Loading...
HomeMy WebLinkAbout20230354 Ver 1_KNOX ROAD WATERLINE_20230303CONTRACT SHEET 0 of 20 STANDARD TOPO SYMBOLS CITY OF GREENSBORO ENGINEERING DESIGN DIVISION Existing Manhole 1 /8' (labeled) ............................ 0 Proposed Manhole 1/8......................................... Telecommunications Manhole 1/8" (labeled) .................. O Exist. Curb Inlet 5/32"-5/64................................. Prop. Curb Inlet 5/32"-5/64.................................. EIEI Telephone Booth 3/16"-5/16................................... ❑Q Exist. Telephone Or Power Pole 3/32"........................ Prop. Telephone Or Power Pole 3/32"......................... -� City Of Greensboro Signal Pole 3/32" (labeled) .............. ® cos Guy Wire 3/32".............................................. v Exist. Hydrant 3/32'........................................ Prop. Hydrant 3/32"......................................... KNOX & BET11EL C11URC11 Water Valve 3/32" (labeled) ................................. Traffic Engineering Signal Box 5/64"........................ ❑ cos Gas Valve 3/32"............................................. Q Grate or Drop Inlet (D.I.) 3/32"............................ Right Of Way Monument 3/32"................................. ROAD WATERLINE Iron Pipe 3/64............................................... a EW Meter 5/64"................................................. Electrical Outlet 5/64" (labeled) ........................... Telecommunications Box Or Pedestal 5/64" (labeled)......... ❑T Exist. Precise Traverse Point 7/64" (labeled) ............... 1106 50 P I / I 18" Or Less Tree 1/4" (labeled) ............................. 10' 0 OF 20 — COVER SHEET Over 20" Tree 5/16" (labeled) ............................... 20„ Shrub 5/32................................................... 1 OF 20 — OVERALL PLAN Clean Out 1/16"-1/32" (labeled)............................-1106 1 50A P p�® 2 OF 20 — PLAN &PROFILE 10+00 TO 21 +00 Light Pole 3/32" (labeled) .................................. ®L:MT Wheelchair Ramp (City Of Greensboro Std. #418).............. 41O 3 OF 20 — PLAN & PROFILE 21+00 TO 32+00 Control Of Access Line 5/16.................................. 4 OF 20 — PLAN & PROFILE 32+00 TO 43+00 Exist. Water Line (labeled) ................................. Wy 5 OF 20 — PLAN & PROFILE 43+00 TO 54+00 Prop. Water Line (labeled) .................................. w Exist. Sanitary Sewer (labeled) ............................. SS 6 OF 20 — PLAN & PROFILE 54+00 TO 65+00 Prop. Sanitary Sewer (labeled) .............................. 7 OF 20 — PLAN & PROFILE 65+00 TO 76+00 Exist. Right Of Way ......................................... Q Proposed Margin ............................................. THEL CHURCH RD 8 OF 20 — PLAN & PROFILE 76+00 TO 87+00 Easement (labeled)........... BE 9 OF 20 — PLAN & PROFILE 87+00 TO 98+00 Temporary Construction Easement ............................. E Exist. Dirt Street .......................................... — — — — -- 10 OF 20 — PLAN & PROFILE 98+00 TO 109+00 ------ Exist. Payment .............................................. ------ o' 11 OF 20 — PLAN & PROFILE 109+00 TO 120+00 Exist. Curb (labeled) ....................................... — — — — — Z n Exist. Curb & Gutter (labeled) .............................. — — — — — Y 12 OF 20 — PLAN & PROFILE 120+00 TO 127+05.46 Prop. Curb & Gutter (shaded & labeled) ...................... CO 12 OF 20 — UTILITY DETAILS Survey Line ................................................. ac SlopeLine .................................................. c F 13 OF 20 — EROSION CONTROL 10+00 TO 32+00 Center Line ................................................. 0 14 OF 20 — EROSION CONTROL 32+00 TO 54+00 Exist. Storm Sewer (labeled) ................................ Q ENCROACHMENT PERMIT IS REQUIRED THROUGH Prop. Storm Sewer (labeled) ................................. Of NCDOT FOR WATER LINE INSTALLA110N, CALL 15 OF 20 — EROSION CONTROL 54+00 TO 76+00 Gas Line (labeled) .......................................... G ox (336) 487-0100 FOR PERMIT. Transmission Line & Tower ................................... 16 OF 20 — EROSION CONTROL 76+00 TO 98+00 Z Underground Telecommunication Cable (labeled) .............. T Y 17 OF 20 — EROSION CONTROL 98+00 TO 120+00 Underground Power Line ...................................... P 18 OF 20 — EROSION CONTROL 120+00 TO 127+05.46 Fence (labeled) ............................................. X Railroad.................................................... 19 OF 20 — EROSION CONTROL DETAILS - Bridge (Prop. Solid &Exist. Broken) ........................ NW % Box Culvert (Prop. Solid & Exist. Broken) ................... J� e0%/V �0 Guard Rail .................................................. RD cTON �N CAR'������� Hedges Or Bushes (labeled) .................................. — — — — 0 � SS Nq .,� Woods Line .................................................. �Nq':, Exist. House ................................................ 12a&D VICINITY MAP PfRtmh- RY Temporary Silt Fence ........................................ NTS NOT P��0Wt6ftWC*N Erosion Control Device (COG Std. No. 215 & 432)............. SEWER L.F. X $1.50 = $ %1'%.NGIGO;��`� DISTURBED LIMITS ............. WATER 11,705 L.F. X $1.50 = $ 0.00 1111111111110 ' B1 wES; ���` WESTCOTT, SMALL & ASSOCIATES, PLLC SEWER L.F. X $1.50 = $ P-0576 125 SOUTH ELM STREET, SUITE 606 RIDTOTAL $ o.00 GREENSBORO, NC 27401 j ❑ ROADWAY TO BE PRIVATELY INSPECTED WWW.WSAAENG.COM JDATE FEES S RECEIVED BY CITY OF GREENSBORO BID DATE: XX XX XX PHONE: 336.310.9722 0 OF 20 CONTRACT SHEET 1 of 20 WESTCOTT, SMALL & ASSOCIATES, PLLC 125 SOUTH ELM STREET, SUITE 606 GREENSBORO, NC 27401 WWW.WSAAENG.COM Mffm[URY NOT P-.owtM3*C*N � '••.FNG I NES-'� o�� G P-0576 STA: 127+05 ADJUST ALL APPLICABLE WATER AND SEWER FEATURES TO CITY OF GREENSBORO AND NCDEQ STANDARDS. ALL CONSTRUCTION TO MEET CITY OF GREENSBORO AND NCDEQ STANDARDS. ENCROACHMENT PERMIT IS REQUIRED THROUGH NCDOT FOR WATER LINE INSTALLATION, CALL (336) 487-0100 FOR PERMIT. PHONE: 336.310.9722 CONTRACT SHEET 13 OF 20 Olz lz R Q�il ?ti J WGC�i��mo@ m?j ly OhV M/B R o ��O 0uA 33 O Ct hZi O Imo: WZ bR vJ O ZWO O h U�V Q ti Onh? G m W c) Q ° QQ� 2 rt titiZ Q N 00� O rzQ)h SDPz o °oQ h �� •DD. Jim c cl U] kz �W� mQ Z U] 2 2 Qi J Q ti FQ-1 za: QQ Q W QjQ up p(� j Z3 Oz O D hc N_�U) p� hW Z� QLIJh Ql lyhh kz lUZ Q O h Vp� E> C�Q p 1 Ow Q > QO� gZ O C� 3 �W DD --iWuj ha:ke R oJO ZD �I t ? - z wo Q Q mLl 3 JQ �p �� _ �Qh� Q uj � �Wh Z.� Q �Q p oJV Q�QLljO�>Q O�J hJ7T� �� �05Ou tiW~J ZW u, W 1)- uk mhCQOh1 Oh O J tieW �W U1U) =W ��K �� pD �R �E mWh �h tim �Q �o V W ��4Zi h� 33 = DD O h ��h Z3 h WQ Nm �o W uhW �a p ti -o O N j Witt �� 03 Wk Wm T J �h'R ZLo p- Ui ti� H T W4iQ �� Z Oti JW �V Q h h > O� 3�0 OZ zO mW N ti�m Jh h J �110 � � J '• W Z :t- II �l h hl hl � '000 ti �2'�{ Z ti N v M/b' oop o m SHMT I OF 3 C/ T Y O F G R E E N S B O R O HOUSE CONNECTION AND HYDRANT STD. NO. REV. SETTING DETAIL 1101 0 -12 0719 3-15 106-16 STREET HOUSE EXIST. 12•• To 12" ��EXIST. PVM'T 2" S9.5B ASPHALT , COMPACTION REQUIRED ON SUBGRADE REMOVE 6 REPLACE EX. ASPHAL T TO STRE W/ 1.5" OF 59.5B ASP ABC ASPHAL T DRI VENA YS COMPACTION' REGUIRED ON SUBGRADE C/ T Y OF GREENSBORO PAVEMENT REPAIR FOR PIPE/UTILITY PLACED STD. NO. REV. UNDER EXISTING PAVEMENT (ASPHALT DRIVEWAYS) 107-A 09-03 03-15 WESTCOTT, SMALL & ASSOCIATES, PLLC 125 SOUTH ELM STREET, SUITE 606 GREENSBORO, NC 27401 WWW.WSAAENG.COM PHONE: 336.310.9722 Bc t B" MIN. 1-1/4 Bc T. ti ' 2000 PSI 4 CONCRETE'.-'P =t' E17Bc7 a II CONCRETE ARCH I Zh GRANULAR FOUNDATION DEPTH OF BEDDING MA TERIAL BELOW PIPE D d (MIN.) 27" 6 SMALLER 3" 30 " TO 60 " 4 " 66" 6 LARGER 6" COMPACTED BACKFILL ti Bc III � GRANULAR FOUNDA TION LOOSE m BACKFILL I I - ._ ti�0 .: :1 =1 CLASS D FLAT SUBGRADE LEGEND Bc = OUTSIDE DIAMETER H = BACKFILL COVER ABOVE TOP OF PIPE D = INSIDE DIAMETER Al = DEPTH OF BEDDING MA TERIAL BELOW PIPE NOTE.' USE 467M OR A. R. E. A. (AMERICAN RAILWAY ENGINEERING y ASSOCIA TION) #4 STONE FOR 21" AND LARGER PIPE. m C/ T Y O F G REENSO OR O N STANDARD TRENCH BEDDINGS FOR STD. NO. REV. CIRCULAR PIPE 207 03-97 w � PS r CQ4Cfi�1& 4{' a .• v _ _ 4 /7 fiXS O- MATM LIAE I - 6EARIA6 AAE'A FMW TAaLES FA9 AG19ZZCffAL BEAM SGFFICIENT SEWDIE AREA TO RAW ACTUAL AAVL#VT TO 6E L ETE WrAED BY FIELD ENSrAEER 2 CYf CiEXC YARDS OF COVOW7F TO AACYW VERTICAL A&V PIPE DIA. tt-t/4" 6EA0 221-1/2" BEM 45' 6EAV S. 812 / 1/2 CY t653 / 1/2 CY 32470 1.0 CY B- 14440 t/2 CY 2959 / 3/4 CY 5773 ift.5 CY 12- 3248 41 1.0 CY 65120 1-3/4 CY 129M / 3.5 CY t6- 5775 / 1-1/2 CY 117W / 3.0 CY 230910 / 6.0 CY C/ T Y O F G R E E N S B O R O STD. NO. REV. STANDARD VERTICAL BEND ANCHORS 110 0 3-03 uu►►► 3/4 m c-i D I D 10 3/4 SECTION A -A VIEW OF VALVE BOX IF - REQUIRED A� O A� TOP VIEW 3 1/2' FLAT FACE GOTHIC 1/4' FLAT FACE GOTHIC 1 3/4 �6 3/4� �6� SECTION VIEW OF VALVE BOX COVER NO TES: 1. VALVE BOX EXTENSION SHALL BE EITHER 6" DIA. SOIL PIPE OR SCH. 40 PVC PIPE. 2. EXTENSION TO BE ONE SOLID PIECE OF PIPE UNLESS BURIAL DEPTYH IS GREATER THAN STANDARD LENGTH OF PIPE. A BELL OR COUPLING SHALL BE UTILIZED AT THE TOP OF VALVE CONNEC77ON (SEE COG STD #101) J. LETTER HEIGHT 3-1/2" 4. COUNTERSINK LETTER 3/16" 5. TO BE USED IN PA WED OR NON -PA VED AREAS. 6. ALL CAS77AIGS SHALL MEET THE REQUIREMENTS OF AASHTO M306. 7. DUE TO VARIA77ONS IN CASTINGS OF DIFFERENT MANUFACTURER'S, DIMENSIONS SHALL BE WITHIN REASONABLE TOLERANCES AS PRE -APPROVED BY GREENSBORO WATER RESOURCES DEPARTMENT AND/OR FIELD INSPECTOR PRIOR TO INSTALLATION. 8. VAL VE BOX MA Y BE REQUIRED TO BE MADE IN U. S. A. " IF FEDERAL FUNDS ARE IN VOL VED C/ T Y OF GREENSBORO STD. NO. REV. WATER VALVE BOX AND EXTENSION 03-93 03-12 1 0 2 08-02 12-12 NOTES.' CONCRETE SHALL BE CLASS AA, 4000 PSI AS PER ASTM C-478. STEEL REINFORCING SHALL MEET ASTM C-185 (4" DIA) OR ASTM C-478 0" DIA) . MANHOLES OVER 3'-6" IN DEPTH SHALL BE PROVIDED WITH STEPS 16" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH COG STD. #206. ON NEW INSTALLATION A MAXIMUM OF (2) GRADE RINGS CAN BE USED. ALL PIPE TO BE MINIMUM 2" 316 STAINLESS STEEL ALLOY AND NIPPLES TO BE 2" 316 STAINLESS STEEL ALLOY. COG STD. #205 OR #205-A RING 6 COVER g N CRISPIN UNIVERSAL - MODEL NO. UL20 - PROTECTOR 2 "AIR RELEASE VAL VE (2) 2- WHEEL : r ,- GATE VAL VES - <r F' NIPPLE- 22" OFFSET WA TER MAIN 2' 12" #67 STONE Q h MIN. SQUARE OPENING SECTION THRU MANHOLE f- ti 2" 315 STAINLESS STEEL ALLOY O 2" CORP. STOP T CC THREAD FIP THREAD OUTLET ClT Y OF GREENSBORO AIR RELIEF VALVE WITH ASSEMBLY STD. NO. REV. AND MANHOLE FOR WATER LINES 116 11-99 09-07 11-01 06-0703-22 0 05 o�0 0 0 0� '\0 \7�\ Qy 0,\v �Opo pQ y�jpv�c�Pti. Q000 ti� pF P�ti Q �QvOp OpOp QP p �QOp c�Q�. �0 0 1Gti� G 00 0� 0� FP P 2' p ti0 Q�'0' Fti 0Q P pJ00 Pp ti Q 6" 11-1/4° B12 I FT2 1 1 I 1 1 I 1 22-1/2' 1653 1 FT2 1 I 1 1 1 2 1 45° 3247 1 FT2 2 1 1 1 1 4 1 90' 5994 2 FT 3 1 1 1 2 6 1 PL UG 4239 1 FT2 2 1 1 1 1 4 1 B„ 11-1/4° 1444 1 FT2 1 I I 1 1 2 1 22-1/2' 2939 I FT2 2 1 1 1 1 3 1 45° 5773 2 FT2 3 1 1 1 2 6 1 90° 10656 3 FT2 6 1 2 2 3 11 2 PLUG 7536 2 FT2 4 1 1 1 2 B 1 12" 11-1/4' 324E 1 FT2 2 1 1 1 1 3 1 22-1/2' 6612 2 FT2 4 1 1 1 2 7 1 45' 12988 3 FT2 7 1 2 2 3 13 2 90' 23976 6 FT2 12 2 3 3 6 24 3 PLUG 16955 4 FT2 9 1 2 2 4 17 2 16" 11-1/4' 5775 2 FT2 3 1 1 1 2 6 1 22-1/2° 11756 3 FT2 6 1 2 1 3 12 1 45° 23090 6 FT2 12 2 3 3 6 23 3 90° 42624 11 FT2 22 3 6 6 11 43 4 PLUG 30d44 B FT2 15 2 4 4 B 30 3 BASED ON TEST PRESSURE OF 150 PSI NOTES.' REACTION BEARING AREAS ARE IN SQUARE FEET MEASURED IN A VERTICAL PLANE IN THE TRENCH SIDE AT AN ANGLE OF 90° TO THE THRUST VECTOR. USE 6 "-90 ° BEND VALUE FOR HYDRANTS FOR ADDITIONAL SAFETY. C/ T Y O F G R E E N S B O R O STANDARD REACTION BEARING AREAS FOR STD. NO. REV. HORIZONTAL WA TER PIPE BENDS 106 COG #102 VALVE BOX GROUND LEVEL r-r-r-r a = -r� �a e Z CHECK VALVE OR M.J. TEE FLAP VALVE ASSEMBLY (SEE DETAILS BELOW) - VARIABLE OLENGTH STArmARD BL,OWOFB DETAB, CONCRETE THRUST BLOCK (CLASS B CONCRETE) REFER TO COG STD #106 DETAIL FOR RUBBER DUCKBILL CHECK VALVE RETAINING GLAND 'RUBBER CHECK 316 STAINLESS STEEL VALVE RETAINING BAND ALL BLOW-OFF5 MU5T P15CHAR6E TO DAYLIGHT. ADD BENDS A5 NECE55ARY TO DAYLIGHT AT A DI5GHARGE ANGLE NO GREATER THAN 22.5' FROM HORIZONTAL. DETAIL FOR DUCTILE IRON FLANGED END FLAP VALVE ASSEMBLY � (Q FLAP VALVE (CLOSED) GENERAL NOTES 1. ALL MECHANICAL JOINTS SHALL BE RESTRAINED GLANDS, TORQUED AS PER MANUFACTURERS SPECIFICATIONS. 2. ADDITIONAL BENDS MAY BE REQUIRED TO CONFORM TO EXISTING TERRAIN, OR AS DIRECTED BY THE FIELD ENGINEER. 3. BLOW -OFF DISCHARGE SHALL CONFORM TO THE LATEST EDITION OF THE STORM DRAINAGE DESIGN MANUAL FOR RIP -RAP ENERGY DISIPA TOP DESIGN AND AS DIRECTED BY THE FIELD ENGINEER. 4. ALL MA TERIAL S SHALL CONFORM TO THE LA TEST EDI TION OF THE Cl TY OF GREENSBORO WA TER L INE AND SEWER L INE STANDARD CONSTRUCTION SPECIFICA TIONS. 5. ANY PROPOSED MODIFICATIONS TO THIS STANDARD BASED ON THE FIELD CONDITIONS MUST BE PRE -APPROVED BY THE CITY OF GREENSBORO FIELD INSPECTOR AND/OR THE ENGINEER OF RECORD. 5. ALL BLOW -OFFS MUST DISCHARGE TO DAYLIGHT. ADD BENDS AS NECESSARY TO DAYLIGHT AT A DISCHARGE ANGLE NO GREATER THAN 22.5 FROM HORIZONTAL. 7. REFER TO SECTION 3.09 OF THE "STANDARD SPECIFICATIONS FOR WATER AND SEWER UTILITY CONSTRUCTION" PUBLISHED BY THE CITY'S WATER RESOURCES DEPARTMENT IN ORDER TO DETERMINE THE CORRECT BLOW -OFF SIZE TO USE. PACE I OF 2 C/ T Y OF GREENSBORO STD. NO. REV. BLOW -OFF DETAIL 12-13 12-19 THRUST BLOCK - MINIMUM 3000 PSI CONCRETE - CLASS A, NON -AIR ENTRAINED RESTRAINING GLANDS SHALL BE WRAPPED WITH POLYETHYLENE AND SECURED PRIOR TO POURING CONCRETE. n q (2)OPPOSING RESTRAINING SPLIT GLANDS BOLTED TOGETHER WITH Q 4 ° STEEL BOL TS. GRIPPING WEDGES SHALL BE TORQUED TO VIEW MANUFACTURERS SPECIFICATIONS. w J ao Q H Q PROIRE VMW VARIABLE FRONT VIEW NOTES• 1. SEE CITY OF GREENSBORO - WA TER LINE AND SEWER LINE STANDARD CONSTRUCTION SPECIFICATIONS, SUB -ARTICLE 3.02 6 3.03 FOR (TRENCH AND BACKFILL) AND (TRENCH STABILIZATION) REQUIREMENTS. 2. THRUST BLOCK SHALL BE ORIENTED APPROXIMA TEL Y CENTER OF PIPE JOINT. 3. *OPTIONAL * A WELDED COLLAR (INSTALLED BY PIPE MANUFACTURER) MAY BE USED IN LIEU OF RESTRAINING GLANDS. ALL OTHER DESIGN REQUIREMENTS SHALL APPLY AS SHOWN. 4. FOR PIPES LARGER THAN 15" DIAMETER, THE DEADMAN THRUST RESTRAINT WITH BLOCKING MUST BE DESIGNED AND SEALED BY A N. C. PROFESSIONAL ENGINEER. 5. ANY PROPOSED MODIFICATIONS TO THIS STANDARD BASED ON THE FIELD CONDITIONS MUST BE PRE -APPROVED BY THE CITY OF GREENSBORO FIELD INSPECTOR AND/OR THE ENGINEER OF RECORD. 6. OUANTITIES SHOWN BELOW ARE TO THE NEAREST QUARTER YARD AND ARE BASED ON MINIMUM MASS WEIGHT REQUIREMENTS OF THE TEST PRESSURES SHOWN. MINIMUM CUBIC YARDS OF CONCRETE REQUIRED PIPE DIAMETER IM PSI rWr MM. 200 PSI TEST PRES. 250 PSI TEST ACRES. 6' Q75 1.0 1.25 B' L5 2.0 2,25 10' ZA 3.0 3.5 12' 3A 4.0 5.0 16' 5�5 7.25 9.0 ClT Y OF GREENSBORO DEADMAN THRUST RESTRAINT WITH STD. NO. REV. 6-13 MASS WEIGHT BLOCKING 11 g 6-15 F='R ff---M ��F�Y R REVISIONS TYPE CONTRACT CONTRACTOR AS -BUILT AUTH. DATE BENCH MARKS JOB NO.P- 6150A P- 6150 CITY OF GREENSBORO NOT k0td C1�N ;� ••••.FN �,�.••',���, •, ,G.INE,.. o . �,, �F�► BwEs .� P-0576 ENGINEERING DIVISION ROADWAY DESIGNED 11 21 22 BY M B W SEWER CONST. SURVEY BY COG KNOX & BETHEL CHURCH ROAD WATERLINE UTILITY DETAILS WATER CHECKED BY VWS SIDEWALK SCALE: I" = 40' SHEET NO. 13 OF 20 / I W w i / l I u I uo I I '3 o m I / Iµ / I j w a I / TWIN OAKS CHURCH INC. I J v I � Z p / 5935 BURLINGTON RD 1 Z N / DB 6677 PG 1852 1 z° I TWIN OAKS CHURCH INC. CD Q Q V PB 155 PG 20 PARCEL# 117358 N 5935 BURLINGTON RD TWIN OAKS KNOX RDH INC. RD I _ 110 = ti� �• 1 ` DB 6677 PG 1852 PB 155 PG 20 DB 6677 PG I I = C �v PARCEL# 117358 PARCEL# 117376 DAVID F. HIGHFILLJR. I �Q I GILBERT M. HUTCHISON III s p Z �� NANETTE G. HUTCHISON 502 KNOX RD 1 I DB91 ry \ PB 29 PG 36 CID 4�1 /� y I PARCEL# 117537 /o y I C m 20, 1 1.0 o cn Ll� CURVE TABLE �24� I o Io 1 ��N BRIANJ.NETTLES N Q1 0CURVE 0 BEARING CHORD RADIUS 500 KNOX RD O < 1 o "E PROP WA70UNE C1 N57'21'11 29.01' 18.00' 1 DB 5768 PG 1680 3 I a N L'�_ 'z GAJIMGN 1 (lU 1 "'PB 29 PG 36 6 Iw 7V FROM WATERLINE) 1 ri MPARCEL# 117538 M Lu'a / / / J 1 1 00 IN N I U \ M START CONSTRUCTION TIE TO EX WATERLINE STA: 10+00 -- — 16"X16" TEE 2-16" GATE VALVES o % 1-22.5' BEND OS W/THRUST BLOCKING — 00H U 0 U 0 — �a Imo— 0 H U - WAYNE WILS DIANE WILS 406 KNOX R DB 6241 PG 2 PB 29 PG 36 PARCEL# 117 O Q H N W Z H a OH i---------- Cn OC O) 1-6" FIRE HYDRANT 1 I o V) EL 1-6• /� 1 NAIL#1000 C _ 1-16"X6" TQ- 4iMNI�R 98' 1 N:848,760.40 OMYL) IED 1 E:1,810,828.00 I „ — — - 30.83` RU BLO G 1 PAVED' 'a o PROP,N 'RIVE 3 +00� a 1-6" FIRE HYDRANT O U C U C NO3'40'56"E 52 � 0 24.00' U— H U < > I I= > N C �UC� - 168.03'- BF ( 0 1 1-6" GATE VALVE C Q W 3 C �C�UC 2 RCP - - w - 1-16"X6" HYDRANT TEE I LOOSE BRICK Z — —t�C RUC =_4UV:71767'— +0� - N034120 E —7 zp KING LANDSCAPE ( < < \' U 16+00 a - - a INV: 7 - I BORDER v U U C — Ul U-�� KNOX — �� � C =�U� 17+00 � ` --� � u. — OH a —UC SR 2814 (FORMERLY CHURCH RD — U UC RUC �U No3.38'27"E 100.25 1900 H _�— �J C,� 0 H U — 0/ — — U 6O' R/W PER PB 29 36 22' PAVED ROAD �� — — NOT 827" 100.2 'ram -0� 0 H U JI lT 3•� 22"W — — — = — - 397.59' NAIL #200-� �� �- c u 15"RCP 21 N:848,388.94 / - �2 - - �� C O- T (1 E:1,810,856.54 \ �— -�� C / �N �1 _ _ RBF BENT v� C �7-15 orli \ — — — — — — 17C o INV: 71010 S03'42'18"W 825.18' BENNY R. VICKERS / — JANICE M. VICKERS I I \ \� I - — 6011 BURLINGTON RD DB 4028 PG 1401 I - - 1001 DB 2135 PG 366 NAIL ,367. 24 PARCEL# 117377 E:1,81,916.2 E:1,810,916.21 O 2 C BONNIE C. LOY 405 KNOX RD DB 4321 PG 349 I PARCEL# 117367 O I C 4 / Scale 1" = 40' co CONTRACT SHEET 14 of 20 ON I ILSI'"WEROSION CONTROL LEGEND Lo to 14- 1 1 34.91 M� 1 1 TEMPORARY SILT FENCE N 1 1 1 1 3 ROCK OUTLET FOR SILT FENCE z 1 1 �o LIMIT OF DISTURBANCE I 11 M� 1 z o I� �, I I` 1 1 CONSTRUCTION ENTRANCE -4I - M I o I 11 11 ONN 04 ROB S. SWINK 04 I \ C I 3 IEL DANIEL C. SWINK 3 c4 DAVID SHOE 0 Q I N0 *3 '44"E D 222 SCOTTT.SWINK FRED W. SWIMK e n ,n JESSICA B. ALLRED 3 = M LUANNA GOODALL-RORIE o6 O m � - JERRYSMALL o RONNIE E. WALL I 1 WANDA W. SMALL TANYA S. WALL 35.28' ROCK CHECK DAM M 404 KNOX RD 402 KNOX RD � 400 KNOX RD Q 338 KNOX RD 336 KNOX RD 1 ^ 1 DB 2526 PG 550 :'� DB 6682 PG 2870 DB 7958 PG 1087 -0 C DB 7294 PG 2953 w z 534 00 pg 2g PG 36 PB 29 PG 36 3 W PB 29 PG 36 1` DB 8271 PG 914 D. C. REESE III 1 1 a0 PB 29 PG 36 M � IN PARCEL# 117538 N PARCEL# 117536 00 ( PARCEL# 117513 i� w PARCEL# 117511 DB 4116 PG 1346 KATHY E. REESE Q N I N � I r IN Q0 PARCEL# 117512 330 KNOX RD 1 cw w 1 D. C. REESE III � DB 8271 PG 914 r � KATHY E. REESE M DB 2597 PG 772--25' I 330 KNOX RD N ( I00 I 00 ( PB 173 PG 98 1 1 B 8271 PG 914 zI PARCEL# 117336 1 1 DB 2597 PG 772 1 PB173PG98 iv 1 PARCEL# 117336 Cl. z N C, n 1 N MICHAEL S. AINSWORTH JR. G) NAIL #1002 C'• 00 I D N:849,853.33 z 1 1 co I KAITLIN P. AINSWORTH G 324 KNOX RD E:1,810,899.69 z I T I O I 1 1 3 I DB 7969 PG 258 � m I z G yG -( I 1 1 PB 100 PG 49 O w J p < N I v_ z p PARCEL# 117337 O z m Czl 1 IN U A { 0 2 G J m H J N z _ �, 111 < = m _ I 1 O N � m D z A m 1 Z 0 = J N D G w 100.25' U 0 = w v c� v m z v 1 S —� - - N \ IPF�`J.��,4\W 100. 0 o 0G G G) r N z z C _ 1 \ m D r W N N G < 1 Z G I Z 03.3"6 100.33' U V Co m -G� N < z 1 - J_ -� �� 4+'38'46"W 103.63' 3zc8 H m = N N J z v z U Z' -- + Q z� SO4'49'S8"W 21 E �� m 1 w 1 D < z z _ E I U C_ C C�0 z— < N w T � D� N° v O Q KN�X RD - SR 28 4 FORMERLY BE v -4 .,QI� `� < A � m EL CHURCH RD �ti C` V UC 1s"RCP � �'w s1.34' w —� 60 /W PER PB 39 PG 26 ti O m c+� U C o ,12.36' — E N o X o U ��—�U Z U U C 15"RCP 2� 0 S03'33'22"W ..L - 5"RCP Ink C �503 50'S4" W x 125.0T U C 21 J +00 - CU - z �a 1 125.34' z S03 36'42"W _ NO3'43'08"E U C 15"RCP U 15" CP 1 +00 NO3'32'19"E 150.03' _ S0328'20"W 135.15 SDP ` A n_ 99.73' U 32 J > N z 4 _ _ S03'28'20"W 135.36' _ U C U —J N� 15"VCP 73 w 73-i� _ — ° < N 6 z 2.1 > a - - - - - S03'28'20"W 96.01' ri C _� —i i p NO3'S2'14 U C 15"RCP S D w �� �_� S03'43'56"W C-D.. I U� CC D < ).z „ z - G v z < m < .� U o moo' C `J — I 0 �_/ J .... m J N m D v G G) U C H UC U \ _ I BONNIE C. LOY 407 KNOX RD I I w D rn < m < < J n a z- < - - -S03'31'08"W T 100.01\ _ - C U C - U C U -' C 15"vCP DB 2303 PG 344 JULIANNE M. JACKSON = N � f U — PB 31 PG 39 337 KNOX RD I w rn < G J v NAIL#10 S03'58 10 W �' 290.12' - PARCEL#117578 I DB 7949 PG 2221 O I HENDRSON, JOHNNY LARRY V N:850,378.73 /C A D G PB 31 PG 39 PARCEL# 117580 335 KNOX RD E:1,810,979.10 J m l wo 'Z m w DB 8493 PG 528 I D r o PARCEL# 117317 � o I I KELLY L. COOPER I ( 333 KNOX RD I 01 M DB 7941 PG 1803 Lq 04 M PARCEL# 117338 N a I0) m a _I I Nj GLORIA REESE MITCHELL 40 0 40 $0 120 w tYf I m w I N RIFTON W. REESE r 14 LoI 325 KNOX RD C'4 O = t w DB 7309 PG 1080 ���111►►►I► N Y W N N io PARCEL# 117316 1114' ao O a :� r a » ' ......... SS 6 WESTCOTT, SMALL & ASSOCIATES, PLLC PIR ffmRA.RY REVISIONS TYPE CONTRACT CONTRACTOR AS —BUILT AUTH. DATE BENCH MARKS JOB NO. P—#06150A CITY OF GREENSBORO 125 SOUTH ELM STREET, SUITE 606ROADWAY NOT01��f11�TIC1�N DESIGNED 11 21 22 BY MBW ENGINEERING DIVISION GREENSBORO, NC 27401 =, �''•F..........GIN. ''�pA_ SEWER CONST. SURVEY BY SHEET NO. KNOX ROAD WATERLINE WWW.WSAAENG.COM PHONE: 336.310.9722 '•,,,tigF�s;.�� ►►►►►►ii►i„`,%P-0576 WATER CHECKED BY VWS CONTROLOF CO 14 OF 2 0 SIDEWALK SCALE: I" = 400 FROM BEGINNING STATION 00 STATION 32+00 I LoZ O U z 00CI21 101 CII1%) A 0) m N N I v ^� IN I C4 IQ w n m PEGGY J. REESE L/T W 0 m DAVID C. REESE III Ln I y cn 322 KNOX RD L' m DB 3848 PG 1229 MICHELLE REESE MORRIS DB 1751 PG 425 1 320 KNOX RD z �20 PB121PIG 15 DB 4441 PIG 1181 PARCEL# 117337 PB 121 PG 15 I PARCEL# 117337 I PREASWALINO I ENT c i FROM WATERLINE) �- 50' - I 04 I MICHELLE REESE MORRIS 1 320 KNOX RD a I N DB 4441 PG 1181 I m� PB121PIG15 (n < z m m I PARCEL# 117337 LLI I G) m z� J ID � 1 C: � m 1-6" FIRE HYDRANT � 0 VALVE z Z-1-6"GATE -HYDRANT•TEErn 1-16"X6 I O W R TRLGGASEM <m -- --- S a? mn P m < X LG — 2 — D * m C� — ILITY EASEMENT " — — ASE VALVE — Tx' < m 15 RCP 3 63\ ' — 12 cP NOS 29'16"E"-�1— 17 — — — O KNOX RD - SR 2814 (F — N0529'16"E 175.Rm' C z W Io 1 I 1 I I F- IW H 1 ¢ Cl m 1 Ha I z Z w pp o a 0) N O 'i UI � I 010 I rn 10 I I I ■ I 0RIVIERLY BETHEL CHURCH RD 60' R PER -PBS PG 15 RCP C c z S03'52'01"W 150.05' _ NO 20'37"E :p 243.44' o n A 0 60 T I < z � m N >m < m m RIFTON W. REESE VIRGINIAY. REESE 323 KNOX RD DB 3471 PG 83 PB 78 PG 107 PARCEL# 117331 F I �H a w M >m Co Ja I ZD I w o a I N I I 1N (O O I b N I � U I w I BETHEL PRESBYTERIAN CHURCH OF McLEANSVILLE INC. N Z 300 KNOX RD Om DB 2735 PG 868 = NAIL #202 DB 2599 PG 744 ►V N:851,628.87 DB 2398 PG 489 DH E:1,811,027.98 PARCEL# 117319, 117327 & 117329 —OHU �OHU OHU ' OHU — OHU OHU z 1 j= �3'90 DISCONNECTED —OHU — FLINE�, IPF (3/4") 2_ 1 "W 125.3a NS �0 N 3p 12'E � ROM DOT pLA 46.1g' SCPLE �// KN U 0 725.6� / OXRD _ 4 HRl SR 28y \ F U C — 72B — 0/yO i N V: 7� ' RBF (1/2") uuu► I I A r W � n GG7 0) j � I I 50' w I` Ln a° Ln ,000 I -? 001 I I 1v KIMBERLY B. HARRIS I I m MARK C. HARRIS 1 DONALD R. I 318 KNOX RD CALLAHAN v DB 7969 PG 1347 314 KNOX RD PB 201 PG 57 DB 8197 PG 862 I rn PARCEL# 117353 PB 201 PG 57 I I 1 PARCEL# 117322 I I I I I I i 1 1 I I � I I 1 I o A W I 0 w z I 1 00 v W 1 1-6" FIRE HYDRANT I m o N N GATE VALVE —+ — — "�y�a�,��"�2 '° - - O m T O 3'33' "W 7.26' 2010T 1 �YjIDyR, A;f TEE, 10T kbCiKI I -- - I N m in v �I A F+ +OCOHU — _ — OHU = OHU (; ri S03'33'09"W I v 149.80' N 0 �733� 37+00 —UC_� UC_UC� \ 3 00 HU — --_—_— — KNOX RD - SR 2814 (FORME U 60' PRL�Y7 tsPtG-T—EC-CHURCH R UA€B1�- m '20345"RCP o C .�� 15"RCP MARIA C. FAIRFIELD SCOTT W. FAIRFIELD 310 KNOX RD DB 7967 PG 330 PB 185 PG 26 PARCEL# 117322 U OHU — 0HU 1 � W N N z L cn 1� VIRGINIA L. JUSTICE / 1� 306 KNOX RD / v DB 7586 PG 1512 N PB185PG41 PARCEL# 117350 / Q. Q f) cn / (A / ' 1� z 411 Ncc m O m 1-6" FIRE HYDRANT D � � v — — _ 10x1&VH-GATF /I / _ 1-16" +ft T TE / A — — — _ � r < 20' UTILITY EASEMENT W_ THRU$T--BLOCKIN CID D C3 SOS'1T29"w ,.� z CD �C N U 733 — 15"RCP NAIL #1004 r1 p _u _ N:850,944.18 _m I w m w z < y U —UC =� 15"CMPE:1,811,014.34 D 0{<S03'3T7211.01' G < D <v 03'56z �.75' I f J J O^ < < mC W C,-i O 00 po N O cn �' BOAT W O �^ 0% C O N W T I V c0 0 �Am v N: x C)N-00 U �i CARLTON W. REESE m P LOIS G. REESE sv CURVE TABLE ANN REESE LIVING TRUST I iP 309 KNOX RD o n DATED 03-15-2016 W DB 6652 PG 1357 �' C__CURVE BEARING CHORD RADIUS MARGARET ANN REESE, TRUSTEE ARLEY G. REESE JR. DB 2528 PG 304 N MATTHEW S. CLAPP, TRUSTEE I u! FONDAT. REESE C2 SO4'26'27"W 165.06' 7508.61' PB 167 PG 132 0 319 KNOX RD 311 KNOX RD PARCEL# 117343 DB 7794 PG 2245 DB 8218 PG 2870 C3 N05`10'27"E 29.06' 7508.61' PB 167 PG 132 ` PB 167 PG 132 PB 83 PG 135 I PARCEL# 117318 C4 S62`29'06"E 99.69' 543.25' PARCEL# 117351 J C9 N34'03'58"W 124.42' 1073.90' IC10 S32`40'17"E 68.16' 1013.90' C11 N18`17'09"E 14.20' 70.10' C12 S13'51'08"W 413.22' 1466.76' z rn CO m w 171 G N 0 am N 0 0 °D SIN N0 r c3 AGO KI 60, R, 723.1— WILLIE M. ALSTON 5904 BETHEL CHURCH RD DB 3135 PG 515 PB 167 PG 132 PARCEL# 117346 h O HH UU —0 7Z g_ �" E �16-�_ _ N0540'47 U C .H 5.94 N J � CA \ W 0 o MAI — Z N o W � c O U m i m m O 2 c O = c 40 0 40 80 120 Scale 1" = 40' 0 L0 H fN W Z Q H ca CONTRACT SHEET 15 OF 20 EROSION CONTROL LEGEND TEMPORARY SILT FENCE ROCK OUTLET FOR SILT FENCE CD LIMIT OF DISTURBANCE CONSTRUCTION ENTRANCE ROCK CHECK DAM WESTCOTT, SMALL & ASSOCIATES, PLLC 125 SOUTH ELM STREET, SUITE 606 GREENSBORO, NC 27401 WWW.WSAAENG.COM PHONE: 336.310.9722 - )mm "' -1 —RY REVISIONS TYPE CONTRACT CONTRACTOR AS -BUILT AUTH. DATE BENCH MARKS JOB NO. P—#06150A P—#06150 CITY OF GREENSBORO NOT 01�1�4F1 I�� V MfM ENGINEERING DIVISION ROADWAY DESIGNED 11 21 22 BY MBW o' ��''�..NG.INEF: '��0�� SEWER CONST. SURVEY BY KNOX & BETHEL CHURCH ROAD WATERLINE WATER CHECKED BY VWS EROSION CONTROL SIDEWALK SCALE: I = 40 P-0576 FROM STATION 32+00 TO STATION 54+00 SHEET NO. 15 OF 20 31 N bI� N1 M 25 z W w 1O No ti W N Wa J �m °6 w HENRY L. LAMBETH LINDA R. LAMBETH 5937 BETHEL CHURCH RD 5919 BETHEL CHURCH RD DB 2964 PG 313-314 JAMES W. BELL Z PARCEL# 120222 5917 BETHEL CHURCH RD DB 7582 PG 1620 1 DB 7722 PG 246 20'-J PB 184 PG 106 PB 184 PG 106 , PARCEL# 120259 PARCEL# 120261 I w I~ w ip I J Q } 1.� W C, W J Q n 3 W o _ E I RBF W S00'51'16"W0.0.40- > WOODS 82.55' E E ,52° — ' N86'35� Q THEL CHURCH D - SR 752 M Z N W 6 'PUBLIC R/W PE PB 16 PG 13 /Z U l> V: u \ HH C LANDSCAPE RE�A� C LAN�DSCAPETINTBERS S89'37'31 "E 650.86' / �HU��OHU�--bHU—OHU— 0 s8�2"E,.ss.�— OHU OHU T OHU IPF (1" SQUARE TOP) I w I �a w of I w Co a ~ w CL o N I KAY R. BAKER L/T 1 ALTON Q. BAKER SETH T. BAKER M M 3 I 1P to N CHARLES G. BELL CYNTHIA T. BELL MI0 W �:i I Q w > w �� w v I I o > N81'02 ,, V: T2 4 an F}-- - I 227. � � to m w I ( Q o CLCn H NWow } O 6 W IN/ 7E8> N82S03'50'30"W 29.45' o> Z _ N�*02 47� 39.10'— o o 2- N81'03'15"E � / U C 15 cP 172.85' ONU Q a Ng� g�0 E 126.64' 3 1T� C » 121. � E �810N85'1T30"E 9.2T o — —4 00+— / a m 724 ppVED BRICK PAVED S85'47'09"W / G SIGN RIVEWAY IPF (1") `< / `M �� DFINE�LIAV Cr `RBF-(1L2") 11�1 MOW I F � � WITH LIGHT IN 111111111111111111 O 02"E 73 N8 230' '21 E . / C —U amp 81"II IPF PINCH — 90.23' / �� CHN81'20'24"E 71.61' RBF j-- II N�: 721.22 o TOP) � W / � s HGRAVEL >_ DRIVEWAY o U C IPF (1" PINCH TOP) w C U —/ OHU _ •� •17'S�5"W �44.54 co m U �H $81 GRAVEL 1 I molts 55.46' DRIVEWAY 54 i94'rs844-4fi26"W 1 I N 5'41 48 E I o z NAIL#1008 N:851,934.64 1 I E:1,812,274.86 20 I LIGHTHOUSE BAPTIST CHURCH OF McLEANSVILLE INC. I o! I _041 5928 BETHEL CHURCH RD DB 5955 PG 1964 00 o II 4 ' m ml PARCEL# 120237 N N W I 00 ro � W O W I N d M IN I Cq o I o M z _ I AILEEN W. REESE 1 I� — +�W 100•03' ro 5920 BETHEL CHURCH RD IZ N z g82'36 6 I DB 2140 PG 461 a I PB 72 PG 42 v W w I VOGRINC, ASHLEY JEFFERS 3 VOGRINC DAVID PAUL 6910 BETHEL CHURCH RD IDEATION, JOHNNIE R; PATRICIA TEESE N D I PARCEL# 120240 n w - = z 5924 BETHEL CHURCH RD in N DB 7740 PG 138 I 5916 BETHEL CHURCH RD 1 a > N rt z DB 8454 PG 574 N PB 167 PG 132 I DB 7994 PG 1806 m I r -1 n n, = v PB 206 PG 15 1 PARCEL# 117354 PB 72 PG 42 1 Cr w N o � z PARCEL# 233141 N PARCEL# 120239 I _ W m71 I O � I \ I I L m I I I r! I N I c01 I (o I — — -- — — 40 0 40 80 120 F����� �� 10o II- � , _ — — 20' UTI PB �2 P 42NT 110.56' I Scale 1" = 40' 2� K IN I ro o PER ,. ON no R6 � HENRY L. LAMBETH LINDA R. LAMBETH 5937 BETHEL CHURCH RD DB 2964 PG 313-314 PARCEL# 120222 N:852,063.08 F•1 R1�1nA 7E: �. 28. t j e _ 3 C13 66+07 c — — ♦ !— \ _ Lo co LIGH 8+0 "Mom N �� \ �— �� OH H 0HU�� f �— CURVE TABLE CURVE BEARING CHORD RADIUS C13 N88°45'47"E 527.38' 1453.71' C14 S82°29'32"E 230.62' 9966.93' C15 S85°39'44"E 60.05' 936.92' C S85°57'31 "E 253.04' 1665.76' W HU 340.52On H —�� UC 15"RCP \ _ -: 7364 5"RCP r U m 1 'RCP(BURIED) (BURIED) \ 7'►+0 � IPF (1") C� �q U��_ U C \ I p _-ate UC 15"RCP � WELL �" < HOUSE v — _ BETHEL C OI NV: 7 61 60' PUBLIC RCH RD - SR 2752 IPF (1") J } 1 56C�E(2")/W S82 PER PB 59 P G 1 23'S7"E 15"RCP 18� j IN � �o o UC w_ � y S82 47'02"E�0, u — 1 z U c IPF (1") � (I I � I I 0 � d W Y 0) Q Ln J Co Cn d z (� I O w I � I � � IRENEJ. NEWSOM I N 1= 5936 BETHEL CHURCH RD I O ESTATE BOOK 93-E-1234 IRENE J. NEWSOM DB 1104 PG 598 5940 BETHEL CHURCH RD CALVIN R. HIGHTOWER PARCEL# 120235 DB 2199 PG 739 DEBORAH L. HIGHTOWER PARCEL# 120245 5942 BETHEL CHURCH RD I DB 3900 PG 300 PARCEL# 120215 I�° I Lo to 1`° of IC N Iro ..11111111/i.. �I IPF (1") 1/ q Q�5 Q � I I I I to IN N M t to n N M I M N I w w M I a wl I C14 I� �LO--� z Iz N O I p HENRY L. LAMBETH z LINDA R. LAMBETH M o DELBERT M. STEWART 5937 BETHEL CHURCH RD I m m wu Ti O Ln N x JEAN L. STEWART DB 2964 PG 313-314 _ p m 6009 BETHEL CHURCH RD N65°0 PARCEL# 120222 I g ¢ c� O g DB 3823 PG 9 FR z a~ rn m w 3 J a PARCEL# 120234 1 I � 1�; WI 2co r.4zMLu Co a z- "v QW�i1CO Co Q wo I Jooa gLnuj I o Ln Qa a ~ Co PROP WATERLINE a EASEMENT (10' FROM WATERLINE) o Lu IPF (2") 1 0 > I } Q U8_ Q) 0 3 J a ��� BRICK WAL 72+ C14 a >¢ w 73I o > N82' N82'54'If O \ 0�Noo,1 7. IPF (1") I� �_OH� 76 \ \ N87 '$�'A 81' 2' R Co "DMP INV:724.40 NV:72 .60 \ V:724.61 S02'36'22" N 41IE AREA \ N \ 'o� S84'24'29"W 189.10' W U� — U S82'16'07"E 152.51' — �U�C N82'25'58"E 99. IPF (11.) a w z L US82'05'22"E 52.81' 788'25'11"E 100.20' cc T IPF IV') �F (1/2") kD o S85'36'32"E 100.00' I C LANDSCAPE AREA I m00 I N 3 I DELBERT M. STEWART I io N JEAN L. STEWART N M DELBERT M. STEWART M w I 6008 BETHEL CHURCH RD JEAN L. STEWART I p �: m I DB 2797 PG 904 114 ANNETTE DABO-CHANDLER 3 6004 BETHEL CHURCH RD o -' a PB 59 PG 6000 BETHEL CHURCH RD 00 DB 2939 PG 524 I N 1 a I PARCEL# 120221 DB 8035 PG 2738 j� PB 59 PG 114 I M PB 59 PG 114 N PARCEL# 120238 PARCEL# 120241 Im I I I I I CONTRACT SHEET 16 of 20 EROSION CONTROL LEGEND TEMPORARY SILT FENCE ROCK OUTLET FOR SILT FENCE LIMIT OF DISTURBANCE CONSTRUCTION ENTRANCE ROCK CHECK DAM 40 0 40 80 120 C!^AI? 111 = An' WESTCOTT, SMALL & ASSOCIATES, PLLC F=Rr-EM'RARY 125 SOUTH ELM STREET, SUITE 606 NOT k0WtMt7WC1jN GREENSBORO, NC 27401 :F ; WWW.WSAAENG.COM '-,,tiq c,INE I �%, PHONE:336.310.9722 ,,� e w �,, �//111111111' P-0576 REVISIONS TYPE CONTRACT CONTRACTOR AS —BUILT AUTH. DATE BENCH MARKS JOB N0. P—#06150 CITY OF GREENSBORO ENGINEERING DIVISION ROADWAY DESIGNED 11 21 22 BY MBW SEWER CONST. SURVEY BY BETHEL CHURCH ROAD WATERLINE EROSION CONTROL FROM STATION 54+00 TO STATION 76+00 WATER CHECKED BY VWS SIDEWALK SCALE: I" = 40' SHEET NO. 16 OF 20 CONTRACT SHEET 17 of 20 ►I i 5 4y"wF i1 "i 1 O/tjCORNF� I PROP WATERLINE EASEMENT (10' FROM WATERLINE) CABELL F. EARLY III ERIN W• EARLY 6031 BETHEL CHURCH RD DB 5908 PG 1670 PB 36 PG 59 PARCEL# 120216 PROP WATERLINE EASEMENT (10' FROM WATERUNE) CABELL F. EARLY III ERIN W. EARLY 6031 BETHEL CHURCH RD DB 5908 PG 1670 PB 36 PG 59 PARCEL# 120216 PROP WATERUNE EASEMENT (10' FROM WATERLINE) O 107 m D 7 F�1852130.311 AVELDR EWAY co ►� INV:72 0 l� O U U OHU OH 12° -� N74'18'S6 E�204.59' — �145s408 O H 0 U H U — 0 H U � i 0HU 0HU OIH _� / \ �E r : C 72 Q V 72 78+00 �— _ $Q+ n "E _ 2'5 732.31' 77 ' c 706`ROLK 6 CO 288.611 V \ 177 20. -- N V 722.33 12 CPP \ � � � —J : • 5..E 76' O _ 1\ S7452'04"W 213.23' - SR 2 ��5P —BETHEL CHURCH RDLq � —/ - _ 5 — \ 60' PUBLIC R/W PER PB 36 59 S72.57'49"W 732.00' \ (J�— Do Q Nv:721.6� \\ U�— C UC t UC \ UC \C \ U\ � \ _ N S76'38'12" W ~ UDC UC UC Bs ER p S74'53'06"W223.82' 7aE \ —� \ZW / /'V S72'57'49"W 731.39' \: = \ H v lV 8SI 91010 BONNIE C. LOY S76'38' yy EI"81q�5'4j 6S1 6032 BETHEL CHURCH RD D 6PG 1 �0 /3 PB 36 PG 59 PARCEL# 120218 II IPF (1'I) - 0 H \'V*� GRAVEL — N — S81'54'24"W 90.81' 7I UC rn UC UC S81'54'31"W 81.52' \ WOODS IPF (2..) NAIL #1012 / N:852,285.50 / E:1,815,320.63 � II BONNIE C Y 6032 BETHEL 20 CH U RRD DB 3865 PG 991 PB 36 PG 59 PARCEL# 120218 ti W M / Qa �W o a N / I WESTCOTT, SMALL & ASSOCIATES, PLLC 125 SOUTH ELM STREET, SUITE 606 GREENSBORO, NC 27401 WWW.WSAAENG.COM PHONE: 336.310.9722 40 0 40 80 120 Scale 1" �(jIU M Z t� �' NI Obi 3 N °I ' U M O _dam' MI O Lo a z EDWARD P. RICH OO BEVERLY B. RICH Z J) CID 6041 BETHEL CHURCH RD w DB 6025 PG 1369 Y DB 3417 PG 842 Q w PARCEL# 120217 I pG C w zcr- Q U 0- J Co O C O PROP WATERUNE PROP WATERLINE I EASEMENT (10' EASEMENT (10' FROM WATERLINE) FROM WATERLINE) I I \ NAIL #1013 � W N:852,424.11 J o M 2 E:1,816,126.39 Z �� w Q \ r./o„•58' W N80'58'05"E 90. C4 S 1'43'17"W 128.72' CHU\ OHU OH OHU OHU OHU OHU OHU ONE 1�� 3 OHS H� U� — - _� - o S84'04'01"W 324.63' + —9 �� S83'0T �} 2' �� �9 \ \� 00 \ " I N BETHE CHU H RD SR 2 2 \ N84'25'37"E 102.47 \ / 0 PUB IC R/W PER P 95 PIS 36 N N82'3s'o2"E 348.22' _ _ _ Z \ _ \ LJ UC UC UC \ C W _ RAVEL —rt \ \ \ \ \ C N �N8 34 0'32" 01E 7.13'—�—�_� C �— U C / / `N82'43'25'E 348.11' — \� — �— C 104 83'23'531,W 100.68' \ �_ C{ Z \ \ \ \ A NDSCAPE \ \ \ \ \ CULTIVATED FIELD\ \ \ \ \ \ \ \ EA CULTIVATED F LD \ 0 r s S84'37'27" W 209.29' JEROME L. WALSH Q JUDITH A. WALSH BONNIE C. LOY = 6040 BETHEL CHURCH RD 6066 BETHEL CHURCH RD C DB 3757 PG 698 ' DB 7999 PG 1002 PB 95 PG 36 DB 4598 PG 1628 PARCEL# 120228 ' DB 3865 PG 993 PB 95 PG 36 PARCEL# 120264 0 ,`11111111///,/,, EROSION CONTROL LEGEND TEMPORARY SILT FENCE ROCK OUTLET FOR SILT FENCE LIMIT OF DISTURBANCE CONSTRUCTION ENTRANCE ROCK CHECK DAM 40 0 40 80 120 A � RULMRARY REVISIONS TYPE CONTRACT CONTRACTOR AS —BUILT AUTH. DATE BENCH MARKS JOBNO. P—#06150 CITY OF GREENSBORO NOT PowtI b It"CI N ROADWAY DESIGNED 11 /21 /22 BY MBW ENGINEERING DIVISION = -f" �.F `�.•' SEWER CONST. SURVEY BY BETHEL CHURCH ROAD WATERLINE % .�!GINEFs•' 0 Z. ,yF....... • % ;, B WES���` EROSION CONTROL WATER CHECKED BY VWS //1111111111 P-0576 FROM STATION 76+00 TO STATION 98+00 SIDEWALK SCALE: I" = 40' SHEET NO. 17OF20 I \ �o Z� \ J m I � r �w a �N I z �o -20'� w N v w a O w < I Zm d a� oa L— I \ II REBAR #7757 \ \ N:852,453.74 \ E:1,816,193.97 \ (SIGHT EASEMENT / ERPB 161PGlOg Br'F �+0O�- � x x O ` +00 v~i Oyu W Z � 12"RCP Ic \ CULT\ \\ N(ATED \ \ \ \ \ � \ FIEL \ D PROP WA7ERUNE EASEMENT (1W FROM WA7ERUNE) .' r *mmm 0 a =NN- � "mF-1m, V � E atZ-24'�\\ NV: 656.85 PROP WA7ERUNE EASEMENT (10' FROM WATMNE) JAMES J. HIRES JR. ANGELETTE M. COFFEY 6119 BETHEL CHURCH RD DB 6176 PG 1230 PB161PG104 PARCEL# 107697 tiys%/ , / / WILLIAM I. JUDY SANDRA H. JUDY / / 6129 BETHEL CHURCH RD / / / DB 7989 PG 1100 DB 5369 PG 880 DB 4598 PG 1631 / / DB 3470 PG 720 PARCEL# 225251 / / PROP WA7ERUNE / EASEMENT (1W / / / / FROM WA7ERUNE) \ IPF &PDE DISK IPF & PDE DISK \ 20UTILITY EASEMENT PDE 20' UTILITY EASEMENT No PER PB 161 PG 104 / PER-M16�6104 N •53'46"E 490.18' & v 10'534 s ,ri ,N30'3627"E 5 0' J < <N80.36'27"E 68.01, — 6 "' -11�00 � RIP R _�� � nrL - o `6-5�.9 V1C '29" OP. 12 0 o — b7 1Is N804 32"E WILLIAM I. JUDY SANDRA H. JUDY 6129 BETHEL CHURCH RD DB 7989 PG 1100 DB 5369 PG 880 DB 4598 PG 1631 DB 3470 PG 720 PARCEL# 225251 'IPF& / "� PDE DISK Off-{ ZY / / Y / MH-S woo —�HU N I 0 0-2.+ G i RIM: 65.8 �O " 6 -N Elm- � �f / (S): '�56.77 �� 4.60'. wna� 30 —H i v - U. IP 12"CMP — — U C U C U C A N57. S80'45' 4"W _ 4 Z) NV:666.52 NAIL#1014 U C \ N:852,504.34 _ mull s / / 1.49' � E:1,816 \ _ —7 0.74 - 852.5 �4' RIP R h / / 0 DS \ m 918.19 NF 12"SPI E) r \ � 6� IPF Q/ �� NF (60D) PDE WOODS & DISK �.- / MH-S N86°18'S9"E 2.26' WOODS FROM RIM:665.02 CORNER RIP RAP BONNIE C. LOY INV(N): 656.03 INV: 657.98 6066 BETHEL CHURCH RD / \ INV(S): 655.86 DB 7999 PG 1002 DB 4598 PG 1628 DB 3865 PG 993 PB 95 PG 36 PARCEL# 120264 wQ / N / / / C / I PERMANENT I BIORETENTION / AREA GUILFORD COUNTY BOARD / OF EDUCATION 415 PEEDEN DR DB 2568 PG 569 PB 178 PG 92 / PARCEL#107680 PERMANENT BIORETENTION ADCA CURVE TABLE CURVE BEARING CHORD RADIUS C17 S82°51'23"W 128.05' 3870.42' C18 S85'08'51 "W 181.47' 3870.42' C19 S87°20'40"W 115.94' 3870.42' C20 S87'20'40"W 114.15' 3810.59' C21 S85'08'51 "W 178.66' 3810.52' tC22 S82`51'05"W 126.74' 3810.42' 111111111 WINFIELD J. HUNTER, TRUSTEE BOBBYE R. HUNTER, TRUSTEE 6146 BETHEL CHURCH RD DB 8248 PG 2390 DB 8004 PG 1884 DB 3944 PG 101 PARCEL# 107743 PROP WA70UNE rAEr•.ruT /4M PERMANENT BIORETENTION AREA D.M.U.E. PER PB 178 PG 92 73' I I BOBBYE R. HUNTER, TRUSTEE 6146 BETHEL CHURCH RD DB 8248 PG 2390 DB 8004 PG 1884 DB 6431 PG 2780 DB 6431 PG 2773 DB 3944 PG 101 PARCEL# 107743 61 O O a N lj �N80'49'25"E 6101' HUNTER LIVING TRUST DATED 02-19-2020 BOBBYE R. HUNTER, TRUSTEE WINFIELDJ. HUNTER, TRUSTEE 6110 BETHEL CHURCH RD DB 8248 PG 2393 PARCEL# 107712 40 0 40 80 120 Scale 1" = 40' GUILFORD COUNTY BOARD OF EDUCATION 415 PEEDEN DR O O O N N Cn W Z 2 FV- a CONTRACT SHEET 18 OF 20 EROSION CONTROL LEGEND TEMPORARY SILT FENCE ROCK OUTLET FOR SILT FENCE LIMIT OF DISTURBANCE CONSTRUCTION ENTRANCE ROCK CHECK DAM 40 0 40 80 120 Scale 1" = 40' WESTCOTT, SMALL & ASSOCIATES, PLLC 125 SOUTH ELM STREET, SUITE 606 GREENSBORO, NC 27401 WWW.WSAAENG.COM PHONE: 336.310.9722 R R E L M R A ERY NOT POWtIN11tWC70 c•'F,yC I NEB o'���' ,y G P-0576 REVISIONS TYPE ROADWAY WATER SIDEWALK CONTRACT CONTRACTORI AS —BUILT 1 AUTH. DATE I BENCH MARKS JOB NO. P—#06150 DESIGNED 11 /21 /22 BY MBW CONST. SURVEY BY CHECKED BY VWS SCALE: I" = 40' CITY OF GREENSBORO ENGINEERING DIVISION BETHEL CHURCH ROAD WATERLINE EROSION CONTROL FROM STATION 98+00 TO STATION 120+00 SHEET NO. 1$ OF 2 0 CURVE TABLE CURVE BEARING CHORD RADIUS C19 S87'20'40"W 115.94' 3870.42' C20 S87`20'40"W 114.15' 3810.59' C23 N85°31'57"E 129.17' 1399.71' C24 S77`45'38"W 142.46' 1021.61' C25 S76'25'15"W 114.13' 1662.95' C26 S78`10'45"W 162.51' 1080.30' C27 S85'15'58"W 124.66' 1034.28' WOODS PROP WATERUNE EASEMENT (10' FROM WATERLINE) GUILFORD COUNTY BOARD OF EDUCATION 415 PEEDEN DR DB 2568 PG 569 PB 178 PG 92 PARCEL# 107680 WOODS GRAHAM MARVIS GRAHAM, ADREA M 6147 BETHEL CHURCH RD DB 8507 PG 721 PARCEL# 107689 ' O11?�) \WITH LIGHT \ -C24 -� &C P C27 AXFI z G1 - N N:852,665.89 INV:726.62 E.1,818 561 � / HUNTER LIVING TRUST DATED 02-19-2020 14 I < I WINFIELD J. HUNTER, TRUSTEE S01 BOBBYE R. HUNTER, TRUSTEE 24'47"W 42.04' I 6146 BETHEL CHURCH RD DB 8248 PG 2390 I IPF DB 8004 PG 1884 DB 6431 PG 2780 I I DB 6431 PG 2773 DB 3944 PG 101 I I PARCEL# 107743 I I I I 1 I �I 1 I I WI z Lu I WI I W Q QI �I I I I � I � I 3 I I I I I �N GRPVE`DRIv�,- cr, OHU- O I �C TMOTHY D. SOWERS . 6149 BETHEL CHURCH RD ` DB 5608 PG 1951 ` 0 PARCEL# 107690 �\ 3 � z o GRAVELDRIVEW RBF BENT N - _- IPF & NCDOT DISK - ABANDONED z)I �4/62r\ GODS �06, NAIL OOD#204 W 3� \`s�S� SIGN a96 N:852,842.15 I \ �6' POST E:1,819,029.36 RBF BENT O INV: 73 .80 / �z_- WOODS 206•2�/ INV.730.1i .�S � OHU L � / U 00 N 67.88' - E 183 45 ?" AIR N71'S$48 woo PER IPF & PVC SLE 19 7 PROP WATERUNE EASEMENT (10' FROM WATERUNE) W. FRED NIX FAMILY TRUST DATED 02-03-2001 JERRY S. NIX, TRUSTEE 6188 BETHEL CHURCH RD DB 7894 PG 3049 DB 1086 PG 277 PARCEL# 107763 »E 22 g51 / 20' PERMANENT �N72•3618UTILITY EASEMENT U C PER COG DWG G-692 C/ C-W & DB 4596 PG 671- _ _ C25 OHU � OHU E LI`VE7 o.82 \ \ OHU -OHU OHI 3 #116 J � ELISABETH P. ALLEN MATTHEW D. ALLEN 6202 BETHEL CHURCH RD DB 8158 PG 762 DB 8155 PG 2704 PARCEL# 107716 SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1 PHASE OF APPROVED EROSION do SEDIMENTATION CONTROL PLAN DATE SIGNATURE (uNmNm wxC LLr mPmmE Pmw oR Am T) INSTALLATION OF EROSION CONTROL DEVICES FILL AND SLOPES COMPLETED FINE GRADES ESTABLISHED INSTALLATION OF SITE UTILITIES STABILIZATION OF BUILDING PAD AND PARKING AREAS FINAL GRADES ACHIEVED: OBTAIN BUILDING C/O VEGETATION ESTABLISHED; REMOVAL OF EROSION CONTROL MEASURES CLOSING OF PERMIT; FINAL INSPECTION APPLY 4,000Ibs. AGRICULTURAL LIMESTONE PER ACRE. APPLY 1,000Ibs. 10-10-10 FERTILIZER PER ACRE FOR GRASS SEEDING. LIME AND FERTILIZER ARE TO BE DISKED INTO THE SOIL SURFACE TO A MINIMUM DEPTH OF 4 INCHES. LATER WINTER - EARLY SPRING A. GRASS: (1) TALL FESCUE-1501bs. PER ACRE. B. GRASS -LEGUME MIXTURE (1) TALL FESCUE-1001bs. PER ACRE PLUS CROWNVETCH- 251bs. PER ACRE. EARLY SPRING - LATE SPRING A. GRASS: (1) TALL FESCUE-1501bs. PER ACRE. LATE SUMMER - EARLY WINTER A. GRASS: (1) TALL FESCUE-1501bs. PER ACRE. (2) TALL FESCUE-1001bs. PER ACRE PLUS ANNUAL RYEGRAIN-251bs. PER ACRE. B. GRASS -LEGUME MIXTURE: (1) TALL FESCUE-1001bs. PER ACRE PLUS CROWN VETCH-251bs. PER ACRE AFTER SEEDING, THE AREA IS TO BE ROLLED OR CULTIPACKED TO INSURE THAT THE SEED IS PRESSED INTO CONTACT WITH SOIL SURFACE. ALL SEEDED AREAS ARE TO BE MULCHED WITH STRAW MULCH AT THE RATE OF 3,000LBS. PER ACRE. (APPX. 100 BALES PER ACRE.) THE ABOVE SEEDING RECOMMENDATIONS AND RATES HAVE BEEN PREPARED FOR SELECTION OF A VEGETATIVE COVER SUITABLE FOR SOIL EROSION CONTROL IN THE GREENSBORO AREA. AREA SOIL TYPES, CLIMATIC CONDITIONS, SEED AVAILABILITY AND INDIVIDUAL PLANT CHARACTERISTICS ARE ALL TAKEN INTO ACCOUNT IN THE ABOVE RECOMMENDATIONS. DUE TO DENSITY, UNIFORMITY AND TEXTURAL QUALITY REASONS, THE ABOVE SELECTIONS ARE NOT RECOMMENDED FOR LAWN AREA USE. EROSION CONTROL SEEDING SPECIFICATION CONTRACT SHEET 19 OF 20 EROSION CONTROL LEGEND TEMPORARY SILT FENCE ROCK OUTLET FOR SILT FENCE LIMIT OF DISTURBANCE CONSTRUCTION ENTRANCE ROCK CHECK DAM STABILIZATION TIMEFRAMES (EFFECTIVE AUG. 3, 2011) SITE AREA DESCRIPT10N STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS NONE HIGH QUALITY WATER (H" ZONES 7 DAYS NONE SLOPES STEEPER THAN & 1 7 DAYS IF SLOPES ARE 10' OR LESS Nr LENGTH AND ARE NOT STEEPER THAN 2.1 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4.1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. 40 0 40 80 120 09-10E-m !%66iiii Scale 1" = 40' CONSTRUCTION SEQUENCE 1. OBTAIN GRADING PERMIT. 2. CLEAR SITE ONLY AS NECESSARY TO CONSTRUCT EROSION CONTROL MEASURES 3. INSTALL ALL SILT FENCE. INSTALL CHECK DAMS IN ALL AREAS CLEARED. 4. CONSTRUCT WATERLINE. 5. INSTALL CHECK DAMS AS THE CONSTRUCTION OF THE WATERLINE PROCEEDS. 6. FINE GRADING OF THE SHOULDER AND DITCHES. 7. SEED ALL DISTURBED AREA AND LINE DITCHES WITH EROSION CONTROL MATTING 8. EROSION CONTROL DEVICES SHALL BE INSTALLED AND DILIGENTLY MAINTAINED THROUGHOUT CONSTRUCTION. DEVICES SHALL BE INSPECTED AND REPAIRED AFTER EACH SIGNIFICANT RAINFALL. 9. NO MAJOR GRADING ACTIVITIES ARE TO TAKE PLACE DURING WET WEATHER OR PERIODS OF PREDICTED WET WEATHER (I.E.HURRICANES) 10. SEED OR OTHERWISE STABILIZE ALL DENUDED AREAS AS REQUIRED ON THE ATTACHED NEW STABILIZATION TIME FRAMES SCHEDULE. 11. ALL EROSION CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL SITE IS PROPERLY STABILIZED WITH GROUND COVER AND EROSION CONTROL OFFICE HAS ISSUED APPROVAL TO REMOVE. ALL UPSTREAM AREAS MUST BE STABILIZED PRIOR TO REMOVAL OF EROSION CONTROL DEVICES. ONCE THIS OCCURS, REMOVE SEDIMENT, GRADE TO FINAL ELEVATIONS AND STABILIZE. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE EROSION CONTROL MAINTENANCE DURING CONSTRUCTION. IN ADDITION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL ITEMS/RECORDS REQUIRED BY THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT. 13. THE CONTRACTOR SHALL HAVE ON SITE THE MEANS TO REMOVE ANY SEDIMENT TRACKED ONTO THE STREET. IF CONDITIONS REQUIRE, EQUIPMENT MUST BE ON SITE TO WASH TIRES OF VEHICLES PRIOR TO ENTERING STREET. 14. FINAL CLEAN UP. 15. NOTIFY NCDEQ LAND QUALITY SECTION INSPECTOR WHEN PROJECT IS READY FOR A CLOSEOUT INSPECTION. FILE FOR NPDES NCGO1000 E-NOTICE OF TERMINATION WHEN FINAL CLOSEOUT INSPECTION REPORT IS RECEIVED FROM NCDEQ LAND QUALITY SECTION. WESTCOTT, SMALL & ASSOCIATES, PLLC PIR MRARY REVISIONS TYPE CONTRACT CONTRACTOR AS -BUILT AUTH. DATE BENCH MARKS JOB NO. P- 6150 CITY OF GR EEN SB OR O 125 SOUTH ELM STREET, SUITE 606 NOTOI���CC1�N ROADWAY DESIGNED 11 21 22 BY MBW ENGINEERING DIVISION GREENSBORO NC 27401 ••FN �,`;�••'`o�'�� '-.,c�/y. SEWER CONST. SURVEY BY BETHEL CHURCH ROAD WATERLINE SHEET N0. WWW.WSAAENG.COM PHONE: 336.310.9722 ....INE° �G `,. '" 4 e� wEs ���• .,,,,, � N, WATER CHECKED BY VWS EROSION CONTROL OF P-0576 SIDEWALK SCALE: 1" = 40' FROM STATION 120+00 TO STA 127+05.46 CONTRACT SHEET 20 of 20 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HOW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HOW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydreseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER all k aaOera�Ma 0 ri. a uro C0d •� �Y xna w 6�8~ a arxvi�� 0 34 ln*J " o sEcvax e-e �MIINYN:V�2 (1fXt{• � �pg�gCTW �-� Ot at�� ICGTOM YCRIYO N 1. MN/L IOGIIOI O[1GYIm N rOD I^� �lOiNLY YM® fNNN: a M NC[E N1NgUr I.� •onp rcwa baaf.• i•U aNuenwa wu s yrrrro a. x a••cc wan snaa:nro suu I ICI' I Na M uoo woo s.n N: IIMIrNIL NBI M WNI MN NlN IWaI 7� 6 M anaa:nro I•:ae 7i 6 M Ea1CI1rEa WApIY A NaNF /LE•ME g�1 asax••rz wart swucnNe � m r: � v �,� � �••rN +a Na.Rr •rw®.tx e•wa NInN mvs. � amac�e wan anueac 1®.10: a•wr w® rN uNrrt BELOW GRADE�WA SMOl1T� STRUCTURE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one ofthe two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlets) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGOI GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) 1 At least once per 1. Identification ofthe measures inspected, Measures 7 calendar days 2. Date and time ofthe inspection, and within 24 3. Name ofthe person performingtheinspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification ofthe discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name ofthe person performingtheinspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days ofthe following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours ofa rain the site limits, event> 1.0 inch in 2. Description, evidence, and date ofcorrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidityfrom the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event> 1.0 inch in 2. Records ofthe required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization cfgrading measures, clearing and grubbing, installation ofstorm measures drainage facilities, completion ofall land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours unless the p g , Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters ofthe United States. EFFECTIVE: 04/01 / 19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7calendardays, a report that contains a description ofthe stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7colendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGOI SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/19I _a.uunir.. DESIGN AGGREGATE SIZE - USE 2-3 INCH WASHED STONE CRITERIA: DIMENSIONS OF GRAVEL PAD - THICKNESS = 6 INCHES MINIMUM WIDTH = 12 FOOT MINIMUM OF FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER LENGTH = 50 FOOT MINIMUM LOCATION = LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. SITE CONDITIONS MAY REQUIRE VARIATIONS FROM THESE DESIGN CRITERIA. VARIATIONS WILL BE DETERMINED OR APPROVED BY THE APPROPRIATE STATE EROSION CONTROL AUTHORITY. •IIIir"n_Wry1 MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2- INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 6" h THICKI CONSTRUCTION ENTRANCE DETAIL N TS STEP 1: DRIVE STEEL POSTS 18" INTO GROUND AND EXCAVATE A 8" X 6" TRENCH UPHILL ALONG THE LINE OF POSTS. MAX. 8' BETWEEN POSTS 6" STEP 4: BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE SO THAT RUNOFF IS FORCED TO GO THROUGH THE FENCE AND CANNOT GO UNDER IT. STEP 2: ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 8" INTO THE EXCAVATED TRENCH. CONSTRUCTION SPECIFICATIONS: 1. PLACE STONES TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 ft. BEYOND THE DITCH BANKS TO KEEP OVERFLOW WATER FROM UNDERCUTTING THE DAM AS IT RE-ENTERS THE CHANNEL. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL DOWNSTREAM FROM THE LOWEST CHECK DAM, CONSIDERING THAT WATER WILL FLOW OVER AND AROUND THE DAM. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT CHANNEL APPURTENANCES, SUCH AS CULVERT ENTRANCES BELOW CHECK DAMS, ARE NOT -- SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. FILTER FABRIC (AMOCO 2000 OR EQUIVALENT) MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS FOR DAMAGE AFTER EACH RUNOFF EVENT. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A PROTECTIVE RIP -RAP LINER IN THAT POSITION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONE TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. /1 CLASS 1 OR B EROSION 1.5' MIN. WIDTH A nni,-oni cTnnir AT CRFST FI L FA STEP 3: ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE TRENCH. SECTION WIRE FENCE "HOG WIRE" STEEL POSTS (14 GAUGE WITH MAX. MESH SPACING = 6 IN. FILTER FABRIC SEE HEIGHT: SPECS. FOR MATERIAL MAX. 3' MIN. 2' BOTTOM OF WIRE FENCE AND FILTER FABRIC BURIED 8" IN EXCAVATED TRENCH. STEEL POST DRIVEN 18" INTO GROUND NOTE: BOTTOM OF FILTER MUST BE PLACED IN TRENCH AND SECURED BY PLACING WASHED STONE TO A HEIGHT OF 6" ABOVE GROUND LEVEL. SILT FENCE DETAIL N TS rER FACE WITH WASHED STONE SECTION A -A ROCK CHECK DAM DETAIL N TS CONSTRUCTION SPECIFICATIONS: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. 2. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120 DEGREES FAHRENHEIT. 3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LBAINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. [G.S. 113A-57(3)] PHYSICAL PROPERTY REQUIREMENTS FILTERING EFFICIENCY 85% (MIN) TENSILE STRENGTH AT STANDARD STRENGTH- 20% (MAX.) ELONGATION 30 Ib./lin IN (MIN) EXTRA STRENGTH- 50 l in IN (MIN) SLURRY FLOW RATE 0.3 gal/sq ft/min (MIN) MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME IN EFFECTIVE, REPLACE IT PROMPTLY. REPLACE BURLAP EVERY 60 DAYS. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 1.5' MIN. NOTE: STONE CHECK DAM - STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. = WESTCOTT, SMALL & ASSOCIATES, PLLC MEMORY 125 SOUTH ELM STREET, SUITE 606 NOT P01�`� CT�N AS GREENSBORO, NC 27401 WWW.WSAAENG.COM ' PHONE: 336.310.9722 F4t gr wE`%%%. P-0576 REVISIONS TYPE CONTRACT CONTRACTOR AS -BUILT AUTH. DATE BENCH MARKS JOB NO. P-#06150A P-#06150 CITY OF GREENSBORO ENGINEERING DIVISION ENGINEERING COMMENTS ROADWAY DESIGNED 11/21/22 BY MBW SEWER CONST. SURVEY BY COG KNOX & BETHEL CHURCH ROAD WATERLINE EROSION CONTROL DETAILS SHEET N0. WATER I I I ICHECKED BY VWS 20 OF 20 SIDEWALK SCALE: I" = 40'