January 30, 2023
LETTER OF APPROVAL
Red Oak Farms Development, LLC
ATTN: Marvin Shearin
5088 Oak Level Road
Rocky Mount, North Carolina 27804
RE: Project Name: Breedlove Road Subdivision
Acres Approved: 21.16
Project ID: NASH-2023-011
County: Nash
City: Town of Nashville
Address: Breedlove Road
River Basin: Tar -Pamlico
Stream Classification: Other
Submitted By: Stocks Engineering
Date Received by LQS: November 4, 2022
Plan Type: New
Dear Mr. Shearin:
The subject erosion and sedimentation control plan has been approved by statute. The
Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a
minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority
must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt
of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or
disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will
be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This
plan approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
All new construction activities are required to complete and submit an electronic Notice of Intent
(e-NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
General Permit. After the form is reviewed and found to be complete, you will receive a link with
North Carolina Deparunent of Environmental Quality . Division of Energy, Mineral and Land Resources
Raleigh Regional Office 1628 Mail Service Center . 3800 Starrett Drive ! Raleigh. North Carolina 27601)
919.791.4200
Letter of Approval
Red Oaks Farms Development, LLC
January 30, 2023
Page 2 of 3
payment instructions for the $100 annual permit fee. After the fee is received, you will receive
the COC via email. You MUST obtain the COC prior to commencement of any land disturbing
activity. The e-NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the e-NOI form to Paul Clark at Paul.Clark(@ncdenr.gov. If the owner/operator of this project
changes in the future, the new responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules, including rules adopted by the Environmental
Management Commission for the protection of riparian buffers in the Tar -Pamlico River Basin. In
addition, local city or county ordinances or rules may also apply to this land -disturbing activity.
This approval does not negate the requirement to obtain any other permit or approval required by
law.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the
acreage will be a violation of this permit and would require a revised plan and additional
application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Nf� " North Carolina Department of Environmental Quality ' Division of Energy. Mineral and Lard Resources
IDE.m.
✓ Raleigh Regional office ; 1628 Mail Service Center 3800 Barrett Drive ; Raleigh. North Carolina 27609
o9; itie ao�awow� 919.791.4:00
Letter of Approval
Red Oaks Farms Development, LLC
January 30, 2023
Page 3 of 3
Your cooperation is appreciated.
Sincerely,
William H. Denton, IV, PE
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGOI Fact Sheet
cc: Regional Office file
Kevin Varnell, PE, Stocks Engineering (kvamell a stocksengineering.com)
�r North Carolina Department of invirnnmental Quality i Divi ;ion of Entrgy. Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Starrett Drive i Raleigh. North Carolina 27609
"%nrid' ' is cam: r 911)391,1200