Loading...
HomeMy WebLinkAbout20200035 Ver 1_LibertyRock_100135_MY0_2023_20230303ID#* 20200035 Version* 1 Select Reviewer: Ryan Hamilton Initial Review Completed Date 03/06/2023 Mitigation Project Submittal - 3/3/2023 Is this a Prospectus, Technical Proposal or a New Site?* Yes No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Email Address: Jeremiah Dow jeremiah.dow@ncdenr.gov Project Information ID#: * 20200035 Version:* 1 Existing ID# Existing Version Project Type: DMS Mitigation Bank Project Name: Liberty Rock Mitigation Site County: Randolph Document Information Mitigation Document Type:* Mitigation As -Built Plans File Upload: LibertyRock_100135_MYO_2023.pdf 24.78MB Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name:* Jeremiah Dow Signature: MONITORING YEAR 0 ANNUAL REPORT FINAL Liberty Rock Mitigation Site Randolph County, NC Cape Fear River Basin HUC 03030003 DMS Project No. 100135 February 2023 NCDEQ Contract No. 7877-01 DMS RFP No. 16-007877 NCDWR Project No. 2020-0035 v1 USACE Action ID Number 2020-00047 Data Collection Period: October 2022 - January 2023 PREPARED FOR: 30 NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 It I Z.: *�, W 1 LDLAN DS February 28, 2023 Jeremiah Dow NC DEQ Division of Mitigation Services 217 West Jones Street Raleigh, NC 27603 Subject: DIMS Comments on Liberty Rock Mitigation Site Monitoring Year 0 Report DMS Project Number 100135 Randolph County, North Carolina Contract No. 7877-01 Dear Mr. Dow, We have reviewed the comments on the MYO Report for the above referenced project dated February 20, 2023. Below are responses to each of the comments. For your convenience, the comments are reprinted with responses in italics. 1. Table 2, last row says "Trees in each plot must average 7 ft at MY5 and 10 ft at MY7 (excluding shrub and canopy species)." Please remove or replace word "canopy" with correct terminology. The typo has been corrected and now reads "sub -canopy." 2. Section 3.5 — says an additional crest gauge will be installed in MYO. During the site visit this had not been done, so please say it will be installed in MY1. The report has been updated to reflect that the additional crest gauge was installed on February 21, 2023 in MY1. 3. Should Water Surface (WSF) be shown on the Rocky River Reach 1 longitudinal profile? No water was present in the stream channel at the time of the as -built survey, therefore, no water surface is shown on the profile. This has been denoted on the Rocky River Reach 1 profile plots. 4. Sheet 1.13 — A log sill is shown near PP14 that is not shown in the approved mitigation plan drawings, and is not colored red to indicate a construction adjustment. Please correct. The structure shown is included in an existing angled log riffle shown and approved in the mitigation plan drawings, the additional symbology has been removed to maintain consistency. Wildlands Engineering, Inc. (P) 919.851.9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 It 'rk.'6*V W1LDLANDS 5. Sheet 1.15 —Similar to comment above. A log sill is shown on the first riffle (-506+50) that is not shown on the mit plan drawings, and is not colored red. The structure shown is included in an existing angled log riffle shown and approved in the mitigation plan drawings; the additional symbology has been removed to maintain consistency. 6. Sheet 1.15 & 1.16 — It appears that the brush toe installed at 508+09 due to the channel alignment deviation should be colored red. The brush toe installed at 508+09 due to channel alignment deviation has been noted and colored red. 7. If any other inconsistencies in the AB drawings are present, please correct, and ensure that Section 2 of the report is updated. No other inconsistencies have been found upon comparison of the as -built and mitigation plan drawings; section 2 of the report has been updated to include the addition of brush toe at 508+08 due to alignment deviation. If you have any questions, please contact me by phone (919) 851-9986, or by email (jlorch@wildlandseng.com). Sincerely, Jason Lorch, Monitoring Coordinator Wildlands Engineering, Inc. (P) 919.851.9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 PREPARED BY: W WILDLANDS E N G I N E E R I N G 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Jason Lorch jlorch@wildlandseng.com Phone: 919.851.9986 LIBERTY ROCK MITIGATION SITE Monitoring Year 0 Annual Report TABLE OF CONTENTS Section 1: PROJECT OVERVIEW.......................................................................................................1-1 1.1 Project Quantities and Credits...................................................................................................1-1 1.2 Project Goals and Objectives.....................................................................................................1-2 1.3 Project Attributes.......................................................................................................................1-4 Section 2: As -Built Condition (Baseline)..........................................................................................2-1 2.1 As-Built/Record Drawings..........................................................................................................2-1 2.1.1 Rocky River Reach 1...........................................................................................................2-1 2.1.2 Rocky River Reach 2...........................................................................................................2-1 2.1.3 Rocky River Reach 3...........................................................................................................2-1 2.1.4 Schist Creek........................................................................................................................2-1 2.1.5 Gypsum Creek Reach 2......................................................................................................2-1 2.1.6 Dolomite Creek Reach 2.....................................................................................................2-1 2.1.7 Mica Creek.........................................................................................................................2-1 Section 3: Monitoring Year 0 Data Assessment...............................................................................3-1 3.1 Vegetative Assessment..............................................................................................................3-1 3.2 Vegetation Areas of Concern.....................................................................................................3-1 3.3 Stream Assessment....................................................................................................................3-1 3.4 Stream Areas of Concern...........................................................................................................3-1 3.5 Hydrology Assessment...............................................................................................................3-1 3.6 Wetland Assessment..................................................................................................................3-1 3.7 Monitoring Year 0 Summary......................................................................................................3-2 Section4: METHODOLOGY.............................................................................................................4-1 Section5: REFERENCES...................................................................................................................5-1 TABLES Table 1: Project Quantities and Credits.....................................................................................................1-1 Table 2: Goals, Performance Criteria, and Functional Improvements......................................................1-2 Table 3: Project Attributes.........................................................................................................................1-5 FIGURES Figure 1 Current Condition Plan View Key Figure la-b Current Condition Plan View APPENDICES Appendix A Visual Assessment Data Table 4 Visual Stream Morphology Stability Assessment Table Table 5 Vegetation Condition Assessment Table Stream Photographs Vegetation Plot Photographs Appendix B Vegetation Plot Data Table 6 Vegetation Plot Data Table 7 Vegetation Performance Standards Summary Table Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final Appendix C Stream Geomorphology Data Cross -Section Plots Longitudinal Profile Plots Table 8 Baseline Stream Data Summary Table 9 Cross -Section Morphology Monitoring Summary Reachwide and Cross- Section Pebble Count Plots Appendix D Project Timeline and Contact Info Table 10 Project Activity and Reporting History Table 11 Project Contact Table Appendix E Record Drawings Appendix F Additional Documentation Soil Boring Descriptions Lunker Box Installation Photographs Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final Section 1: PROJECT OVERVIEW The Liberty Rock Mitigation Site (Site) is located in Randolph County two miles south of the Town of Liberty and nine miles northwest of Siler City. The Site is located within the Rocky River Headwaters targeted local watershed (TLW) Hydrologic Unit Code (HUC) 03030003070010 and the NC Division of Water Resources (DWR) Subbasin 03-06-12. The Site will provide stream and wetland credits to the Cape Fear River Basin Cataloging Unit (CU) 03030003 through restoration, enhancement, and preservation of the Rocky River and four unnamed tributaries to the Rocky River (referred to as Schist Creek, Gypsum Creek, Dolomite Creek, and Mica Creek for the project) and riparian wetland re-establishment, rehabilitation, and enhancement. The Site is located on 2 parcels owned by one landowner and a conservation easement was recorded on 41.12 acres. 1.1 Project Quantities and Credits The Wilmington District Stream Buffer Credit Calculator (updated (1/19/2018) was used to determine final crediting for the "Additional Credit from Extended Buffers" shown in Table 1 below. Table 1: Project Quantities and Credits PROJECT QUANTITIES Mitigation Mitigation As -Built Mitigation Restoration Project Segment Plan Ratio Credits Comments Footage Category Level Footage (X:1) Stream Rocky River Full Channel Restoration, Planted 1,989 2,023 Warm R 1.0 1,989.000 Reach 1 Buffer, Extended Buffers Rocky River Bank Stabilization, 580 585 Warm El 1.0 580.000 Reach 2 Extended Buffers Rocky River Reach 3 479 482 Warm R 1.0 479.000 Full Channel Restoration, Planted Buffer, Extended Buffers Schist Creek 420 476 Warm R 1.0 420.000 Gypsum Creek 152 152 Warm P 10.0 15.200 Conservation Easement Reach 1 Gypsum Creek Full Channel Restoration, Planted 208 218 Warm R 1.0 208.000 Reach 2 Buffer, Extended Buffers Dolomite Creek 188 188 Warm P 10.0 18.800 Conservation Easement Reach 1 Dolomite Creek Minor Bank Grading, Planted 36 31 Warm Ell 5.0 7.200 Reach 2 Buffer Full Channel Restoration, Planted Mica Creek 1,151 1,182 Warm R 1.0 1,151.000 Buffer, Extended Buffers Total: 4,868.200 Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 1-1 Wetland Restored Hydrology, Re-establishment N/A 12.868 Riverine R 1 12.868 Planted Enhanced Hydrology, Rehabilitation 3.308 3.308 Riverine RE 1.5 2.205 planted Enhancement 0.893 0.893 Riverine RE 5 0.179 Conservation Easement Total: 15.252 Restoration Level Stream Riparian Wetland Warm Cool Cold Riverine Non - Riverine Restoration 4,247.000 Enhancement 1 580.000 Enhancement 11 7.200 Preservation 34.000 Additional Credits from Extended Buffers 274.150 Re-establishment 12.868 Rehabilitation 2.205 Enhancement 0.179 TOTALS 5,142.350 15.252 1.2 Project Goals and Objectives The project is intended to provide numerous ecological benefits. Table 2 below describes expected outcomes to water quality and ecological processes and provides project goals and objectives. Table 2: Goals, Performance Criteria, and Functional Improvements Goal Objective/ Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Entrenchment ratio over 2.2 for Cross-section Construct stream C/E restoration monitoring will be Cross-section Reduce sediment assessed during data meets Improve the channels that will reaches and bank inputs from bank MY1, MY2, MY3, performance stability of maintain stable height ratio below erosion. Reduce MYS, and MY7 criteria; all stream cross -sections, shear stress on 1.2 with visual and visual Entrenchment channels. patterns, and profiles channel boundary. assessments inspections will Ratios are >2.2 over time. showing be performed and BHR is <1.2. progression annually. towards stability. Exclude livestock Livestock have Exclude livestock from through removal of N/A N/A been removed N/A livestock from the from project streams. project parcel. parcel. Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 1-2 Objective/ Likely Functional Performance Cumulative Goal Treatment Uplift Criteria Measurement Monitoring Results Increase and Install habitat diversify available features such as habitats for There is no performance Mussel surveys constructed riffles, macroinvertebrates, criteria for this will take place in lunker logs, and fish, mussels, and Pre - Improve brush toes into amphibians leading metric. However, restoration construction instream restored/enhanced to colonization and mussel survey and/or relocation mussel surveys habitat. streams. Add woody increase in reports are reaches in MY1, completed. materials to channel biodiversity over required MY2, MY3, MY5, beds. Construct pools time. Add complexity deliverables to and MY7. the IRT. of varying depth. including LWD to the streams. Free groundwater 11 groundwater Remove livestock to surface within 12 gauges equipped allow soil profiles to Increased surface inches of the with pressure Data will be Im Improve p stabilize. Remove water residence time ground surface transducers are collected wetland drain effect of will provide contact for 12% of the located in throughout the hydrology. channelized stream treatment and growing season representative year and and floodplain groundwater under normal wetland areas reported in swales. recharge potential. precipitation and monitored MY1. conditions. annually. Four bankfull Allow more frequent events in separate flood flows to years within the Reconstruct stream disperse on the monitoring Crest and flow Data will be Reconnect channels with floodplain. Support period. Thirty gauges (pressure collected channels with designed bankfull geomorphology and days of transducers) throughout the floodplains. dimensions and higher -level continuous flow recording flow year and depth relative to the functions. Improve each year on elevations. reported in existing floodplain. wetland hydrology in intermittent MY1. the Rocky River streams during floodplain. years of normal precipitation. Survival rate of 210 planted One hundred Reduce sediment stems per acre at Plant native tree and inputs from bank MY7. Interim square meter vegetation plots understory species in erosion and runoff. survival rate of are placed on 2% All 19 Restore and riparian zones and Increase nutrient 320 planted of the planted vegetation enhance native plant native shrub cycling and storage in stems per acre at area of the Site plots have a floodplain and and herbaceous floodplain. Provide MY3 and 260 at planted stem streambank species on riparian habitat. Add MY5. Trees in and monitored density greater vegetation. streambanks. Treat a source of LWD and each plot must during MY1, MY2, than 320 stems MY3, MY5, and invasive species organic material to average 7 ft at MY7 and assessed per acre. within project area. stream. Support all MY5 and 10 ft at visually in MY4 stream functions. MY7 (excluding shrub and sub - and MY6. canopy species). Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 1-3 Goal Objective/ Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Establish a conservation Protect Site from Visually inspect easement on the encroachment on the Permanently the perimeter of Site. Preserve high riparian corridor and protect the Site Prevent easement the Site to ensure No easement quality stream direct impact to from harmful encroachment. no easement encroachments. reaches through the streams and uses. placement of a wetlands. Support all encroachment is conservation stream functions. occurring. easement on site. 1.3 Project Attributes Five jurisdictional stream channels are located on Site: Rocky River, Schist Creek, Gypsum Creek, Dolomite Creek, and Mica Creek. As referenced in the Liberty Rock Mitigation Site Final Mitigation Plan, historic aerials indicate that on -site streams have existed in their same approximate location for over 75 years, with some changes to the agricultural management of the land. Aerials show that the riparian buffers for Dolomite, Gypsum, and Schist Creeks have remained undisturbed since prior to 1943. The riparian buffer of Mica Creek was timbered and converted to agricultural use in the 1960's and the riparian buffer and floodplain of Rocky River was timbered and converted to agricultural use in the 1980's. The Rocky River was straightened and moved to the south valley edge during that time. Land use and buffer extents have remained consistent since then. A review of historic imagery for the greater Rocky River Watershed draining to the Site shows little land use change since 1993 as well. Nearly 4% of the watershed area is planted pine trees for future harvesting. According to aerial photography, the most recent logging event occurred between 2006 and 2008 when approximately 75 acres of pines in the upper watershed were timbered. Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 1-4 Table 3: Project Attributes PROJECT INFORMATION Project Name Liberty Rock County Randolph County Mitigation Site Project Area (acres) 41.12 Project Coordinates 35°49'12.34" N 79°33'43.89" W PROJECT,.Y INFORMATION Cape Fear River Physiographic Province Piedmont River Basin USGS HUC 8-digit 03030003 USGS HUC 14-digit 03030003070010 42% Cultivated Crops, 24% Developed, DWR Sub -basin 03 06 12 Land Use Classification 24% Forest, 5% Shrubland, 3% Grassland/Herbaceous, 1% Open Water, 1% Wetlands Project Drainage Area Percentage of Impervious (acres) 2,600 6.70% Area RESTORATION TRIBUTARY SUMMARY INFORMATION Parameters Rocky River Schist Creek Gypsum Creek Dolomite Creek Mica Creek Pre -project length (feet) 2,652 211 113 44 952 Post -project (feet) 3,090 476 218 31 1,182 Valley confinement Unconfined Moderately confined Drainage area (acres) 2,600 219 2 7 92 Perennial, Intermittent, P P I I P Ephemeral DWR Water Quality Water Supply III Classification Dominant Stream C4 C4/E4 N/A' N/A' C4/E4 Classification (existing) Dominant Stream C4 C4 C4 N/Az C4 Classification (proposed) Dominant Evolutionary class (Simon) if N/A N/A N/A N/A N/A applicable WEGULATORY CONSIDERATIONS Parameters Applicable? Resolved? Supporting Documentation Water of the United States - Section 404 Yes Yes USACE Nationwide Permit No. 27 and DWQ401 Water QualityCertification Water of the United States -Section 401 Yes Yes No. 4134. Endangered Species Act Yes Yes Categorical Exclusion in Mitigation Plan (Wildlands, 2020) Historic Preservation Act Yes Yes Coastal Zone Management Act N/A N/A N/A Essential Fisheries Habitat N/A N/A N/A 1. Gypsum Creek Reach 2 and Dolomite Creek Reach 2 were severely degraded and eroded due to cattle trampling. Cross- section surveys could not be performed. 2. Source: Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199. Reaches not slated for restoration or enhancement I were not classified (NC). Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 1-5 Section 2: As -Built Condition (Baseline) The Site construction and as -built surveys were completed in August 2022 and October 2022 respectively. The survey included developing an as -built topographic surface; as well as surveying the as - built channel centerlines, top of banks, structures, and cross -sections. 2.1 As-Built/Record Drawings A sealed half-size set of record drawings are in Appendix E which includes the post -construction survey, alignments, structures, and monitoring features. A slight adjustment falling within 2 feet of design was made on Mica Creek due to the presence of bedrock. No other significant field adjustments were made during construction, the adjustments made during construction were minimal, made only where needed, and were based on field evaluations. They are listed below. 2.1.1 Rocky River Reach 1 • STA 101+48 — STA 101+86 — Added rock to existing riffle. • STA 102+05 — STA 102+69 — Vegetative soil lift replaced with brushtoe for increased channel stability. • STA 112+41— STA 113+31— Vegetative soil lift replaced with brushtoe for increased channel stability. 2.1.2 Rocky River Reach 2 • STA 123+26 — STA 123+64 — Streambank stability was achieved by grading instead of installing vegetative soil lift. 2.1.3 Rocky River Reach 3 • STA 126+95 — STA 127+36 — Vegetative soil lift replaced with brushtoe for increased channel stability. 2.1.4 Schist Creek • No significant changes made. 2.1.5 Gypsum Creek Reach 2 • No significant changes made. 2.1.6 Dolomite Creek Reach 2 • STA 401+88 — STA 402+33 — Realigned during construction due to slight change in Rocky River from initial survey. 2.1.7 Mica Creek • STA 508+09 — STA 509+04 — Alignment changed due to bedrock. • STA 508+09 — STA 509+04 — Brushtoe added for stabilization. • STA 509+08 — STA 509+29 — Brushtoe added for stabilization. • STA 510+69 — STA 511+00 — Brushtoe added for stabilization. • STA 511+27 — STA 511+45 — Brushtoe added for stabilization. Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 2-1 Section 3: Monitoring Year 0 Data Assessment The vegetation and stream success criteria for the Site follow the approved success criteria presented in the Mitigation Plan (Wildlands, 2021). Performance criteria for vegetation, stream, and hydrologic assessment are located in Section 1.2 Table 2: Goals, Performance Criteria, and Functional Improvements. 3.1 Vegetative Assessment The MYO vegetative survey was completed in January 2023. Vegetation monitoring resulted in a stem density range of 526 to 688 planted stems per acre which is well above the interim requirement of 320 stems per acre required at MY3. Average stem density across all vegetation plots was 594 planted stems per acre. All 19 vegetation plots met the interim success criteria and are on track to meet the final success criteria required for MY7. Herbaceous groundcover has become established across the site. Refer to Appendix A for Vegetation Plot Photographs and the Vegetation Condition Assessment Table and Appendix B for Vegetation Plot Data. 3.2 Vegetation Areas of Concern Vegetation management and herbicide treatments were applied prior to construction in sporadic areas of existing forested areas to prevent the spread of invasive species that could potentially compete with planted native species. Throughout March -June 2021, multiflora rose (Rosa multiflora), Chinese privet (Ligustrum sinense), and parrot feather (Myriophyllum aquaticum) were treated physically and chemically. Scattered populations of blackberry (Rubus spp.) were also present on the site and treated prior to construction. Wildlands recognizes that multiple treatments are typically needed for effective invasive plant control. Supplemental treatments were applied monthly post -construction throughout August -December 2022. Additional physical and chemical removal is planned for spring 2023. These areas will be monitored and retreated as necessary. 3.3 Stream Assessment Morphological surveys for MYO were conducted in October 2022. All streams on Site are stable and functioning as designed. Streams show only minor deviations from design and visual assessments show streams remain stable. Cross -sections show entrenchment and width -to -depth ratios within an acceptable range of the design parameters, and bank height ratios are less than 1.2. Refer to Appendix A for the Visual Stream Morphology Stability Assessment Table and Stream Photographs. Refer to Appendix C for Stream Geomorphology Data. 3.4 Stream Areas of Concern No stream areas of concern were identified, all streams are stable and functioning as intended. 3.5 Hydrology Assessment Two crest gauges were installed, one on Rocky River Reach 2 (Enhancement 1) and another on Mica Creek. An additional crest gauge was installed on Rocky River Reach 1 in MY1 to better reflect the interaction of flow conditions within the restored portion of the site. One flow gauge was installed on Gypsum Creek. Stream gauge data will be collected quarterly, and hydrologic data will be reported during MY1. 3.6 Wetland Assessment Eleven groundwater gauges were installed in wetlands across the Site. These gauges will be monitored quarterly to observe wetland hydrology and determine if they meet success criteria. Groundwater gauge Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 3-1 data will be collected and reported during MY1. Soil profile data has been recorded near each groundwater well and included in Appendix F. 3.7 Monitoring Year 0 Summary Overall, the Site looks great, is performing as intended, and is on course to meet success criteria. Vegetation plot data shows an average density of 594 planted stems per acre across plots. All vegetation plots are on track to exceed the MY3 interim requirement of 320 planted stems per acre. All project streams are stable, functioning as intended, and meeting project goals. Stream and wetland hydrology data will be included in the MY1 annual report. Invasive species were treated prior to construction and again after construction. Invasive species will continue to be assessed and treated as necessary in future monitoring years. Summary information and data related to the performance of various project and monitoring elements can be found in the tables and figures in the report appendices. All raw data supporting the tables and figures in the appendices are available from DIMS upon request. Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 3-2 Section 4: METHODOLOGY Geomorphic data was collected following the standards outlined in The Stream Channel Reference Site: An Illustrated Guide to Field Techniques (Harrelson et al., 1994) and in Stream Restoration: A Natural Channel Design Handbook (Doll et al., 2003). All Integrated Current Condition Mapping was recorded using an EOS Arrow handheld GPS with sub -meter accuracy and processed using ArcPro. Pressure transducers were installed in riffle cross -sections and monitored throughout the year. Hydrologic monitoring instrument installation and monitoring methods are in accordance with the United States Army Corps of Engineers standards (USACE, 2003) and the North Carolina Interagency Review Team Stream and Wetland Compensatory Mitigation Update (NCIRT, 2016). Vegetation monitoring protocols followed the Carolina Vegetation Survey-EEP Level 2 Protocol (Lee et al., 2008). Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 4-1 Section 5: REFERENCES Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream Restoration, A Natural Channel Design Handbook. Harrelson, C.C; Rawlins, C.L.; Potyondy, John P. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM-245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. Lee, M.T., Peet, R.K., Roberts, S.D., & Wentworth, T.R. 2008. CVS-EEP Protocol for Recording Vegetation Version 4.2. North Carolina Interagency Review Team (NCIRT). 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update. Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199. Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books. Rosgen, D.L. 1997. A Geomorphological Approach to Restoration of Incised Rivers. Proceedings of the Conference on Management of Landscapes Disturbed by Channel Incision. Center For Computational Hydroscience and Bioengineering, Oxford Campus, University of Mississippi, Pages 12-22. United States Army Corps of Engineers. 2003. Stream Mitigation Guidelines. USACE, NCDENR-DWQ, USEPA, NCWRC. United States Geological Survey. 1998. North Carolina Geology. Wildlands Engineering, Inc. 2021. Liberty Rock Mitigation Site - Final Mitigation Plan. DMS, Raleigh, NC. Liberty Rock Mitigation Site Monitoring Year 0 Annual Report - Final 5-1 r I Conservation Easement Stream Approach L__._ Wetland Approach Stream Restoration ® Wetland Re -Establishment Stream Enhancement I Wetland Rehabilitation Stream Enhancement 11 Wetland Enhancement � Stream Preservation ® Wetland Not for Credit/No Treatment � Not for Credit Stream Fixed Vegetation Plot � Stream Design Deviation ORandom Vegetation Plot Non -Project Streams q WILD LAND 5 ENGINEERING Unpaved Access Road Existing Culvert DOT Right of Way Railroad Right of Way Railroad Cross -Section (XS) Q Photo Point (PP) Groundwater Well Gauge (GWG) Crest Gauge Flow Gauge Barotroll Soil Temperature Probe Reach Break Q Property Access Point Reach 1 Rocky River Reach 2 ?ek o � Reach 1 -��_ ypsum Creek O o. Reach 1 0 200 400 Feet I i I i I IN A Figure 1. Current Condition Plan View Key Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Randolph County, NC Conservation Easement Wetland Approach Wetland Re -Establishment Wetland Rehabilitation Wetland Enhancement Stream Approach Stream Restoration Stream Enhancement I Stream Preservation Not for Credit Stream Existing Culvert DOT Right of Way Cross -Section (XS) Photo Point (PP) Groundwater Well Gauge (GWG) I - l mobil ,,- OWN NNo v _ �WW3 %toWILDLANDS E N G I N E E R I N G Reach 1 Figure 1a. Current Condition Plan View Liberty Rock Mitigation Site 0 100 200 Feet DMS Project No. 100135 I I I I I Monitoring Year 0- 2023 Randolph County, NC at i Reach 1 Conservation Easement Wetland Approach ® Wetland Re -Establishment Wetland Rehabilitation Wetland Not for Credit/No Treatment Fixed Vegetation Plot ORandom Vegetation Plot Stream Approach Stream Restoration Stream Enhancement I Stream Enhancement II Stream Preservation Not for Credit Stream Stream Design Deviation Non -Project Streams Structure — — • Top of Bank Existing Culvert ===== Unpaved Access Road uge (GWG) )e _V i L8 11L% % 10 6-7, WILDLANDS %4�0 ENGINEERING x r-Wig , 4t IR Figure 1b. Current Condition Plan View Liberty Rock Mitigation Site P DMS Project No. 100135 0 100 200 Feet Monitoring Year 0 - 2023 Randolph County, NC APPENDIX A. Visual Assessment Data Table 4. Visual Stream Morphology Stability Assessment Table Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rockv River Reaches 1-3 Number Total Amount of Major Channel Category Metric Stable . , Number Ji Unstable M�Muilt Footage Assessed Stream Length % Stable, Performing as Intended 3,090 Assessed Bank Length 6,180 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure Bank Toe Erosion appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing 0 100% habitat. Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% Structure Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 21 21 100510 Schist Creek Number Total Amount of annel Category Metric Stable . , Number in Unstable Performing As -BA Footage 7 as Intended L A Assessed Stream Length % Stable, Performing as Lntended 476 Assessed Bank Length 952 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure Bank Toe Erosion appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing 0 100% habitat. Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. N/A N/A N/A Structure Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Table 4. Visual Stream Morphology Stability Assessment Table Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Gvpsum Creek Reach 2 Number Total Amount of Major Channel Category Metric Stable . , Number Ji Unstable M�Muilt Footage Assessed Stream Length % Stable, Performing as Intended 218 Assessed Bank Length 436 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure Bank Toe Erosion appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing 0 100% habitat. Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 2 100% Structure Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 7 7 100510 Mica Creek Number Total Amount of Channel Category Metric Stable . , Number in Unstable Performing As -BA Footage 7 as Intended L AN Assessed Stream Length % Stable, Performing as Intended 1,182 Assessed Bank Length 2,364 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure Bank Toe Erosion appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing 0 100% habitat. Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 6 6 100% Structure Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 19 19 100% Table 5. Vegetation Condition Assessment Table Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Planted Acreaee 23.70 Vegetation Catego INV Mapping Definitions Threshold L (ac) Very limited cover of both woody and herbaceous material. 0.10 Combined Acreage 0.00 %ofPlanted Acreage 0.00 Bare Areas Low Stem Density Woody stem densities clearly below target levels based on current MY stem count 0.10 0.00 0.00 Areas criteria. Total 0.0 0% Areas of Poor Growth Planted areas where average height is not meeting current MY Performance 0.10 0.00 0.00 Rates Standard. Cumulative Totall 0.0 1 0% Easement Acreage 41.12 Invasives may occur outside of planted areas and within the easement and will therefore be calculated against the total easement acreage. Include species with the Invasive Areas of potential to directly outcompete native, young, woody stems in the short-term or 0.10 0.00 0.00 Concern community structure for existing communities. Invasive species included in summation above should be identified in report summary. Encroachment may be point, line, or polygon. Encroachment to be mapped consists Easement of any violation of restrictions specified in the conservation easement. Common 0 Encroachments Noted Encroachment Areas encroachments are mowing, cattle access, vehicular access. Encroachment has no none / 0 ac threshold value as will need to be addressed regardless of impact area. STREAM PHOTOGRAPHS PHOTO POINT 1 Rocky River RI — upstream (812212022) PHOTO POINT 1 Rocky River RI — downstream (812212022) PHOTO POINT 2 Rocky River RI — upstream (812212022) 1 PHOTO POINT 2 Rocky River RI — downstream (812212022) 1 PHOTO POINT 3 Rocky River R1— upstream (812212022) PHOTO POINT 3 Rocky River R1— downstream (812212022) Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Stream Photographs PHOTO POINT 4 Rocky River RI — upstream (812212022) 1 PHOTO POINT 4 Rocky River RI — downstream (812212022) 1 PHOTO POINT 5 Rocky River R1— upstream (812212022) PHOTO POINT 6 Rocky River R2 — upstream (812212022) PHOTO POINT 5 Rocky River RI — downstream (812212022) PHOTO POINT 6 Rocky River R2 — downstream (812212022) Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Stream Photographs PHOTO POINT 7 Rocky River R2 — upstream (812212022) 1 PHOTO POINT 7 Rocky River R2 — downstream (812212022) 1 PHOTO POINT 8 Rocky River R3 — upstream (812212022) PHOTO POINT 9 Schist Creek — upstream (812212022) PHOTO POINT 8 Rocky River R3 — downstream (812212022) PHOTO POINT 9 Schist Creek — downstream (812212022) Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Stream Photographs PHOTO POINT 10 Schist Creek — upstream (812212022) 1 PHOTO POINT 10 Schist Creek — downstream (812212022) 1 PHOTO POINT 11 Gypsum Creek RI — upstream (812212022) PHOTO POINT 12 Gypsum Creek R2 — upstream (812212022) PHOTO POINT 11 Gypsum Creek R1 —downstream (812212022) PHOTO POINT 12 Gypsum Creek R2 — downstream (812212022) Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Stream Photographs PHOTO POINT 13 Dolomite Creek Ri — upstream (812212022) 1 PHOTO POINT 13 Dolomite Creek R1 —downstream (812212022) 1 PHOTO POINT 14 Mica Creek — upstream (812212022) 1 PHOTO POINT 14 Mica Creek — downstream (812212022) 1 LPHOTO POINT 15 Mica Creek — upstream (812212022) PHOTO POINT 15 Mica Creek —downstream (812212022) Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Stream Photographs PHOTO POINT 16 Mica Creek — upstream (812212022) 1 PHOTO POINT 16 Mica Creek — downstream (812212022) 1 PHOTO POINT 17 Mica Creek — upstream (812212022) .. r PHOTO POINT 17 Mica Creek — downstream (812212022) Lunker Box Installation (810412022) Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Stream Photographs VEGETATION PLOT PHOTOGRAPHS FIXED VEG PLOT 1 (0111212023) 1 FIXED VEG PLOT 2 (0111212023) 1 FIXED VEG PLOT 3 (0111212023) FIXED VEG PLOT 5 (0111212023) FIXED VEG PLOT 4 (0111212023) FIXED VEG PLOT 6 (0111212023) ok Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Vegetation Plot Photographs FIXED VEG PLOT 7 (0111212023) FIXED VEG PLOT 8 (0111212023) FIXED VEG PLOT 9 (0111212023) 1 FIXED VEG PLOT 10 (0111212023) 1 FIXED VEG PLOT 11(0111212023) FIXED VEG PLOT 12 (0111212023) Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Vegetation Plot Photographs FIXED VEG PLOT 13 (0111212023) FIXED VEG PLOT 15 (0111212023) FIXED VEG PLOT 14 (0111212023) ok Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Vegetation Plot Photographs RANDOM VEG PLOT 16 (0111212023) 1 RANDOM VEG PLOT 17 (0111212023) 1 RANDOM VEG PLOT 18 (0111212023) I RANDOM VEG PLOT 19 (0111212023) ok Liberty Rock Mitigation Site Appendix A: Visual Assessment Data —Vegetation Plot Photographs APPENDIX B. Vegetation Plot Data Table 6. Vegetation Plot Data Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Planted Acreage 26.50 Date of Initial Plant 2023-01-06 Date of Current Survey 2023-01-12 Plot size (ACRES) 0.0247 Scientific Name Common Name Tree/ Shrub Indicator Status Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 F Veg Plot 5 F Planted Total Planted Total Planted Total Planted Total Planted Total Acernegundo boxelder Tree FAC 1 1 1 1 1 1 1 1 1 1 Alnus serrulata hazel alder Tree FACW 1 1 1 1 1 1 Asimina triloba* pawpaw Tree FAC Betula nigra river birch Tree FACW 1 1 2 2 3 3 5 5 Celtis laevigata sugarberry Tree FACW Cephalanthus occidentalis* buttonbush Shrub OBL 2 2 2 2 1 1 Corpus amomum* silky dogwood Shrub FACW Species Diospyros virginiana common persimmon Tree FAC Included in Approved Euonymus americanus* strawberry bush Shrub FAC Mitigation Plan Platanus occidentalis American sycamore Tree FACW 3 3 2 2 2 2 2 2 2 2 Quercus lyrata overcup oak Tree OBL 2 2 1 1 2 2 4 4 Quercus michauxii swamp chestnut oak Tree FACW 1 1 2 2 1 1 Quercus phellos willow oak Tree FACW 1 1 1 1 1 1 2 2 1 1 Quercus rubra northern red oak Tree FACU Salix nigra* blackwillow Tree OBL 2 2 2 2 2 2 1 1 2 2 Sambucus canadensis* American black elderberry Tree FACW 1 1 1 1 Ulmus americana American elm Tree FAC 1 1 3 3 3 3 1 1 Sumsoff Performance Standard 15 15 16 16 14 14 14 14 14 14 Current Year Stem Couni 15 16 14 14 14 Stems/Acre 648 567 567 567 Mitigation Plan Species Count 10 8 7 8 Performance Standard Dominant Species Composition (%) 2 19 21 29 36 Average Plot Height (ft.)1 2 2 3 2 %Invasives 0 0 0 0 0 Current Year Stem Count 15 16 14 14 14 Post Mitigation Stems/Acre 607 648 597 567 567 Plan Species Count 10 10 8 7 8 Performance Dominant Species Composition (%) 20 19 21 29 36 Standard Average Plot Height (ft.) 2 2 2 3 2 %Invasives 0 0 0 0 0 *Species not subject to monitoring height requirement due to species growth habit. 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 6. Vegetation Plot Data Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Planted Acreage 26.50 Date of Initial Plant 2023-01-06 Date of Current Survey 2023-01-12 Plot size (ACRES) 0.0247 Scientific Name Common Name Tree/ Shrub Indicator Status Veg Plot 6 F Veg Plot 7 F Veg Plot 8 F Veg Plot 9 F Veg Plot 10 F Planted Total Planted Total Planted Total Planted Total Planted Total Acernegundo boxelder Tree FAC 1 1 1 1 1 1 2 2 1 1 Alnus serrulata hazel alder Tree FACW 2 2 1 1 2 2 Asimina triloba* pawpaw Tree FAC Betula nigra river birch Tree FACW 3 3 3 3 2 2 1 1 Celtis laevigata sugarberry Tree FACW Cephalanthus occidentalis* buttonbush Shrub OBL 2 2 1 1 1 1 2 2 Corpus amomum* silky dogwood Shrub FACW Species Diospyros virginiana common persimmon Tree FAC Included in Approved Euonymus americanus* strawberry bush Shrub FAC Mitigation Plan Platanus occidentalis American sycamore Tree FACW 3 3 3 3 1 1 2 2 1 1 Quercus lyrata overcup oak Tree OBL 1 1 3 3 2 2 Quercus michauxii swamp chestnut oak Tree FACW 3 3 1 1 2 2 Quercus phellos willow oak Tree FACW 1 1 1 1 2 2 2 2 Quercus rubra northern red oak Tree FACU Salix nigra* blackwillow Tree OBL 2 2 1 1 2 2 2 2 2 2 Sambucus canadensis* American black elderberry Tree FACW 1 1 1 1 1 1 1 1 Ulmus americana American elm Tree FAC 2 2 1 1 1 1 2 2 2 2 Sum I JL Performance Standard 15 15 14 14 15 15 15 15 16 16 Current Year Stem Count 15 14 15 15 16 Stems/Acre 567 607 607 648 Mitigation Plan Species Count 7 10 9 9 10 Performance Standard Dominant Species Composition (%) 20 21 20 13 12 Average Plot Height (ft.) 2 2 3 3 3 % Invasives 0 0 0 0 0 Current Year Stem Count 15 14 15 15 16 Post Mitigation Stems/Acre 607 567 607 607 648 Plan Species Count 7 10 9 9 10 Performance Dominant Species Composition (%) 20 21 20 13 12 Standard Average Plot Height (ft.) 2 2 3 3 3 % Invasives 0 0 0 0 0 *Species not subject to monitoring height requirement due to species growth habit. 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 6. Vegetation Plot Data Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Planted Acreage 26.50 Date of Initial Plant 2023-01-06 Date of Current Survey 2023-01-12 Plot size (ACRES) 0.0247 Scientific Name Common Name Tree/ Shrub Indicator Status Veg Plot 11 F Veg Plot 12 F Veg Plot 13 F Veg Plot 14 F Veg Plot 15 F Planted Total Planted Total Planted Total Planted Total Planted Total Acernegundo boxelder Tree FAC 1 1 2 2 3 3 2 2 1 1 Alnus serrulata hazel alder Tree FACW Asimina triloba* pawpaw Tree FAC 1 1 1 1 Betula nigra river birch Tree FACW 2 2 3 3 1 1 2 2 3 3 Celtis laevigata sugarberry Tree FACW 1 1 Cephalanthus occidentalis* buttonbush Shrub OBL Corpus amomum* silky dogwood Shrub FACW Species Diospyros virginiana common persimmon Tree FAC 2 2 2 2 3 3 2 2 2 2 Included in Approved Euonymus americanus* strawberry bush Shrub FAC 1 1 1 1 2 2 1 1 1 1 Mitigation Plan Platanus occidentalis American sycamore Tree FACW 2 2 3 3 2 2 3 3 2 2 Quercus lyrata overcup oak Tree OBL Quercus michauxii swamp chestnut oak Tree FACW 2 2 2 2 2 2 1 1 2 2 Quercus phellos willow oak Tree FACW 2 2 1 1 2 2 2 2 Quercus rubra northern red oak Tree FACU 1 1 Salix nigra* blackwillow Tree OBL Sambucus canadensis* American black elderberry Tree FACW Ulmus americana American elm Tree FAC 1 1 1 1 2 2 1 1 1 1 Sum Performance Standard 15 15 15 15 17 17 15 15 13 13 Current Year Stem Count 15 15 17 15 13 Stems/Acre 607 688 607 526 Mitigation Plan Species Count 8 8 9 8 Performance Standard Dominant Species Composition (%) 1 20 18 20 23 Average Plot Height (ft.)1 2 2 2 2 % Invasives 0 1 0 0 0 0 Current Year Stem Count 15 15 i7 15 13 Post Mitigation Stems/Acre 07 607 688 607 526 Plan Species Count10 L 8 8 9 8 Performance Dominant Species Composition (%) 13 20 18 20 23 Standard Average Plot Height (ft.) 2 2 2 2 2 % Invasives 0 0 0 0 0 *Species not subject to monitoring height requirement due to species growth habit. 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 6. Vegetation Plot Data Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Planted Acreage 26.50 Date of Initial Plant 2023-01-06 Date of Current Survey 2023-01-12 Plot size (ACRES) 0.0247 Scientific Name Common Name Tree/ Shrub Indicator Status Veg Plot 16 R Veg Plot 17 R Veg Plot 18 R Veg Plot 19 R Total Total Total Total Acernegundo boxelder Tree FAC 1 1 2 1 Alnus serrulata hazel alder Tree FACW Asimina triloba* pawpaw Tree FAC 1 1 Betula nigra river birch Tree FACW 4 4 3 2 Celtis laevigata sugarberry Tree FACW Cephalanthus occidentalis* buttonbush Shrub OBL Corpus amomum* silky dogwood Shrub FACW 1 Species Diospyros virginiana common persimmon Tree FAC 1 Included in Approved Euonymus americanus* strawberry bush Shrub FAC 1 1 Mitigation Plan Platanus occidentalis American sycamore Tree FACW 3 2 2 2 Quercus lyrata overcup oak Tree OBL 2 2 Quercus michauxii swamp chestnut oak Tree FACW 1 1 2 Quercus phellos willow oak Tree FACW 1 1 1 Quercus rubra northern red oak Tree FACU 2 1 Salix nigra* blackwillow Tree OBL 1 2 Sambucus canadensis* American black elderberry Tree FACW 1 1 Ulmus americana American elm Tree FAC 2 1 1 Sum Performance Standard 15 15 13 13 Current Year Stem Coun 15 15 13 13 Stems/Acre 607 607 526 5 Mitigation Plan Species Count 9 8 8 10 Performance Standard Dominant Species Composition (%) 27 27 23 15 Average Plot Height (ft.) 2 3 % Invasives Current Year Stem Coun 15 0 15 0 13 0 13 Post Mitigation Stems/Acre 607 607 526 526 Plan Species Count 9 8 8 10 Performance Dominant Species Composition (%) 27 27 23 15 Standard Average Plot Height (ft.) 2 3 2 2 % Invasives 0 *Species not subject to monitoring height requirement due to species growth habit. 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 7. Vegetation Performance Standards Summary Table Liberty Rock Mitigation Site DIMS Project No. 100135 Monitoring Year 0 - 2023 Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 607 2 10 0 648 2 10 0 567 2 8 0 Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 567 3 8 0 567 2 8 0 607 2 7 0 Veg Plot 7 F Veg Plot 8 F Veg Plot 9 F Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 567 2 10 0 607 3 9 0 607 3 9 0 Veg Plot 10 F Veg Plot 11 F Veg Plot 12 F Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 3 10 0 607 2 10 0 607 2 8 0 Veg Plot 13 F Veg Plot 14 F Veg Plot 15 F Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 688 2 8 0 607 9 26 2 8 0 *Each monitoring year represents a different plot for the random vegetation plot "groups". Random plots are denoted with an R, and fixed plots with an F. **Species not subject to monitoring height requirement due to species growth habit are not included in height calculations. Table 7. Vegetation Performance Standards Summary Table Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Veg Plot 16 R Veg Plot 17 R Veg Plot 18 R Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Stems/Ac. Av. Ht. (ft)** # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 607 2 9 0 6 3 8 0 526 2 8 0 Veg Plot 19 R Stems/Ac. Av. Ht. (ft)** # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 *Each monitoring year represents a different plot for the random vegetation plot "groups". Random plots are denoted with an R, and fixed plots with an F. **Species not subject to monitoring height requirement due to species growth habit are not included in height calculations. APPENDIX C. Stream Geomorphology Data Cross -Section Plots 674 c W_ 672 7 W LlJ 670 Cross -Section 1 - Rocky River Reach 1 (Pool) 20 40 50 Distance (ft.) -� MY 0 - - Bankfull Elevation - Based on As -Boil[ Bankfull Area -- Current Low Top of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area N/A Bank Height Ratio - Based on AB-Bankfull Area N/A Thalweg Elevation 669.63 LTOB Elevation 673.16 LTOB Max Depth 3.53 1 LTOB Cross Sectional Area 107.09 Downstream (0811912022) Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots 674 c 672 9 m w 670 Cross -Section 2 - Rocky River Reach 1 (Riffle) 20 40 50 Distance (ft.) -� MY 0 - - Bankfull Elevation - Based on As -Boil[ Bankfull Area — Current Low Top of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 673.41 Bank Height Ratio - Based on AB-Bankfull Area 1.00 Thalweg Elevation 671.25 LTOB Elevation 673.41 LTOB Max Depth 2.16 1 LTOB Cross Sectional Area 38.51 r P 41 � l Downstream (0811912022) Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots 67? Gio C 7 W LU 668 666 Crass -Section 3 - Rocky River Reach 1 (Riffle) n 20 40 50 Distance (ft.) MY 0 - - Bankfull Elevation - Based on As -Built Bankfull Area Current Low Top of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 670.49 Bank Height Ratio - Based on AB-Bankfull Area 1.00 Thalweg Elevation 668.06 LTOB Elevation 670.49 LTOB Max Depth 2.43 1 LTOB Cross Sectional Area 41.72 'AWL;, y 6 vK Downstream (0811912022) r Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data —Cross-Section Plots MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area N/A Bank Height Ratio - Based on AB-Bankfull Area N/A Thalweg Elevation 665.88 LTOB Elevation 669.97 LTOB Max Depth 4.09 1 LTOB Cross Sectional Area 100.78 Downstream (0811912022) Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots 7 W LU 666 M4 Gross -Section 5 -Rocky River Reach 2 (Riffle) n 20 40 Fp Distance (ft.) MY 6 - - Bankfull Elevation - Based on As -Built Bankfull Area — Current Low Top of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 667.70 Bank Height Ratio - Based on AB-Bankfull Area 1.19 Thalweg Elevation 665.39 LTOB Elevation 668.15 LTOB Max Depth 2.76 1 LTOB Cross Sectional Area 50.63 Downstream (0811912022) Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots 666 m 7 _m LU 664 662 Cross -Section 6 - Rocky River Reach 3 (Riffle) 20 40 50 Distance (ft.) - MY 0 - - Bankfull Elevation - Based on As -Built Bankfull Area Current Low Top of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 666.63 Bank Height Ratio - Based on AB-Bankfull Area 1.00 Thalweg Elevation 663.81 LTOB Elevation 666.63 LTOB Max Depth 2.82 1 LTOB Cross Sectional Area 44.03 Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots Crass -Section 7 - Schist Creek (Riffle) 674 0 672 W LLJ 670 n 20 40 t;Cs Distance (ft.) MY 0 — — Bankfull Elevation - Based on As•Bull[ Bankfull Area Current Law Top of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 673.50 Bank Height Ratio - Based on AB-Bankfull Area 1.00 Thalweg Elevation 671.62 LTOB Elevation 673.50 LTOB Max Depth 1.88 1 LTOB Cross Sectional Area 14.01 Downstream (0811912022) r Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data —Cross-Section Plots 672 C 6;0 7 W LU E66 Crass -Section 8 - Gypsum Creek Reach 2 (Riffle) 20 40 60 Distance (ft.) -� MY 0 - - Bankfull Elevation -Based an As -Built Bankfull Area — Current Low Fop of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 670.42 Bank Height Ratio - Based on AB-Bankfull Area 1.00 Thalweg Elevation 669.38 LTOB Elevation 670.42 LTOB Max Depth 1.04 LTOB Cross Sectional Area 5.42 Downstream (0811912022) Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots M Cross -Section 9 - Mica Creek (Riffle) 20 40 50 Distance (ft.) -� MY 0 - - Bankfull Elevation -Based on As -Built Bankfull Area — Current Low Fop of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 670.34 Bank Height Ratio - Based on AB-Bankfull Area 1.00 Thalweg Elevation 669.58 LTOB Elevation 670.34 LTOB Max Depth 0.75 LTOB Cross Sectional Area 3.29 Downstream (0812212022) Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots Lu 666 666 Cross -Section 10 - Mica Creek (Pool) 20 40 60 Distance (ft.) - MY 0 - - Bankfull Elevation -Based on As -Built Bankfull Area — Current Low Top of Bank MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area N/A Bank Height Ratio - Based on AB-Bankfull Area N/A Thalweg Elevation 667.60 LTOB Elevation 669.70 LTOB Max Depth 2.11 LTOB Cross Sectional Area 9.62 Downstream (0812212022) Liberty Rock Mitigation Site Appendix C: Stream Geomorphology Data — Cross -Section Plots Longitudinal Profile Plots Liberty Rock Mitigation Site DIMS Project No. 100135 Monitoring Year 0 - 2023 Kiver Keacn 115 to IUl+L4 tO 680 675 v 0 w 670 665 10100 L I I I I I I I I 10150 10200 tTW (MYO-10/2022) )water present in channel at the time of survey, water surface not shown. 680 675 w c 0 0 670 665 10600 10250 10300 10350 10400 10450 10500 Station (feet) WSF (MYO-10/2022) ♦ LBKF/LTOB (MYO-10/2022) ♦ RBKF/RTOB (MYO-10/2022) • STRUCTURE (MYU30/2022) 10550 10600 1 1F,_1 1 x 1 1 1 1 ' •• • 1 •♦ • ' ♦ ♦ • i ♦ A • . •' ♦• r &A ' • • • • ♦ ' ' 1 • • ♦' ♦ • ♦ ♦ ♦ • • • ♦ • • A A♦ ♦ ♦♦♦ ♦♦♦ 1 1 1 1 10650 10700 TW (MYO-10/2022) *No water present in channel at the time of survey, water surface not shown. **No structures present in As -Built design. 10750 10800 10850 10900 10950 11000 Station (feet) WSF (MYO-10/2022) ♦ LBKF/LTOB (MYO-10/2022) ♦ RBKF/RTOB (MYO-10/2022) • STRUCTURE (MYU30/2022) 11050 11100 Longitudinal Profile Plots Liberty Rock Mitigation Site DIMS Project No. 100135 Monitoring Year 0 - 2023 Kiver Keacn 1151A 111+UU tO 675 670 w w c 0 0 665 660 11100 ♦ ♦ • ♦ : r M , ♦ ♦ ♦ ♦ ♦♦ ♦ ♦ ♦ ♦• ♦♦ ♦ ♦♦ ♦ ♦ ♦ ♦ ♦♦ &A i 11150 11200 tTW (MYO-30/2022) *No water present in channel at the time of survey, water surface not shown. **No structures present in As -Built design. Rocky River Reach 1(STA 116+00 to 121+00) 11250 11300 11350 11400 11450 11500 Station (feet) WSF (MYO-30/2022) ♦ LBKF/LTOB (MYO-30/2022) ♦ RBKF/RTOB (MYO-30/2022) • STRUCTURE (MYO-30/2022) 11550 11600 675 670 ♦ ♦ **No structures present in As -Built design. Longitudinal Profile Plots Liberty Rock Mitigation Site DIMS Project No. 100135 Monitoring Year 0 - 2023 ruver Keacn L tJ IA IZI?UU LO 675 670 v 0 w 665 660 12100 Y L X I Iv ; m C �♦ ♦ ♦ ♦ ♦ ♦♦ i ♦ ♦♦ I I ♦ ______ I • I I 12150 12200 -TW (MYO-10/2022) **No structures present in As -Built design. KIVer Keach 3 (S I A 1Lb+UU to 670 665 w 0 w 660 655 12600 12250 12300 12350 12400 12450 12500 Station (feet) WSF(MYO-10/2022) ♦ LBKF/LTOB(MYO-10/2022) ♦ RBKF/RTOB(MYO-10/2022) • STRUCFURE(MYO-30/2022) 12550 12600 11 IF._1 ♦ ♦ ♦ ♦ -I - ♦ ♦ ♦ ' X ------------------- I I I Y L I ii I I 12650 12700 12750 12800 12850 12900 12950 13000 Station (feet) t TW (MYO-10/2022)------- WSF (MYO-30/2022) ♦ LBKF/LTOB (MYO-30/2022) ♦ RBKF/RTOB (MYO-30/2022) • STRUCTURE (MYO-30/2022) **No structures present in As -Built design. 13050 13100 12650 12700 12750 12800 12850 12900 12950 13000 Station (feet) t TW (MYO-10/2022)------- WSF (MYO-30/2022) ♦ LBKF/LTOB (MYO-30/2022) ♦ RBKF/RTOB (MYO-30/2022) • STRUCTURE (MYO-30/2022) **No structures present in As -Built design. 13050 13100 Longitudinal Profile Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 bcniSL creeK (b I [UU+/U to 680 675 v O m 670 665 20000 680 675 m m `o m 670 665 20300 a V I ^ I x O C ♦ ♦ iU m ♦ I ♦ • ♦ • •♦ ♦ ♦ • Y i ♦♦ ♦ ♦ ♦ ♦ ♦ &A ♦ ♦ • AA I I I I 20050 20100 20150 20200 20250 Station (feet) TW (MYO-10/2022)------- WSF (MYO-10/2022) ♦ LBKF/LTOB (MYO-10/2022) ♦ RBKF/RTOB (MYO-10/2022) • STRUCTURE (MYO-10/2022) 20300 -------------------------- ----�- ---- ---------------------------- ----- -___ _______________________________________-------- __--- _--- "-1 20350 20400 20450 20500 20550 Station (feet) TW (MYO-10/2022)------- WSF(MYO-10/2022) ♦ LBKF/LTOB(MYO-10/2022) ♦ RBKF/RTOB(MYO-10/2022) 0 STRUCTURE(MYU30/2022) 20600 Longitudinal Profile Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Gypsum Creek Reach 2 (STA 301+52 to 303+70) 675 670 ii w 665 660 30100 30150 30200 30250 30300 30350 30400 Station (feet) TW (MYO-10/2022)------- WSF (MYO-10/2022) LBKFATOB (MYO-10/2022) ♦ RBKF/RTOB (MYO-30/2022) • STRUCTURE (MYO-10/2022) I I I ro x I I I I E I � I I I I I Longitudinal Profile Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 mica creeK 151A bU[+UU to 685 680 v `o m 675 670 50000 685 680 m w Y m 675 670 50300 ♦♦ • I •' • i _- • i Y • • - -----A----- ----- ---------J---------- ♦♦ ♦♦ --_-_ ♦ ♦ AA A --- a u I m 50050 50100 50150 50200 50250 Station (feet) TW (MYO-10/2022)------- WSF (MYO-10/2022) ♦ LBKF/LTOB (MYO-10/2022) ♦ RBKF/RTOB (MYO-10/2022) O STRUCTURE (MYO-10/2022) 50300 1 50350 50400 50450 50500 50550 Station (feet) TW (MYO-10/2022)------- WSF(MYO-10/2022) ♦ LBKF/LTOB(MYO-10/2022) ♦ RBKF/RTOB(MYO-10/2022) 0 STRUCTURE(MYU30/2022) 50600 Longitudinal Profile Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 mica creeK (JIA bULT+UU to 680 675 v 0 w 670 665 50600 680 675 w w m 670 665 50900 As A • ♦ ♦♦ ♦ ♦ • - ! ♦ •♦ •lk ♦• • -------------------------------- ♦ r • t • ► i 1 AA ------------------------------- ---- - ---------- --------------- 50650 50700 50750 50800 50850 Station (feet) TW (MYO-10/2022)------- WSF (MYO-10/2022) ♦ LBKF/LTOB (MYO-10/2022) ♦ RBKF/RTOB (MYO-10/2022) • STRUCTURE (MYO-10/2022) 50900 1 O1 1m 1 0 1 x 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ♦♦ ♦ •• • 1 1 1 ♦ Y • ------------------------------ - --- - ,� ♦ ♦ • ♦♦ • • --------------------------- 1 1 1 1 50950 51000 51050 51100 51150 Station (feet) TW (MYO-10/2022)------- WSF(MYO-10/2022) ♦ LBKF/LTOB(MYO-10/2022) ♦ RBKF/RTOB(MYO-10/2022) 0 STRUCTURE(MYU30/2022) 51200 Longitudinal Profile Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Mica Creek (STA 512+00 to 513+53) 675 670 v 0 v 665 660 51200 51250 51300 51350 51400 51450 51500 Station (feet) TW (MYO-10/2022)------- WSF (MYO-10/2022) ♦ LBKF/LTOB (MYO-10/2022) ♦ RBKF/RTOB (MYO-10/2022) • STRUCTURE (MYO-10/2022) Table 8. Baseline Stream Data Summary Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Parameter MONITORING CONDITIONSDESIGN • Rocky River Reach 1 Riffle Only Min I Max n Min I Max Min Max n Bankfull Width (ft) 21.6 2 28.0 30.6 1 30.7 2 Floodprone Width (ft) 200.0 2 >100.0 200.0 2 Bankfull Mean Depth (ft) 1.7 2 1.6 1.3 1.4 2 Bankfull Max Depth (ft) 2.8 2 2.5 2.2 2.4 2 Bankfull Cross Sectional Area (ft2) 35.7 2 45.5 38.5 41.7 2 Width/Depth Ratio 12.7 2 17.2 22.4 24.2 2 Entrenchment Ratio >2.2 2 >2.2 6.5 2 Bank Height Ratio 1.0 2 1.0 1.0 2 Max particle size (mm) mobilized at bankfull 19.0 60.0 12.0 13.0 2 Rosgen Classification C4 C4 C4 Bankfull Discharge (cfs) 110.0 1 121.0 2 110.0 94.1 107.2 2 Sinuosity 1.10 2 1.26 1.26 Water Surface Slope (ft/ft)2 0.0010 0.0090 2 0.0010 1 0.0050 ---Z Other --- --- Parameter Rocky River Reach 21 Riffle Only Min Max n Min I Max Min Max n Bankfull Width (ft) 22.8 1 N/A 22.4 1 Floodprone Width (ft) 200.0 1 >20.0 200.0 1 Bankfull Mean Depth (ft) 2.1 1 N/A 1.8 1 Bankfull Max Depth (ft) 3.0 1 N/A 2.3 1 Bankfull Cross Sectional Area (ft2) 48.1 1 N/A 50.7 1 Width/Depth Ratio 12.6 1 N/A 12.8 1 Entrenchment Ratio >2.2 1 N/A 8.9 1 Bank Height Ratio 1.0 1 N/A 1.2 1 Max particle size (mm) mobilized at bankfull 11.0 N/A 8.0 Rosgen Classification C4 N/A C4 Bankfull Discharge (cfs) 110.0 1 121.0 1 N/A 83.3 Sinuosity 1.00 1 N/A 1.09 Water Surface Slope (ft/ft)2 0.0010 1 0.0090 1 N/A 0.0027 Other --- -- Restoration activities along Rocky River Reach 2 were limited to bank grading and stabilization. No work was done on the channel bed per agreement with USFWS and WRC on potential impact to on -site mussels. Design parameters were not used on this reach. 2Water Surface not recorded, no water present in channel at time of as -built survey. Table 8. Baseline Stream Data Summary Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Parameter MONITORING DESIGN • • Rocky River Reach 3 Riffle Only Min I Max n Min I Max Min I Max n Bankfull Width (ft) 18.1 1 26.0 22.5 1 Floodprone Width (ft) 200.0 1 >100.0 200.0 1 Bankfull Mean Depth (ft) 2.3 1 1.9 1.6 1 Bankfull Max Depth (ft) 2.9 1 3.0 2.5 1 Bankfull Cross Sectional Area ft2) 41.4 1 49.0 44.0 1 Width/Depth Ratio 7.9 1 13.8 14.4 1 Entrenchment Ratio >2.2 1 >2.2 8.9 1 Bank Height Ratio 1.0 1 1.0 1.0 1 Max particle size (mm) mobilized at bankfull 12.0 55.0 17.0 Rosgen Classification C4 C4 C4 Bankfull Discharge (cfs) 110.0 121.0 1 128.0 105.7 Sinuosity 1.00 1.10 1 1.10 1.10 Water Surface Slope (ft/ft)Z 0.0010 0.0090 1 0.0020 0.0002 Other --- -- Parameter Schist Creek Riffle Only Min I Max n Min I Max Min I Max n Bankfull Width (ft) 11.2 1 12.8 24.4 1 Floodprone Width (ft) 75.0 1 >75.0 75.0 1 Bankfull Mean Depth (ft) 0.9 1 1.0 0.6 1 Bankfull Max Depth (ft) 1.8 1 1.5 1.9 1 Bankfull Cross Sectional Area ft2) 10.4 1 12.5 14.0 1 Width/Depth Ratio 12.4 1 13.0 38.7 1 Entrenchment Ratio >2.2 1 >2.2 3.1 1 Bank Height Ratio 1.2 1 1.0 1.0 1 Max particle size (mm) mobilized at bankfull 7.0 62.0 3.0 Rosgen Classification C4/E4 C4 C4 Bankfull Discharge (cfs) 20.9 1 31.0 17.2 Sinuosity 1.00 1 1.17 1.17 Water Surface Slope (ft/ft)2 0.0000 1 0.0010 1 0.0060 1 0.0170 0.0038 Other -- Table 8. Baseline Stream Data Summary Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Parameter Gypsum Creek Reach 23 Riffle Only Min Max n Min I Max Min Max n Bankfull Width (ft) --- --- 8.7 8.3 1 Floodprone Width (ft) --- --- >100.0 100.0 1 Bankfull Mean Depth (ft) --- --- 0.5 0.7 1 Bankfull Max Depth (ft) --- --- 0.8 1.0 1 Bankfull Cross Sectional Area (ft2) --- --- 2.9 5.4 1 Width/Depth Ratio --- --- 13.0 12.7 1 Entrenchment Ratio --- --- >2.2 12.1 1 Bank Height Ratio --- --- 1.0 1.0 1 Max particle size (mm) mobilized at bankfull --- 31.0 12.0 Rosgen Classification --- C4 C4 Bankfull Discharge (cfs) --- 4.0 11.7 Sinuosity 1.00 1.15 1.15 Water Surface Slope (ft/ft)2 0.0001 0.0100 1 0.0096 0.0057 Other --- --- --- Parameter Mica Creek Riffle Only Min Max n Min I Max Min I Max n Bankfull Width (ft) 6.6 1 8.7 7.5 1 Floodprone Width (ft) 50.0 1 >50.0 50.0 1 Bankfull Mean Depth (ft) 0.7 1 0.7 0.4 1 Bankfull Max Depth (ft) 1.5 1 1.0 0.8 1 Bankfull Cross Sectional Area (ft2) 4.9 1 5.7 3.3 1 Width/Depth Ratio 9.4 1 13.0 17.3 1 Entrenchment Ratio >2.2 1 >2.2 6.6 1 Bank Height Ratio 1.7 1 1.0 1.0 1 Max particle size (mm) mobilized at bankfull 25.0 79.0 24.0 Rosgen Classification C4/E4 C4 C4 Bankfull Discharge (cfs) 20.1 16.0 9.5 Sinuosity 1.00 1.12 1.18 Water Surface Slope (ft/ft)2 0.00901 0.0150 1 0.0140 0.0138 Other --- ---i --- 'Gypsum Creek Pre-Exisiting Conditions data not recorded. Table 9. Cross -Section Morphology Monitoring Summary Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Cross -Section 1 (Pool) Cross -Section 2 (Riffle) Cross -Section 3 (Riffle) Cross -Section 4 (Pool) MYO MY1 MY2 MY3 I MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) -Based on AB-Bankfull' Area N/A 673.41 670.49 N/A Bank Height Ratio -Based on AB Bankfull' Area N/A 1.00 1.00 N/A Thalweg Elevation 669.63 671.25 668.06 665.88 LTOB 2 Elevation 673.16 673.41 670.49 669.97 LTOB2 Max Depth (ft) 3.53 2.16 2.43 4.09 F__ LTOB2 Cross Sectional Area (ftZ) 107.09 1 1 38.511 -kocky 1 1 00.78 Rocky River �� Cross -Section 5 (Riffle) River Rea�� Cross -Section 6 (Riffle) Jh_ Schist Creek Cross -Section 7 (Riffle) Gypsum Creek Cross -Section 8 (Riffle) MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfull' Area 667.70 666.63 673.50 670.42 Bank Height Ratio - Based on AB Bankfull' Area 1.19 1.00 1.00 1.00 Thalweg Elevation 665.39 663.81 671.62 669.38 LTOB 2 Elevation 668.15 666.63 673.50 670.42 LTOB2 Max Depth (ft) 2.76 2.82 1.88 1.04 LTOB Cross Sectional Area (ftZ) 50.63 44.03 14.0 T 5.42 Cross -Section 9 (Riffle) Cross -Section 10 (Pool) MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfull' Area 670.34 N/A Bank Height Ratio - Based on AB Bankfull' Area 1.00 N/A Thalweg Elevation 669.58 667.60 LTOB2 Elevation 670.34 669.70 LTOB2 Max Depth (ft) 0.75 2.11 LTOB2 Cross Sectional Area(ft Z 3.29 9.62 'Bank Height Ratio (BHR) takes the As -built ban kfuI area as the basis for adjusting each subsequent years ban kfuII elevation. 2LTOB Area and Max depth -These are based on the LTOB elevation for each years survey (The same elevation used for the LTOB in the BHR calculation). Area below the LTOB elevation will be used and tracked for each year as above. The difference between the LTOB elevation and the thalweg elevation (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth. Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rocky River Reach 1, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 3 20 23 23 23 SP�O Very fine 0.062 0.125 13 13 13 36 Fine 0.125 0.250 1 9 10 10 46 Medium 0.25 0.50 1 4 5 5 51 Coarse 0.5 1.0 51 Very Coarse 1.0 2.0 51 GQQ Very Fine 2.0 2.8 51 Very Fine 2.8 4.0 51 Fine 4.0 5.6 51 Fine 5.6 1 8.0 51 Medium 8.0 11.0 1 1 2 2 53 Medium 11.0 16.0 1 2 3 3 56 Coarse 16.0 22.6 5 5 5 61 Coarse 22.6 32 7 7 7 68 Very Coarse 32 45 8 1 1 8 8 76 Very Coarse 45 64 10 1 11 11 87 Small 64 90 5 5 5 92 Sma Largee 128 180 2 2 2 99 Large 180 256 99 Small 256 362 99 Small 362 512 1 1 1 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35 - 0.12 D50 = 0.4 D80. = 58.1 D95 = 111.2 D100 = 512.0 Rocky River Reach 1, Reachwide Pebble Count Particle Distribution 100 a d 90 SiIVCIay Gravel bble 80 rr�er e roc 0 y 70 0 60 E 50 V c 40 `w a 30 20 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) --0.- MYO-01/2023 Rocky River Reach 1, Reachwide Individual Class Percent 100 90 80 70 w 60 w a 50 � m 40 u 30 v 20 2 10 0 oti .L1 .L5 oy 00 o 1 'L ,L4� b h� W yti yC0 .�'L �5 �b �O _Ib ..O 5� �ti yti .LDS bq, ti ti ti ti 3 5 do do �o Particle Class Size (mm) 0 MYO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rocky River Reach 2, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 4 4 4 4 r1� SP Very fine 0.062 0.125 4 Fine 0.125 0.250 4 Medium 0.25 0.50 2 8 10 10 14 Coarse 0.5 1.0 4 4 8 8 22 Very Coarse 1.0 2.0 3 2 5 5 27 GQP Very Fine 2.0 2.8 27 Very Fine 2.8 4.0 1 1 1 28 Fine 4.0 5.6 1 1 1 29 Fine 5.6 8.0 1 1 2 2 31 Medium 8.0 11.0 2 2 4 4 35 Medium 11.0 16.0 8 5 13 13 48 Coarse 16.0 22.6 3 6 9 9 57 Coarse 22.6 32 5 7 12 12 69 Very Coarse 32 45 6 2 8 8 77 Very Coarse 45 64 4 4 4 81 Small 64 90 1 4 5 5 86 Sma Largee 128 180 2 3 5 5 96 Large 180 256 1 1 1 97 Small 256 362 1 1 1 98 Small 362 512 1 1 1 99 Medium 512 1024 99 Large/Very Large 1024 2048 99 BEDROCK Bedrock 2048 >2048 1 1 1 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = 0.59 D35 = 11.00 D50 = 17.3 D80. = 78.5 D95 = 168.1 D100 = >2048 Rocky River Reach 2, Reachwide Pebble Count Particle Distribution 100 Silt/Clay Sand 90 Gravel bble er a roc 80 70 0 60 0 50 40 V 30 w u y 20 a 10 film 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) --0.- MYO-01/2023 Rocky River Reach 2, Reachwide Individual Class Percent 100 90 80 70 w 60 w a 50 � m 40 u 30 v 20 2 10 0 00 oti o ,L4b b hb W yti yC0 .�'L �5 �b �O .ti4� ..O 5� �ti yti .LDS bq, ti ti ti ti 3 5 do do �o Particle Class Size (mm) 0 MYO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rocky River Reach 3, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 15 15 15 15 r1� SP Very fine 0.062 0.125 18 18 18 33 Fine 0.125 0.250 8 8 8 41 Medium 0.25 0.50 8 8 8 49 Coarse 0.5 1.0 1 1 1 50 Very Coarse 1.0 2.0 50 GQP Very Fine 2.0 2.8 50 Very Fine 2.8 4.0 50 Fine 4.0 5.6 1 50 Fine 5.6 8.0 1 1 1 51 Medium 8.0 11.0 1 1 1 52 Medium 11.0 16.0 5 5 5 57 Coarse 16.0 22.6 12 12 12 69 Coarse 22.6 32 11 11 11 80 Very Coarse 32 45 9 9 9 89 Very Coarse 45 64 5 5 5 94 Small 64 90 2 2 2 96 Smal 90 128 96 Largee 128 180 2 2 2 98 Large 180 256 98 Small 256 362 2 2 2 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = 0.06 D35 = 0.15 D50 = 1.0 D84 = 37.2 D95 = 75.9 D100 = 362.0 Rocky River Reach 3, Reachwide Pebble Count Particle Distribution 100 SandGravel 90 Silt/Clay bble a roc er gp 70 0 60 0 50 E 40 V 30 w u y 20 a 10 1- 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) --*.- MYO-01/2023 Rocky River Reach 3, Reachwide Individual Class Percent 100 90 80 70 w 60 w a 50 � m 40 u 30 v 20 2 10 0 00 oti o ti ti ti ti 3 5 do do �o Particle Class Size (mm) 0 MYO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Schist Creek, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 7 24 31 31 31 r1� SP Very fine 0.062 0.125 3 3 3 34 Fine 0.125 0.250 1 4 5 5 39 Medium 0.25 0.50 2 11 13 13 52 Coarse 0.5 1.0 4 4 4 56 Very Coarse 1.0 2.0 1 1 1 57 GQP Very Fine 2.0 2.8 57 Very Fine 2.8 4.0 1 1 2 2 59 Fine 4.0 5.6 1 1 2 2 61 Fine 5.6 8.0 2 2 4 4 65 Medium 8.0 11.0 1 1 1 66 Medium 11.0 16.0 1 2 3 3 69 Coarse 16.0 22.6 1 1 1 70 Coarse 22.6 32 3 1 4 4 74 Very Coarse 32 45 4 1 5 5 79 Very Coarse 45 64 7 7 7 86 Small 64 90 3 3 3 89 Sma Largee 128 180 4 4 4 99 Large 180 256 1 1 1 100 Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35 = 0.14 D50 = 0.4 D80. = 57.9 D95 = 128.0 D100 =1 256.0 Schist Creek, Reachwide Pebble Count Particle Distribution 100 Sand 90 Silt/Clay Gravel bble a roc er 80 70 0 60 0 50 40 V 30 w u y 20 a 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) --*.- MYO-01/2023 Schist Creek, Reachwide Individual Class Percent 100 90 80 70 w 60 w a 50 � m 40 u 30 v 20 'v 10 0 00 oti o ti ti ti ti 3 5 do do �o Particle Class Size (mm) 0 MYO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Gypsum Creek, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 2 27 29 29 29 r1� SP Very fine 0.062 0.125 1 1 1 30 Fine 0.125 0.250 7 7 7 37 Medium 0.25 0.50 1 7 8 8 45 Coarse 0.5 1.0 2 2 4 4 49 Very Coarse 1.0 2.0 1 1 2 2 51 GQP Very Fine 2.0 2.8 51 Very Fine 2.8 4.0 1 2 3 3 54 Fine 4.0 5.6 2 1 3 3 57 Fine 5.6 8.0 2 1 3 3 60 Medium 8.0 11.0 1 1 1 61 Medium 11.0 16.0 7 1 8 8 69 Coarse 16.0 22.6 9 9 9 78 Coarse 22.6 32 10 10 10 88 Very Coarse 32 45 4 4 4 92 Very Coarse 45 64 6 6 6 98 Small 64 90 1 1 1 99 Smal 90 128 99 Largee 128 180 1 1 1 00 Large 180 256 100 Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35 - 0.21 D50 = 1.4 D80. = 27.8 D95 = 53.7 D100 =1 180.0 Gypsum Creek, Reachwide Pebble Count Particle Distribution 100 Sand 90 Silt/Clay Gravel bble a roc er 80 70 0 60 0 50 40 V 30 w u y 20 a 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) --0.- MYO-01/2023 Gypsum Creek, Reachwide Individual Class Percent 100 90 80 70 w 60 w a 50 � m 40 u 30 v 20 10 0 00 oti o W yti yC0 .�'L �5 �b �O .ti4� ..O ti ti ti ti 3 5 do do �o Particle Class Size (mm) 0 MYO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DIMS Project No. 100135 Monitoring Year 0 - 2023 Mica Creek, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 19 19 19 19 r1� SP Very fine 0.062 0.125 19 Fine 0.125 0.250 16 16 16 35 Medium 0.25 0.50 2 1 3 3 38 Coarse 0.5 1.0 1 3 4 4 42 Very Coarse 1.0 2.0 42 GQP Very Fine 2.0 2.8 42 Very Fine 2.8 4.0 42 Fine 4.0 5.6 1 1 1 43 Fine 5.6 8.0 43 Medium 8.0 11.0 2 3 5 5 48 Medium 11.0 16.0 3 4 7 7 55 Coarse 16.0 22.6 11 2 13 13 68 Coarse 22.6 32 10 10 10 78 Very Coarse 32 45 7 1 8 8 86 Very Coarse 45 64 5 5 5 91 Small 64 90 6 6 6 97 Sma Largee 128 180 1 1 1 99 Large 180 256 1 1 1 100 Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35 - 0.25 D50 = 12.2 D80. = 41.3 D95 = 80.3 D100 = 256.0 Mica Creek, Reachwide Pebble Count Particle Distribution 100 Sand 90 Silt/Clay Gravel bble a roc er gp 70 0 60 0 50 E 40 V 30 w u y 20 a 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) --*.— MYO-01/2023 Mica Creek, Reachwide Individual Class Percent 100 90 80 70 w 60 w a 50 � m 40 u 30 v 20 2 10 0 00 oti o W yti yC0 .�'L �5 �b �O .ti4� ..O 5� �ti yti .LDS bq, ti ti ti ti 3 5 do do �o Particle Class Size (mm) 0 MYO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rocky River Reach 1, Cross -Section 2 Particle Class Diameter (mm) Riffle 100-Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 6 6 6 P�0 S Very fine 0.062 0.125 6 Fine 0.125 0.250 3 3 9 Medium 0.25 0.50 1 1 10 Coarse 0.5 1.0 1 1 11 Very Coarse 1.0 2.0 3 3 14 GQQ Very Fine 2.0 2.8 1 1 15 Very Fine 2.8 4.0 2 2 17 Fine 4.0 5.6 17 Fine 5.6 8.0 17 Medium 8.0 11.0 4 4 21 Medium 11.0 16.0 12 12 33 Coarse 16.0 22.6 11 11 44 Coarse 22.6 32 7 7 51 Very Coarse 32 45 7 7 58 Very Coarse 45 64 16 16 74 (0 Small 64 90 13 13 87 Small 90 La ge 1 8 180 1 1 97 Large 180 256 97 QFQ 0�%� 'b Small 256 362 2 2 99 Small 362 512 1 1 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 1 2048 1 >2048 100 Total 100 1 100 100 Cross -Section 2 Channel materials (mm) D16= 3.35 D35 = 17.04 D50 = 30.4 D84 = 83.2 D95 = 123.1 D100 = 512.0 Rocky River Reach 1, Cross -Section 2 Pebble Count Particle Distribution 100 and 90 Silt/Clay Gravel bble a ro gp er 70 0 60 Z;° 50 E 40 V 30 w u 20 y a 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MVO-01/2023 Rocky River Reach 1, Cross -Section 2 Individual Class Percent 100 90 80 w 70 60 w a 50 j 40 30 v 20 'v 10 0 1�Op bO0' Particle Class Size (mm) MVO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rocky River Reach 1, Cross -Section 3 Particle Class Diameter (mm) Riffle 100-Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 1 1 1 P�0 S Veryfine 0.062 0.125 1 Fine 0.125 0.250 1 Medium 0.25 0.50 1 1 2 Coarse 0.5 1.0 2 Very Coarse 1.0 2.0 2 GQQ Very Fine 2.0 2.8 2 Very Fine 2.8 4.0 2 Fine 4.0 5.6 2 Fine 5.6 8.0 1 1 3 Medium 8.0 11.0 2 2 5 Medium 11.0 16.0 7 7 12 Coarse 16.0 22.6 15 15 27 Coarse 22.6 32 28 28 55 Very Coarse 32 45 20 20 75 Very Coarse 45 64 13 13 88 (0 Small 64 90 6 6 94 Small 90 Large 1 8 180 4 4 99 Large 180 256 1 1 100 QFQ 0 Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK JBedrock 2048 1 >2048 100 Totall 100 1 100 1 100 Cross -Section 3 Channel materials (mm) D16= 17.54 D35 = 24.96 D50= 30.1 D84 = 57.4 D95 = 128.0 D100 = 256.0 Rocky River Reach 1, Cross -Section 3 Pebble Count Particle Distribution 100 - 90 Silt/Clay and Gravel bble gp er a ro 70 0 60 50 E 40 V 30 w u 20 y a 10 ----tEE 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MVO-01/2023 Rocky River Reach 1, Cross -Section 3 Individual Class Percent 100 90 80 w 70 60 w a 50 j 40 30 v 20 'v 10 0 o �'Loytih O.tih Qh 1 'L ,L'b b �<o �b ,�5 ,��o �,tio ,�'L �h �b �O htiO h�0 �yC� ��'1, h,�'1.1O,LP �Op bOo Particle Class Size (mm) MVO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rocky River Reach 2, Cross -Section 5 Particle Class Diameter (mm) Riffle 100-Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 0 P�0 S Very fine 0.062 0.125 0 Fine 0.125 0.250 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 1 1 1 Very Coarse 1.0 2.0 6 6 7 GQQ Very Fine 2.0 2.8 2 2 9 Very Fine 2.8 4.0 2 2 11 Fine 4.0 5.6 1 1 12 Fine 5.6 8.0 1 1 13 Medium 8.0 11.0 7 7 20 Medium 11.0 16.0 14 14 34 Coarse 16.0 22.6 9 9 43 Coarse 22.6 32 16 16 59 Very Coarse 32 45 16 16 75 Very Coarse 45 64 8 8 83 Small 64 90 8 8 91 Smal Largel 128 180 3 3 99 Large 180 256 1 1 100 QFQ Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1 1024 1 2048 100 BEDROCK Bedrock 2048 1 >2048 100 Total 100 100 100 Cross -Section 5 Channel materials (mm) D16= 9.17 D35 = 16.63 D50 = 26.3 D84 = 66.8 D95 = 119.3 D100 = 256.0 Rocky River Reach 2, Cross -Section 5 Pebble Count Particle Distribution 100 90 Silt/Clay and Gravel bble 80 er a ro 70 0 60 50 E 40 V 30 1 w u 20 y a 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MVO-01/2023 Rocky River Reach 2, Cross -Section 5 Individual Class Percent 100 90 80 w 70 60 w a 50 j 40 30 v 20 'v 10 0 o �'Loytih O.tih �h 1 'L ,L'b b �b lb ,�5 ,��o o ,�'L �h �b �O htiO h�0 �yC� ��'1, h,�'1.1O,LP �Op bO4, Particle Class Size (mm) MVO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Rocky River Reach 3, Cross -Section 6 Particle Class Diameter (mm) Riffle 100-Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 0 P�0 S Very fine 0.062 0.125 0 Fine 0.125 0.250 0 Medium 0.25 0.50 1 1 1 Coarse 0.5 1.0 1 1 2 Very Coarse 1.0 2.0 1 1 3 GQQ Very Fine 2.0 2.8 3 Very Fine 2.8 4.0 1 1 4 Fine 4.0 5.6 1 1 5 Fine 5.6 8.0 1 1 6 Medium 8.0 11.0 2 2 8 Medium 11.0 16.0 11 11 19 Coarse 16.0 22.6 14 14 33 Coarse 22.6 32 30 30 63 Very Coarse 32 45 18 18 81 Very Coarse 45 64 12 12 93 Small 64 90 1 1 94 Smal Largel 128 180 2 2 99 Large 180 256 99 QFQ Small 256 362 1 1 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1 1024 1 2048 100 BEDROCK Bedrock 2048 1 >2048 100 Total 100 100 100 Cross -Section 6 Channel materials (mm) D16= 14.45 D35 = 23.13 D50 = 27.5 D84= 49.1 D95 = 101.2 D100 = 362.0 Rocky River Reach 3, Cross -Section 6 Pebble Count Particle Distribution 100 90 Silt/Clay Sand Gravel We gp a ro 70 0 60 50 E 40 V 30 w u 20 y a 10 0 — 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MVO-01/2023 Rocky River Reach 3, Cross -Section 6 Individual Class Percent 100 90 80 w 70 60 w a 50 j 40 30 v 20 'v 10 0 �Op bO4, Particle Class Size (mm) MVO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Schist Creek, Cross -Section 7 Particle Class Diameter (mm) Riffle 100-Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 13 13 13 P�0 S Very fine 0.062 0.125 13 Fine 0.125 0.250 10 10 23 Medium 0.25 0.50 2 2 25 Coarse 0.5 1.0 25 Very Coarse 1.0 2.0 1 1 26 GQQ Very Fine 2.0 2.8 26 Very Fine 2.8 4.0 2 2 28 Fine 4.0 5.6 28 Fine 5.6 8.0 2 2 30 Medium 8.0 11.0 3 3 33 Medium 11.0 16.0 8 8 41 Coarse 16.0 22.6 11 11 52 Coarse 22.6 32 10 10 62 Very Coarse 32 45 13 13 75 Very Coarse 45 64 6 6 81 Small 64 90 10 10 91 Smal Largel 128 180 2 2 00 Large 180 256 100 QFQ 0 Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1 1024 1 2048 100 BEDROCK JBedrock 1 2048 1 >2048 100 Total 100 100 1 100 Cross -Section 7 Channel materials (mm) D1fi= 0.15 D35 - 12.08 D50 = 21.2 D84 = 70.9 D95 = 110.1 D100 = 1 180.0 Schist Creek, Cross -Section 7 Pebble Count Particle Distribution 100 90 Silt/Clay and Gravel bble gp er a ro 70 0 60 50 40 V 30 w u 20 y a 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MVO-01/2023 Schist Creek, Cross -Section 7 Individual Class Percent 100 90 80 w 70 60 w a 50 j 40 30 v 20 10 0 �Op bO0' Particle Class Size (mm) MVO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Gypsum Creek, Cross -Section 8 Particle Class Diameter (mm) Riffle 100-Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 6 6 6 P�0 S Very fine 0.062 0.125 6 Fine 0.125 0.250 6 Medium 0.25 0.50 10 10 16 Coarse 0.5 1.0 2 2 18 Very Coarse 1.0 2.0 6 6 24 GQQ Very Fine 2.0 2.8 24 Very Fine 2.8 4.0 4 4 28 Fine 4.0 5.6 28 Fine 5.6 8.0 6 6 34 Medium 8.0 11.0 6 6 40 Medium 11.0 16.0 14 14 54 Coarse 16.0 22.6 12 12 66 Coarse 22.6 32 16 16 82 Very Coarse 32 45 6 6 88 Very Coarse 45 64 8 8 96 Small 64 90 96 Smal Largel 128 180 2 2 00 Large 180 256 100 QFQ Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 100 100 100 Cross -Section 8 Channel materials (mm) D16= 0.50 D35 = 8.44 D50 = 14.4 D84 = 35.9 D95 = 61.2 D100 = 180.0 Gypsum Creek, Cross -Section 8 Pebble Count Particle Distribution 100 and 90 Silt/Clay Gravel bble a ro gp er 70 0 60 50 40 V 30 w u 20 y a 10 _'41 _4wo oo, 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MVO-01/2023 Gypsum Creek, Cross -Section 8 Individual Class Percent 100 90 80 w 70 60 w a 50 j 40 30 v 20 'v 10 0 Particle Class Size (mm) MVO-01/2023 Reachwide and Cross -Section Pebble Count Plots Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Mica Creek, Cross -Section 9 Particle Class Diameter (mm) Riffle 100-Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 0 P�0 S Very fine 0.062 0.125 0 Fine 0.125 0.250 1 1 1 Medium 0.25 0.50 1 Coarse 0.5 1.0 1 Very Coarse 1.0 2.0 1 41 GQQ Very Fine 2.0 2.8 1 Very Fine 2.8 4.0 1 Fine 4.0 5.6 1 Fine 5.6 8.0 1 1 2 Medium 8.0 11.0 7 7 9 Medium 11.0 16.0 12 12 21 Coarse 16.0 22.6 26 26 47 Coarse 22.6 32 15 15 62 Very Coarse 32 45 13 13 75 Very Coarse 45 64 13 13 88 Small 64 90 7 7 95 Smal Largel 128 180 1 1 99 Large 180 256 1 1 100 QFQ Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Totall 100 1 100 100 Cross -Section 9 Channel materials (mm) D16= 13.69 D35 = 19.27 D50 = 24.2 D84 = 57.4 D95 = 90.0 D100 = 256.0 Mica Creek, Cross -Section 9 Pebble Count Particle Distribution 100 Sand 90 Silt/Clay Gravel bble a ro gp er 70 0 60 50 E 40 V 30 w u 20 y a 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MVO-01/2023 Mica Creek, Cross -Section 9 Individual Class Percent 100 90 80 w 70 60 w a 50 j 40 30 v 20 'v 10 0 o �'Loytih O.tih �h 1 'L ,L'b b �<o �b ,�5 ,��o �,tio ,�'L �h �b �O htiO h�0 �yC� '1, h,�'1.1O,LP �O, bO��o Particle Class Size (mm) MVO-01/2023 APPENDIX D. Project Timeline and Contact Info Table 10. Project Activity and Reporting History Liberty Rock Mitigation Site DMS ID No. 100135 Monitoring Year 0 - 2023 Activity or Reporlp Data Collection Complete Instituted N/A Completion or Scheduled Delivery November 2019 Mitigation Plan Approved N/A October 2021 Invasive Vegetation Treatment March -June 2021 Construction (Grading) Completed N/A August 2022 Invasive Vegetation Treatment August -December 2022 As -Built Survey Completed October 2022 October 2022 Planting Completed N/A January 2023 Baseline Monitoring Document (Year 0) Stream Survey October 2022 January 2023 Vegetation Survey January 2023 Year 1 Monitoring Stream Survey 2024 December 2024 Vegetation Survey 2024 Year 2 Monitoring Stream Survey 2025 2025 Vegetation Survey 2025 Year 3 Monitoring Stream Survey 2026 2026 Vegetation Survey 2026 Year 4 Monitoring 2027 2027 Year 5 Monitoring Stream Survey 2028 2028 Vegetation Survey Year 6 Monitoring 2029 Year 7 Monitoring Stream Survey 2030 Vegetation Survey Table 11. Project Contact Table Liberty Rock Mitigation Site DMS ID No. 100135 Monitoring Year 0 - 2023 Wildlands Engineering, Inc. Designer 312 West Millbrook Road, Suite 225 Abigail Vieira, PE Raleigh, NC 27609 919.851.9986 Wildlands Construction Construction Contractor 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Monitoring Performers Wildlands Engineering, Inc. Jason Lorch Monitoring, POC 919.851.9986 APPENDIX E. Record Drawings Liberty Rock Mitigation Site Randolph County, North Carolina for 0 a a N p4 Park :,be m a' I 2 Rocky River SITE • 41I i Vicini Ma of to c e I, DAVID S. TURNER, CERTIFY THAT THE SURVEY TO COLLECT AS -BUILT DATA WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION; THAT THE TOPOGRAPHIC SURVEY WAS PERFORMED AT THE 95 PERCENT CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC SURVEY TO THE HORIZONTAL ACCURACY OF CLASS A AND THE VERTICAL ACCURACY WHEN APPLICABLE TO CLASS C STANDARD, AND THAT THE ORIGINAL DATA WAS OBTAINED IN SEP-OCT 2022; THAT THE SURVEY WAS COMPLETED ON 17 OCTOBER 2022; AND ALL COORDINATES ARE BASED ON NAD83 (2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. WITNESS MY ORIGINAL SIGNATURE, LICENSE NUMBER, AND SEAL TH IS 28th DAY OF FEBRUARY 2023. ��. � ,�O�oFESS/pti9'Yy s DAVID S. TURNER, P... pL-4551 Q sFAL �. L4551 SUR. ` NCDEQ Division of Mitigation Services AS -BUILT AND RECORD DRAWINGS ISSUE DATE: FEBRUARY 28, 2023 Project Location 35049'12.34" N, 790 33'43.89" W I, DAVID S. TURNER, AS A DULY REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE OF NORTH CAROLINA, HEREBY CERTIFY THAT THE DATA SHOWN ON THIS DRAWING, WAS OBTAINED UNDER MY SUPERVISION, IS AN ACCURATE AND COMPLETE REPRESENTATION OF WHAT WAS CONSTRUCTED IN THE FIELD, AND THAT THE PHYSICAL DIMENSIONS OR ELEVATIONS SHOWN THUS ARE AS -BUILT CONDITIONS EXCEPT WHERE OTHERWISE NOTED HEREON. WITNESS MY ORIGINAL SIGNATURE, REGISTRATION NUMBER, AND LTHIS 28th DAY OF FEBRUARY ,2023. J; � ,w CAR ""'. I TU ER, P.L.S. itL-4551 �oQ !/ _ SEAL L-4551 - y > Sheet Index Title Sheet 0.1 Project Overview 0.2 General Notes and Symbols 0.3 Stream Plan and Profiles Rocky River 1.01-1.07 Schist Creek 1.08-1.09 Gypsum Creek Reach 2 1.10 Dolomite Creek Reach 2 1.11 Mica Creek 1.12-1.18 Wetland Overview 2.0 Planting 3.0-3.1 Project Directory Engineering: Wildlands Engineering, Inc License No. F-0831 312 W. Millbrook Rd, Suite 225 Raleigh, NC 27609 Angela Allen, PE, Project Manager Abigail Vieira, PE, Project Engineer 919-851-9986 Surveying: Turner Land Surveying P.O. Box 148 Swannanoa, NC 28778 David S. Turner, PLS 919-827-0745 Owner: NCDEQ DMS 1652 Mail Service Center Raleigh, NC 27699-1652 Attention: Jeremiah Dow 919-791-4248 NCDEQ Contract No. 7877-01 DMS ID No. 100135 USACE Action ID No. 2020-00047 DWR No. 20200035 \ \ N/F N/F d LYN S. RICHARDSON LYN VILLA SMITH RICHARDSON D.B. 2629, PG. 732 \ D.B. 2629, PG. 726 P.B. NA, PG. NA P.B. NA, PG. NA N/F PID:78500 \ PID:78502 CLYDE OLIVER PG. 197 .. d PIN: 8735-35-5209 \ PIN: 8735-35-9444 D.B. 1912, PG. 197 P.B. NA, PG.NA \ PID:7844447 PIN: 8735-15-4919 \ / / BEGIN MICA CREEK (RESTORATION) r STA.502+01 l� N/F SUMMITNORTH LIBERTY HOLDINGS I LLC u D.B.2219 , PG. 750 P.B. 61, PG. 94 PID:78529 J. PIN: 8735-44-1640 v N/F 4- 4z \ LYN VILLA SMITH RICHARDSON D.6.2629,PG.G.714714 P.B. 32, PG.85 \\ PIN 877358484859 .14 Lu N/F I u \ / C• TOWN OF SILER CITY \ D.B. 1887, PG.2132 FEMA 100YR FLOODPLAIN I U a' P.B. 95, PG. 93 \ \ Q �F Q PID:78409 / END SCHIST CREEK U_ 1.15 2j PIN: 8735-15-4919 \ \ (RESTORATION) END GYPSUM CREEK END ROCKY RIVER \ v CE STA.205+01 REACH 2 (RESTORATION) REACH 1(RESTORATION) �, N/F CE ( - - F' SUMMITNORTH LIBERTY HOLDINGS I LLC y., CE STA. 303+68 BEGIN ROCKY RIVER 22 D.B. 2228, PG. 765 \ u REACH 2 (ENHANCEMENT I) CE - CE CE - \ d P.B. 61, PG. 94 \ CE STA.121+13 I F PIN 444200 ID:7 3 CE CE- CE-CE1. 6 �\ �CE CE _u I ROCKY RIVER END MICA CREEK \ 1. 1 1. % (RESTORATION) 1 2 STA.513+57 rF d 1 3 4 BEGIN ROCKY RIVER Y 1.05 END ROCKY RIVER REACH 1 (RESTROATION) Lu • 1 REACH 3 (RESTORATION) R/ STA. 101+24 �� 1 0 1 10 U END DOLOMITE CREEK 1.0 \ 07 STA. 131+72 \O X, REACH 2 (ENHANCEMENT II) STA.402+30 W G END GYPSUM CREEK �j Q d a- END ROCKY RIVER REACH 1(PRESERVATION) Lu END DOLOMITE CREEK F\ \ REACH 1 (PRESERVATION) REACH 2 (ENHANCEMENT I) � BEGIN GYPSUM CREEK U (� BEGIN DOLOMITE CREEK BEC31N ROCKY RIVER BEGIN SCHIST CREEK REACH 2 (RESTORATION) Lu (RESTORATION) REACH 2 (ENHANCEMENT II) REACH 3 (RESTORATION) 10-3J R/ STA.301+52 LYN VILLA /y STA. 2D0+72 c STA.401+88 3 STA. 126+93 SM T/H RICHARDSON G - 30 D.B. 2629, PG. 726 0 �37-37 P.B. 13, PG.47 33 _ 3D 30 30 33-OI 30 PID:78499 0 LYN VILLA SMITH PIN: 8735-33-8516 H RICHARDSON BEGIN GYPSUM CREEK BEGIN DOLOMITE CREEK D.B. 2629, PG. 726 LL R/ REACH 1 (PRESERVATION) REACH 1 (PRESERVATION) P.B. 20, PG. 27 STA.300+00 STA.400+00 PID:78499 PIN: 8735-33-8516 -- Y 4,1 Raw N R/� I N/F HAMPTON J. PIKE TRUSTEE D.B. 1713, PG. 720 A P.B. 39, PG. 26 PID:78526 PIN: 8735-42-1852 NOTES: 1. DEVIATIONS FROM THE DESIGN WILL BE SHOWN IN RED. Rik/ \ 0' 150' 300' 450' R/'• (HOHIZONTPL) r, U r y 0 N O s 680 675 670 665 ILT PRE -CONSTRUCTION GRADE \ \ \ DESIGN GP,ADE 105+00 680 0' 2' 4' 6' (VERTICAL) 0' 20' 40' 60' 70 (HORIZONTAL)74 Z N .j GzT� z a Q� 675 665 1 660 105+50 ROCKY RIVER BOO \ \ le U � ,�. ,il. ,o. ,n. ,o. ,n. ,�. V / .i �--�. � � m._;: •� � \BOO LOD � � � � ,n. ,�. ,il. ,o. ,n. ,il. ,o. / %•%n. 6.'% ,�. ,o. ,n. ,�. ,�. ,o. ,n. ,�. ,�. ,o. ,n. •� � \ 1� ,�:.:: ,o. ,n. ,n. ,�. ,o. / v 1 � � \ x \ 77 LOD O \ L • p• �• ,�. ,w. w,. ,� w,. ,� ,�,. \ VO �. . ......... . ' • STA.101+24 . �� 102+00 JF v w w v ti�h� _ BEGIN ROCKY RIVER REACH 1 (RESTORATION) vpliz- \ STA 102+05-STA 102+69 STA 101+48-STA 101+86 ) VEGETATIVE SOIL LIFT REPLACED WITH BRUSHTOE ADDED ROCK TO EXISTING RIFFLE \ FOR INCREASED CHANNEL STABILITY —11 �-I r--� � U o � � O �z NOTES: 1. DEVIATIONS FROM THE DESIGN WILL BE SHOWN IN RED. x CJ 0 Q � U � o m v 0 u V P'-i O P4 675 675 Mq�\ c iti��NF � 670 665 660 655 PRE -CONSTRUCTION GRADE AS -BUILT GRADE 14 — — i DESIGN GRADE 670 665 660 655 118+50 119+00 119+50 120+00 120+50 121+00 121+50 122+00 122+50 123+00 \ J �`o Boa - - - ROCKY RIVERLUL)—too - - - - Vot 6jI - - - - - �Op� STA.121+13 END ROCKY RIVER C REACH 1 (RESTORATION) \`r% too BEGIN ROCKY RIVER \� 6) O� D—VOD REACH 2 (ENHANCEMENT 1) — T8 �� �::_•,�� ��,` -•TB668_- - -- �TB-- CG O CIO PPS Ol —GO, 0' 2' 4' 6' (VERTICAL) 0' 20' 40' 60' 70 (HORIZONTAL)74 Z b N w N �aW �zTz z a Q� �ta� *�L••� '�+jr� �r � U o � � O �z NOTES: 1. DEVIATIONS FROM THE DESIGN WILL BE SHOWN IN RED. 2. AS -BUILT INFORMATION FOR DOLOMITE (xj CREEK IS ADDRESSED ON SHEET 1.11. (] Q � U a~ _ m v 0 0' 2' 4' 6' IvERncay � o' 20' 40' 60' G z (HORIZOIVTPL) NSW zTz z a 670 670 Q a `iti LL* I .I Irrrr��ffi ---- -- _ DESIGN GRADE : '•AL ''j%r 66S — — _ _ 665 AS -BUILT GRADE �rlrl 11 l5� PRE -CONSTRUCTION GRADE 660 660 r-•I 655 655 0 w 654 654 123+00 123+50 124+00 124+50 125+00 125+50 126+00 126+50 127+00 127+30 ,.. 669 �. o - - I NOTES: 0°� \ 1. DEVIATIONS FROM THE DESIGN WILL BE \ SHOWN IN RED. ''' '"' "'' 93A 66& I 2. AS -BUILT INFORMATION FOR MICA CREEK IS f m •. Q \ hjl ADDRESSED ON SHEETS 1.12 THROUGH 1.18. 0 Q �/ m • +� VP8 ,' LOD OD—LODL.DD—LOD 668 STA 123+26 - STA 123+64 STREAMBANK STABILITY WAS VEG ad, CiQ� I \2F ACHIEVED BY GRADING INSTEAD OF 668 `,.. �-^ eIr L INSTALLING VEGETATIVE SOIL LIFT. ` 1 PP6 _ 6 - \ STA. 126+93 i \ �81� .�•�\ END ROCKY RIVER A, -�66. 6� a;c \ •"� REACH 2 (ENHANCEMENT 1) \Q •-�-:6'-—........ s�\� \66s BE GIN ROCKY RIVER --- -- REACH 3 (RESTORATION) \ ifig' / "- 66�'Y66`b� • • s6� ```- � � � S*pp � Bl — — Bl — r I , `�. _ i � \ T\7 `�6 Op ` ` ` 81 '' _<� 667 1 \ p0 _ 669 12 PP7 ROCKY RIVER a 127+0(307 0 \ 0 OOl oo 001 O ----- r. '7 0 rA CIO \ c6 f\ 4 CIOSTA 126+95 - STA 127+36 \ O f \ pOl VEGETATIVE SOIL LIFT REPLACED \ . 00'I OOl — WITH BRUSHTOE FOR INCREASED .V CHANNEL STABILITY \ s kQ\ x Q 4ciu�n 670 665 660 655 653 127+30 127+50 128+00 7/LOD � OD—LOD—LOD G$ / VP9 AS -BUILT GRADE DESIGN GRADE — — PRE -CONSTRUCTION GP.ADE 670 665 660 655 653 128+50 129+00 129+50 130+00 130+50 131+00 131+50 131+80 s6, C' 668 66) OF ROCKY RIVER r F\ GWG11 \ I ec) 2gxp0 \ �00 z\ �• •• yam$ \ _ s..'..,�. ,o. `• ..� ' . `: • . `• 66> \C ,n. ,�.�F ,o. ,n. ,n. ,�. i O (Op �F `:'• CLOD �L \ STA.131+72 6B \ i '• 1;;'• 03A > OD END ROCKY RIVER vPlo � G VEG cl STA 126+95 - STA 127+36 VEGETATIVE SOIL LIFT REPLACED WITH BRUSHTOE FOR INCREASED CHANNEL STABILITY •9 \ 11 �nt001—OOl 01—Col •.�• LOD�LOD—LOD LOD—� OF REACH 3 (RESTORATION) 1 SIX.._.667-------81 381 ... _.-: --- ... _.... _.6' \\` 131+00 l0 ..o TB — — — — - 0' 2' 4' 6' (VERTICAL) 0' 20' 40' 60' (HORIZONTAL) N NOTES: 1. DEVIATIONS FROM THE DESIGN WILL BE SHOWN IN RED. r, U v 0 d1•� / OF O \ 667 0� Ooaol—o OOl 0l A. CIO] — OOl"— 00 II 680 675 AS -BUILT GRADE I - DESIGN GRADE 503+00 503+50 GE \9s \ 678 677 v.�., ,o. ,o. ,�. ,o. ,o. ,o. ,n� ,o. ,�. ,o. ,o. ,o. ,�. ,w.= �,� • �u • . ,o. 'n` +00 503 _ • �� w,. ,� ,w. imp. ,� - ,� J ,4; $,w., w�. ,� ,� ,w. w�. ,� ,w. w�. •,� \` w�. ,� ,� w�. �,k . �,�•. •. Sd—�ti,. •-,i�• • • • �.' • �� / . . . 678 L 679 P14 /E MICA CREEK 6j9 ,� ,w. ,m. ,� ,� ,w. ,m. ,� ,� ,w. ,m. ,� ,m ,w. ,o. ,� ,m ,w. ,o. ,� ,� ,w. ,o. ,� 678 STA.502+01 BEGIN MICA CREEK 6 1 (RESTORATION) 4 - FOR CREDIT 679 672 501+90 502+00 502+50 yX 681 co/ 680 LE/ c� 6; 680 675 672 504+00 0' 1' 2' 3' (VERTICAL) 0' 10' 20' 30' (HORIZONTAL) NOTES: 1. DEVIATIONS FROM THE DESIGN WILL BE SHOWN IN RED. r U v 675 670 669 504+00 — — — AS -BUILT GRADE DESIGN GRADE -- ` / I I \ / I I II 505+00 505+50 MICA CREEK / ---677--- ;' .r.✓ 675 670 669 506+00 506+10 0 1 2 3 IVEkTcrU z Z J 0' 10' 20' 30' (HORIZONTAL) z a Q� \ NOTES: 1. DEVIATIONS FROM THE DESIGN WILL BE \ SHOWN IN RED. \y 677 \ r U v ol �.-_-_, `2%~` :`r Ate„ �/ � dll � � U � w F..- '•4I i'�,'/;/�1 ��1'�Yr„ ;,, _- - `,'d,C, ``� -`-=r' Iny 'Y Z'.j Z, �I R��` \� � `•; �(v I -I z a s, J oz Tc� ti ' i;" uS� 1. ;lii .I �n,�� � �j :�` T•.....: ,yffi _ a ,r"•i,, _,.: ^�,' Ir , I ',.:. t Rw � `, \ `,', \, u_ ------------- I(:'/ ` _-tom n II � _ _ _ _"�`• 'l{`suenl- -- 000vvoovvvvoovvvvvvvvoo`vvDvvvv'voo avvwo`¢v -va �P+-,' vvvroLvovvvvvoo_voovdSsvvoo`vo'vvvvoooovvvvoooo %vt0oomoovdvo•- o`v _yr ---- v�o'voyv5¢o�vb-o-'�'v•, o _.q_'-o_-_-_ -v'y'vv'vvb - -- _ __- - y•'..-D',,`• -- vvoi -- vv vv �O 70 70 70 lP0.9 O O O v O v, O v d,v O O O�v O v , -� z � l - v - - _ � - - P•¢ o d o v o d o v o v P/v - v _ ovo - - • tl' V v o v'o vV v v d�-,,�"- - 1 '----- - `_ - _ , _ -- - - ` '` ? �`/,'�_: t�;_ •t\`` ,`�`� \ \ vv _ o=o-¢ �vo vo O-evv_ovavvv-vv000 -9 --=__v- D_ av_- Tv_- _ _= - v vv,q �II bv,p O / -__-,T, -�_i - = _ vvvOvovv vOo v _\ ovbv�oP,vv,vvO,vo4oO7 vvQvV�cvvdA4c17 d4.0voV6,Yv,o0mo?b v.yovvov' YO_`v ` O P 7,7 ovovovovvo vvo v v 9_'-'o'rd/• ,lv0o'- a -o -_ --_ F-�`a',',v'\1�„-•l �';�^•+ = _`--"- -''"`?,�5.�-��;��'',L`,- ,•, \\`„, u•�,�4- M`,\1 O ova ovovovov v v v OF(v v v v vvv vv vv vvv - -OvVvOavovovovyvv vv 'ro vb77vvvv v "ovLlvogo90 __ vovo - \ -d"vvv- \ yvd, y� = o ov v y vovfv-c�Qvovov ov - o,bovovovb-bvv ov`ovovovod•,0000rtoo y - vovovov __ rs:;='°', '\, `�'r`I°,�,'"'3 '-+ ��;%�`�'' vv v v� �- `vv moo ,,ovovo v � vv--v,-a II'vv v v vv boo vvlvvII3vm_Qvvvvvv v_zvvvv v vvv 777,vvvvvvvv`ov vovovov'v� go ov '`z_ovovov vo o •ovov' ovov _ ov off vvv "- ";,t'•. e`v�v.vvovvv®�vII o v d`o o- v o vas_ _ rov_______v� 3v 3--�F v_vvvovavo v9- o =-,ti' vovo, v-Pvovovovovo�-vvvvvv _o o' '�_`�'�'+ =_�_- "n;, {\,e��°,'`,�-'•ctx'` `U �g v vovo v - vvv 9-ovog vovov vovd, -ba,ov vovo ovo ovo vo`o vadv - o - - , h v` ••o`S•v'iJceo✓T° vgoQ.o vPv0 a�vzI,P{v^aicovy_va 9v�v_vv-va_vy ov vv -vv p'dr,L 'dv'`Q PvwO "oa`-evbvv"Pvvv_q ovw O v Ovvpv_dmv__v_"`v--v--v-,v-,v__9v,-agvW�vv vvvO�vvffiv0�dvv-_Cv¢- �Og'v�,=� v_ II-b v v_--•O-=P.[_j�_oOv_,9_v_LD_v_dOv-�v: av-�v.-.g�F\-d-, gvv`vgov,bv vayfII9vvadII.vvvvvv I:"°r}'\';t', ✓:••1' � �Q^1 - I-ovovvvvcIIvovvvvv_yv vo -77 v PaQv vv vv vvvv9vvvv vvvv vv vv Odvvv s_sz v v v vvvv a-ovv v v vvvvvvv vvQvvvv v v_Oov v v v v v v O_Q v777 avvvI voOvvadPfvvvvo,vbvdvvvi� vovovov _ ___ _ �j �,' •^I '?� _l - ,v o v g - - ,r'-i'; -----_-- __ __-_-'" __--_ -b o•q '- -- -y.`. _ - -- v d- _ __== v_o v D-moo-v_y o v o v o v v9 0 o v orov"o y,•o a;¢y.9 v o v o o;o o+p o 0 0 o v o �� - -" - --. a"` �] -- - _ - -' - bv..v ado-o_v.s-v"v�:IIv` v _va •¢'v v'o. "xzvvkvvvvvvvvvba o - -- ' " -• - - - - - ' "- " -- - vv-crC. ,la'v v o v `[S_dv` -v'v'b• v o 0 0 0 o c b Y 0 0 0 0 0 y - - - - - vvv v-e.e' °v�' v`' v. B �vvd�vvo -g �ovovos' - _ o v'-<f'a o o 0 v a'cl v o 0 ®•v do 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oe+ - \O VL O dv 98v v v O v O v QRRQQR F�QO v cl _ - _____ _Ll 1' — a - - _ S - - �s - h _.\ _ _ - q", ------------- - - 3 ' — r� D r\ , w•z _ - 1 WETLAND RE-ESTABLISHMENT 0000000 - `rA'' - - _ ' I i _ - 'ti ,''�r; "'� t,'=' ' \ .fir•-...-' ' (�\I ,-` - ,_ - - - - - - WETLAND REHABILITATION �` V •s ywy Raw �� � _ � ti WETLAND ENHANCEMENT WETLAND PLUG R N �w K \ 0' 100' 200' 300' K (HORIZONTAL) �,+ 7. Zone 1 - Streambank Planting - Rocky River, Schist Creek Zone 2 - Streambank Planting - Gypsum Creek, Dolomite Creek, Mica Creek Zone 3 - Buffer Planting Zone Zone 4 - Wetland Planting Zone 5, Zone 5 - Permanent Seeding Outside Easement Zone 6 - Supplemental Planting in Existing Forested Wetlands Note: Non -hatched areas within easement are currently vegetated and were planted as needed to achieve target density. Hatched areas determined to be meeting target density were not planted. \ Buffer planting occured within the Limits of Disturbance. o°� v LOD E OOl 001 LOD - LOD WWI -N r--� O o U d � o �z �o � U � o 3D-3J3D30�30�30�30�30 �30�30�30�3��30� 30-3.) 33-30 3J 33- I w I by I R 0' 100, 200' 300, /w )HORIZONTAL) i� Kx a APPENDIX F. Additional Documentation SOIL BORING DESCRIPTIONS Soil Boring Descriptions Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Soil Profile Description at Location of Groundwater Well 1: Depth Range (in.) Color Redox Texture Notes 0-17 10YR 5/1 (90%) 7.5YR 5/8 (10%) C Buried Charcoal 17-31 N 5 (90%) 7.5YR 5/8 (10%) 7.5YR 5/8 (10%) C 31-40 10YR 5/1 100% --- SL Gravelly Soil Profile Description at Location of Groundwater Well 2: Depth Range (in.) Color Redox Texture Notes 0-4 10YR 5/3 (98%) 2.5YR 4/8 (2%) L 4-7 10YR 6/2 (96%) 5YR 5/8 (4%) L 7-16 2.5Y 7/1 (97%) 5YR 6/8 (3%) LS 16-25 2.5Y 7/3 (98%) 5YR 5/8 (2%) SL 25-34 10YR 7/1 (100%) S 34-43 10YR 7/2 (100%) S Coarse 43-55 2.5Y 8/1 100% S Coarse Soil Profile Description at Location of Groundwater Well 3: Depth Range (in.) Color Redox Texture Notes 0-10 10YR 6/3 (85%) 2.5YR 5/8 (15%) CI -Si 10-21 5Y 7/1(90%) 5YR 5/8 (10%) SSi 21-33 2.5Y 7/1 (30%)/2.5Y 6/8 (40%) 5YR 5/8 (30%) Sic Sandy 33-64 5Y 6/1 100% -- Sc Soil Profile Description at Location of Groundwater Well 4: Depth Range (in.) Color Redox Texture Notes 0-5 10YR 4/4 (85%) 7.5YR 5/6 (15%) LSiS 5-14 2.5Y 5/2 (100%) --- SL OM 14-40 2.5Y 6/4 (85%) 7.5YR 6/8 (15%) LS 40-70 5Y 6/1 90% 7.5YR 6/6 10 % LS Soil Profile Description at Location of Groundwater Well 5: Depth Range (in.) Color Redox Texture Notes 0-37 2.5Y 6/1 (55%) 10YR 6/8 (45%) C 37-41 7.5YR 7/1(65%) 7.5YR 6/8 (35%) CS 41-64 5Y 6/1 98% 2.5YR 5/8 2% CS 80% , Gravel 20% Soil Profile Description at Location of Groundwater Well 6: Depth Range (in.) Color Redox Texture Notes 0-3 10YR 4/3 (95%) 5YR 4/3 (5%) SiL 3-15 10YR 6/3 (90%) 7.5YR 5/8 (10%) LS 15-23 2.5Y 6/3 (80%) 2.5YR 4/8 (20%) Sc 23-28 10YR 5/2 (100%) --- Sc Undecomposed Wood 28-30 2.5Y 5/2 100% S Soil Boring Descriptions Liberty Rock Mitigation Site DMS Project No. 100135 Monitoring Year 0 - 2023 Soil Profile Description at Location of Groundwater Well 7: Depth Range (in.) Color Redox Texture Notes 0-9 10YR 5/1 (95%) 7.5YR 5/6 (5%) SiCL 9-14 10YR 5/1 (95%) 7.5YR 5/6 (5%) CL 14-31 10YR 5/1 (98%) 7.5YR 5/6 (2%) Sc 31+ 2.5Y 7/1 100% --- S Soil Profile Description at Location of Groundwater Well 8: Depth Range (in.) Color Redox Texture Notes 0-3 10YR 4/2 (97%) 5YR 5/6 (3%) L 3-16 10YR 5/1 (85%) 2.5YR 4/6 (15%) CL 16-22 7.5YR 4/1(96%) 7.5YR 5/6 (4%) CL Sandy 22-30 5YR 5/1 (95%) 7.5YR 5/6 (5%) CL 30-39 5YR 4/1(100%) C Soil Profile Description at Location of Groundwater Well 9: Depth Range (in.) Color Redox Texture Notes 0-7 10YR 4/3 (95%) 7.5YR 6/8 (5%) SiL 7-16 10YR 6/4 (97%) 7.5YR 6/6 (3%) SL 16-27 7.5YR 7/1 (75%) 7.5YR 6/8 (25%) SiCL 27-42 10YR 6/1 (85%) 7.5YR 6/8 (15%) CL Stiff (Wets/Dries) 42+ 5Y 6/1 100% SiCL Soil Profile Description at Location of Groundwater Well 10: Depth Range (in.) Color Redox Texture Notes 0-19 10YR 5/6 (100%) --- CL 19-27 10YR 7/2 (90%) 10YR 6/8 (10%) LC Sandy 27-34 10YR 7/2 (100%) --- S 34-50 10YR 5/1 100% --- S Very Fine Soil Profile Description at Location of Groundwater Well 11: Depth Range (in.) Color Redox Texture Notes 0-8 2.5Y 5/2 (95%) 7.5YR 5/8 (5%) SL 8-11 2.5Y 6/2 (95%) 10YR 6/8 (5%) SL 11-25 10YR 6/3 (96%) 10YR 7/6 (4%) S Very Fine 25-36 2.5Y 6/3 (98%) 2.5Y 6/8 (2%) S Very Fine 36-45 2.5Y 6/1 100% S 95% , Gravel 5% Very Fine LUNKER BOX INSTALLATION Lunker Box Installation (810412022) Liberty Rock Mitigation Site Appendix F: Additional Documentation - Lunker Box Installation Photographs