Loading...
HomeMy WebLinkAbout20230341 Ver 1_ePCN Application_20230302DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process? * Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 2/7/2023 BIMS # Assigned * Version#* 20230341 1 Is a payment required for this project? * No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Holley Snider:Holley.Snider@ncdenr.gov Information for Initial Review la. Name of project: COURTESY COPY TIDES END, PHASE II la. Who is the Primary Contact?* BETTY BULLOCK Reviewing Office* Wilmington Regional Office - (910) 796-7215 1b. Primary Contact Email: * lc. Primary Contact Phone: * BETTYB@JLPNC.COM (910)346-9800 Date Submitted 3/2/2023 Nearest Body of Water TURKEY CREEK Basin White Oak Water Classification SA;ORW Site Coordinates Latitude: 34.508893 A. Processing Information Longitude: -77.477046 Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Onslow Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 29 - Residential Developments NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: If. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lh. Is the project located in any of NC's twenty coastal counties? Yes No li. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? * Yes No 2. Owner Information 2a. Name(s) on recorded deed: BEAVER CREEK INVESTORS, INC 2b. Deed book and page no.: 2c. Contact Person: BETTY BULLOCK 2d. Address Street Address 405 JOHNSON BLVD Address Line 2 City JACKSONVILLE Postal / Zip Code 28540 401 Water Quality Certification - Express Riparian Buffer Authorization Unknown State / Province / Region NC Country US Yes No Yes No 2e. Telephone Number: (910)346-9800 2f. Fax Number: 2g. Email Address:* BETTYB@JLPNC COM 4. Agent/Consultant (if applicable) 4a. Name: ATHAN PARKER, PE 4b. Business Name: AMP'D ENGINEERING, PLLC 4c. Address Street Address 8754 REED DRIVE Address Line 2 SUITE 14 City EMERALD ISLE Postal / Zip Code 28594 4d. Telephone Number: (252)777-0141 4f. Email Address: * ATHAN.PARKER@AMPDENGINEERING.COM State / Province / Region NC Country US 4e. Fax Number: C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) TIDES END, PHASE II lc. Nearest municipality / town: HOLLY RIDGE 2. Project Identification 2a. Property Identification Number: 425702979811; 425702875799 2c. Project Address Street Address 126 GUS HORNE RD Address Line 2 City HOLLY RIDGE Postal / Zip Code 28445 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * TURKEY CREEK 3b. Water Resources Classification of nearest receiving water: * SA;ORW 3c. What river basin(s) is your project located in?* White Oak 3d. Please provide the 12-digit HUC in which the project is located. 030203020301 4. Project Description and History 2b. Property size: 137.808 State / Province / Region NC Country US 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * TIDES END, PHASE II IS A NEW CONSTRUCTION PROJECT FOR A RESIDENTIAL NEIGHBORHOOD. THIS PROJECT IS AN EXTENSION OF TIDES END, PHASE I THAT WAS PERMITTED AND IS CURRENTLY BUILD OUT. TIDES END, PHASE II WILL CONSIST OF TWO STREAM CROSSINGS AND TWO WETLANDS CROSSINGS. THIS PROJECT IS CURRENTLY UNDEVELOPED WOODLAND. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 11.69 4g. List the total estimated linear feet of all existing streams on the property: 2,959 4h. Explain the purpose of the proposed project: * 129 LOT SINGLE FAMILY RESIDENTIAL SUBDIVISION IS PROPOSED ON THE PROPERTY 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * THIS PROJECT AS PROPOSED INCLUDES 129 LOT SINGLE FAMILY RESIDENTIAL SUBDIVISION. AS PROPOSED, THE PROJECT WILL BE PERMITTED IN THREE PHASES OF LAND DISTURBANCE. THE FIRST PHASE WILL CONSIST OF ONE STREAM AND ONE WETLAND CROSSING. THE SECOND PHASE WILL CONSIST OF ONE STREAM CROSSING. THE FINAL PHASE WILL CONSIST OF ONE WETLAND CROSSING. THE EQUIPMENT THAT CAN BE EXPECTED TO BE USED TO CONSTRUCT THE INFRASTRUCTURE OF THE PROJECT INCLUDE DOZERS, EXCAVATORS, PANS, MOTORGRADERS, ROLLERS, HIGHWAY CAPABLE DUMP TRUCKS, AND OTHER TRACTORS. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? * Yes No Comments: HAYWOOD PITTMAN, LSS PLANS TO SUBMIT THE WETLANDS AND STREAM JD AT THE SAME TIME AS THIS APPLICATION. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project? * Yes O No G Unknown 6b. If yes, explain. THE PROJECT AS PROPOSED INCLUDES 129 LOT SINGLE FAMILY RESIDENTIAL SUBDIVISION WITH THREE PHASES OF LAND DISTURBANCE. PHASE ONE TO INCLUDE ONE STREAM AND ONE WETLANDS CROSSING. PHASE TWO TO INCLUDE ONE STREAM CROSSING. PHASE THREE TO INCLUDE ONE WETLANDS CROSSING. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 2. Wetland Impacts Streams -tributaries Pond Construction Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W.* 2d. W. name 2e. Forested* 2f. Type of Jurisdicition * (?) 2g. Impact area* IMPACT #1 CULVERT P Unknown #1 Yes Corps 0.204 (acres) IMPACT #2 CULVERT P Unknown #2 Yes Corps 0.026 (acres) IMPACT #3 CULVERT P Unknown #3 Yes Corps 0.075 (acres) IMPACT #4 CULVERT P Unknown #4 Yes Corps 0.073 (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.378 2i. Comments: 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.378 3a. Reason for impact (?) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length* S1 IMPACT #1 Permanent Culvert ISSAC CREEK Perennial Corps 8 Average (feet) 156 (linear feet) S2 IMPACT #3 Permanent Culvert TRIBUTARY OF ISSAC CREEK Perennial Corps 5 Average (feet) 98 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 254 3i. Total stream and ditch impacts: 3j. Comments: STREAM IMPACT #1 TOTALS 1,243 SF (.0285 AC) STREAM IMPACT #3 TOTALS 480 SF (.0110 AC) 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Catawba Goose Creek Other WHITE OAK RIVER 3i. Total temporary stream impacts: 0 Tar -Pamlico Randleman Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact IMPACT #1 P ISSAC CREEK No 9,701 5,036 IMPACT #3 P TRIBUTARY OF ISSAC CREEK No 6,181 3,749 6h. Total buffer impacts: Total Temporary impacts: Total Permanent impacts: Total combined buffer impacts: 6i. Comments: Zone 1 0.00 Zone 1 15,882.00 Zone 2 0.00 Zone 2 8,785.00 Zone 1 Zone 2 15,882.00 8,785.00 E. Impact Justification and Mitigation O 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: LAYOUT SPECIFICALLY DESIGNED TO MINIMIZE THE IMPACTS OF THE STREAM AND WETLANDS WHILE MEETING NCDOT DESIGN REQUIREMENTS. TO ACCESS A LARGE PORTION OF THE DEVELOPMENT TRACT, IT IS NOT FEASIBLE TO AVOID IMPACTS. PROPOSED ROADSIDE DITCHES SHALL TERMINATE AND DIFFUSE FLOW PRIOR TO ENTERING THE RIPARIAN BUFFER AND WETLANDS. THE ONLY SECTIONS OF BUFFER AND WETLANDS PROPOSED TO BE DISTURBED ARE THOSE NEEDED TO CONSTRUCT THE NCDOT TYPICAL CROSS SECTION. HEADWALLS HAVE ALSO BEEN DESIGNED, WHERE PRACTICAL, TO LIMIT IMPACTS TO THE STREAMS, WETLANDS, AND BUFFERS. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: THE EROSION CONTROL DESIGN HAS BEEN COMPILED SUCH THAT TEMPORARY SEDIMENT BASINS BE INSTALLED DIRECTLY UP -SLOPE OF THE ROADSIDE DITCHES THAT DISCHARGE UP -SLOPE OF BUFFERS AND WETLANDS. SILT FENCE WILL ALSO BE UTILIZED TO SURROUND ALL DISTURBED AREA AND STRAW WATTLES WILL BE UTILIZED WHERE NEEDED TO SLOW VELOCITIES AND REDUCE SUSPENDED SOLIDS PRIOR TO ENTERING THE WETLANDS. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: PROJECT DOES NOT OCCUR INSIDE OF THE WATERSHEDS LISTED IN THE RULES 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * Yes No 3b. If you answered "no," provide a short narrative description. NO ADDITIONAL DEVELOPMENT IS PROPOSED BEYOND THIS PROJECT. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. WASTEWATER TO BE INDIVIDUAL SEPTIC SYSTEMS PERMITTED UNDER THE ENGINEERED OPTION PERMIT ("EOP") THROUGH ONSLOW COUNTY ENVIRONMENTAL HEALTH DEPARTMENT. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://www.fws. gov/office/easte rn-north-caro I i na/project-plan n i ng-and-consu ltation - CONTACTED JOHN ELLIS WITH FWS AND HE DIRECTED US TO THE ABOVE WEBSITE - CONTACTED THE EMAIL PROVIDED ON THE ABOVE WEBSITE (RALEIGH@FWS.GOV) WITH QUESTIONS ON 2/07/2023 AND NO REPLY WAS GIVEN. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No Are there submerged aquatic vegetation (SAV) around the project vicinity?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * CONTACTED FRITZ ROHDE AT NOAA 252-838-0828 FRITZ ROHDE@NOAA.GOV 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Unknown 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? * Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * HTTP://G I S. N C DC R. GOV/H PO W E B/ SITE ID:ON0227 SITE NAME: HOUSE ABOVE MENTIONED IS LOCATED ON THE PROPERTY 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? * FEMA NATIONAL FLOOD HAZARD INTERACTIVE VIEWER Miscellaneous O Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here 10 attach document 2023.03.01.PCN.TidesEndll.ImpactExhibit.pdf 13.83MB File must be PDF or KMZ Comments Signature 0 "' By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: ATHAN PARKER Signature (Jr /()J`/Sze}1.�7tl Date 3/2/2023 TURKEY POINT RD LEGEND: S PARKER RD DEED BOOK D.B. NOTES: GUS HORNE RD EXISTING EX MAP BOOK M.B. 1. ALL PERMITS MUST BE OBTAINED PRIOR TO DISTURBING WETLANDS. PAGE P.G. 2. INITIAL DISTURBANCE OF CROSSING TO BE LIMITED TO WHAT IS NECESSARY TO ALLOWING PASSAGE OF EQUIPMENT TO PREPARE FOR THE REMOVAL TAR LANDING RIP RAP APRON RRA AND REPLACEMENT OF THE CROSSING. RD RIGHT OF WAY ROW 3. ALL MATERIALS TO INCLUDE BUT NOT LIMITED TO EQUIPMENT, WATER, STORM DRAIN AND EROSION & SEDIMENT CONTROL MATERIALS OR DEVICES TYPICAL TYP SUFFICIENT TO SUBSTANTIALLY COMPLETE THE CONSTRUCTION AND STABILIZE THE CROSSING ARE STAGED OR STOCKPILED AT THE LOCATION PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHOULD EXECUTE THE REPLACEMENT OF THE CROSSING WITH DUE CONSIDERATION OF INCLEMENT HOLLY PROJECT SITE WETLANDS WEATHER THAT POTENTIALLY AFFECT THE TIMELINE OF THE CROSSING . RIDGE 4. CLEARING LIMITS SHOULD BE ESTABLISHED PER THE APPROVED PLANS. THE CONTRACTOR SHOULD PREP THE CROSSING PER THE PLAN. ONLY AFTER RD PREPPING THE CROSSING THE CONTRACTOR SHALL CLEAR & GRUB TO PROVIDE SUFFICIENT AREA FOR PROPOSED CROSSING AS NEEDED. IMMEDIATELY INSTALL SILT FENCE AS SHOWN. UPON GRADING THE SLOPES FOR THE CROSSING THE CONTRACTOR SHOULD LINE ALL SLOPES WITH EROSION CONTROL MATTING & SEED PER THE SEEDING SCHEDULE. THE CONTRACTOR SHOULD NOT CLEAR OR DISTURB ANY UN -PERMITTED AREAS. 5. THE CONTRACTOR, WHEN POSSIBLE, SHOULD PLAN ALL WORK IN & AROUND THE CROSSING DURING PERIODS OF DRY WEATHER. IF THIS IS NOT POSSIBLE, THE CONTRACTOR SHALL IMPLEMENT A PUMP -AROUND PRACTICE WHERE SANDBAG DIKES ARE SITUATED AT THE UPSTREAM AND SIMON LN DOWNSTREAM ENDS OF THE WORK AREA, AND THE STREAM FLOW IS PUMPED AROUND THE WORK AREA. THE PUMP SHALL DISCHARGE ONTO A STABLE VELOCITY DISSIPATER MADE OF RIPRAP OR SANDBAGS. WATER FROM THE WORK AREA SHOULD BE PUMPED TO A SEDIMENT FILTERING MEASURE. THE -'� MEASURE SHOULD BE LOCATED SUCH THAT WATER DRAINS BACK INTO THE CHANNEL DOWNSTREAM OF THE SANDBAG DIKE. 6. THE CONTRACTOR SHOULD MINIMIZE CONSTRUCTION TIME WORKING WITHIN THE CROSSING AREA TO THE MAXIMUM EXTENT POSSIBLE. 7. ALL EXCAVATED SOILS SHOULD BE STOCKPILED SEPARATELY TO ALLOW FOR APPROPRIATE TOPSOIL MATERIAL TO BE PLACED BACK GIVING VEGETATION VICINITY SKETCH THE NECESSARY SOILS TO PROVIDE HEALTHY GROWTH. NOT TO SCALE 8. UPON COMPLETING THE CROSSING PIPE THE CONTRACTOR SHOULD THEN PROCEED TO FILLING & GRADING THE AREA TO MATCH THE PROPOSED CONTOURS. 9. SILT FENCE SHOULD BE MAINTAINED THROUGH OUT CONSTRUCTION AND BE PLACED AS SHOWN. 10. ON DOWNSTREAM SIDE OF CROSSING, ONLY CLEAR WHAT IS NECESSARY TO INSTALL HEADWALL. RIP RAP APRON IS TO BE INSTALLED ALONG THE STREAM BANKS ON NATURAL GROUND. DO NOT EXCAVATE VEGETATION FROM STREAM BANKS FOR RIP RAP INSTALLATION. 11. SHOULD ANY AREAS OUTSIDE THE SHOWN IMPACT ZONE BE DISTURBED DURING THE REMOVAL AND REPLACEMENT OF THE CROSSING THE CONTRACTOR IMPACT SHOULD RE -GRADE THE SITE TO EXISTING CONDITIONS, SEED THE AREA WITH ANNUAL SEED, LINE WITH HIGH VELOCITY EXCELSIOR MATTING THEN .#1: STREAM - 156 LF STAKE WITH LIVE WILLOW STAKES 3' ON CENTER. THE US ARMY CORPS OF ENGINEERS (WILMINGTON OFFICE) SHALL ALSO BE NOTIFIED ALONG WITH A WETLAND - 8,908 SF MAP AND SUMMARY OF CORRECTIVE ACTIONS TAKEN. ZONE 1 BUFFER - 9,701 SF 12. SEE FULL CONSTRUCTION PLANS AND PERMITTING DOCUMENTS FOR ADDITIONAL DETAILS AND INFORMATION. ZONE 2 BUFFER - 5,036 SF TOTAL BUFFER - 14,737 SF (0.338 AC) IMPACT .#2: STREAM - N/A WETLAND - 1,132 SF ZONE 1 BUFFER - N/A ZONE 2 BUFFER - N/A TOTAL BUFFER - N/A IMPACT #3: STREAM - 98 LINEAR FEET WETLAND - 3,249 SF ZONE 1 BUFFER - 6,181 SF ZONE 2 BUFFER - 3,749 SF TOTAL BUFFER - 9,930 SF (0.228 AC) IMPACT .#4: STREAM - N/A WETLAND - 3,195 SF ZONE 1 BUFFER - N/A ZONE 2 BUFFER - N/A TOTAL BUFFER - N/A OVERALL SITE IMPACT TOTALS: STREAM - 254 LINEAR FEET WETLAND - 16,484 SF ZONE 1 BUFFER - 15,882 SF ZONE 2 BUFFER - 8,785 SF TOTAL BUFFER - 24,667 SF (0.566 AC) 1-1 \G�y C'RP�gpO� N\\PL ib VS� N\LLP I RES 6 SPN�E BPS lot0) �p NPP� g3'15P�Sp�N'C\P\- P 5A0 �p PP VSE � OFF S UBD /="S 76 P,199 NTIAL USE c�F gSNE\R'' Nag 2�a �PMES 00 8 P °MNEo �o 0 200 400 Feet SCALE 1 "=200' THIS PLAN IS THE PROPERTY OF AMP'D ENGINEERING, PLLC, AND MAY NOT BE USED OR REPRODUCED WITHOUT THEIR PERMISSION. DESIGNER ASSUMES NO LIABILITY FOR ANY CONSTRUCTION FROM THIS PLAN. CONTRACTOR MUST VERIFY ALL DIMENSIONS PRIOR TO PROCEEDING WITH CONSTRUCTION. CAUTION MUST BE EXERCISED IN MAKING ANY CHANGES IN THIS PLAN. ONLY QUALIFIED ENGINEER SHOULD ATTEMPT MODIFICATIONS, AS EVEN MINOR CHANGES IN ONE AREA OF THE HOUSE COULD LEAD TO MAJOR PROBLEMS IN ANOTHER AREA. TOPSAIL BLUFF SUBD. OOMMON AR M.8.74 P.25� ZONED R 7 RESIIDDENTIAL USE Poor DN. cn=Nthan Par , PE, t-US, o 11"d ^ L _ Engineering, PLLC, t mail=alhan. parker@ampiengineenn•j. Dale: 202'.03.011G M l: o5'00' • "'}rG j1 0fjlll. 101� k E O U In In .� N N �0Li z � E Liza zwo J@ c� z o cn a, o WLLJ U LLJ �� w a_ F-5::�i LLJ N Ln Q L� M c/) L+_J U N C 1 r 0 F__ Ln U) 00 W N > z U z o 0 Y w Ln Lj 00 w CC)J M m�J z � ..mx0 mLw0cn LJ>m�� 3:w 0 Q 0 Q LL = U Z � z cn z z W Lw�3: W cn )_� w� cj� o 0 o z 0 O U W zw�0 z J m �z Q Do n DATE: 3/01 /2023 REV: I DATE: SHEET: OVERALL IMPACT SITE PLAN SHEET NUMBER: SHEET 1 OF 3 LEGEND: DEED BOOK D.B. NOTES: EDGE OF PAVEMENT EOP 1. SEE SHEET 1 OF 3 OVERALL IMPACT SITE PLAN FOR NOTES. EXISTING EX 2. SEE CONSTRUCTION DRAWINGS FOR MORE INFORMATION. MAP BOOK M.B. 3. ROAD TYPICAL CROSS-SECTION TO STOP PRIOR TO 50' STREAM BUFFER, PAGE P.G. ALLOWING RUN-OFF TO SHEET FLOW FROM PAVEMENT WITHIN THE 50' STREAM RIP RAP APRON RRA BUFFER AND CROSSING. RIGHT OF WAY ROW TYPICAL TYP LOT NUMBER ❑1 PROPERTY LINE — - - — SWALE WATER LINE N WETLANDS i 30' BUFFER FROM TOP OF BANK, TYP ✓ \ a ` 50' BUFFER FROM > \1 � 1 HEADWALL 02 TOP OF BANK, TYP ^ RIM: 10.00�-- INV IN: 4.00 (01)- TIDES END, PHASE I WETLANDS, TYP -TOP OF BANK OF STREAM, TYP v EXISTING CONTOUR, TYP 156 LF STREAM 9,701 IMPACT / SF IMPACT ZONE 1 RIPARIAN BUFFER 6" C900 WATER 4' OFF OF EOP THIS PLAN IS THE PROPERTY OF AMP'D ENGINEERING, PLLC, AND MAY NOT BE USED OR REPRODUCED WITHOUT THEIR PERMISSION. DESIGNER ASSUMES NO LIABILITY FOR ANY CONSTRUCTION FROM THIS PLAN. CONTRACTOR MUST VERIFY ALL DIMENSIONS PRIOR TO PROCEEDING WITH CONSTRUCTION. CAUTION MUST BE EXERCISED IN MAKING ANY CHANGES IN THIS PLAN. ONLY QUALIFIED ENGINEER SHOULD ATTEMPT MODIFICATIONS, AS EVEN MINOR CHANGES IN ONE AREA OF THE HOUSE COULD LEAD TO MAJOR PROBLEMS IN ANOTHER AREA. 50 5 1 -� r� \ j `�/S. �� •��`�\ ��J EXISTING CONTOUR, TYP / _710 I 1,132 SF WETLANDS IMPACT J / RRA. SEE NOTE 10 -A I y ��\ �� ON SHEET 1 OF 3. —I— — I FES 07 F-C> / INV: 21.73) / ROADSIDE DITCHES TO 6" C900 WATER P \ d J/ F / DAYLIGHT PRIOR TO 4' OFF OF EOP / �� I _ENTERING WETLAND, TYP �) — J I_ / — — / —` ✓— \� TIDES END DRIVE 60' ROW 24+ / 25+00 kf// " /26+00 / i L__ ��� 14 \\ PROPOSED CONTOUR, TYP PROPOSED CONTOUR, TYP FES 08 / I PIPE D I INV: 21.97 / 48 LF OF �\ 62 IN 30" I 30" RCP � _ _��/'•fir � � TIDES END DRIVE ROADSIDE DITCHES TO LSO I I r� 60 ROW Jf DAYLIGHT PRIOR TO C ll� I ENTERING BUFFER, TYP I J 1 � \ � � � , \• ' 5,036 SF IMPACT ZONE 2 � �' � l F � I ` r � ` Feet 8,908 SF WETLANDS IMPACT `�I / I I �� J 1 / \ RIPARIAN BUFFER � �I � / � ` \ VERTICAL SCALE 1"=40' PIPE A \ I \ r o ao 80Feet j -120 LF OF ti RRA. SEE NOTE 10 '"� l �� ✓ \ \ HORIZONTAL SCALE 1"=10' 53 16 60" RCP HEADWALL \ �\ ON SHEET 1 OF 3. a a VERTICAL SCALE 1"=40' / 0 -0.58% RIM: 9.30 HORIZONTAL SCALE 1"=10' ILINV OUT: 3.30 (02)\ WETLANDS IMPACT #2 IMPACT #2: STREAM - N/A IMPACT #1: STREAM AND BUFFER IMPACT #1 PLAN VIEW WETLAND - 1,132SF STREAM - 156 LF ZONE 1 BUFFER - N/A WETLAND - 8,908 SF PLAN VIEW ZONE 2 BUFFER - N/A ZONE 1 BUFFER - 9,701 SF TOTAL BUFFER - N/A ZONE 2 BUFFER - 5,036 SF TOTAL BUFFER - 14,737 SF (0.338 AC) 22 o w U 21 °0IES ``' 20 19 PROPOSED GRADE 18 17 16 15 \ 14 13 12 11 \ 10 \ / 9 \ g 6" C900 WATER \ 3' MIN COVER 7 � 6 EXISTING GRADE 5 4 3 2 PIPE A. 60" EXISTING RCP 1' 8ELOW GRADE. 1 0 —1 —2 ' ' NIt 00 N n O � M 00 n N Nui M -50 2+00 2+50 3+00 3+50 4+00 4+50 STREAM AND BUFFER IMPACT #1 PROFILE VIEW : N r ^ I 0. pl) 000 t00 to 14) 00 Lo Lo 39�N NN NN NN NN N N NN 38 50 24 00 24 50 25 00 25 50 26 00 26 50 37 36 LOW POINT TA: 24+9 .88 35 P VI EL V: 24.96 AD: .32% 34 K: 45.00 3 149. 9' VC 00 32 31 .0 ccN '* N 30 N N CA Lij 29 > PROPOSED GRADE > > m m 28 EXISTING GRADE 27 26 24 23 22 / 21 INSTALL ONE INSTALL ONE 20 BEYOND JOINT RJDIP TOP 45 45 DEGREE JOINT BEYOND DEGREE RJDIP TOP 45 19 6" C900 3' MIN WATER COVER 45 18 BENDS BENDS 17 16 INSTALL ONE JOINT RJDIP CENTERED PIPE D. 30" RCP 1' BELOW EXISTING GRADE. 15 UNDER STORMDRAIN WETLANDS IMPACT #2 PROFILE VIEW CSSap En, N,cn=rnI-Parker. P{.. c=US. o=AM..J EiYL en gmesrin9,-1 1 il-alFan.parker(r}aryptlengineenng. Date: 2023.03:011ti:19:io-95'90' E O U N N In In . " 0 I a N N E Li z z W cl:f o Ll C) i 0zo cn zo W U 1, 1 Lj LLJ N Ln Q L__ M Cn LLJ 0 N z Cn O Ln U) 00 LLJ N > z U z 0 0 LLJ Lo LLJ 00 W 00 J M I co z � .. Elf X O r0 LLJ 0 Cn LLJ>my� � LLJ 0 - OMa- D Q = U Z F- z Co z z W LLJ W Cnw�z F-- 3: � W cjl _j 0 < o _j z 0 O U LL zw z o � o 0 Q m Q- �z (7) V ) 0 DATE: 3/01 /2023 REV: I DATE: SHEET: IMPACT #1 AND #2 SITE PLAN AND PROFILE SHEET NUMBER: SHEET 2 OF 3 LEGEND: DEED BOOK D.B. EDGE OF PAVEMENT EOP EXISTING EX MAP BOOK M.B. PAGE P.G. RIP RAP APRON RRA RIGHT OF WAY ROW TYPICAL TYP LOT NUMBER ❑1 PROPERTY LINE — - - — SWALE WATER LINE ■ WETLANDS 0 40 80 Feet VERTICAL SCALE 1 "=40' HORIZONTAL SCALE 1"=10' IMPACT #3: STREAM - 98 LINEAR FEET WETLAND - 3,249 SF ZONE 1 BUFFER - 6,181 SF ZONE 2 BUFFER - 3,749 SF TOTAL BUFFER - 9,930 SF (0.228 AC) WETLANDS, TYP STREAM AND BUFFER IMPACT #3 PLAN VIEW NOTES: 1. SEE SHEET 1 OF 3 OVERALL IMPACT SITE PLAN FOR NOTES. 2. SEE CONSTRUCTION DRAWINGS FOR MORE INFORMATION. 3. ROAD TYPICAL CROSS-SECTION TO STOP PRIOR TO 50' STREAM BUFFER, ALLOWING RUN-OFF TO SHEET FLOW FROM PAVEMENT WITHIN THE 50' STREAM BUFFER AND CROSSING. OM TYP i J HES TO R TO ER, TYP JL F' I 51A:L+ ti.lU 1 vl v. 31 AD: 3.85 a K:6 .0" 30 M K: 45.0 29 �� Lo vj 28 ±N _ L MN 27 010 N N N 26 ww � mm 25 m PROPOSED GRADE w 24 23 _1 22 21 \ / 20 INSTALL 6" OVER C900 PIPE E 19 \ WATER 18 17 16 \ 6" C900 3' MIN WATER COVER 15 EXISTING GRADE 14 \ 13 \ 12 \ 11 PIPE E. 36" RCP 10 9 8 N .0 N N �� N �� N cV� N N 17� N N N 1 +50 2+00 2+50 3+00 3+50 4+00 STREAM AND BUFFER IMPACT #3 PROFILE VIEW EXISTING CONTOUR, TYP 115 Cc 116 70 P RRA. SEE NOTE 10 ) I 3,195 SF WETLANDS IMPACT / J ON SHEET 1 OF 3. FES20 �INV: 14.26 ROADSIDE DITCHES TO 6" C900 WATER l DAYLIGHT PRIOR TO 4' OFF OF EOP J ENTERING WETLAND, TYP w w PROPOSED CONTOUR, TYP ) 1 \ — �� �'/a. / PIPE J l\ 80 LF OF /)/moo L�- �;� -FES 19 36 RCP �, ` v . / -INV- 16.85 — J 1f —� 0-3.24%� 131_/ -- `� � � � WETLAN DS (,\ /, TYP ) --\ '/ 1 30 / G ! NC t ` WETLAND IMPACT #4 PLAN VIEW THIS PLAN IS THE PROPERTY OF AMP'D ENGINEERING, PLLC, AND MAY NOT BE USED OR REPRODUCED WITHOUT THEIR PERMISSION. DESIGNER ASSUMES NO LIABILITY FOR ANY CONSTRUCTION FROM THIS PLAN. CONTRACTOR MUST VERIFY ALL DIMENSIONS PRIOR TO PROCEEDING WITH CONSTRUCTION. CAUTION MUST BE EXERCISED IN MAKING ANY CHANGES IN THIS PLAN. ONLY QUALIFIED ENGINEER SHOULD ATTEMPT MODIFICATIONS, AS EVEN MINOR CHANGES IN ONE AREA OF THE HOUSE COULD LEAD TO MAJOR PROBLEMS IN ANOTHER AREA. S. SANDY SHORE LANE 60' ROW 0 40 80 Feet VERTICAL SCALE 1 "=40' HORIZONTAL SCALE 1"=10' IMPACT #4: STREAM - N/A WETLAND - 3,195 SF ZONE 1 BUFFER - N/A ZONE 2 BUFFER - N/A TOTAL BUFFER - N/A ca +� +vi +4 (0 N 28 0i w 27 W w mm mm 26 PROPOSED GRADE 25 EXISTING GRADE 24 .06� % ' 1 - \ 1.8 23 i 22 21 \ ' 20 19 18 INSTALL ONE JOINT RJDIP BEYOND TOP 45 17 \ INSTALL ONE 16 \ JOINT RJDIP TOP 45 15 XBEYOND 14 45 DEGREE BENDS 45 BENDS DEGREE 13 12 11 INSTALL ONE JOINT PIPE EXISTING J. 36" GRADE. RCP 1' BELOW 10 RJDIP CENTERED UNDER STORMDRAIN 9 8 (p N N O co r- N 0) N N ui M N N Qi N N N N N F) N N N 4+00 4+50 5+00 5+50 6+00 6+50 WETLAND IMPACT #4 PROFILE VIEW 1917��f+� NO UA 0"ES576'.., DN. U//�u/d1• /y///•� E�napgiaeiinl: =e2ae9lrinag, paPrRyec r@raPE=0in0e'oe=riAngN.Pco'tl Pln SEAL 23n931715:1m4a.OnSg �'�,•' •,,�G�. irk ��•?; •• , E O U N N In In .� " 0 I a N N E Li zWC z cl:f J@ 0 0 z o — a, I WU� c) C� Q LJ D:f c Ln LLJ N Q L_ M C/) Li 0 N C/ cl:� T'_ 0 ';;t Ln /_ V I 00 LLJ N z U z o 0 Y LIJ Lo LLJ 00 W CC) J M z � ..mx0 LIJ 0 Cn LIJ>my� zLw0Qo O m a- --D Q = U Z F- z Co z z W LIJ�3: W CnLw�z )_� LIJ 0:�a cj� :�E 0 C) LLj _ LLJ j 0 O W Z zu� zo w�0 J E)E Q a_�z m� I l Q cf) 0 DATE: 3/01 /2023 REV: I DATE: SHEET: IMPACT #3 AND #4 SITE PLAN AND PROFILE SHEET NUMBER: SHEET 3 OF 3