Loading...
HomeMy WebLinkAboutNCG140517_Inspection Report_20230307Compliance Inspection Report Permit: NCG140517 Effective: Expiration: Owner : Chandler Concrete Company Inc SOC: Effective: Expiration: Facility: Plant 611 County: Wake 10529 Ponderosa Service Rd Region: Raleigh Wake Forest NC 27587 Contact Person: Ryan Foley Title: Phone: 336-226-1181 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/07/2023 Entry Time 10:OOAM Primary Inspector: Lauren Garcia Secondary Inspector(s): Certification: Phone: Exit Time: 10:30AM Phone: 919-707-3648 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140517 Owner -Facility: Chandler Concrete Company Inc Inspection Date: 03/07/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection was requested so a COC can be issued and the plant can become operational. The site is currently at the end of the construction process and stormwater conveyances are mostly installed. There are two permanant basins onsite. Outfall 002 is located behind the materials storage area at the western end of the site. It is expected to only recieve stormwater from the service road and parking area. There are ditches that convey water from these areas to the outfall. At this time, two diversion ditches convey water around the basin. No water is being conveyed to the basin other than what the basin recieves via sheet flow. The two diversion ditches converge at a point behind the skimmer outlet of the basin and discharge onto the adjacent quarry property. If the basin is to be permanant, it is recomended that stormwater be conveyed to the basin, instead of around the basin. The central office should note that Outfall 002 will recieve water from the service/haul road in an( out of the site. The basin has not yet been fully stabilized. Outfall 001 discharges from a permanant riser basin at the nothern end of the site. The basin has not been fully stabilized at this time. The truck wash station and assocaited settling basins and material storage are located at the northern end of the site and water discharges to the riser basin. A pH treatment system is not yet installed to treat the wash water. It was stated onsite that the pH treatment will be installed by Friday March 10, 2023 or Monday March 13, 2023 at the latest. Site contacts should submit photos showing the treatment system once it is intalled. The site is graded for stormwater and wash water to flow to the truck wash areas and settling basins at the north end of the site. Water flows through the settling basins and recieves pH treatment in the last basin, before treated water is conveyed to the riser basin and outfall 001. The settling basins are about 4ft in depth. Water is proposed to be managed so the basins will not overflow. Once construction is finsihed,the parking lot will be top dressed. Eventually there will be stone placed. It is also possible there will be a diesel tank placed on site. It has not yet been finalized. It was stated that secondary containment will be built around the tank if one will be onsite. Page 2 of 3 Permit: NCG140517 Owner -Facility: Chandler Concrete Company Inc Inspection Date: 03/07/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine Page 3 of 3