Loading...
HomeMy WebLinkAboutWQ0044151_Application (FTSE)_20230214State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name: Johnston County Public Utilities (company, municipality, HOA, utility, etcc..)��88.ry, 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership tic Utility ❑ Federal ® State/County ❑ Municipal ❑ Other ' elltal Quality 3. Signature authority's name: Chandra C. Farmer, PE per 15A N(`At_ 02T..0106(b) Title: Public Utilih+ Director -- 142023 4. Applicant's mailing address: PO Box 2263 Raley gh City: Smithfield State: NC Zip: 27577-t'�i411c�1 Vince 5. Applicant's contact information: Phone number: (�19) 989-5075 Email Address: chandra.farmer@iohnstonnc.com II. PROJECT INFORMATION: 1. Project name: Wellesley Phase 6 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Johnston 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.5666' Longitude:-78.5223 5. Parcel ID (if applicable): 06FO4067H (or Parcel ID to closest downstream sewer) 11 KGOW1`Yll R Kla a 101 TO :16 Gil Y Wa 1. Professional Engineer: Eva King, PE License Number: 039159 Firm: Adams & Hodge Engineering, PC Mailing address: 314 E. Main Street City: Clayton State: NC Zip: 27520- Phone number: (980) 253-5773 Email Address: evaOadamsandhod eg com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Central Johnston County WWTP Permit Number: NCO030716 Owner Name: Johnston County Public Utilities V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ0042284 2. Downstream (Receiving) Sewer Information: 8 inch ® Gravity ❑ Force Main 3. System Wide Collection System Permit Numbers) (if applicable): WQCS00060 Owner Name(s): Johnston County Public Utilities FORM: FTA 06-21 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ®N'A 2. If the Applicant is a Developer of lots to be sold, has a Developer's. Operational Agreement (FORM: DEVj been attached? ❑ Yes [:]No ® NIA 3. If the Applicant is a Home/Property Owners' Association, has an HOA,'POA OpcEati(xlal Agreement (FCkRM: HOA I and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? [:)Yes [:]No ®NIA 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School! preschooli day care ❑ Medical 1 dental!" veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices,' factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial (Scc 15A NCAC 02T .0l 03(2 If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A.W:AQ .02T .01 JAM? ❑ Yes ❑ No ➢ If Yes, provide a copy of flow reduction approval letter with this spplicatiop 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow'"b No. of Units Flow Single Family Residential 240 gal/unit 45 10,800 GPD gal/ GPD gal/ GPD gall GPD gal/ GPD gal/ GPD Tolal 10,800 GPD a See .15A NCAC 02T .0114(b). (A (elf 1) and (e)(21 for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G,S_ 42A-4). b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.t31141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. S. Wastewater generated by project: 10.800 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 1,065 PVC ➢ Section II & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains}: PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.Lb, ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)( I l: ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(t)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f1 & I y? ® Yes ❑ No 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 'Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 'Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet "Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(f) or (g), see Section X.1 of this application * 15A NCAC 02T.0056, contains alternatives where separations in 02T.0305t fi cannot be achieved. Please check "Yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ NIA ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft -separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Neuse ❑ No If yes, does the project comply with setbacks found in the river basin rules per I SA NCAC 02B .0200? ® Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 213.0202 5. Does the project require coverage/authorization under a 404 Nationwidelindividual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0I05Ic1(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105{c61, directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T. the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office Approval of the request will be issued concurrently with the approval of the permit, and proiects reauilme a variance approval may be sykjqct to Ion¢er review times. For prgiects requiring two or more variances or where thevariance is determined by the Division to hea significant portion of the vroiect. the full technical review is reauired. 2. Professional Engineer's Certification: I, Eva King. PE . attest that this application for Welleslqy Phase 6 (Professional Engineer's name horn Application Item ]I1 I) (Project Name from Application Ilem 11 1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE -- In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a tine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) `i�rilrnrrr,,r North Carolina Professional Engineer's sea], signature, and date: �%+`.��► 0:39159 VA 08/03/2022 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Chandra C. Farmer, PE, Public Utility Director, attest that this application for Wellesley Phase 6 (Signature Authority Name from Application Item 13 ) (Project Name from Application Item II 1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215 6A and 143-215 613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: 1A 4 11M Date: — al, Ir -3). -A -5 FORM: FTA 06-21 Page 5 of 5 NC Dept Of Environmental Quality State of North Carolina t Department of Environmental Quality FEB 14 03 Division of Water Resources Division of: Water Itosourk es pwelgh Re FIow Tracldng for Sewer Extension Applications gi0ba, ofi- (FTSE 10-18) Entity Requesting Allocation: Johnston County Project Name for which flow is being requested: Wellesley Phase 6 More than one FTSEWray be requiredfor n single project if the owner of the WWTP is not responsible for all pump stations along lire route of fire proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Central Johnston County Regional WW Facility b. WWTP Facility Permit #: NC 030716 A11 flows are in MGD c. WWTP facility's permitted flow 9.5 d. Estimated obligated flow not yet tributary to the WWTP 1.8717 e. WWTP facility's actual avg. flow 5.507(2022 Effluent Flow) f. Total flow for this specific request 0.0108 g. Total actual and obligated flows to the facility 7.3891 h. Percent of permitted flow used 58 actual/78 paper II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) Design Pump Pump Average Station Station Firm Daily Flow** (Name or Permit Capacity, * (Firm / pt), Number) No. MGD MGD Wellesley 39596 0.1728 0.06912 Landfill 'icn 20340 1.9296 1.6718 (B) (C) (D)=WC) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Tributary Flow Plus Avg. Daily Daily Flow, Obligated Available Flow, MGD MGD Flow Capacity*** 0.0150 0.0168 0.0318 0.0373 1.1128 0.3392 1.452 0.2199 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Wellesley Phase 4 Downstream Permit Number: WQ0042284 Page 1 of 6 FTSE 10-18 Ill. Certification Statement: i Chandra C. Farmer, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Date Title of Signing Official Page 2 of 6 FTSE 10- 18 USGS MAP -WELLESLEY PHASE 6- �`� ' i�vArr sr IDA RA _}' + PROPOSED _ 6� <z ... EXISTING k -. GRAVITY o �" ; _ \ GRAVITY SEWER PERMIT # r EXTENSION ' _x W00043441 1 ' WELLESLEY '1 { EXISTING PHASE 6 aYyt a� r rf - .I GRAVITY SEWER PERMIT# 1 7 WQ0042284 .0 { - 8 ��•,. �.� _ ram" , - . � f ' � � Y = - �_ ' + ' • Bo ris CWEIC _ .. LODGE- . ( F ra x i A w * 114 5 �f fit. F 3 Scale: 1 in. = 2000 feet Y The scale is onlyaccurate when printed W portrait p p � ►DAMS & HDOE on a 8 112 x 11 size sheet with no page scaling.}-�N�NamPC - II' .u■ \�1■ XWFJF }NIN-0 milris��tir %EMI r 11>ff■�R%.1*/Ir ��r "j lye *a hlll:: 44111l� ►j �Q1i��it iii �� - �� ■ FI� FA ,� ` �11 ��1'' Imo• � t � ���� ��` :��"'•-�' �`ys►��;�ry��%Nv .�iii�1\!��rN11t 411 • �% ��` I �' uu--nuu�. Ii A"*. IF r '*►yam~` =�' ���' •','i-", ♦ . K ..,,.,, ...�� /�ram ��11a�r���� �,• ���� �rl�, 'aim i Ilfj�� Ir,� ifl �� 1111►� ♦ is '�..,'•.•-. .. SAS �� O` Opm '' '►ism'•• •,�, - = ; •. • IWA IN ► i .� r JIM jo SS 4 /�l..rtti� ,a . ♦� sue• '� �/ III �'� I``,��'�� �.'.! . =c•�1..~�,'_r�L�����:�`�a��_It������i��i� RIF y •�" � 1�rJli��y'I/.� •p � i :,��+lea LN x !�->�nll�■ 11 iAVatz n1+� ,I,''��::J IIIP '7i' �� 111I� 111►-� �4�FIiirrJ3 JI11•, 17 ADAMS & HODGE ENGINEERING, PC February 10 2023 Ted Cashion NC DWQ 3800 Barrett Dr. Raleigh, NC 27609 Subject: Public Sewer Construction Plans Wellesley Phase 6 Johnston County Dear Mr. Cashion, aa1j.O 113uotSa%j u2!a11612I K111eno I-61u;)WuostAu3 Jo tdau:)R Please find attached a $480.00 check for the application fee and a copy of the following: 1. Fast Track Application (Form FTA 06-21) 2. Flow Tracking/Acceptance for Sewer Extension (Form FTSE 10-18) 3. USGS Map 4. Vicinity Map Project Narrative: This application is for an extension of the gravity sewer system of Johnston County to serve Wellesley Phase 6. This extension includes 1,0651f of new 8" gravity sewer and will connect to an existing Johnston County gravity sewer system permit number WQ0042284. The sewer system will serve 45 single family homes in this subdivision, which is the basis for flow for this project. If you have any questions or comments, please give me a call at 980-253-5773 or email eva@adamsandhodge.com I Si , Eva King, PE ADAMS & HODGE ENGINEERING, PC • 314E Main Street Clayton, NC 27S20 • Office: 919-243-1332 • Firm # C.4187