORM WITH ASTM C478 EXCEPT AS MODIFIED NON -PAVED AREAS BELOW. CAST IRON FRAME 8 COVER - SEE STD DETAIL 2. WALL REINFORCING TO BE A MINIMUM OF 0.12 SO. IN. PER LINEAR FOOT. EITHER TONGUE AND GROOVE OF JOINTS SHALL BIT. PAVEMENT HAVE REINFORCING EQUAL IN AREA TO MINIMUM OF WALL 8 BASE COURSE SECTION. 2'-0" BUTYL SEM 3. ALL JOINTS SHALL CONFORM WITH ASTM C443. �Q CONCRETE GRADE RINGS 4. STEPS SHALL BE COPOLYMER POLYPROPYLENE PLASTIC WITH 1T MAX. ADJUSTMENT 1/2" GRADE 60 STEEL REINFORCEMENT AND RESIST 1000 LB. PULLOUT TEST. OOO 2F 5. ALL PIPE OPENINGS TO BE NO GREATER THAN 3" LARGER THAN O.D. OF PIPE AND ADDITIONALLY REINFORCED WITH A MINIMUM \ MANHOLE OF 0.20 SQ. IN. OF STEEL AT 90 DEGREES. PIPE TO BE `STEP(TYP) CENTERED IN OPENINGS. JOINT BUTYL REAL AND 6. ALL SURFACES SHALL BE SMOOTH EVEN TEXTURED WITH A EXTERNAL WRAP ITYP. MINIMUM OF HONEYCOMB, FINS AND OTHER IMPERFECTIONS. n 7. MANHOLE BASE SHALL BE 3600 P.S.I. CONCRETE PLACED AGAINST SHAPED BANKS IN LIEU OF FORMS. B. CARE MUST BE TAKEN TO FORM A SMOOTH FINISHED TROUGH FROM ENTRANCE PIPES TO EXIT PIPE, AND IN CURVED MANHOLES THE TROUGH MUST BE A SMOOTH CIRCULAR ARC _ T TANGENT TO THE INSIDE WALLS OF THE PIPES AT THEIR ENDS. ALL CHANNELS TO BE 100 % OF PIPE DIAMETER. 1' 4' MAX. 9. ALL MANHOLE RINGS SHALL BE BOLTED THROUGH MANHOLE RUBBER POLYME 1 _ AND/OR CONCRETE GRADE RING WITH 112"DIAMETER KWIK GASKET SEAL AND NON -SHRINK GROUT I BOLT STUD ANCHOR SYSTEM. 10. MANHOLE GRADE SETTING SHALL BE AS FOLLOWS: A. FLUSH WITH GRADE IN PAVED AREAS O 1• B. 0.10' ABOVE GRADE IN MOWED PLAZA AREAS WITHIN OR ADJACENT TO STREET RIGHT-OF-WAY. 6" #67 CRUSHED STONE C. 2.0' ABOVE GRADE IN CROSS-COUNTRY UTILITY RIGHTS -OF -WAY. SECTION INVERT PLAN D. A HEIGHT SPECIFIED BY THE WATER RESOURCES ENGINEER. 11. PENETRATING LIFTING HOLES SHALL BE PLUGGED WITH EXPANSION GROUT. 12. INFLOW DISHES/INSERTS SHALL BE INSTALLED IN ALL MANHOLES, 12-INCH SEWER MAINS OR LESS, WITH THE EXCEPTION TO CROSS COUNTRY MANHOLES. 13. FLOW CHANNELS MUST ALLOW FOR PLACEMENT, REMOVAL AND PASSAGE OF CITY OF MONROE CCTV EQUIPMENT. # REVISED DATE: 7/1/04 STANDARD DETAIL WATER RESOURCES DEPARTMENT NONE 1/26/17 SCALE: CITY OF MONROE, NC DRAWN BY: JPH STREET R/W SEWER MANHOLE DETAIL CHECKED BY: DSW FILE 12.01.00 No: 12 DSW APPROVED BY: 10 3/4" 12" COPOLYMER POLYPROPYLENE PLASTIC 1/2" GRADE 60 STEEL REINFORCEMENT s 5 3/4" NOTE �( •< MANHOLE STEPS SHALL BE MANUFACTURED IN ' `f' ACCORDANCE WITH ASTM G-478 STANDARDS `!. AND OSHA REGULATIONS. THIS STEP TO BE DRIVEN INTO TAPERED HOLES IN PRECAST MANHOLE SECTIONS. DO NOT USE AS A GROUTED IN STEP. 1• •4 , 4 `y' • . 1000 LB. PULLOUT TEST REPORT REQ'D ' 1F' ON EACH STEP. REVISED DATE: 7/1/04 SCALE: NONE STANDARD DETAIL DRAWN BY: EZ CHECKED BY: DSW MANHOLE STEP DETAIL APPROVED BY: DSW PROPOSE MA50NK AT BOTH ENDS RE5TRAINED JOINT 5EWER RATED DUCTILE IRON PIPE (MU5T EXTEND 5' MIN. BEYOND CA51NG BOTH END5) # REVISED DATE: 7/1/04 1/26/17 SCALE: NONE DRAWN BY: EZ CHECKED BY: DSW APPROVED BY: DSW STANDARD DETAIL CASING PIPE DETAIL MANHOLE RING AND COVER CASTINGS SHALL BE OF THE SWIVEL TYPE. SEE APPROVED MATERIALS LIST FOR ACCEPTABLE MANUFACTURERS AND MODELS NO -SHRINK GROUT 2•-p^ BUTYL SEAL S, RING BOLTED OF,/, TO MANHOLE �c 02 F MANHOLE STEP(TYR) JOINT 3 BUD'LSEALAND EXTERNAL WRAP ITYP 1-a" MAX. RUBBER POLYMER I _ GASKET SEAL MID T ON-SHRINKGROUT H 2G MAX.''^^11 W OF N7 STONE SECTION INVERT PLAN # REVISED DATE: 7/1/04 1/26/17 SCALE: NONE STANDARD DETAIL WATER RESOURCES DEPARTMENT DRAWN BY: JPH CITY OF MONROE, NC CHECKED BY: DSW CROSS COUNTRY SEWER MH DETAIL APPROVED BY: DSW NO 12.02.00 UIV 12 # REVISED1 DATE: 7/1/04 WATER RESOURCES DEPARTMENT 1/26/17 SCALE NONE CITY OF MONROE, NC DRAWN BY: EZ CHECKED BY: DSW No 1 2.07.00 No. 12 APPROVED BY: DSW 5TAINLE55 IN5ULATOR CE AT 60C WATER RESOURCES DEPARTMENT CITY OF MONROE, NC No 12.11.00 No. 12 5' SCH 40 STEEL PIPE ;60 /EXTEND VENT 2'-O'ABOVE -- 100 YEAR FLOOD LINE. 1/4' MESH SCREEN WELDCONNECTION 114" X T STAINLESS STEEL STRAPS 2'41" O.C. FROM BASE 2- 3/4" X 3' S.S. ANCHOR BOLTS PER STRAP t'1212"11"IR-E-IHIR NOTES STEEL VENT PIPE UNLESS OTHERWISE SPECIFIED SHALL BE SCHEDULE 40, FIVE INCH (5") DIAMETER, GRADE "B" WITH A MINIMUM YIELD STRENGTH OF 35,000 P.S.I. THE STEEL PIPE SHALL HAVE AN INSIDE COAL TAR LINING 3/32 INCH MINIMUM THICKNESS INACCORDANCE WITH AWWA C-203 OR A COAL TAR EPDXY LINING CONFORMING TO THAT REQUIRED O ofi c,s 1112"LETTERING 1 1/4" LETTERING HOLES ON 29 3AV SPNITgR ZO (756mm) BOLT CIRCLE. (2) OPEN PICKHOLES 231/2"DIA 1. [597 MMI 125 MM] 21"DIA 23/4" [533 MM] 170 MM] COVER SECTION 251/8" DIA 1 1638 MM] [25 MM] 7 t 23 11/i6"DIA 1191 M MM] (602 MM] 5/8.. 22"DIA 7I8" [17 MMI JTE���:1559 MM] 122 MM] 515116" DIA [659 MM] 331AR DIA [845 MM] FRAME SECTION # REVISED DATE: 3/31/05 BOTTOM VIEW BOTTOM VIEW (2 VENT HOLES) (NO VENT HOLES) NOTES: 1. FRAME AND COVER SHALL BE CAST IRON, FREE OF SAND HOLES; NO PLUGGING PERMITTED. 2. TWO VENT HOLES SHALL BE PROVIDED EXCEPT WHERE PLANS REQUIRE NO VENT HOLES AND ONLY PICK HOLES. 3. FRAME SHALL INCLUDE FOUR DRILLED HOLES FOR EXPANSION ANCHORS THROUGH MANHOLE CONE. 4. METAL RINGS SHALL BE BOLTED INTO ADJUSTING RINGS WITH 112" DIAMETER KWIK BOLT STUD ANCHOR SUSTEM. HILTI BRAND OR APPROVED EQUAL. 5. CASTINGS FOR CROSS COUNTRY MANHOLES SHALL BE OF THE SWIVEL TYPE. SEE APPROVED MATERIALS LIST FOR ACCEPTABLE MANUFACTURERS AND MODELS. 1/26/17 SCALE: NONE STANDARD DETAIL DRAWN BY: JPH CHECKED BY: DSW STANDARD MANHOLE APPROVED BY: DSW FRAME AND COVER DETAIL FOR DIP < i WATER RESOURCES DEPARTMENT CITY OF MONROE, NC N'oE 12.06.01 NO 12 FOR DIP BURY > 20' FOR PVC C900 DR-25 T < BURY < 20' NON% NOR \\\\\\\ - - - ♦♦ -♦-.�.-.,.♦..4, 1404 ♦1 WE 1* 1 112-LEUERING r 1 1/4" LETTERING DIA HOLE ON 2 HOLES ON 9 3/4" [ (756mm) BOLT CIRCLE. (2) CAM LOCKS SEE DETAIL (2) CAM LOCKS 0 BOTTOM VIEW 23 1/2"DIA 1597 MM] 1. I25I 20" DIA 1 1/4" DIA 132 MM] [508 MM] 1/4" DIA. NEOPRENE GASKET 2.4, [70 MM] COVER SECTION 111161 e MMI CAM LOCKS 51/8"DIA [25 MM] CAM LOCK DETAIL (638 MM] 7 112" 5/8' 2311/16"DIA [602 MM] 22" DIA 1191 MM] 1/4' DIA 5116" 132 MM] 5/8" IS IM I17 MM] [17 MMI 1559 M.1 7I8" [22 MM] 515116 "DIA AS 3/16" [5 MM] 15 MIMI 33 114" DIA [845 MM] CAM HOLE AND GASKET FRAME SECTION GROOVE DETAIL # REVISED DATE: 3 STANDARD DETAIL 1/26/17 SCALE: NONEONE DRAWN BY: JPH WATERTIGHT MANHOLE CHECKED BY: DSW FRAME AND COVER DETAIL APPROVED BY: DSW SEE DRAWING U PAVEMENT SHOULDER O / 15 / END CAP SLOPE RJ SEWER RATED I CARRIER PIPE END CAP CONNECTION (TYP.) .1 WASHED GRAVEL I STEEL PIPE CASING 8„ SECTION ENCASEMENT SPIDER SPACED EVERY 6' 1 FOR AERIAL CREEK CROSSING PIPE. TYPE I TYPE II B. DIA. 8" OUTSIDE SURFACE OF PIPE SHALL BE SAND OR GRIT BLASTED TO COMMERCIAL STANDARD AND FOR DIP BURY > 30' NOTES: COMMON BRICK 1 COAT OF ZINC CHROMATE PRIMER FOR PVC SDR-35 3' < BURY < 12' MORTAR-1 PA AND LANDCEMENT HAVE ONE ( ) 1. A MINIMUM OF 12" FROM OUTSIDE DIAMENTER OF PIPE TO SIDE OF 2 PARTS SAND APPLIED IN ACCORDANCE WITH FEDERAL SPECIFICATION TT-86A. PIPE SHALL BE FURNISHED WITH TWO (2) EVENLY APPLIED COATS OF RUST INHIBITING ENAMEL PAINT. MONOMER w. r TRENCH MUST BE ALLOWED FOR COMPACTION OF FILL MATERIAL. d 0 2. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. 3, UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF 2 WEEPHOLES MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY TAMPED INTO PLACE. 4. ALL PIPE GRADES SHALL BE AS SHOWN ON APPROVED PLANS OR AS DIRECTED BY ENGINEER. 5. ANY OVER EXCAVATION BELOW GRADE SHOWN SHALL BE BACKFILLED SS ROLL PINS DIA X 1 3/4" NOTES: 1. AME FRAND COVER SHALL BE CAST IRON, FREE OF SAND HOLES; NO PLUGGING PERMITTED. 2. CASTING SHALL BE COATED WITH COAL TAR EPDXY WHILE HOT. 3. FRAME SHALL INCLUDE FOUR DRILLED HOLES FOR EXPANSION ANCHORS THROUGH MANHOLE CONE. 4. SLIGHT VARIATION IN DIMENSIONS NOT CRITICAL TO INTERCHANGABIUTY WILL BE ACCEPTABLE. 5. METAL RINGS SHALL BE BOLTED INTO ADJUSTING RINGS WITH I/2" DIAMETER MIN BOLT STUD ANCHOR SYSTEM. WATER RESOURCES DEPARTMENT CITY OF MONROE, NC NoE 12.06.02 No. 12 CARRIER PIPE DOT SIZE DOTTHICKNESS RAILROADSIZE RAILROAD THICKNESS (-INCH DIP 12.75" .250" 16" .281" 8-INCH DIP 16" .250" 18" .312" 10-INCH DIP 18" .250" 20" .344" 12-INCH DIP 24" .250" 2 .406" 16-INCH DIP 24" .250" 30" .469" 18-INCH DIP 30" 312" 30" .469" 20-INCH DIP 36" .375" 36' .562" 24-INCH DIP 36" .375" 36" .562" 30-INCH DIP 42" .500" 48" .750" B. WHIEKE H'UUKY SUIL UONUI I IONS A ENUUUN I EKEU KEUUIKING BLASTING, TYPE III BEDDING SHALL BE USED REGARDLESS OF PIPE MATERIAL PER SPECIFICATIONS. TYPE III STANDARD DETAIL WATER RESOURCES DEPARTMENT CITY OF MONROE, NC # REVISED DATE: 7/1/04 STANDARD DETAIL WATER RESOURCES DEPARTMENT CITY OF MONROE, NC # REVISED DATE: 7/1/04 STANDARD DETAIL WATER RESOURCES DEPARTMENT CITY OF MONROE, NC 1/26/17 SCALE: NONE 1/26/17 SCALE: NONE VENTED MANHOLE DETAIL DRAWN BY: JPH SEWER PIPE BEDDING DETAIL DRAWN BY: JPH TYPICAL CASED CROSSING DETAIL CHECKED BY: DSW CHECKED BY: DSW FILE 1 2.08.00 No No. 1 2 FILE 12.09.00 No. 12 FILE 12.10.00 No: 12 APPROVED BY: DSW APPROVED BY: DSW NOTES'. 1. CONTRACTORS INSTALLING NEW GRAVITY MAINS SHALL HAVE THE OPTION OF USING SLIP JOINT SDR-35 PVC TEES WITH 4' SCH. 40 BRANCH OR MAKING TAPS AS SHOWN ON THE DETAIL WITH SEWER SADDLE. 2. CONTRACTOR OR CITY OF MONROE PERSONNEL SHALL INSTALL THE CLEAN -OUT 2 FEET ABOVE GROUND WITH A 4" X4" X U SUPPORT POST ABUTTING TO GRADE AND THE POST 4" X 4" X V POST TO BE REMOVED AFTER CONNECTION REMOVED BY THE PLUMBER UPON CONNECTION TO THE TAP. THE INSTALLATION OF TO BUILDING PLUMBING THE 4" X 4" POST SHALL BE WAIVED FOR EXISTING BUILDINGS AND BUILDINGS UNDER SEE NOTE 2. CONSTRUCTION. 3. PLUMBER SHALL HAVE THE OPTION TO INSTALL A ONE PIECE 4' SCH. 40 COMBINATION ME 118 BEND TO MINIMIZE TRENCH DEPTH OR INSTALL THE SEWER SERVICE LATERAL 4-ABOVE GROUND CLEAN OUT FROM THE 4" STUB OUT. COMMERCIAL AND INDUSTRIAL BUILDINGS REQUIRING EXTENSION TO BE LOWERED SAMPLING OF THE WASTEWATER DISCHARGE SHALL BE REQUIRED TO INSTALL AFTER CONNECTION TO BUILDING PLUMBING FITTINGS IN ACCORDANCE WITH THE CONDITIONS LISTED ON THE BUILDING PLUMBING SEE NOTE 2. PERMIT. 4. THE OPENING IN THE PIPE SHALL BE CUT WITH ATAP MACHINE ONLY. FINISHED GRADE 5. 6" OR LARGER SEWER LATERAL TAPS SHALL BE INSTALLED INTO THE NEAREST SANITARY SEWER MANHOLE DOWNSTREAM OF THE BUILDING OR A NEW MANHOLE _03EM CONSTRUCTED OVER THE SEWER MAIN (SEE "DOGHOUSE" MANHOLE DETAIL.) 7- 6. ALL CONSTRUCTION BY PLUMBER, EITHER OPTION 1 OR OPTION 2, SHALL BE INSPECTED 4' PVC FEMALE AND APPROVED BY A BUILDING INSPECTOR UNDER A VALID PERMIT. ADAPTER W/ T. CONTRACTOR OR CITY OF MONROE PERSONNEL MAY ADJUST SERVICE LATERAL BRASS PLUG. TO BE INSTALLED ELEVATION WITH FITTINGS IF ADEQUATE GRADE EXISTS. AFTER BUILDING B. LATERAL SHALL HAVE 4'SUBBASE OF N7 WASHED STONE TO A LEVEL OF 4' ABOVE THE CONNECTION. TO BUILDING TOP OF THE PIPE. BY PLUMBER �1 OPTION 1 4'MAX 9. BRASS CAP TO BE INSTALLED PER DETAIL AFTER BUILDING CONNECTION. 10. CLEANOUTS SHALL NOT BE PLACED IN LOW LYING AREAS, OR IN AREAS WHERE FLOODING OR RUN OFF MAY OCCUR. OPTIONAL 4' SCH. 40 COMBINATION 21 M I N WYE AND 118 BEND ONE PIECE 4' SCH. 40 COMBINATION WE TO BE INSTALLED BY BUILDER'S PLUMBER IF ADEQUATE GRADE 4' SCH. 40 PVC NIPPLE LENGTH VARIES AND 118 BEND ONE PIECE EOBUILDING'S FLOOR DEPENDINGON DEPTH OF SEWERMAIN TO 4"SCH. 40-1/8 BEND ELLEVATIEVATION SEE NOTE 3. MINIMIZE ADDITIONAL BENDS GLUE JOINT CONNECTION (TYP.) DISTANCE VARIES 4" TAP MADE APPROX. 45 ABOVE SPRING LINE TO BUILDING OF SEWER MAIN 1°o MIN. SL I BY PLUMBER OPTION OPTION 2 SPRING LINE 1-�24 4- CH. 40 PVC WATER SEW SADDLL TAP SADDLE E SHALL HAVE COMPRESSED RUBBER TIGHT, GLUE JOINT CAP SEAL ON TAP OPENING W/ CAST IRON BODY 4' SCH. 4.50-INCH INTERNAL DIAMETER RUBBER SLEEVE 40 PVC INTEGRAL STAINLESS STEEL STRAP WITH BOLTS A STRAIGHT TEE SHALL REPLACE THE SHOWN SWEEP ELBOW ON LATERAL SHALL BE COMPLETELY BEDDED GRAVITY SEWER MAIN SDR-35 PVC OR IN N67 WASHED STONE THE SERVICE LATERAL IF A CLASS 350 DIP FOR NEW CONSTRUCTION. PRIVATE SEWER PUMP CONNECTION CITY OF MONROE SHALL MAKE TAPS ON IS REQUIRED. OTHERWISE ACTIVE SEWER MAINS. UNLESS SPECIFICALLY CONNECTION SHALL BE MADE APPROVED OTHERWISE. TO A MANHOLE. # REVISED DATE: 7/1/04 STANDARD DETAIL WATER RESOURCES DEPARTMENT 1 1/26/17 SCALE: NONE DRAWN BY: SPT CITY OF MONROE, NC CHECKED BY: DSW SEWER LATERAL DETAIL 12.13.00 No. 12 APPROVED BY: RGC NoE 344 BARS PIPE O.D. BELL � J i M O CID M TREN PLAN H WALL TRENCH WALL N v 12"MIN. POURED . - (SIDES , (SIDES NEXT TO TRENCH NOT FORMED) NOTE: 11 FORMS NOT REQUIRED BELOW SPRING LINE, CONCRETE MAY BE PLACED SEE NOTE AGAINST SHAPED BANKS IN LIEU OF FORMS. z 4„ CONCRETE PLACED ON N UNDISTURBED SOIL AS DETERMINED BY ENGINEER. SECTION CONCRETE SEEPAGE COLLAR NOT TO SCALE SL020.dwg z O U rI / z O U O I� Uj v / Uj J W O z I w U) V z_ 5�_ L m W WK DICKSON communitv infrastructure consultants 1213 W. MOREHEAD STREET CHARLOTTE, NC 28208 (t) (704) 334-5348 (f)OFFICE FAX NO. WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL CD O w Z O 0- cc 0 U) Z p O/^ U) W Lu Q 0 O N Y 1 N Z Ir U O LLI W J LU O Cn a LLI O } W M a i VJ CZ C ILL. 0 0 ^W LL U W W g J z Z LIJ > O Q PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: I MAR 2023 DRAWING NUMBER: D-5 OF 7 WKD PROJ. NO.: 20190559.00. C L 00. pJU a0¢ Z~ � ww� �J U= 0� ,�o =�o w ozw -o Zo. wOZ " zzU 0Om wY =UQ OY� uwi�w OOU ,wa 0 .� ,0a ozz C) G w�Q �3:z ol, Q >oO w z w3a _ =Ko U Z w -x ao¢ 2 z ° W �:2 OZD U-U zw o w= Y U ti U po0 Y Q �2Z oo¢ �NQ moo= �w oo� 2 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A O O SANDBAGS(TYP.) O O OR STAPLES 10 MIL O SILT FENCE 1:1 PLASTIC SANDBAGS (TYP.) LINING SIDE SLOPE OR STAPLES O 0 (TYP ) Oo 00 A CLEARLY MARKED SIGNAGE SECTION A -A IPV NOTING DEVICE (18"X24" MIN.)NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE SANDBAGS(TYP.) OR STAPLES 0 MIL HIGH COHESIVE & PLASTIC LINING LOW FILTRATION 11 SIDE SLOPE zTY SOIL BERM Mix¢ 0 X m � SECTION B-B .,.,AGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT PLAN NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 Z O U D U) Z O U O LL 0 W 0 Q W W O Z I- LU U) Z W n PaWK WDICKSON community infrastructure consultants 1213 W. MOREHEAD STREET CHARLOTTE, NC 28208 (t) (704) 334-5348 (f)OFFICE FAX NO. WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL CID o z o 0 LU 0 °C w z o 0 W LU w Q 0 IIIIIIIIz N Y N 0 o O w N a LU 0 J >v)I m o } w I z z o Z) 0 cn 2i ° o CD LU 0 U w w J Q � z LU z o a Cc o PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: I MAR 2023 DRAWING NUMBER: D.6OF7 WKD PROJ. NO.: 20190559.00. C L 00. pJU Q Q I Z~ � WWI �J U= 0� ,do =�0 W ozw -o Zo. WOO " Z zU WY =UQ OY� w�a �o� ,Z< 0 . ,OQ ozZ o G W�Q �3:z ol, >oo Wz w3a z =Ko cDZw ao-o= 2 z ° W �:2 oZD U-U zZo W Y U ti U 000 Y Q �2Z ��¢ No moo= >w� o0 o� 2 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours S. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated e Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance . Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 Z O U D U) Z O U O L.L 0 LU Q L LI J L LI O Z I- LU U) Z L LI n PaWK WDICKSON community infrastructure consultants 1213 W. MOREHEAD STREET CHARLOTTE, NC 28208 (t) (704) 334-5348 (f)OFFICE FAX NO. WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL co p Z o O 0- U it W U °C w Z o O Lu rr w Q 0 1Z z w o O Q w U OCl) LU >- 0- z Q z LL z J O � U) 2 0 Lu IL u.i Ii.i J Q ~ Z U Z Lu O Q o PROJ. MGR.: JRB DESIGN BY: CH DRAWN BY: CH PROJ. DATE: MAR 2023 DRAWING NUMBER: D.7OF7 WKD PROJ. NO.: 20190559.00. C L