Project Information
CreekStone, PLLC (CS, PLLC) was retained by John Meshad to complete the construction of
the associated approved CAP. CreekStone personnel completed construction oversight of
the corrective action plan prepared by others which was approved by the USACE and
NCDEQ on June 16, 2020. Stream monitoring began on June 15th 2021 and commenced
quarterly through December 15t", 2022 with additional visits lasting through February 14t"
2023.
Steam Monitoring
Construction of the restoration plan began on December 10t" and was completed on April
29th, 2021. Stream monitoring began shortly thereafter and continued quarterly until
February 14th 2023. The livestakes were installed in late February on 2023, accordingly,
survival rate is not known at this time. However, considering the fertility of the valley soils,
soil moisture and duration of direct sunlight, survival rate is expected to be high. The
restored stream channels are very stable and show no erosion. Flows do not fluctuate much
due to being spring fed. The stream level has been observed to rise in large sustained storm
events. No issued were observed. The confluence with Big Norton Prong will back up as
stormwaters begin to inundate the associated bench areas. The root wads and H-vane have
protected the confluence from erosion and head cutting from Big Norton Prong storm event
flows. The stream does go intermittent just before the confluence during base flow likely due
to the sandy soils adjacent to Big Norton Prong. Overall, the restored stream reaches S1 and
S2 are stable. Additionally, the restored wetland area east of Big Norton Prong is functioning
well with pockets of standing water and a variety of thriving wetland vegetation. At this time,
CreekStone, PLLC, on the behalf of John Meshad, would like to request no further action and
NOV closure of this project. Please refer the following photographs:
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com
Page 2 of 9
Ronnie Dilbeck, PG
CreekStone, PLLC
Project Photographs:
. 47 - LIN
it _��
L
.ems.'.:;
3 -ice'; �•�-
-�"rye✓,
Srr ' •
.17i T•
Tr -ve'X' • A -
3 '�
•
_ F
to
Restored wetland area
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com
Page3of9
Confluence with Big Norton Prong w/ rootwads
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com
Page 4 of 9
Upstream view from Big Norton Prong confluence
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com
Page5of9
Typical with woody structure
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com
Page6of9
Upstream towards S 1 and S2 confluence
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com
Page 7 of 9
S 1 and S2 Confluence
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com
Page 8 of 9
.
Spr
nghead
CrookStona.PLLC-132Blueberry Lane 'FRANKL|N.NC'28734
Page9of9
Greener times with restored wetland in background
CreekStone, PLLC — 132 Blueberry Lane - FRANKLIN, NC - 28734
(828) 200-4585, Ronnie@creekstonewnc.com