Loading...
HomeMy WebLinkAboutNC0005363_Approval Repair_20150306 AVA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald van der Vaart Governor Secretary Certificate of Approval March 6, 2015 Mr. John Elnitsky Vice President Duke Energy P.O Box 1321, DEC 22C Charlotte,NC 28201-1007 RE: Approval to Repair—Scope 4 Weatherspoon 1979 Ash Pond Dam RECEIVED/DENR/DWR Robeson County MAR 1 2 2015 State Dam ID: ROBES-009 Water Quality Dear Mr. Elnitsky: Permittina Sectior This is in response to your submission dated February 4, 2015,received on February 25, 2015 of plans, specifications and design data dated on December 8, 2014 for repair of the subject dam in compliance with the Dam Safety Law of 1967. This dam is of high hazard classification. The plans, specifications and design data submitted were prepared under the supervision of Mr. Jason S. Reeves, PE of S&ME. Scope 4 General Work Description: Repair of erosion damage on the upstream face of the dam. This letter constitutes approval of the proposal to repair the subject dam according to the plans and specifications received by this Division on February 25, 2015 with the following stipulations: 1. Project construction shall be supervised by Mr. Jason S. Reeves, PE. Mr. Jason S. Reeves, PE shall be responsible for field observation of construction as necessary to ensure compliance with approved plans. 2. During construction, the Division of Energy, Mineral, and Land Resources may require such progress reports as are deemed necessary. 3. In accordance with GS 143-215.29 and NCAC 15A-2K .0203, .0212, .0215, and .0216, within 30 days of completion of the project, Mr. Jason S. Reeves, PE shall inspect the completed work and upon finding that the work has been done as specified and the dam is safe, shall file with the Division of Energy, Mineral, and Land Resources two sets of record Division of Energy, Mineral, and Land Resources Energy Section•Geological Survey Section•Land Quality Section 1612 Mail Service Center,Raleigh, North Carolina 27699-1612.919-707-9200/FAX:919-715-8801 512 North Salisbury Street,Raleigh, North Carolina 27604•Internet:http://portal.ncdenr,org/web/Irl An Equal Opportunity\Affirmative Action Employer—50%Recycled 110%Post Consumer Paper , Mr. John Elnitsky Weatherspoon 1979 Ash Pond Dam Approval to Repair- Scope 4 ROBES-009 March 6, 2015 Page 2 of 3 drawings and a certificate stating that the work has been completed in accordance with approved plans, specifications and other requirements. 4. In accordance with GS 143-215.30 and NCAC 15A-2K .0220, final written consent must be issued by the Director of the Division of Energy, Mineral, and Land Resources for use of this dam pursuant to these repairs. • 5. An operation and maintenance (O&M) plan are required for all high hazard dams. The O&M plan should address routine maintenance, frequency of piezometer readings, frequency of inspections by the owner or the owner's representative, and annual operation of the bottom drain to ensure that it is functional. The O&M plan must be received prior to issuance of final written consent for use of this dam pursuant to these repairs. 6. This approval does not convey the right to access the private property of others. Any required access to perform the approved work must be secured prior to initiation of construction activities. 7. Water control activities required to complete approved repairs which involve diversion and discharge of reservoir waters to discharge points not covered by an existing NPDES permit, or which utilize procedures that are not approved by an existing NPDES permit, must receive approval from the Division of Water Resources prior to implementation. 8. You must notify Mr. Brad Cole, PE, Regional Supervisor, Land Quality Section, 225 Green Street, Suite 714, Fayetteville,North Carolina 28301-5094,(910)433-3300 ten days before the start of construction. The Army Corps of Engineers and the Water Resources Division of this Department should be contacted to determine if additional permits are required. Also,the erosion and sediment control program having jurisdiction should be contacted to determine permit requirements. In any case, sediment must be prevented from entering the waters of the state or flowing onto neighboring property. Because the subject dam is currently under a Notice of Deficiency issued by this Division, it is essential that the approved repairs are implemented as soon as possible to protect public safety and eliminate the need for further enforcement actions. For assistance you may contact the Fayetteville Regional Office at(910)433-3300 or a staff member of the Dam Safety Program in the Raleigh Central Office at telephone number(919) 707-9220. Sinc rely, ir-"\-- y avis, PE, CPM Director TED/smm/bsc Mr.John Elnitsky Weatherspoon 1979 Ash Pond Dam Approval to Repair—Scope 4 ROBES-009 March 6, 2015 Page 3 of 3 cc: Mr. Jason S.Reeves, PE Mr. Brad Cole, PE, Land Quality Regional Engineer Mr.Jeff Poupart, Division of Water Resources .Ms. Kim Hutchinson, Duke Energy Mr. John Toepfer,Duke Energy Mr. Sean DeNeale, Duke Energy File name: ROBES-009 20150305_COAR-Scope 4_Weatherspoon 1979 Ash Pond Dam