Loading...
HomeMy WebLinkAboutNCG021012_Site Plan Set_20230306HAVELOCK DRUGSTORE MINE SITE DATA TABLE OWNER: HAVELOCK DRUGSTORE, LLC. 1500 SUNDAY DR. SUITE 300 RALEIGH, NC, 27607 CONTACT: MELTON "SKIP" VALENTINE PHONE: (919) 395-4592 PIN: PORTION OF 5778-10-4708 ALL OF 5768-95-4102 PARCEL ID: PORTION OF 0504927 ALL OF 0500677 PORTION OF DEED: C-28/31 ALL OF DEED: 0-28/766 TOTAL PARCEL AREA: 640.0 AC +/ EXISTING ZONING: MARTIN COUNTY (UN -ZONED) PROPOSED USE: BORROW PIT (SAND & GRAVEL) PARKING CALCULATIONS REQUIRED: 1 SPACE/PER EMPLOYEE X 10 EMPLOYEES: 10 SPACES PROPOSED: 10 SPACES (INCLD H.C.) ❑� SHEET INDEX C1 COVER C2 MINE SITE LAYOUT PLAN C3 MINE PLAN - PIT #1 & 2 C4 MINE PLAN - PIT #3&4 BORROW SOURCE VIEW NICHOLSON ROAD MARTIN COUNTY, NORTH CAROLINA `_I I LOCATION MAP SCALE: NTS C5 MINE PLAN - PIT #5 FEBRUARY 2023 C6 RECLAMATION PLAN - PIT #1 & 2 C7 RECLAMATION PLAN - PIT #3 & 4 PLANS BY: C8 RECLAMATION PLAN - PIT #5 DA1 DRAINAGE AREA MAP DRAFTING AND DESIGN O SERVICES, INC. I PROVIDED FOR: HAVELOCK DRUGSTORE, LLC. 1500 SUNDAY DR. SUITE 300 RALEIGH, NC, 27607 CONTACT: MELTON "SKIP" VALENTINE III PHONE: (919) 395-4592 6728 CARBONTON ROAD C9-C13 CONSTRUCTION DETAILS Sanford, North Carolina 27330 AGENCY REVIEW (919) 499-8759 phone NOT FOR CONSTRUCTION draftinganddesignCymail.com C14-C20 STORM/EROSION CALCULATIONS project no. 2022-08 3 a ai c g Y U O m O lfj O N N O N Y w G O O U m g Y U O m O O N N O N N N O N a 30' UNDISTURBED BUFFER (TYP) DOUBLE ROW SILT FENCE (TYP) INSTALLATION 1. REMOVE ALL TREES, BRUSH ROAD TO CONTINUE THROUGH PIT (TYP) SLOPE TOWARDS PIT ALL SILT FENCE ALONG SIDES OF HAUL ROAD WETLAND BOUNDARY (TYP) I 3 BERM 3 PIT #3 46.2 AC\� Y �1;1;1;; ;aa, =EM 4 WETLANDS 20' BOTTOM WIDTH 1 PIT � � I I NOTE 1. SEE PLAN SHEET FOR WIDTH HEIGHT DETERMINED BY SIDE SLOPES. 2. WIDTH INDICATED ON PLAN IS BOTTOM WIDTH. 3. SEED PER TEMPORARY/PERMANENT SEEDING SCHEDULE. 4. NATURAL VOLUNTEER VEGETATION SHALL REMAIN. 5. BERM ENDS SHALL BE 4:1 SLOPES LIKE SIDE SLOPES. 6. SLOPES SHALL BE TRACKED WITH A DOZER DURING CONSTRUCTION TO AID IN THE ESTABLISHMENT OF VEGETATIVE COVER. 7. ALL EXPOSED AREA SHALL BE STABILIZED BY ESTABLISHING PERENNIAL VEGETATIVE COVER. MAINTENANCE 1. INSPECT ALL PERIMETER BERMS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REPAIR ERODED SLOPES, RESTORE ERODED SLOPES TO THEIR ORIGINAL CONDITION AS SHOWN ON THIS DETAIL AND RE-ESTABLISH VEGETATION. INTERNAL WETLANDS BOUNDARY VEGETATIVE BUFFER/BERM CROSS-SECTION INSTALLATION 1. REMOVE ALL TREES, BRUSH SLOPE TOWARDS PIT 4 BERM 4 \/ Q 1 I /\\\\/\//\\\/\ EXISTING //i//i�/ice✓�/i�/i�/i�!i� > LU GROUND BOTTOM WIDTH PIT 50' NOTE 1. SEE PLAN SHEET FOR WIDTH HEIGHT DETERMINED BY SIDE SLOPES. 2. WIDTH INDICATED ON PLAN IS BOTTOM WIDTH. 3. SEED PER TEMPORARY/PERMANENT SEEDING SCHEDULE. 4. NATURAL VOLUNTEER VEGETATION SHALL REMAIN. 5. BERM ENDS SHALL BE 4:1 SLOPES LIKE SIDE SLOPES. 6. SLOPES SHALL BE TRACKED WITH A DOZER DURING CONSTRUCTION TO AID IN THE ESTABLISHMENT OF VEGETATIVE COVER. 7. ALL EXPOSED AREA SHALL BE STABILIZED BY ESTABLISHING PERENNIAL VEGETATIVE COVER. MAINTENANCE 1. INSPECT ALL PERIMETER BERMS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REPAIR ERODED SLOPES, RESTORE ERODED SLOPES TO THEIR ORIGINAL CONDITION AS SHOWN ON THIS DETAIL AND RE-ESTABLISH VEGETATION. PERIMETER VEGETATIVE BERM (TYP) NTS NTS AFFECTED AREA (TYP � 132.2 AC +/- i.' \ O-OUTLET PR CTION #1 CULVERT #2 La=7.5' \ \ \-_ \\ 36 LF 15" HDPE @ 0.5% W=5.0' MATCH CHANNEL �- \ 1,6 ��/ STONE 0= CLASS A OUTLET PROTECTION # �� <6 OUBLE SILT FENCE (TYP) La=7.5' �� I ULVER 1 ' ALONG WETLANDS W=5.0' MATCH CHANNEL / SL - 36 LF 18" HD @ 0.5% \ STONE 0= CLASS A 76 w: co \ \ / 0' MIN UNDISTURBED BUFFER (TYP) EXTERIOR BOUNDARY 70 TD 0 TD 06 /H=3 0' WIDE VEGETATIVE BERM (TYP) /� SILK FENCE (TYP E� 1IOR PROPERTY PIT BOUNDARY W=2FT 5.0 FT �� SB #2C \ I \�\0 SB #2B �( \ \ \ J X. 20' WIDE HAUL ACCESS ROAD (TYP) �� \ �` a ( , PIT #1 \ /olN F P T E (TYP) P �� \� � 2.8 AC \ \ L \ C ( \ \ \ \A_ �) 60 1 V\V �� TD 07 TD 0 I �� �,� 4/ STD 05 8 \� \ HIGH &7 � N � \ \ \ \ � \4, �, \ �, �~ 1 \ EXTEO'MRIOR BIOUNDARD BUFFER (TYP) \ TD 0 PIT #2 \ \ 30' MIN UNDISTURBED ALONG WETLANDS TD 04 & 51 9.7 AC ROPERTY/PERMIT BOUNDARY (TYP) HIGHROINT \ 640.0 AC +/- 11 h* \ \ I�Il OUBLE SILT FENCE (TYP) : ALONG WETLANDS 50' MIN UNDISTURBED BUFFER (TYP EXTERIOR BOUNDARY 20' WIDE VEGETATIVE BERM (TYP INTERIOR PROPERTY PIT BOUNDARY H=3.0 FT BW=25.0 FT TW=0.0 FT SIDE SLOPES=4:1 50' MIN UNDISTURBED BUFFER (TYP EXTERIOR BOUNDARY DOUBLE SILT FENCE (TYP ALONG WETLANDS CONSTRUCTION SEQUENCE MINING ACTIVITY SITE ENTRANCE 1. PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES CONTACT NCDEQ LAND QUALITY SECTION (252) 946-6481. 2. INSTALL CONSTRUCTION ENTRANCE ON ACCESS ROAD THAT TIES TO VIEW NICHOLSON ROAD. 3. UPGRADE ACCESS ROADS PER PLAN. 4. INSTALL SILT FENCE ALONG ACCESS ROAD PER PLAN. 5. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. PHASE 1 - SITE CONSTRUCTION 1. INSTALL SILT FENCE BELOW ALL DISTURBED AREAS WITH SILT FENCE OUTLETS IN LOW AREAS. 2. INSTALL SEDIMENT BASINS IN MINING PHASE AREA FOR CLEARING AND BERM INSTALLATION. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL BASINS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL GOOD GROUND COVER IS ESTABLISHED. 3. INSTALL TEMPORARY DIVERSIONS. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL DIVERSIONS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. 4. INSTALL PERMANENT BERMS AROUND PIT. 5. ONCE BERMS ARE COMPLETE AROUND EXCAVATION AREA AND ARE STABILIZED AND SEEDED. MAINTAIN SILT FENCE UNTIL THIS ACHIEVED. REMOVE TEMPORARY DIVERSIONS AND TEMPORARY SKIMMER BASINS ONCE POSITIVE DRAINAGE IS ACHIEVED TO THE PIT. MAINTAIN ALL DOWNSTREAM DIVERSIONS AND SILT FENCE UNTIL GOOD GROUND COVER IS ESTABLISHED. 6. ONCE GOOD GROUND COVER IS ESTABLISHED AND NO RUTTING OF SLOPES IS OCCURRING REMOVE ALL EROSION CONTROL MEASURES WHILE MAINTAINING SILT FENCE ON DOWNSTREAM SIDE. 7. MINE EXCAVATION WILL START IN SEDIMENT BASINS AND ALL DRAINAGE WITHIN PIT LIMITS SHALL BE DIRECTED IN TO THE PIT. 3 8. PIT AREAS WILL BE BERMED AND DRAINED TEMPORARILY FOR EXCAVATION. 9. MAINTAIN SILT FENCE AFTER MAJOR RAIN EVENTS. 10. STABILIZE AND SEED ALL DENUDED AREAS IN WHICH WORK WILL NOT RECOMMENCE WITHIN 7 WORKING DAYS OR 14 CALENDAR DAYS. 11. CALL NCDEQ LAND QUALITY SECTION FOR INSPECTION (252) 946-6481. PHASE 2 - MINING 1. BEGIN MINING ACTIVITIES. 2. AS EXCAVATION AREA IS EXPANDED POSITIVE DRAINAGE TO BE MAINTAINED TO EXCAVATION PIT. 3. SITE WILL BE MINED FROM SOUTHERN MOST PIT/AREA OF PIT TOWARDS NORTHERN END WHILE RECLAMATING SLOPES AS THE MATERIAL IS MINED. 4. TEMPORARY SEED STOCKPILE AREAS THAT WILL BE DENUDED FOR 30 DAYS OR MORE. 5. MAINTAIN ALL EROSION CONTROL DEVICES WEEKLY AND AFTER MAJOR STORM EVENTS. 6. CALL NCDEQ LAND QUALITY SECTION FOR INSPECTION (910) 796-7215. PROPOSED DIVERSION TABLE CHANNEL ID CHANNEL SLOPE SIDE SLOPES BOTTOM WIDTH CHANNEL DEPTH B TEMPORARY LINING PERMANENT LINING LINING DEPTH TD#1 0.0 % TD#2 0.0 % TD#3 0.0 % TD#4 0.0 % TD#5 0.0 % TD#6 0.0 % TD#7 0.0 % TD#8 0.0 % INSTALL CHECK DAMS IN CHANNELS 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS 3:1 3.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS PROPOSED BASIN TABLE BASIN ID TOP BOTTOM POOL TOP BOTTOM VOLUME VOLUME WEIR WEIR WIER RISER BARREL RISER SKIMMER SKIMMER BAFFLES DIM DIM DEPTH EL. EL. REQUIRED PROPOSED LENGTH DEPTH LINING SIZE SIZE BASE ORIFICE SIZE SB#1 60X120 45X90 3 7.0 4.0 6,660 SF 14,823 SF NA NA NA NA NA NA NA NA NA SB#2A 104X208 89X178 3 7.0 4.0 22,140 SF 52,757 SF NA NA NA NA NA NA NA NA NA SB#2B 65X130 50X100 3 7.0 4.0 8,100 SF 17,943 SF NA NA NA NA NA NA NA NA NA SB#2C 64X128 49X98 3 7.0 4.0 7,560 SF 17,295 SF NA NA NA NA NA NA NA NA NA SB - SEDIMENT BASIN STABILIZE AND SEED ALL SLOPES IMMEDIATELY SEE DETAIL CROSS-SECTION FOR ELEVATIONS TD 0� STD 04 vh < SIB A TW-0.0 FT SIDE SLOPES=4:1 30' MIN UNDISTURBED BUFFER (TYP) ALONG WETLANDS 50' MIN UNDISTURBED BUFFER (TYP) EXTERIOR BOUNDARY 50' MIN UNDISTURBED BUFFER (TYP) EXTERIOR BOUNDARY DISTURBED AREAS TAILINGS/SEDIMENT PONDS 5.1 AC STOCKPILES 16.0 AC* (INSIDE MINE EXCAVATION) PROCESSING AREA/HAUL ROADS 12.1 AC MINE EXCAVATION 108.0 AC OTHER MISC EXCAVATION 7.0 AC (BERMS, DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC 'AREAS BONDED AS HIGHER BOND AMOUNT INTERNAL DRAINAGE = 116.3 AC EXTERNAL DRAINAGE= 15.9 AC EROSION CONTROL LEGEND TOP OF BERM SKIMMER BASIN SKIMMER BAFFLES SPILLWAY ROCK CHECK DAMS - SILT FENCE SF TEMPORARY DIVERSION DITCH OUTLET PROTECTION J-HOOK W/ SILT FENCE OUTLET SILT FENCE OUTLET LEGEND PERMIT BOUNDARY EXISTING CONTOUR WETLAND BUFFER AFFECTED AREA CREEK BERM POND Z O 70 -I 200 0 100 200 400 HORIZONTAL SCALE: 1" = 200' RAFTING AND !DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ a Z J W W o o�c Q Q O ~ z O � � � Q C� to W o JZ O_ � IL O � W � W v� �Z z E Z � O � C� O W � O _ pp > Z W REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: 1 "=200' MTB Sheet: Designed by: MTB C3 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 30' UNDISTURBED BUFFER (TYP) DOUBLE ROW SILT FENCE (TYP) INSTALLATION 1. REMOVE ALL TREES, BRUSH SLOPE TOWARDS PIT D BOUNDARY (TYP) I 3 BERM 3 4 WETLANDSf 20'BOTTOMWIDTH �1 PIT I I NOTE 1. SEE PLAN SHEET FOR WIDTH HEIGHT DETERMINED BY SIDE SLOPES. 2. WIDTH INDICATED ON PLAN IS BOTTOM WIDTH. 3. SEED PER TEMPORARY/PERMANENT SEEDING SCHEDULE. 4. NATURAL VOLUNTEER VEGETATION SHALL REMAIN. 5. BERM ENDS SHALL BE 4:1 SLOPES LIKE SIDE SLOPES. 6. SLOPES SHALL BE TRACKED WITH A DOZER DURING CONSTRUCTION TO AID IN THE ESTABLISHMENT OF VEGETATIVE COVER. 7. ALL EXPOSED AREA SHALL BE STABILIZED BY ESTABLISHING PERENNIAL VEGETATIVE COVER. 1. INSPECT ALL PERIMETER BERMS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REPAIR ERODED SLOPES, RESTORE ERODED SLOPES TO THEIR ORIGINAL CONDITION AS SHOWN ON THIS DETAIL AND RE-ESTABLISH VEGETATION. INTERNAL WETLANDS BOUNDARY VEGETATIVE BUFFER/BERM CROSS-SECTION SLOPE TOWARDS PIT BERM INSTALLATION 4 4 + 1. REMOVE ALL TREES, BRUSH EXISTING N GROUNDBOTTOM WIDTH PST 50' I � NOTE 1. SEE PLAN SHEET FOR WIDTH HEIGHT DETERMINED BY SIDE SLOPES. 2. WIDTH INDICATED ON PLAN IS BOTTOM WIDTH. 3. SEED PER TEMPORARY/PERMANENT SEEDING SCHEDULE. 4. NATURAL VOLUNTEER VEGETATION SHALL REMAIN. 5. BERM ENDS SHALL BE 4:1 SLOPES LIKE SIDE SLOPES. 6. SLOPES SHALL BE TRACKED WITH A DOZER DURING CONSTRUCTION TO AID IN THE ESTABLISHMENT OF VEGETATIVE COVER. 7. ALL EXPOSED AREA SHALL BE STABILIZED BY ESTABLISHING PERENNIAL VEGETATIVE COVER. 1. INSPECT ALL PERIMETER BERMS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REPAIR ERODED SLOPES, RESTORE ERODED SLOPES TO THEIR ORIGINAL CONDITION AS SHOWN ON THIS DETAIL AND RE-ESTABLISH VEGETATION. PERIMETER VEGETATIVE BERM (TYP) NTS 50' UNDISTURBED BUFFER (TYP) EXTERIOR BOUNDARY 50' WIDE VEGETATIVE BERM (TYP) EXTERIOR BOUNDARY H=6.0 FT BW-50.0 FT TW=2.0 FT SIDE SLOPES=4:1 NTS l PROPERTY/PERMIT BOUNDARY (TYP l 640.0 AC +I- - .. ....... y TD 14 TD 1 _ •,?a�SI3 #3C TD 14 &i5 HIGH POI INT B #31 I �. v + + + \7 +`. ` SB #4CTD 2 y . \ �\ TD1 i 1 � I J TD29&3 B#4B HIGH POINT : \, \L, cb ----- �� �_ _ ��+� � . OUBLE SILT FENCE (TYP) 20' WIDE VEGETATIVE BERM (TYP TD 3 \ °�( ALONG WETLANDS INTERIOR PROPERTY PIT BOUNDARY PIT #4 \_\ 1 H=3.0 FT BW=25.0 FT 0 A� 3� �' % I TW=0.0 FT \ SIDE SLOPES=4:1 TD 26 & 3 I ,• +' ' HIGH POINT `/ \ 30' UNDISTURBED BUFFER (TYP \ ALQNG WETLANDS \ / DOUBLE SILT FENCE (TYP :• �l I ALONG WETLANDS ~�\\ 50' UNDI ( F P TD 2 - IU27 SB#� CHANNEL ID CHANNEL SLOPE SIDE SLOPES PROPOSED DIVERSION TABLE BOTTOM WIDTH CHANNEL DEPTH TEMPORARY LINING PERMANENT LINING LINING DEPTH TD#9 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#10 0.0 % 3:1 2.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#11 0.0 % 3:1 1.5 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#12 0.0 % 3:1 4.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#13 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#14 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS - TD#15 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#16 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS - TD#17 0.0 % 3:1 0.0 FT 2.5 FT NAG BC75BN BERMUDAGRASS - TD#18 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#19 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#20 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#21 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#22 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#23 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#24 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#25 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#26 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#27 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#28 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS - TD#29 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS - TD#30 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS - TD#31 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS - INSTALL CHECK DAMS IN CHANNELS PROPOSED BASIN TABLE BASIN ID TOP BOTTOM POOL TOP BOTTOM VOLUME VOLUME WEIR WEIR WIER RISER BARREL RISER SKIMMER SKIMMER BAFFLES DIM DIM DEPTH EL. EL. REQUIRED PROPOSED LENGTH DEPTH LINING SIZE SIZE BASE ORIFICE SIZE SB#3A 73X146 58X116 3 7.0 4.0 10,440 SF 23,559 SF NA NA NA NA NA NA NA NA NA SB#3B 101X202 86X172 3 7.0 4.0 20,700 SF 49,263 SF NA NA NA NA NA NA NA NA NA SB#3C 61X122 46X96 3 7.0 4.0 7,020 SF 15,423 SF NA NA NA NA NA NA NA NA NA SB#3D 68X136 53X106 3 7.0 4.0 8,820 SF 19,959 SF NA NA NA NA NA NA NA NA NA SB#3E 101X202 86X172 3 7.0 4.0 20,520 SF 49,263 SF NA NA NA NA NA NA NA NA NA SB#3F 79X158 64X128 3 7.0 4.0 12,240 SF 28,275 SF NA NA NA NA NA NA NA NA NA SB#3G 59X118 44X88 3 7.0 4.0 6,300 SF 14,235 SF NA NA NA NA NA NA NA NA NA SB#3H 42X84 27X54 3 7.0 4.0 2,880 SF 6,075 SF NA NA NA NA NA NA NA NA NA SB#4A 81X162 66X132 3 7.0 4.0 12,780 SF 29,943 SF NA NA NA NA NA NA NA NA NA SB#4B 37X74 22X44 3 7.0 4.0 2,160 SF 4,335 SF NA NA NA NA NA NA NA NA NA SB#4C 43X86 28X56 3 7.0 4.0 3,060 SF 6,459 SF NA NA NA NA NA NA NA NA NA SB - SEDIMENT BASIN STABILIZE AND SEED ALL SLOPES IMMEDIATELY SEE DETAIL CROSS-SECTION FOR ELEVATIONS TD 1 : \ 0 OUBLE SILT FENCE (TYP '+ (1 \ \ALONG WETLANDS TD 12 30-' U ISTURBED BUFFER (TYP AL WETLANDS SB #3 20 WIDE VEGETATI E BERM (TYP / INTERIOR PROPERTY PI BOUNDARY__ -)'4/ H=3.0 FT W=25.0 FT \L/ IR �3/\ • W=0.0 FT SIDE$ ES=4:1- :+ gll A A/ 50' WIDE VEGETATIVE BERM (TYP) EXTERIOR BOUNDARY H=6.0 FT BW=50.0 FT TW=2.0 FT SIDE SLOPES=4:1 50' UNDISTURBED BUFFER (TYP) EXTERIOR BOUNDARY �AFFECTED AREA (TYP) 132.2 AC -, ,.4'.� ; SB #3G + D 2 : TD2� 14 & 25 TR 24 TD 22 & 23�� I POINT ' �� ` HIGH POINT f! II TD 23 �Y SB #3 � TD 25� II 30' UNDISTURBED BUFFER (TYP) ALONG WETLANDS >� �, � �, \ �, PROCESSING AREA/HAUL ROADS 12.1 AC SB#3F \ MINE EXCAVATION 108.0 AC OTHER MISC EXCAVATION 7.0 AC (BERMS, DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC *AREAS BONDED AS HIGHER BOND AMOUNT \ 20' WIDE VEGETATIVE BERM (TYP) \ \ '+ INTERIOR PROPERTY PIT BOUNDARY \4/ \1/ l l H=3.0 FT BW=25.0 FT �) ,I INTERNAL DRAINAGE = 116.3 AC TD 1 SIDE SLOPES=4:1 > EXTERNAL DRAINAGE= 15.9 AC '+ SIDE � � � / �/ � \ �Y 70 � •. \ 1 A � OUBLE SILT FENCE (TYP) A/ A/ A/ \� ALONG WETLANDS PIT #3 a� 46.2 AC EROSION CONTROL LEGEND � SB 3 `+. '°r = vJ�i \J/ )I✓ �� TOP OF BERM SKIMMER BASIN SKIMMER BAFFLES +` � %"( lu( •. l� � � �\ \� \ � � � � � -iV �`li `I/ SPILLWAY TD 1 ` -1 - ___\ ROCK CHECK DAMS D 9 & 1 / `I' `I' `I' � I, A SILT FENCE SF H n `V `I' `I' �`I `I'\ `I' `I r `I' TEMPORARY DIVERSION DITCH A/ \k % \, OUTLET PROTECTION \ l TD 11 \ A/ \1/ J-HOOK W/ SILT FENCE OUTLET TD 10 & 11 -- _21 f HIGH POINT TD 0 \\ + w SILT FENCE OUTLET �Y CONSTRUCTION SEQUENCE MINING ACTIVITY SITE ENTRANCE 1. PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES CONTACT NCDEQ LAND QUALITY SECTION (252) 946-6481. 2. INSTALL CONSTRUCTION ENTRANCE ON ACCESS ROAD THAT TIES TO VIEW NICHOLSON ROAD. 3. UPGRADE ACCESS ROADS PER PLAN. 4. INSTALL SILT FENCE ALONG ACCESS ROAD PER PLAN. 5. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. PHASE 1 - SITE CONSTRUCTION 1. INSTALL SILT FENCE BELOW ALL DISTURBED AREAS WITH SILT FENCE OUTLETS IN LOW AREAS. 2. INSTALL SEDIMENT BASINS IN MINING PHASE AREA FOR CLEARING AND BERM INSTALLATION. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL BASINS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL GOOD GROUND COVER IS ESTABLISHED. 3. INSTALL TEMPORARY DIVERSIONS. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL DIVERSIONS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. 4. INSTALL PERMANENT BERMS AROUND PIT. 5. ONCE BERMS ARE COMPLETE AROUND EXCAVATION AREA AND ARE STABILIZED AND SEEDED. MAINTAIN SILT FENCE UNTIL THIS ACHIEVED. REMOVE TEMPORARY DIVERSIONS AND TEMPORARY SKIMMER BASINS ONCE POSITIVE DRAINAGE IS ACHIEVED TO THE PIT. MAINTAIN ALL DOWNSTREAM DIVERSIONS AND SILT FENCE UNTIL GOOD GROUND COVER IS ESTABLISHED. 6. ONCE GOOD GROUND COVER IS ESTABLISHED AND NO RUTTING OF SLOPES IS OCCURRING REMOVE ALL EROSION CONTROL MEASURES WHILE MAINTAINING SILT FENCE ON DOWNSTREAM SIDE. 7. MINE EXCAVATION WILL START IN SEDIMENT BASINS AND ALL DRAINAGE WITHIN PIT LIMITS SHALL BE DIRECTED IN TO THE PIT. 3 8. PIT AREAS WILL BE BERMED AND DRAINED TEMPORARILY FOR EXCAVATION. 9. MAINTAIN SILT FENCE AFTER MAJOR RAIN EVENTS. 10. STABILIZE AND SEED ALL DENUDED AREAS IN WHICH WORK WILL NOT RECOMMENCE WITHIN 7 WORKING DAYS OR 14 CALENDAR DAYS. 11. CALL NCDEQ LAND QUALITY SECTION FOR INSPECTION (252) 946-6481. PHASE 2 - MINING 1. BEGIN MINING ACTIVITIES. 2. AS EXCAVATION AREA IS EXPANDED POSITIVE DRAINAGE TO BE MAINTAINED TO EXCAVATION PIT. 3. SITE WILL BE MINED FROM SOUTHERN MOST PIT/AREA OF PIT TOWARDS NORTHERN END WHILE RECLAMATING SLOPES AS THE MATERIAL IS MINED. 4. TEMPORARY SEED STOCKPILE AREAS THAT WILL BE DENUDED FOR 30 DAYS OR MORE. 5. MAINTAIN ALL EROSION CONTROL DEVICES WEEKLY AND AFTER MAJOR STORM EVENTS. 6. CALL NCDEQ LAND QUALITY SECTION FOR INSPECTION (910) 796-7215. DISTURBED AREAS TAILINGS/SEDIMENT PONDS 5.1 AC STOCKPILES 16.0 AC* (INSIDE MINE EXCAVATION) \\+ LEGEND TD 10 \\ y SB #3A oo � PERMIT BOUNDARY o \ I u� EXISTING CONTOUR �jl is UTLET PRO TE TION #3 ` \ La=8.0' WETLAND W=6.0' MATCH CH NEL d=18" 1 '+'+ :' STONE 0= CLASS A BUFFER � �v uLVERT#3 AFFECTED AREA 36 LF 24" HDPE @ 0.5% f \ CREEK X. 20' WIDE HAUL R ADy(TYP) ✓ BERM +++++++++++++++++ POND v Z O 70 -I 2 200 0 100 200 400 HORIZONTAL SCALE: 1" = 200' RAFTING AND DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ a Z J W W o� Q Q O 00 19 Z I- z O 019 Q t'tI)WJZ � O J O_ IL O n x W DO W0z z ce Z E � 3:p C� W U O Om � >Z J W Q � REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: 1 "=200' MTB Sheet: Designed by: MTB C4 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 / � 1 I 20' WIDE HAUL ROAD (TYP) 0' UNDISTURBED BUFFER (TYP) CONSTRUCTION SEQUENCE MINING ACTIVITY SITE ENTRANCE 1. PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES CONTACT NCDEQ LAND QUALITY SECTION (252) 946-6481. 2. INSTALL CONSTRUCTION ENTRANCE ON ACCESS ROAD THAT TIES TO VIEW NICHOLSON ROAD. 3. UPGRADE ACCESS ROADS PER PLAN. 4. INSTALL SILT FENCE ALONG ACCESS ROAD PER PLAN. 5. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. PHASE 1 - SITE CONSTRUCTION 1. INSTALL SILT FENCE BELOW ALL DISTURBED AREAS WITH SILT FENCE OUTLETS IN LOW AREAS. 2. INSTALL SEDIMENT BASINS IN MINING PHASE AREA FOR CLEARING AND BERM INSTALLATION. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL BASINS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL GOOD GROUND COVER IS ESTABLISHED. 3. INSTALL TEMPORARY DIVERSIONS. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL DIVERSIONS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. 4. INSTALL PERMANENT BERMS AROUND PIT. 5. ONCE BERMS ARE COMPLETE AROUND EXCAVATION AREA AND ARE STABILIZED AND SEEDED. MAINTAIN SILT FENCE UNTIL THIS ACHIEVED. REMOVE TEMPORARY DIVERSIONS AND TEMPORARY SKIMMER BASINS ONCE POSITIVE DRAINAGE IS ACHIEVED TO THE PIT. MAINTAIN ALL DOWNSTREAM DIVERSIONS AND SILT FENCE UNTIL GOOD GROUND COVER IS ESTABLISHED. 6. ONCE GOOD GROUND COVER IS ESTABLISHED AND NO RUTTING OF SLOPES IS OCCURRING REMOVE ALL EROSION CONTROL MEASURES WHILE MAINTAINING SILT FENCE ON DOWNSTREAM SIDE. 7. MINE EXCAVATION WILL START IN SEDIMENT BASINS AND ALL DRAINAGE WITHIN PIT LIMITS SHALL BE DIRECTED IN TO THE PIT. 3 8. PIT AREAS WILL BE BERMED AND DRAINED TEMPORARILY FOR EXCAVATION. 9. MAINTAIN SILT FENCE AFTER MAJOR RAIN EVENTS. 10. STABILIZE AND SEED ALL DENUDED AREAS IN WHICH WORK WILL NOT RECOMMENCE WITHIN 7 WORKING DAYS OR 14 CALENDAR DAYS. 11. CALL NCDEQ LAND QUALITY SECTION FOR INSPECTION (252) 946-6481. PHASE 2 - MINING 1. BEGIN MINING ACTIVITIES. EXTERIOR BOUNDARY 2. AS EXCAVATION AREA IS EXPANDED POSITIVE DRAINAGE TO BE MAINTAINED TO EXCAVATION PIT. 3. SITE WILL BE MINED FROM SOUTHERN MOST PIT/AREA OF PIT TOWARDS NORTHERN END WHILE RECLAMATING SLOPES AS THE MATERIAL AFFECTED AREA (TYP) \� IS MINED. 132.2 AC +1- 4. TEMPORARY SEED STOCKPILE AREAS THAT WILL BE DENUDED FOR 30 DAYS OR MORE. A/ A/ 5. MAINTAIN ALL EROSION CONTROL DEVICES WEEKLY AND AFTER MAJOR STORM EVENTS. 6. CALL NCDEQ LAND QUALITY SECTION FOR INSPECTION (910) 796-7215. SB #5D �- ILT FENCE (TYP) ``.`. TD 3 �df HIGHTD DINT �� ' - - 1 1 +•r', OUBLE SILT FENCE (TYP) Y ALONG WETLANDS TD37&38 HIGH POINT TD4 ` B #6E BUFFER (TYP) � \ A/ S 30' UNDISTURBED BU R ALONG WETLANDS } OUBLE SILT FENCE (TYPE 20' WIDE VEGETATIVE BERM (TYP) / ` \ °j%' _ INTERIOR PROPERTY PIT BOUNDARY �, f TD 34 ALONG WETLANDS I,` / �� �- H=3.0 FT / J ,_fff, BW=25.0 FT '• • TW=0.0 FT 1 \/ TD 37 DOUBLE SILTS EN`E (TYP SIDE SLOPES=4:1 ALONG WETLANDS TD 4 SB #5B SB #5C • TD 42 & 43f ` .. PIT #5 HIGH POINT . SB #5F \� Sim ,v. y„co J + f`f<. Z�3 AC 1 .� IL4� !NCE (TP) \ <� 8 8\ 20' WIDE VEGETATIVE BERM (TYP � TD 3 '� / INTERIOR PROPERTY PIT BOUNDARY ., TD 33� TD 50 / \ H=3.0 FT ` �� 20' WIDE VEGETATIVE BE (TYP) TD4 ,� SB #5H BW=25.0 FT INTERIOR PROPERTY PIT BOUNDARY TD 35 & 36- . TD4 & 4 ;, a,' PROPERTY/PERMIT BOUNDARY (TYP) TW=0.0 FT : H=3.0 FT SIDE SLOPES=4:1 HIGH POINT �`: gW=25.0 FT HIGH POINT _�'� ;;%% s%'. 640.0 AC +/- TW=0.0 FT SB #5 TD 4 A'%'- %'" f,f ,fs SIDE SLOPES=4:1 `s ++ ++ \_%D 3 ++ + .+ + + `-� DOUBLE SILT FENCE (TYP) ALONG WETLANDS 50' UNDISTURBED BUFFER (TYP) EXTERIOR BOUNDARY CHANNEL ID CHANNEL SLOPE SIDE SLOPES PROPOSED DIVERSION TABLE BOTTOM WIDTH CHANNEL DEPTH TEMPORARY LINING PERMANENT LINING LINING DEPTH TD#32 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#33 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#34 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#35 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#36 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#37 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#38 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#39 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#40 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#41 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#42 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#43 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#44 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#45 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#46 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#47 0.0 % 3:1 0.0 FT 1.5 FT NAG BC75BN BERMUDAGRASS TD#48 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#49 0.0 % 3:1 0.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS TD#50 0.0 % 3:1 2.0 FT 2.0 FT NAG BC75BN BERMUDAGRASS INSTALL CHECK DAMS IN CHANNELS BASIN ID TOP DIM BOTTOM POOL DIM DEPTH TOP EL. PROPOSED BASIN TABLE BOTTOM VOLUME VOLUME WEIR WEIR WIER EL. REQUIRED PROPOSED LENGTH DEPTH LINING RISER BARREL SIZE SIZE RISER BASE SKIMMER SKIMMER BAFFLES ORIFICE SIZE SB#5A 61X122 46X96 3 7.0 4.0 7,020 SF 15,423 SF NA NA NA NA NA NA NA NA NA SB#5B 58X116 43X86 3 7.0 4.0 6,120 SF 13,659 SF NA NA NA NA NA NA NA NA NA SB#5C 65X130 50X100 3 7.0 4.0 7,920 SF 17,943 SF NA NA NA NA NA NA NA NA NA SB#5D 57X114 42X84 3 7.0 4.0 5,940 SF 13,095 SF NA NA NA NA NA NA NA NA NA SB#5E 67X134 52X104 3 7.0 4.0 8,460 SF 19,275 SF NA NA NA NA NA NA NA NA NA SB#5F 45X90 30X60 3 7.0 4.0 3,420 SF 7,263 SF NA NA NA NA NA NA NA NA NA SB#5G 81X162 66X132 3 7.0 4.0 12,780 SF 29,943 SF NA NA NA NA NA NA NA NA NA SB#5H 46X92 31X62 3 7.0 4.0 3,600 SF 7,683 SF NA NA NA NA NA NA NA NA NA SB#51 50X100 35X75 3 7.0 4.0 4,500 SF 9,483 SF NA NA NA NA NA NA NA NA NA SB - SEDIMENT BASIN STABILIZE AND SEED ALL SLOPES IMMEDIATELY SEE DETAIL CROSS-SECTION FOR ELEVATIONS 50' UNDISTURBED BUFFER (TYP HIGH POINT "° °0 EXTERIOR BOUNDARY TD 49 .. 4% TD 46�'. + TD 48 & 49 �i \ , HIGH POINT \� �I �. TD46&47 `� HIGH POINT `� / 3 30' UNDISTURBED BUFFER ((TYP) TD 48 '• I ALONG WETLANDS \\ TD 47 \\ %� z 30' UNDISTURBED BUFFER (TYP) DOUBLE ROW SILT FENCE (TYP) INSTALLATION 1. REMOVE ALL TREES, BRUSH SLOPE TOWARDS PIT I NETLANDBOUNDARY (TYP) I 3 BERM 3 4 4 WETLANDSI 2060TTOMWIDTH PIT I I I � NOTE 1. SEE PLAN SHEET FOR WIDTH HEIGHT DETERMINED BY SIDE SLOPES. 2. WIDTH INDICATED ON PLAN IS BOTTOM WIDTH. 3. SEED PER TEMPORARY/PERMANENT SEEDING SCHEDULE. 4. NATURAL VOLUNTEER VEGETATION SHALL REMAIN. 5. BERM ENDS SHALL BE 4:1 SLOPES LIKE SIDE SLOPES. 6. SLOPES SHALL BE TRACKED WITH A DOZER DURING CONSTRUCTION TO AID IN THE ESTABLISHMENT OF VEGETATIVE COVER. 7. ALL EXPOSED AREA SHALL BE STABILIZED BY ESTABLISHING PERENNIAL VEGETATIVE COVER. MAINTENANCE 1. INSPECT ALL PERIMETER BERMS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REPAIR ERODED SLOPES, RESTORE ERODED SLOPES TO THEIR ORIGINAL CONDITION AS SHOWN ON THIS DETAIL AND RE-ESTABLISH VEGETATION. INTERNAL WETLANDS BOUNDARY VEGETATIVE BUFFER/BERM CROSS-SECTION NTS EXISTING GROUND I SLOPE TOWARDS PIT I BERM 4 + a INSTALLATION _ a 1. REMOVE ALL TREES, BRUSH PST BOTTOM WIDTH 50, NOTE 1. SEE PLAN SHEET FOR WIDTH HEIGHT DETERMINED BY SIDE SLOPES. 2. WIDTH INDICATED ON PLAN IS BOTTOM WIDTH. 3. SEED PER TEMPORARY/PERMANENT SEEDING SCHEDULE. 4. NATURAL VOLUNTEER VEGETATION SHALL REMAIN. 5. BERM ENDS SHALL BE 4:1 SLOPES LIKE SIDE SLOPES. 6. SLOPES SHALL BE TRACKED WITH A DOZER DURING CONSTRUCTION TO AID IN THE ESTABLISHMENT OF VEGETATIVE COVER. 7. ALL EXPOSED AREA SHALL BE STABILIZED BY ESTABLISHING PERENNIAL VEGETATIVE COVER. MAINTENANCE 1. INSPECT ALL PERIMETER BERMS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REPAIR ERODED SLOPES, RESTORE ERODED SLOPES TO THEIR ORIGINAL CONDITION AS SHOWN ON THIS DETAIL AND RE-ESTABLISH VEGETATION. PERIMETER VEGETATIVE BERM (TYP) NTS DISTURBED AREAS TAILINGS/SEDIMENT PONDS 5.1 AC STOCKPILES 16.0 AC* (INSIDE MINE EXCAVATION) PROCESSING AREA/HAUL ROADS 12.1 AC MINE EXCAVATION 108.0 AC OTHER MISC EXCAVATION 7.0 AC (BERMS, DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC *AREAS BONDED AS HIGHER BOND AMOUNT INTERNAL DRAINAGE = 116.3 AC EXTERNAL DRAINAGE= 15.9 AC EROSION CONTROL LEGEND TOP OF BERM SKIMMER BASIN SKIMMER BAFFLES SPILLWAY ROCK CHECK DAMS - SILT FENCE SF TEMPORARY DIVERSION DITCH OUTLET PROTECTION J-HOOK W/ SILT FENCE OUTLET SILT FENCE OUTLET LEGEND PERMIT BOUNDARY EXISTING CONTOUR WETLAND BUFFER AFFECTED AREA CREEK BERM POND Z O 70 -I 2 200 0 100 200 400 HORIZONTAL SCALE: 1" = 200' RAFTING AND !DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ a Z J W W o o0c tj Q Q O �O ZH z 019 Q C� U)O tI�W JZ J 0_ IL O n _� W �O W0z z z :) � 3:O C� O W U Ow _ >Z W REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: 1 "=200' MTB Sheet: Designed by: MTB C5 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 ACCESS ROAD (TYPPIT) \ AKE ACREAGE=2.5 AC ALONG PIT EDGEACCESS FOR MA NTENOANCE \ \ \ STOABL E AND SEEDOF WATER EL=8' SLOPES PIT SEEDED AREA=0.3 AC GATE(TYP PIT ACCESS FOR MAINTENANCE ✓ \,4, '4/ �- z ASSUMED WATER LINE (TYP) �, ACCESS ROAD (TYP) , 'V 'J, APPRX. EL=8' TO REMAIN FOR PIT 6 ACCESS FOR MAINTENANCE 0 R STRAND BARBED WIRE FENCE (TYP) WARNING SIGNS ALONG FENCE 3:1 MAX SLOPE ABOVE WATER LINE ,f TO BE VEGETATED ACCESS ROAD (TYP / ALONG PIT EDGE FOR PIT 20" VEGETATIVE BERM (TYP) •. ACCESS FOR MAINTENANCE i 1 / \ \\ \ TO REMAIN \ ` I \ , ......... SILT FENCE (TYP) ............ . - � T BE REMOVED DURING MINING ACTIVITIES O O U G �� ,y \ \ :� t�ttt .. mo o" CP PIT #1 . n . \\ \ •. �" :`+' '` \8 TO BE REMOVEID DURING MINING ACTIVITIES V......................... > \ W W W I W W \\ �' W\ W \ \ mu xm IN � \ \ \ SEDIMENT BASIN (TYP TO BE REMOVED DURING MINING ACTIVITIES 0 �\ \ .... \ �l P I T #2 � \ 19.7 AC \ \ ROPERTY/PERMIT BOUNDARY (TYP) \ 640.0 AC +/- I TEMPORARY DIVERSION (TYP LAKE ACREAGE=19.0 AC ; TO BE REMOVED DURING MINING ACTIVITIES TOP OF WATER EL=8' (APPRX.) STABILIZE AND SEED ALL SLOPES PIT SEEDED AREA=0.7 AC ATE (TYP) 3:1 MAX SLOPE BELOW WATER LIN PIT ACCESS FOR MAINTENANCE TO 10 FT BELOW WATER LEVEL ACCESS ROAD (TYP) TO REMAIN FOR PIT 3:1 MAX SLOPE ABOVE WATER LIN CC SS O C TO BE VEGETATED A E FOR MAINTENAN E 20" VEGETATIVE BERM (TYP t, TO REMAIN \ J SILT FENCE (TYP \ TO BE REMOVED DURING MINING ACTIVITIES , .......... 4 STRAND BARBED WIRE FENCE (TYP WARNING SIGNS ALONG FENCE y� 1 ASSUMED WATER LINE (TYP APPRX. EL=8' 4 BERM 4 Hill III III 1=III=III=III=III=III=III=III=III=III=III=III- WATER LEVEL (APPROX.) o NOTES: =I1=1TI=11=11=11=11=11=11=1I� I� 1=11=11=1I- 1=11=1 1=1 1=1 1=1 1=1 1=1 1=1 1=1 1=1 1=1 1=1 3 II II II II Ilb�'��L/b�%���'EI II I11 II I1�1 NOTES: 11�I ElI El11ElII__ 1=III=III=111=111=111=111=111=111�11�I ElI El11=1 - 1. SITE TO BE RECLAMATED TO MEET ANY APPLICABLE LOCAL JURISDICTION REQUIREMENTS AND THE NCDEQ MINE -III-III-III-III-I I -I 1=1 I-ITI-I I -I I -I I -I I -I I-111-III-111-111-1Ti=1 i- a11El11El11El11El11=11= =III=111�11�11=III=111�11�11- j/ . 3:1 MAX SLOPE ABOVE WATER LINE PERMIT RECLAMATION BOND REQUIREMENTS. I=11j 2. AS PART OF THE NCDEQ MINE PERMIT THE OWNER IS REQUIRED TO BOND THE RECLAMATION OF THE TOTAL SEDIMENT BASIN (TYP 3:1 MAX SLOPE BELOW WATER LINE AT MIN 20' PROJECT BASED ON THE STATE MINING PROGRAM REQUIRED AMOUNTS. TO BE REMOVED DURING MINING ACTIVITIES nEPOS�IT/%///j/j/j /// HORT. AND 10' VERTICAL DISTANCE 3. TOPSOIL STOCKPILE MATERIAL SHALL BE USED TO PROVIDE FERTILE SOIL DURING RECLAMATION TO AID IN THE /j/�� j%/ j%/ %// ESTABLISHMENT OF PERMANENT GROUND COVER. UNUSED TOPSOIL MATERIAL IN THE STOCKPILE AREAS SHALL ALL DENUDED AREAS ABOVE WATER LINE TO BE REGRADED PER DETAIL TO PROVIDE STABLE SLOPES. ALL SLOPES SHALL BE PERMANENTLY STABILIZED AND BE VEGETATED PER SECTION 919 QUARRY OF ZONING ORDINANCE. SEEDED. i/W // % i%ii%!��// PIT SIDE WALL RECLAMATION (TYP) NTS PROPOSED MINING AREAS PIT #1 2.8 AC PIT #2 19.7 AC PIT #3 46.2 AC PIT #4 9.0 AC PIT #5 30.3 AC TOTAL MINE EXCAVATION 108.0 AC TAILINGS/SEDIMENT PONDS 5.1 AC PROCESSING AREA/HAUL ROADS 12.1 AC OTHER MISC. AREA 7.0 AC (BERMS, TEMP. DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC UNDISTURBED BUFFER 507.8 AC PERMIT AREA 640.0 AC DISTURBED AREAS TAILINGS/SEDIMENT PONDS 5.1 AC STOCKPILES 16.0 AC* (INSIDE MINE EXCAVATION) PROCESSING AREA/HAUL ROADS 12.1 AC MINE EXCAVATION 108.0 AC OTHER MISC EXCAVATION 7.0 AC (BERMS, DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC AREAS BONDED AS HIGHER BOND AMOUNT INTERNAL DRAINAGE = 116.3 AC EXTERNAL DRAINAGE= 15.9 AC EROSION CONTROL LEGEND TOP OF BERM SKIMMER BASIN SKIMMER BAFFLES SPILLWAY ROCK CHECK DAMS - SILT FENCE SF TEMPORARY DIVERSION DITCH OUTLET PROTECTION J-HOOK W/ SILT FENCE OUTLET SILT FENCE OUTLET LEGEND PERMIT BOUNDARY EXISTING CONTOUR WETLAND BUFFER AFFECTED AREA CREEK BERM POND O 2 200 0 100 200 400 HORIZONTAL SCALE: 1" = 200' RAFTING AND DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ Q Z J W W o� Q Q Q�IMEO0 19 ZH z O p� o oc Q C� to W Z O_ IL O n W p0 W � � z cc z Z' � ce R 3: O C� O W U O _ Z ma I- Q � REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: 1 "=200' MTB Sheet: Designed by: MTB C6 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 ATE (TYP) PIT ACCESS FOR MAINTENANCE ROPERTY/PERMIT BOUNDARY (TYP) 640.0 AC ACCESS ROAD (TYP) GATE (TYP) --ACCESS REMAIN FOR PIT PIT ACCESS FOR MAINTENANCE ACCESS FOR MAINTENANCE SEDIMENT BASIN (TYP) TO BE REMOVED DURING MINING ACTIVITIES ACCESS ROAD (TYP 9— -- TO REMAIN FOR PIT 10— 1` ACCESS FOR MAINTENANCE \ \ ------ - GATE (TYP) PIT ACCESS FOR MAINTENANCE -- - - -- / ... .. ... " PROPOSED MINING AREAS PIT #1 2.8 AC PIT #2 19.7 AC PIT #3 46.2 AC PIT #4 9.0 AC PIT #5 30.3 AC TOTAL MINE EXCAVATION 108.0 AC TAILINGS/SEDIMENT PONDS 5.1 AC PROCESSING AREA/HAUL ROADS 12.1 AC OTHER MISC. AREA 7.0 AC (BERMS, TEMP. DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC UNDISTURBED BUFFER 507.8 AC PERMIT AREA 640.0 AC DISTURBED AREAS TAILINGS/SEDIMENT PONDS 5.1 AC STOCKPILES 16.0 AC* (INSIDE MINE EXCAVATION) PROCESSING AREA/HAUL ROADS 12.1 AC MINE EXCAVATION 108.0 AC OTHER MISC EXCAVATION 7.0 AC (BERMS, DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC A, �, �, �, \ I I UY Ur WA I the tL—t3 (AFFKA.) A, A, ASSUMED WATER LINE (TYP ASSUMED WATER LINE(TYP)AREAS BONDED AS HIGHER BOND AMOUNT \ \ \ STABLIZE AND SEED ALL SLOPES APPRX. EL=8 I / \ \ APPRX. EL=8' \ \ PIT SEEDED AREA 1.6 AC / .................. \ \ ++ .. 1 4 STRAND BARBED WIRE FENCE (TYP \� r p: i �� INTERNAL DRAINAGE — 116.3 AC WARNING SIGNS ALONG FENCE - 4c PIT \ EXTERNAL DRAINAGE= 15 9 AC LAKE ACREAGE=8.4 AC �`� \ I `1 V \ ^� rr�� hh TOP OF WATER EL=8' (APPRX.) >'•. �F6. G r1C.- - .. _... \ —� 4 BERM 4 1 F __,R, .. ,\ , �1 AA LEGEND IL\\ \\ \� - 'x PERMIT BOUNDARY EXISTING CONTOUR WATER LEVEL (APPROX.) V 3 = 1 NOTES: �111=1 [�=1 1I- -II— 3:1 MAX SLOPE ABOVE WATER LINE 3:1 MAX SLOPE BELOW WATER LINE AT MIN 20' HORT. AND 10' VERTICAL DISTANCE ALL DENUDED AREAS ABOVE WATER LINE TO BE VEGETATED PER SECTION 919 QUARRY OF ZONING ORDINANCE. PIT SIDE WALL RECLAMATION (TYP) NTS NOTES: 1. SITE TO BE RECLAMATED TO MEET ANY APPLICABLE LOCAL JURISDICTION REQUIREMENTS AND THE NCDEQ MINE PERMIT RECLAMATION BOND REQUIREMENTS. 2. AS PART OF THE NCDEQ MINE PERMIT THE OWNER IS REQUIRED TO BOND THE RECLAMATION OF THE TOTAL PROJECT BASED ON THE STATE MINING PROGRAM REQUIRED AMOUNTS. 3. TOPSOIL STOCKPILE MATERIAL SHALL BE USED TO PROVIDE FERTILE SOIL DURING RECLAMATION TO AID IN THE ESTABLISHMENT OF PERMANENT GROUND COVER. UNUSED TOPSOIL MATERIAL IN THE STOCKPILE AREAS SHALL BE REGRADED PER DETAIL TO PROVIDE STABLE SLOPES. ALL SLOPES SHALL BE PERMANENTLY STABILIZED AND SEEDED. WETLAND BUFFER AFFECTED AREA CREEK BERM +++++++++ POND O 70 2 200 0 100 200 400 HORIZONTAL SCALE: 1" = 200' RAFTING AND DESIGN \ SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ Q Z J W 19 W o� Q Q p���� 7 Z O 019 C� to W o J Z O_ � IL O � 3: W �0 W v� z � - 0e Z z z Z 0� 3: o C� 0 W U O - z J - W > a Q � REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale- Drawn by- 1 "=200' MTB Sheet: Designed by: MTB C7 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 0 N V N N 45 CU 0 Y (TYP) ACCESS ROAD (TYP) TO REMAIN FOR PIT \ ACCESS FOR MAINTENANCE A/ A/ A/ JA/ A/ 3:1 MAX SLOPE ABOVE WATER LINE ATE (TYP) TO BE VEGETATED — Q V \4/ \J/ PIT ACCESS FOR MAINTENANCE' �� \4/ L�] `V \P-- 1 3:1 MAX SLOPE BELOW WATER LINE J TO 10 FT BELOW WATER LEVEL ASSUMED WATER LINE (TYP) H \� APPRX. EL=8' v \ \ \ \ \� \ !{ STRAND BARBED WIRE FENCE (TYP) \ �. WARNING SIGNS ALONG FENCE A/ \J/ \ \\ TEMPORARY DIVERSION (TYP) \ A/ \ TO BE REMOVED DURING MINING ACTIVITIES SEDIMENT BASIN (TYP) -� 20" VEGETATIVE BERM(TYP)TO BE REMOVED DURING MINING ACTIVITIES TO REMAIN \ %r l / . .. .� ..................... \ .I, SILT FENCE (TYP) TO E DURING MINING ACTIVITIES ..................... SILT FENCE (TYP ry �i PIT tt5 _ 00 TO BE REMOVED DURING MINING ACTIVITIES y kit \ LAKE ACREAGE=28.6 AC `� 30.3 AC_ ;. ` TOP OF WATER EL=8' (APPRX.) \ J \ / _ ,,. \ \ STABILIZE AND SEED ALL SLOPES ✓ \�% \ \ 1 \ ,= P IT SEEDED -AREA .1.....7;AC 8 8 \ \ 0, / . 7 `'•. \ `. . .... \ ..... .... ti ...... ...... .: . \\ . . \ \ \ \ aa` = \ fill .. ------- ------ �li .. .... _4 *. Ali Ali Ali Ali �. .,*`'®` . *. . � .::::� ..._...._... SEDIMENT BASIN (TYP) TO BE REMOVED DURING MINING ACTIVITIES 4 BERM 4 rill=rrrll1=ff-111=III-II=II-Ll=II-LI=II-LI=II-LI=II-LI=II-L1=T-IIef. WATER LEVEL (APPROX.) p _ 3 -III-III-III-III-III-III-I 1=1 I -III -I 1-1 1=1 1=1 1=1 1=1 - tITIWITW=mWIItb0 rE)`bVffFi 0kb'EW7-,,Wll 1 NOTES: lllllllll = i ll=111=111=111=-ll=ll-Ll I-LI I-LI I-LI 1-1I1 1 H 11=111=111=111=111- -III—III—III—III—I � 1=1 � I —III —III —III —III —III —III —I 11=1 � 1=1I 1=1 � 1=1 � 1=1 � I- iT-1T=-W-=W-- - - -J11 LI=LI=L1=111=111= - 3:1 MAX SLOPE ABOVE WATER LINE j 3:1 MAX SLOPE BELOW WATER LINE AT MIN 20' HORT. AND 10' VERTICAL DISTANCE jPOT j j jjj j jjj j jj j jjj jjj/ ALL DENUDED AREAS ABOVE WATER LINE TO BE VEGETATEDPER SECTION 919 QUARRY OF jj/jj/ / / jj/v�/ ZONING PIT SIDE WALL RECLAMATION (TYP) NTS ... / "'I/�6. \ A \ A/ r \1/ \�/l \1/\ A/ � A/ 4/ .� \ NOTES: 1. SITE TO BE RECLAMATED TO MEET ANY APPLICABLE LOCAL JURISDICTION REQUIREMENTS AND THE NCDEQ MINE PERMIT RECLAMATION BOND REQUIREMENTS. 2. AS PART OF THE NCDEQ MINE PERMIT THE OWNER IS REQUIRED TO BOND THE RECLAMATION OF THE TOTAL PROJECT BASED ON THE STATE MINING PROGRAM REQUIRED AMOUNTS. 3. TOPSOIL STOCKPILE MATERIAL SHALL BE USED TO PROVIDE FERTILE SOIL DURING RECLAMATION TO AID IN THE ESTABLISHMENT OF PERMANENT GROUND COVER. UNUSED TOPSOIL MATERIAL IN THE STOCKPILE AREAS SHALL BE REGRADED PER DETAIL TO PROVIDE STABLE SLOPES. ALL SLOPES SHALL BE PERMANENTLY STABILIZED AND SEEDED. PROPOSED MINING AREAS PIT #1 2.8 AC PIT #2 19.7 AC PIT #3 46.2 AC PIT #4 9.0 AC PIT #5 30.3 AC TOTAL MINE EXCAVATION 108.0 AC TAILINGS/SEDIMENT PONDS 5.1 AC PROCESSING AREA/HAUL ROADS 12.1 AC OTHER MISC. AREA 7.0 AC (BERMS, TEMP. DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC UNDISTURBED BUFFER 507.8 AC PERMIT AREA 640.0 AC DISTURBED AREAS TAILINGS/SEDIMENT PONDS 5.1 AC STOCKPILES 16.0 AC* (INSIDE MINE EXCAVATION) PROCESSING AREA/HAUL ROADS 12.1 AC MINE EXCAVATION 108.0 AC OTHER MISC EXCAVATION 7.0 AC (BERMS, DIVERSIONS, ETC.) TOTAL AFFECTED AREA 132.2 AC AREAS BONDED AS HIGHER BOND AMOUNT INTERNAL DRAINAGE = 116.3 AC EXTERNAL DRAINAGE= 15.9 AC EROSION CONTROL LEGEND TOP OF BERM SKIMMER BASIN SKIMMER BAFFLES SPILLWAY ROCK CHECK DAMS - SILT FENCE SF TEMPORARY DIVERSION DITCH OUTLET PROTECTION J-HOOK W/ SILT FENCE OUTLET SILT FENCE OUTLET LEGEND PERMIT BOUNDARY EXISTING CONTOUR WETLAND BUFFER AFFECTED AREA CREEK BERM POND O 2 200 0 100 200 400 HORIZONTAL SCALE: 1" = 200' RAFTING AND DESIGN \ SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ Q Z J W W o� O � � 00 ZH z C) OIt Q t� U) U) uW Z —.1O 0- �� IL O n _ � W ��W0z19 z � 3:p C� W O Om � >Z W Q Q REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: 1 "=200' MTB Sheet: Designed by: MTB C8 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 a ai c g Y U O m O lfj O N N O N Y w G O O U m g Y U O m O O N N O N N N O N a GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A Gs6 v-I O o5�(Tva) SaL BERM ry B E 0 0 oR sTAP E o T o o aErvM ry o ��TTErv�E AN-1EsnP, LO os'rvoEO A O0 0 SECTION B-B B ArvoOA�=srPl ,�. SECTION A -A oRSTAa�E ��ocnTiory of*ERMIrvED iry FiED rvoTirvG DEviCEIP to N(PCiIIAL LOCATION o[T[RMirveo iry FieLo [;]]VNo*iNODEVICE 118 x]a'QMIN.) -T 1TrvE=TR�c �R� e PA �r D��rvR� crvE MIrvIMrvM„�rv�rvE_-QUATE HOLD— E-Z. E A aE RV MARMEow�THs�GrvgpE rvoi�rvo DEv�cE LL N kEo wnry 9lGun,E § BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGOI GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event> 1.0 inch in properly, 24 hours 5. Description of maintenance needs forthe measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event> 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event> 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event> 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.411 EFFECTIVE: 04/01 / 19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d�)list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and . Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance . Within 24 hours, an oral or electronic notification. with the conditions • Within 7calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGOI SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01 / 19 RAFTING AND DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a Z J W W o� � J a a Z ZH LU 0 C 0 19 Z t�tAW JZ O IL O In _� C)�OWvz D ce Z Z D 0� I- C� 3:p 0 YJ V cn Z Om - >Z O U W o� REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C9 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 MAINTENANCE PLAN THE OPERATOR IS RESPONSIBLE FOR MAINTAINING EROSION CONTROL DEVICES THROUGHOUT THE PROJECT DURATION. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES AS DESIGNED. SKIMMER BASINS: 1. BASINS ARE TO BE CLEANED OF SEDIMENT WHEN ITS STORAGE CAPACITY IS REDUCED BY 50%. PLACE SEDIMENT REMOVED FROM THE BASIN IN A STOCKPILE AREA AS SHOWN ON THE PLAN OR AN AREA THAT HAS ADEQUATE EROSION CONTROL MEASURES. 2. CHECK BERM STRUCTURE, SPILLWAYS, AND SKIMMER PIPE EVERY WEEK FOR EROSION AND PIPING. 3. MAINTAIN BAFFLES AS DIRECTED BELOW. 4. ANY RIP RAP DISPLACED FROM SPILLWAY MUST BE REPLACED IMMEDIATELY. 5. AFTER ALL AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE BASIN (PHASE 2 OF CONSTRUCTION SEQUENCE) AND ALL UNSTABLE SEDIMENT. GRADE ACCORDING TO GRADING PLAN OR BLEND IN WITH ADJACENT GRADES - ADDITIONAL COMPACTION EFFORTS MAY BE REQUIRED IF STRUCTURE IS PROPOSED FOR THAT AREA. STABILIZE AREA. BAFFLES: 1. MAINTAIN ACCESS TO BAFFLES. SHOULD THE FABRIC COLLAPSE, DECOMPOSE, TEAR, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 2. REMOVE BUILDUP SEDIMENT WHEN IT REACHES ONE-HALF FULL. TAKE CARE NOT TO DISTURB BAFFLES DURING CLEANOUT. SILT FENCE: 1. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE FENCE SHALL BE REPAIRED AS REQUIRED TO MAINTAIN A SUFFICIENT BARRIER. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, DECOMPOSE, TEAR, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. AFTER ALL AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT. GRADE AREA TO GRADING PLAN OR BLEND WITH ADJACENT GRADES. STABILIZE AREA. TEMPORARY DIVERSIONS: 1. IMMEDIATELY REMOVE EXCESS SEDIMENT FROM FLOW AREA AND REPAIR DIVERSION RIDGE. 2. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. 3. AFTER ALL AREAS HAVE BEEN STABILIZED REMOVE THE RIDGE AND THE CHANNEL AND GRADE ACCORDING TO GRADING PLAN OR BLEND WITH ADJACENT GRADES. STABILIZE AREA. RIP RAP LINED DITCHES/CHANNELS/OUTLETS: 1. PAY CLOSE ATTENTION TO INLET AND OUTLET SECTIONS WHERE CONCENTRATED FLOW ENTERS. 2. INSPECT FOR INDICATIONS OF PIPING, SCOUR HOLES, OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. 3. MAINTAIN VEGETATION ADJACENT TO THE ROCK LINING IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR. GRASS LINED DITCH ES/C HANN ELS/SWALES: 1. DURING GRASS ESTABLISHMENT PERIOD, INSPECT AFTER EVERY RAINFALL. 2. AFTER GRASS HAS ESTABLISHED, INSPECT PERIODICALLY AND AFTER HEAVY RAINFALL. IMMEDIATELY MAKE REPAIRS. 3. PAY CLOSE ATTENTION TO INLET AND OUTLET SECTIONS WHERE CONCENTRATED FLOW ENTERS. 4. GRASS SHOULD BE MAINTAINED IN A HEALTHY VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION. TEMPORARY SEEDING SCHEDULE WINTER & EARLY SPRING Seeding mixture Species Rate (lb/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains —Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont —Jan. 1 - May 1 Coastal Plain —Dec. 1 -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. PERMANENT SEEDING SCHEDULE TEMPORARY SEEDING SCHEDULE FALL Seeding mixture Species Rate (lb/acre) Rye (grain) 120 Seeding dates Mountains —Aug. 15 - Dec. 15 Coastal Plain and Piedmont —Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. HERBACEOUS PLANTS -Seeding recommendations for primary stabilization Successful development depends on planting date (effectiveness goal: 6 mo. - 3 yrs. without an ongoing maintenance program) unu_wrwrnie Enerree Table 6.11.b - Optimal Planting Dates Common Name Botanical Name I Cultivar Dative I ntroduced Broadcast Seeding Rates lbslacre Fartirrzatord limestone Ibs/acre Mountains Piedmont coastal Plains Sun/Shade tolerant Wetlands RiparianqlnvasiveInstallation BuffersConsiderations / Maintenance Other information, commentarySericaa Lespedeze Lespedeze cuneate Dumonr 1 15lbs 8 soil test 911-6/1 9/1 - 511 1011 -4/1 Sun NR NR Responds wall to controlled - - -- Severe Threat -trurns Invasive species Crown Vetch Secu ' era varia I 151bs B soU fast 3/15-4/30 NR NR Sun NR NR Yes Highcocompetitive,Prefers neutral soNs - --- - - (Coronilla vada) -- -- ---- - - - - - -- -- _ -- -- -- not recommended unless - - --- - an acceptable all mative - -- - is not available.-- ------ ----- ------- ---- -- --- - -- - ---- ---- Centi e�de Grass __.._ Eremo_ chloa h urol - - 1 5 Ibs 10 Ibs. for road B� soil test shoulders NR_- Eastern only 9/1 - 5/1 _Sun_ N_R_ NR ,. -_ No Si nifirant maintenance -- may be required to obtain Dces not tolerate hl�h tratTc___ _ __ Acceptable for sodding --- --- ------ - - -- desired cover KY 31 Tall Fescue Schedonorus phoenl I 100 Ibs B soil test 8/15-5/1 9/1-4/15 9/30-3/151 Sun! NR NR Yes If utilized, it is imperative Acceptable for sodding Festuce arundinacea - --- mod. Shade that maintenance includes________-_,_______ -- - a containment an -- - - ---- KY Blue Orass ---- Poa ratensis -- - I 151bs---- ----- B sod test --- --- 8/15S/1 ---NR----- NR NR---- -- - Sun --- NR - --. NR --- - Yes -------- -- If utilized, it is imperative - - -- - --- - Prefers neutral soils, highly - - - - - __- that rrraintenance includes -- competitive, not recommended _ -- ---`- "- - - `-"" -- --- ---` -- -- -- ---- a containment Ian unless an acceptable alternative _---_-_ ---_- - -- - - - -- -- _--_-- -_-- _ -- - - - --__----- -----.-----_.__. is not available. _ Acceptable for soddin -- --- Hard Fescue --------- Festuce bmw ila - I 15lbs --- By sail teta 8/1 - 6/1 --- NR --- -- NR --- Shade -- - - NR ---- NR _ - No _ ___ Not recommended for - ------ --- Low rowing, bunch�rass __ Festuca to ifolia Slopes realer than 5% --------- Bermuda Gress — - C nodon dac n -- -' I -- 251be - --- B soil test - --- NR ---- 4/15-6/30 - -- 4/15.6/30 - - --- Sun - NR -- --- NR ---' Yes -- -- — ----- If it is imperative ------- e, not -- Extreme aggressive, sh not at main that maintenance Includes recommended and should be - — a containment an — avoided unless an ax table __ _— '---- - -"--` - -- --- `- - - - - -i- ---- --- alternative Is not available. May be sodded ors rp igged - TEMPORARY SEEDING PROVIDE TEMPORARY SEEDING TO ALL DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE WITHIN THE FOLLOWING SCHEDULE: PERMANENT DITCHES --> IMMEDIATELY (ROCK LINED) SLOPES 4:1 OR STEEPER --> 7 DAYS ALL OTHER AREAS --> 14 DAYS IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES. SEEDBED PREPARATION: LIME: APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE SOIL PH IS NOT KNOWN, APPLY AT A RATE OF 1 TO 1 %2 TONS PER ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS PER ACRE OF FINE -TEXTURED SOILS. APPLY LIME UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH PH HIGHER THAN 6 DO NOT NEED LIME. FERTILIZER: FERTILIZE ACCORDING TO SOIL TEST RECOMMENDATIONS. WHERE SOIL TESTS ARE NOT AVAILABLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. INCORPORATE FERTILIZER INTO THE TOP 4-6 INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. SURFACE ROUGHENING: IF AREAS TO BE SEEDED BECOME HARDENED, SEALED, OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING. PLANT SELECTION: SELECT THE APPROPRIATE SPECIES BASED ON THE PLANTING SEASON. SEEDING: APPLY SEED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RATES GIVEN IN TABLES. BROADCAST SEEDING AND HYDROSEEDING IS ACCEPTABLE ON STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN ONE INCH DEEP AND GRASSES AND LEGUMES ON MORE THAN %Z INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD NOT INCLUDE A WOOD FIBER MULCH. MULCHING: MULCHING IS REQUIRED FOR ALL TEMPORARY SEEDING AT A MIN RATE OF 2 TONS/ACRE WITH ASPHALT TACK. MAINTENANCE: CONTRACTOR TO MONITOR GRASS ESTABLISHMENT. PROMPTLY RESEEED AREAS WHERE A HEALTHY, DENSE GROWTH DOES NOT ESTABLISH. CONTRACTOR MAY NEED TO PROVIDE NETTING OR TEMPORARY LINERS TO AREAS WHERE GRASS CANNOT BE ESTABLISHED DUE TO EROSION. TEMPORARY SEEDING SCHEDULE SUMMER Seeding mixture Species German millet Rate (lb/acre) 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding dates Mountains —May 15 - Aug. 15 Piedmont —May 1 -Aug. 15 Coastal Plain —Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. TEMPORARY SEEDING SCHEDULE HERBACEOUS PLANTS -Seeding recommendations for primary stabilization Successfull development depends on planting date (effectiveness goal: 6 mo. -3 yrs. without an ongoing maintenance program) Table 6.11.c NATIVE SPECIES I®I® I®II® 0 PERMANENT SEEDING SEE SEEDING SCHEDULE FOR SEED TYPE AND RATE. PROVIDE PERMANENT SEEDING TO ALL DENUDED AREAS THAT WILL NOT BE COVERED BY PAVING, BUILDINGS, OR OTHER LANDSCAPING. AREAS RECEIVING PERMANENT VEGETATION MUST BE STABILIZED WITHIN THE FOLLOWING TIMEFRAMES AFTER FINAL GRADE IS REACHED, UNLESS TEMPORARY STABILIZATION IS APPLIED. PERMANENT DITCHES --> IMMEDIATELY (ROCK LINED) SLOPES 4:1 OR STEEPER --> 7 DAYS ALL OTHER AREAS --> 14 DAYS COMPLETE GRADING BEFORE PREPARING SEEDBEDS. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES. SEEDBED REQUIREMENTS: THE SOIL SHOULD MEET THE FOLLOWING MINIMUM CRITERIA FOR VEGETATION ESTABLISHMENT: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST 0.05 INCHES OF WATER TO 1 INCH OF SOIL • SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION. • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH OF ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. • A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0-6.5. • NO LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, AND TRASH. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDROSEEDED. IF THE ABOVE CRITERIA CANNOT BE MET, SPECIAL SOIL CONDITIONERS OR TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION: LIME: APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE SOIL PH IS NOT KNOWN, FOLLOW RATES ON THE SEEDING SPEC TABLE. FERTILIZER: FERTILIZE ACCORDING TO SOIL TEST RECOMMENDATIONS. WHERE SOIL TESTS ARE NOT AVAILABLE, FOLLOW RATES ON THE SEEDING SPEC TABLE. SURFACE ROUGHENING: IF AREAS TO BE SEEDED BECOME HARDENED, SEALED, OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING. PLANT SELECTION: SELECT THE APPROPRIATE SPECIES BASED ON THE PLANTING SEASON, SOIL TYPE, SLOPES, AND LAND USES. SEE SEEDING SPEC TABLES IN PLANS FOR RECOMMENDED PERMANENT SEEDING MIXTURE. SEEDING: USE CERTIFIED SEED (INSPECTED BY THE NORTH CAROLINA CROP IMPROVEMENT ASSOCIATION). APPLY SEED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. USE SEEDING RATES GIVEN IN TABLES. WHEN USING A DRILL OR CULTIPACKER SEEDER, SMALL GRAINS SHOULD BE PLANTED NO MORE THAN ONE INCH DEEP AND GRASSES AND LEGUMES ON MORE THAN %2 INCH. WHEN BROADCAST SEEDING, SUBDIVIDE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA AND APPLY THE REMAINING SEED IN THE SAME MANNER BUT AT RIGHT ANGLES TO THE FIRST PASS. COVER SEED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRM WITH A ROLLER OR CULTIPACKER. MULCH AREAS IMMEDIATELY AFTER SEEDING IN ACCORDANCE WITH RATES GIVEN IN TABLES. ANCHOR MULCH WITH NETTING OR LIQUID ASPHALT AT A RATE OF 0.10 GALLON PER SQUARE YARD (10 GAL / 1000 SQ FT). HYDROSEEDING: SURFACE ROUGHENING IS REQUIRED. FINE SEEDBED PREPARATION IS NOT NECESSARY. RATE OF WOOD FIBER APPLICATION SHOULD BE AT LEAST 4,000-6,000 LB/ACRE. APPLY LEGUME INOCULANTS AT FOUR TIMES THE RECOMMENDED RATE WHEN ADDING INOCULANT TO HYDROSEEDER SLURRY. APPLY LIME IN DRY FORM. APPLICATION STEP 1 -1/3 MULCH RATE, ALL SEEDING AND ALL INOCULANT SPREAD IN ONE DIRECTION STEP 2 - 2/3 MULCH RATE APPLIED IN OPPOSING DIRECTION MAINTENANCE: IF STAND IS INADEQUATE, RE-EVALUATE PLANT CHOICE AND QUANTITIES OF LIME AND FERTILIZER. REESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. NEW STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None ° High Quality Water (HQW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 flatter or 14 days 7 days for slopes greater than 50' in length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. STABILIZATION TIME TABLES NTS RAFTING AND DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a E Z J W W o0 U) J a a 0 0 ZH W 0 0 Z C� to W Z 0 O In _� U �OWvz ce Z C� at R p 0 W co Z Om _ >Z11114 0 U W o� REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale. Drawn by: NTS MTB Sheet: Designed by: MTB C 10 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3:1 MAX TOP EL= 7.0 3:1 MAX SLOPES SLOPES i l l i i l l I VOLUME REQUIRED 1800 CF/Q25 3:1 MAX SLOPE (TYP) 3:1 MAX SLOPE (TYP) - - I nnT M F=I 0 11 NOTES 1. BASIN TO BE INSTALLED WITHOUT OUTLETS. 2. BASIN IS TO BE EXCAVATED BELOW EXISTING GROUND. 3. INSTALL TEMPORARY DIVERSIONS TO BASIN. 3. BASINS ARE TO BE INSTALLED AND MARKET MATERIAL STOCKPILED. 4. OVERBURDEN TO BE USED TO CONSTRUCT BERMS ADJACENT TO BASIN. 5. INSTALL PERIMETER BERMS BELOW BASIN THROUGH LOW LYING AREAS TO PREVENT RUNOFF FROM LEAVING THE SITE. 6. WHEN BASINS OVERFILL THE WATER WILL POND INSIDE THE PERIMETER BERM AND INFILTRATE AND EVAPORATE. 7. PIT TO BE EXCAVATED FROM BASIN OUT. BASIN SIZE WILL INCREASE WITH EXCAVATION. 8. MATERIAL WILL BE EXCAVATED WET NO PIT DEWATERING. 9. BASIN HAVE BEEN DESIGNED WITH TWICE THE VOLUME CAPACITY THAN REQUIRED. 10. BASINS TO BE INSPECTED WEEKLY. 11. ALL SLOPES THAT ARE DENUDED MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS SHALL BE STABILIZED AND SEEDED. 12. ONCE SEDIMENT REACHES 1 FT DEPTH THE SEDIMENT SHALL BE REMOVED. SEDIMENT BASIN #1 NO OUTLET NTS 3:1 MAX TOP EL= 7.3:1 MAX SLOPES 0 SLOPES I VOLUME REQUIRED 1800 CF/Q25 3:1 MAX SLOPE (TYP) 3:1 MAX SLOPE (TYP) - I 66 M EL-4 0 ill III III III ��� 3:1 MAX TOP EL= 7.0 3:1 MAX SLOPES SLOPES I I VOLUME REQUIRED 1800 CF/Q25 = 3:1 MAX SLOPE (TYP) 3:1 MAX SLOPE (TYP) I M EL_"10 III III III III i� NOTES 1. BASIN TO BE INSTALLED WITHOUT OUTLETS. 2. BASIN IS TO BE EXCAVATED BELOW EXISTING GROUND. 3. INSTALL TEMPORARY DIVERSIONS TO BASIN. 3. BASINS ARE TO BE INSTALLED AND MARKET MATERIAL STOCKPILED. 4. OVERBURDEN TO BE USED TO CONSTRUCT BERMS ADJACENT TO BASIN. 5. INSTALL PERIMETER BERMS BELOW BASIN THROUGH LOW LYING AREAS TO PREVENT RUNOFF FROM LEAVING THE SITE. 6. WHEN BASINS OVERFILL THE WATER WILL POND INSIDE THE PERIMETER BERM AND INFILTRATE AND EVAPORATE. 7. PIT TO BE EXCAVATED FROM BASIN OUT. BASIN SIZE WILL INCREASE WITH EXCAVATION. 8. MATERIAL WILL BE EXCAVATED WET NO PIT DEWATERING. 9. BASIN HAVE BEEN DESIGNED WITH TWICE THE VOLUME CAPACITY THAN REQUIRED. 10. BASINS TO BE INSPECTED WEEKLY. 11. ALL SLOPES THAT ARE DENUDED MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS SHALL BE STABILIZED AND SEEDED. 12. ONCE SEDIMENT REACHES 1 FT DEPTH THE SEDIMENT SHALL BE REMOVED. SEDIMENT BASIN #4A-C NO OUTLET NTS NOTES 1. BASIN TO BE INSTALLED WITHOUT OUTLETS. 2. BASIN IS TO BE EXCAVATED BELOW EXISTING GROUND. 3. INSTALL TEMPORARY DIVERSIONS TO BASIN. 3. BASINS ARE TO BE INSTALLED AND MARKET MATERIAL STOCKPILED. 4. OVERBURDEN TO BE USED TO CONSTRUCT BERMS ADJACENT TO BASIN. 5. INSTALL PERIMETER BERMS BELOW BASIN THROUGH LOW LYING AREAS TO PREVENT RUNOFF FROM LEAVING THE SITE. 6. WHEN BASINS OVERFILL THE WATER WILL POND INSIDE THE PERIMETER BERM AND INFILTRATE AND EVAPORATE. 7. PIT TO BE EXCAVATED FROM BASIN OUT. BASIN SIZE WILL INCREASE WITH EXCAVATION. 8. MATERIAL WILL BE EXCAVATED WET NO PIT DEWATERING. 9. BASIN HAVE BEEN DESIGNED WITH TWICE THE VOLUME CAPACITY THAN REQUIRED. 10. BASINS TO BE INSPECTED WEEKLY. 11. ALL SLOPES THAT ARE DENUDED MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS SHALL BE STABILIZED AND SEEDED. 12. ONCE SEDIMENT REACHES 1 FT DEPTH THE SEDIMENT SHALL BE REMOVED. SEDIMENT BASIN #2A-C NO OUTLET NTS 3:1 MAX SLOPES TOP EL= 7.0 II VOLUME REQUIRED - 1800 CF/Q25 - I 3:1 MAX SLOPE (TYP) 3:1 MAX SLOPE (TYP) - - I Rf1T EL=-4 0 -III III III III ��� NOTES 1. BASIN TO BE INSTALLED WITHOUT OUTLETS. 2. BASIN IS TO BE EXCAVATED BELOW EXISTING GROUND. 3. INSTALL TEMPORARY DIVERSIONS TO BASIN. 3. BASINS ARE TO BE INSTALLED AND MARKET MATERIAL STOCKPILED. 4. OVERBURDEN TO BE USED TO CONSTRUCT BERMS ADJACENT TO BASIN. 5. INSTALL PERIMETER BERMS BELOW BASIN THROUGH LOW LYING AREAS TO PREVENT RUNOFF FROM LEAVING THE SITE. 6. WHEN BASINS OVERFILL THE WATER WILL POND INSIDE THE PERIMETER BERM AND INFILTRATE AND EVAPORATE. 7. PIT TO BE EXCAVATED FROM BASIN OUT. BASIN SIZE WILL INCREASE WITH EXCAVATION. 8. MATERIAL WILL BE EXCAVATED WET NO PIT DEWATERING. 9. BASIN HAVE BEEN DESIGNED WITH TWICE THE VOLUME CAPACITY THAN REQUIRED. 10. BASINS TO BE INSPECTED WEEKLY. 11. ALL SLOPES THAT ARE DENUDED MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS SHALL BE STABILIZED AND SEEDED. 12. ONCE SEDIMENT REACHES 1 FT DEPTH THE SEDIMENT SHALL BE REMOVED. SEDIMENT BASIN #5A-1 NO OUTLET NTS 3:1 MAX SLOPES 3:1 MAX TOP EL= 7.0 3:1 MAX SLOPES SLOPES I VOLUME REQUIRED 1800 CF/Q25 I 3:1 MAX SLOPE (TYP) 3:1 MAX SLOPE (TYP) - - I RnT M EL--4 0 ill III III III ��� NOTES 1. BASIN TO BE INSTALLED WITHOUT OUTLETS. 2. BASIN IS TO BE EXCAVATED BELOW EXISTING GROUND. 3. INSTALL TEMPORARY DIVERSIONS TO BASIN. 3. BASINS ARE TO BE INSTALLED AND MARKET MATERIAL STOCKPILED. 4. OVERBURDEN TO BE USED TO CONSTRUCT BERMS ADJACENT TO BASIN. 5. INSTALL PERIMETER BERMS BELOW BASIN THROUGH LOW LYING AREAS TO PREVENT RUNOFF FROM LEAVING THE SITE. 6. WHEN BASINS OVERFILL THE WATER WILL POND INSIDE THE PERIMETER BERM AND INFILTRATE AND EVAPORATE. 7. PIT TO BE EXCAVATED FROM BASIN OUT. BASIN SIZE WILL INCREASE WITH EXCAVATION. 8. MATERIAL WILL BE EXCAVATED WET NO PIT DEWATERING. 9. BASIN HAVE BEEN DESIGNED WITH TWICE THE VOLUME CAPACITY THAN REQUIRED. 10. BASINS TO BE INSPECTED WEEKLY. 11. ALL SLOPES THAT ARE DENUDED MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS SHALL BE STABILIZED AND SEEDED. 12. ONCE SEDIMENT REACHES 1 FT DEPTH THE SEDIMENT SHALL BE REMOVED. SEDIMENT BASIN #3A-H NO OUTLET NTS RAFTING AND DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ a Z J W 19 W o� � J a a LLJ 0 Z t�tAW JZ O IL O n _� U �OWvz � �ZZ� 0� � C� 3:p 0 YJ V cn z 0 - m 5Z O U mi P W o� REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 11 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 TYPICAL FENCE SPACING STAPLE WIRE TWIST- 1" MIN FENCE STAPLE WARNING SIGN WIRE CLIPS e STAPLE WIRE 1" MIN FENCE STAPLE 0 V MAX WIRE SPACING e e U METAL "T" POST e e 0 4.5' MIN HEIGHT e ABOVE GROUND n 0 e e 1.5' MIN DEPTH BELOW GROUND DISCHARGE LINE FROM PUMP 1.5' MIN DEPTH BELOW GROUND STONE BEL .. . . INSTALLATION & MAINTENANCE 1. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. 2. PROVIDE STABILIZED OUTLET TO STREAM BANK. 3. WOOD PALLETS MAY BE USED IN LIEU OF STONE AND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE SPECIAL STILLING BASIN ABOVE NATURAL GROUND. 4. THE SIZE AND NUMBER OF SILT BAGS SHOULD BE BASED ON THE DEWATERING PUMP AND MANUFACTURER RECOMMENDATIONS. S. TIGHTLY SECURE THE PUMP DISCHARGE TO THE SILT BAG SLEEVE WITH A STRAP OR SIMILAR DEVICE TO PREVENT WATERISEDIMENT FROM LEAKING WITHOUT TREATMENT_ & CONTROL PUMPING RATE TO PREVENT EXCESSIVE PRESSURE WITHIN THE SILT BAG IN ACCORDANCE WITH THE MANUFACTURER RECOMMENDATIONS. AS THE BAG FILLS WITHIN SEDIMENT, REDUCE THE PUMP RATE. 7. REPLACE THE SILT BAG WHEN ONE HALF (112) FULL OF SEDIMENT. a. SILT BAG DEVICE MUST BE L I FROM THE TOP OF THE STREAM BANK AND WATER MUST BE DISCHARGED IN A DIFFUSE MANNER. CORNER BRACING 4.5' MIN HEIGHT ABOVE GROUND STAPLE WIRE TWIST 1" MIN FENCE STAPLE SEDIMENT FILTER BAG (BAG SIZE BASED ON MANUFACTURER'S RECOMMENDATIONS) LAY ON 6-12" THICK BED OF 2"-3" DIA. STONE SEDIMENT FILTER BAG NTS VARIES LINESF SILT FENCE wa (TP. A. OR C) of P T FABRIC w 10 'TYP. TOE OF SLOPE a -------- -------------- '-------------------'----- -------------------- ------2------------_- FLOW FLOW (SLOPE PLAN SINGLE ROW SILT FENCE S LINEFENCEVARIESTOASLT . R wa C) 0 J POST FABRIC ' 10TYP. w_ TOE OF SLOPE ---- --- __ FLOW �� FLOW ���� FLOW �� SLOPE CORNER BRACING CORNER BRACE 6' x 4" MIN TREATED POST CORNER POST �15.5 GA BARBED WIRE TYPICAL J HOOK SPACING SLOPE PERCENT TYPE OF SILT FENCE MINIMUM SPACING (METERS) 1% TO 2% TYPE A 30 . 2% TO 3% TYPE A IS ± 3% TO 4% TYPE C 15 ± 4% TO 5% TYPE C 7.5 ± NOTE I. IF THE GRADE IS BETWEEN 0 TO I PERCENT, THE SILT FENCE SHALL BE PLACED ACROSS THE DITCH. 2.TEMPORARY SILT FENCE SHALL NOT BE PLACED WITHIN STATE WATERS. GROUND (TYP) 15.5 GA BARBED WIRE U METAL "T" POST x 4" MIN TREATED POST -NAIL BRACE TO POST USE 30 PENNY NAIL MIN (4) -NOTCH POST 1" MIN FOR CORNER BRACE 5.5 GA BARBED/ 12.5 GA HIGH TENSILE WIRE TWIST x 1" x 1" WOOD STICK INSTALLATION: POST TO BE DRIVEN OR BORED AND TAM NOTE: USE ONE SECTION OF CORNER BRACING AT GATES AND FENCE ENDS 4 STRAND BARBED WIRE FENCE NTS EXISTING GRADE PLAN DOUBLE ROW SILT FENCE Installation: Refer to the approved erosion control plan for location, extent, and specifications. If silt fence is not installed correctly the first time, it will have to be reconstructed. Determine the exact location of the outlet before completing installation of the silt fence, taking into consideration: 1. Installation at the lowest points) in the fence where water will pond. 2. Maximum allowable drainage area restriction for silt fence. 3. Installation where the outlet is accessible for installation, maintenance and removal. 4. Placement of the outlet so that water flowing through it will not create an erosion hazard below - avoid steep slopes below the outlet and areas without protective vegetation. Use slope drains if necessary. The silt fence outlet shall be installed in accordance with the standard detail, and the approved erosion control plan. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. SILT FENCE J-HOOK NTS -SEE PLAN MIN. STONE DEPTH SEE NOTE B. NOTES: FILTER FABRIC PUBLIC RIGHT OF WAY A) MINIMUM WIDTH OF CONSTRUCTION ENTRANCE PAD SHALL BE 20 FT B) STONE SHALL BE 2-3" WASHED STONE, 12" THICK. C) THE ENTRANCE SHALL BE MAINTAINED TO PREVENT TRACKING OR FLOW- ING OF SEDIMENT ONTO PUBLIC RIGHTS -OF -WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. D) INSTALL PADS WHERE SHOWN ON PLANS OR OTHERWISE DIRECTED BY ENGINEER. CONSTRUCTION ENTRANCE PAD NTS �• .1111 i ill• ;�.ti00, `S11 �• 9� Construction 1. Place stone to the lines and dimensions shown in the plan on a filter fabric foundation. Specifications 2. Keep the center stone section at least 9 inches below natural ground level where the dam abuts the channel banks. 3. Extend stone at least 1.5 feet beyond the ditch bank (Figure 6.83b) to keep water from cutting around the ends of the check dam. 4. Set spacing between dams to assure that the elevation at the top of the lower darn is the same as the toe elevation of the upper dam. 5. Protect the channel after the lowest check dam from heavy flow that could cause erosion. 6. Make sure that the channel reach above the most upstream dam is stable. 7. Ensure that other areas of the channel, such as culvert entrances below the check dams, are not subiect to damage or blockal from displaced stones. Maintenance Inspect check dams andchannels at least weekly and after each sigtiifieaut (1/2 inch or greater) rainfall event and repair immediately. Clean out sediment, straw, limbs, or other debris that could clog the channel when needed. Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. Correct all damage immediately. If significant erosion occurs between dams, additional measures can be taken such as, installing a protective riprap liner in that portion of the channel (Practice 6.31, Ripraprline and Paved Channels). Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation, allow the channel to drain through the stone check dam, and prevent large flows from carrying sediment over the dam. Add stones to dams as needed to maintain design height and cross section. CHECK DAM NITS 2 BRACE IN TREATED POST FILTER OF 1 INCH DIAMETER # 57 WASHED STONE R POST NOTE: SILT FENCE FABRIC TO OVERLAP HARDWARE CLOTH BY 12 INCHES STEEL FENCE POST WIRE FENCE HARDWARE CLOTH FILTER OF 1 INCH DIAMETER # 57 WASHED STONE FLOW DIRECTION o 1 " 18" GRADE -III. I -I I I-11 ` "-I p L=11 -III W III_ III IF 6" II SIDE VIEW II II U SILT FENCE FABRIC Installation: Refer to the approved erosion control plan for location, extent, and specifications. If silt fence is not installed correctly the first time, it will have to be reconstructed. Determine the exact location of the outlet before completing installation of the silt fence, taking into consideration: l . Installation at the lowest point(s) in the fence where water will pond. 2. Maximum allowable drainage area restriction for silt fence. 3. Installation where the outlet is accessible for installation, maintenance and removal. 4. Placement of the outlet so that water flowing through it will not create an erosion hazard below - avoid steep slopes below the outlet and areas without protective vegetation. Use slope drains if necessary. The silt fence outlet shall be installed in accordance with the standard detail, and the approved erosion control plan. S�OQ� #57 STONE 0P� GO�pvNO 2.0% MIN SLOPE S\s�\N f OVN� S\-Ove 4.0% MAX SLOPE „ GR x/`s>> F TEMPORARY INTERNAL SITE ROAD NTS r ���p, orb- °O°o oqC�� o°O ° ° °Oo �o� Sc 0&,o 0000 ° 0 5�0° o° o°�i. O, (:� o° ° 0 TIPw °og0°oo o �°ov5 o °So° o TI000 p°C7'O o o ° o r ° o po0 0°8° oo ° O 0° °o �° o r ° ° , ° '00 �o 00 00 °° qq oa c 0 ° O Jo 0 0 0000 0 00 0 0 �o°O °Oo°n° °C���1°Oono°.,o OC • • • E!i!i!iE 00•�•�•�O�•4�•�OOOOi�O�•�•�•�•�•�•�000•�•�•�•�•�•�•�•�000•�•�O�•�•�•�•�•�000��•�p'•�•�•�•�•�•�00•�•�•�•�•�•�09,Orli!•!�!�!i!"!i!i!i!a3i 1■■■■■■ elo�!1!i!w �00000•� • .....•���•0�.......p0�•0�.......pO�.O�.......�p p�.......00�•�•0���� INN*rOCe►�!��74�SC2�!! NOON[ .o.•!i�..::::::::::::::.:::::::::.,..,..:::::::::::::.........::::::::::::::.........::::::.•♦►..��:i�i�i�i�i�i�i�0i�i�i':'I� �....•.•.o...wn■■■■1 1 • OIM NONE i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�iO�i�i�i�i�i�i�i%%%%p%%%%%% !' •■■■■■, 1 Oi�i�i�i�i�ii�i�i�i�i�i�i!Oi�i�i�♦�•�i�ii�i�i�i�i�i�ii�i�i�ii�i�i�i�i�i�ii%% C►�%%%%%%%%%%%%%il NONE N■■■■II �i�0i'i'i'i�i�i�i�i�i�i�4i�i►i'i� �i�i�i�i�i'i'i'i�i�i�i�i�i�i'ii�i'i'i�i�i�i�i�i e�i�i�i�i�i�i�i�i�i�i�0i�i�i�i''•':�_ :.• NONE■I ,%ii; :i��„ OO��i�000000000�•►00 �OOOOOi�0000000000i�0000000i•.A�►�000OOOOOOOi�00�' J 4 .�� �� ��:� D4� NONE■ ''' ' �" �i�i�00i�i�i�i�i�i�i�i�i i�00 �i�i�i�i�00i�i�i�i�i�i�i�i�i�00i�i�i�i�i�i�i�i�i'�i �i�i�i�i�i�i�i�i�00i�i�i�ii!'!!i!i!i!►!i!!i!!i• ■■■■I Ri�i�i�i�i�i�i�iO�i .1.!%II 1o'e-o i-� i� 1�.1. JI �����b �1�F, 1 i e 1 ,'e.hNIIIhEIII: �Oi�i�i�i�i�i�i�i�i�i�i ��� i����������������������O���i�i�i�i�0i�i�i�iO�i�<I/ � il.l 0�. c 15 t��5 �� �?� � �� �c i t i q -j;a � r.-' - III■III■I .<.<•<•<•<•<•<.<.<.<.<.<•<f�•�.<•<.<.<.<.<.<.<•<•<•<•<.<.<.<.<.<.<.<.<•<•<•<.<.<.<<<�I/_.�.11„�<.IIF . CIF � vIG .�+ru� a1,�i �a1.C...l. 0.�..I:C:�.1'.9�1 ICIIIEIII G .l�lOi'O�100�1�100�1�'OJ�l�l�l00�1�1000000�1�1�1���aa�pp0�.�•'';: •I `!::J_�!� �! ���i �-���-�_Ee1-� CE;:?!��?ii!� �' i'S �!3'i. I IIIEd111E. I _ n • I .- 011ie I II - n 1 : 1 4 1 .. - ". 1 1 .... SILT FENCE OUTLET NTS SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD Instead of excavating a trench, placing fabric and then backfilling trench, sediment fence may be installed using specially designed equipment that inserts the fabric into a cut sliced in the ground with a disc (Figure 6.62b). Installation 1. The base of both end posts should be at least one foot higher than the Specifications middle of the fence. Check with a level if necessary. 2. Install posts 4 feet apart in critical areas and 6 feet apart on standard applications. 3. Install posts 2 feet deep on the downstream side of the silt fence, and as close as possible to the fabric, enabling posts to support the fabric from MIN. 10 GA. LINE WIRES upstream water pressure. 4. Install posts with the nipples facing away from the silt fabric. S. Attach the fabric to each post with three ties, all spaced within the top 8 inches of the fabric. Attach each tie diagonally 45 degrees through the fabric, with each puncture at least 1 inch vertically apart. Also, each tie should be positioned to hang on a post nipple when tightened to prevent sagging. 6. Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties. 7. No more than 24 inches of a 36 inch fabric is allowed above ground level. 8. The installation should be checked and corrected for any deviations before compaction. 9. Compaction is vitally important for effective results. Compact the soil immediately next to the silt fence fabric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first, and then each side twice for a total of 4 trips. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. 8' MAX. 2-1/2 GA. MEDIATE GRADE I- III I I 1= -II 11= III IIII IIII III IIII IIII IIII III IIII III�1=1�111 llll�l Ilil FRONT VIEW NOTE: DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW -USE SILT FENCE ONLY WHEN DRAINAGE AREA -END OF SILT FENCE NEEDS TO BE TURNED UPHILL. o 'v N co SILT FENCE NTS q SECTION VIEW N - - STEEL POST �- WOVEN WIRE FABRIC SILT FENCE GEOTEXTILE FABRIC = UPSLOPi 0 z_ FOR REPAIR OF SILT 2 FENCE FAILURES, USE N No. 57 WASHED STONE. M..... - FOR ANCHOR WHEN SILT BACKFILL TRENCH FENCE IS PROTECTING OVER SILT FENCE CATCH BASIN. RAFTING AND DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z_ a Z_ J W W o� W J a a 1 Z I- W 0 O p� Z C� to W Z 0 IL O n _� U �OW0Z � Z Z C� 0 0 W v! Z �m _ >Z 0 U ■■� P W II% REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 1 2 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 Construction 1. Clear the foundation area of trees, stumps, roots, loose rock, and other objectionable material. Specifications 2. Excavate the cross section to the lines and grades of the foundation of the liner as shown on the plans. Bring over -excavated areas to grade by increasing the thickness of the liner or by back -filling with moist soil compacted to the density of the surrounding material. 3. Concrete linings: • Place concrete linings to the thickness shown on the plans attd finish them in a workmanlike manner. • Take adequate precautions to protect freshly placed concrete from extreme temperatures to ensure proper curing. • Ensure that subgrade is moist when concrete is poured. • Install foundation drains or weep holes where needed to protect against uplift and piping. • Provide transverse (contraction)joints to control cracking at approximately 20-feet intervals. These joints may be formed by using a 1/2-inch thick removable template or by sawing to a depth of at least 1 inch. • Install expansion joints at intervals not to exceed 100 feet. 4. Rock riprap linings: Practice 6.15, Riprap. 5. Place filters, beddings, acid foundation drains to line and grade in the manner specified. Place filter and bedding materials immediately after slope preparation. For synthetic filter fabrics, overlap the downstream edge by at least 12 inches with the upstream edge which is buried a minimum 12 inches in a trench. See figure 6.14a, page 6.14.6. Space anchor pins every 3 feet along the overlap. Spread granular materials in a uniform layer. When more than one gradation is required, spread the layers so there is minimal mixing. Filter material should consist of at least 3 inches of material on all sides of the drain pipe. The drain pipe conduit should be a minimum of 4 inches in diameter. Acceptable materials include perforated, continuous, closed joint conduits of clay, concrete, metal, plastic, or other suitable material (Practice 6.81, Subsurface Drain). 6. Perform all channel construction to keep erosion and water pollution to a minimum. Immediately upon completion of the channel, vegetate all disturbed areas or otherwise protect them against soil erosion. Where channel construction will take longer than 30 days, stabilize channels by reaches. Maintenance Inspect channels at regular intervals as well as after major rains, and make repairs promptly. Give special attention to the outlet and inlet sections and other points where concentrated flow enters. Carefully check stability at road crossings, and look for indications of piping, scour holes, or bank failures. Make repairs immediately. Maintain all vegetation adjacent to the channel in a healthy, vigorous condition to protect the area from erosion and scour during out -of -bank flow. w 2/3 W IIIII-IIIII-1 d ts° = II111-11111110llll_Ilill, , 4„to12„ FILTER FABRIC OR GRAVEL BEDDING PARABOLIC -SHAPED WATERWAY WITH STONE CENTER DRAIN (SHAPED BY BULLDOZER) W IIn1=11111=11111---Zlliia d IIll=1 - II- �OII Ilii - a" to 12" 18" l_ FILTER FABRIC OR -1�11 Ill GRAVEL BEDDING V-SHAPED WATERWAY WITH STONE CENTER DRAIN (SHAPED BY MOTOR GRADER) RIP RAP LINED TEMPORARY/PERMANENT DIVERSION DITCH NTS Figure 6.17e Channel Installation and Slope Installation; Washington State Ecology Department Longitudinal anchor trench Stake at T-5' - - intervals ry Initial channel anchor trench 00 .4 `slot at 25' intervals NOTE: 1. Check slots to be constructed per manufacturers specifications. 2. Staking or stapling layout per manufacturers specifications. Slope surface shall be smooth before placement for proper soil contact. Stapling pattern as Min. 2" per manufacturers recommendations. Do not stretch blankets/matting tight -allow the rolls to conform to any irregularities. For slopes less than 3H:1V, rolls may be placed in horizontal strips. a •AAVI•AI IKA ci npGc SEE PLAN .. COMPACTED SOILS Construction 1. Remove all trees, brush, stumps, and other objectionable material from the foundation area, and dispose of properly. Specifications 2. Excavate the channel, and shape it to neat lines and dimensions shown on the plans plus a 0.2-foot overcut around the channel perimeter to allow for bulking during seedbed preparations and sod buildup. 3. Remove and properly dispose of all excess soil so that surface water may enter the channel freely. 4. The procedure used to establish grass in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period (Appendix 8.05). Maintenance Duringthe establishment period, check grass -lined channels afterevery rainfall. After grass is established, periodically check the channel; check it after every heavy rainfall event. Immediately make repairs. It is particularly important to check the channel outlet and all road crossings for bank stability and evidence of piping or scour holes. Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the grass in a healthy, vigorous condition at all times, since it is the primary erosion protection for the channel (Practice 6.11, Permanent Seeding). GRASS LINED TEMPORARY/PERMANENT DIVERSION DITCH NTS Figure 6.17d Temporary Channel Liners; Washington State Department of Ecology Overlap 6" min. Terminal slope and channel anchor trench 44 Overcut channel 2" to allow'"i-n! g "'.' during seedbed preparation Intermittent check slot If there is a berm at the top of slope, anchor upslope of the berm. Anchor in 6"x6" min. Trench and staple at 12" intervals. Min. 6" overlap. i Staple overlaps " max. 5" spacing. Bring material down to a level area, turn the end under 4" and staple at 12" intervals. Lime, fertilize, and seed before installation. Planting of shrubs, trees, etc. should occur after installation. Intermittent check slot Shingle -lap spliced ends or begin new roll in an intermittent check slot Prepan Install) tempt Excavate channel to design grade and cross-section 1 b Design depth , Typical installation with erosion control blankets or turf reinforcement mats Longitudinal anchor trench Longitudinal anchor trench NOTES: 1. Design velocities exceeding 2 ft/sec require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes established. 2. Grass -lined channels with design velocities exceeding 6 ft/sec should include turf reinforcement mats TEMPORARY LINING FOR TEMPORARY/PERMANENT DIVERSION DITCH NTS Construction Construction Specifications Even if properly designed, if not properly installed, RECP's will probably not function asdesired. Proper installation is imperative. Even if properly installed, if not properly timed and nourished, vegetation will probably not grow as desired. Proper seed/vegetation selection is also imperative. Grade the surface of installation areas so that the ground is smooth and loose. When seeding prior to installation, follow the steps for seed bed preparation, soil amendments, and seeding in Surface Stabilization, 6.1. All gullies, rills, and any other disturbed areas must be fine graded prior to installation. Spread seed before RECP installation. (Important: Remove all large rocks, dirt clods, stumps, roots, grass clumps, trash, and other obstructions from the soil surface to allow for direct contact between the soil surface and the RECP.) Terminal anchor trenches are required at RECP ends and intermittent trenches must be constructed across channels at 25-foot intervals. Terminal author trenches should be a minimum of 12 inches in depth and 6 inches in width, while intermittent trenches need be only 6 inches deep and 6 inches wide. Installation for Slopes- Place the RECP 2-3 feet over the top of the slope and into an excavated end trench measuring approximately 121 inches deep by 6 inches wide. Pin the RECP at 1 foot intervals along the bottom of the trench, backfill, and compact. Unroll the RECP down (or along) the slope maintaining direct contact between the soil and the RECP. Overlap adjacent rolls a minimum of 3 inches. Pin the RECP to the ground using staples or pins in a 3 foot center -to -center pattern. Less frequent stapling/pinning is acceptable on moderate slopes. Installation in Channels- Excavate terminal trenches (12 inches deep and 6 inches wide) across the channel at the upper and lower end of the lined channel sections. At 25-foot intervals along the channel, anchor the RECP across the channel either in 6 inch by 6 inch trenches or by installing two closely spaced rows of anchors. Excavate longitudinal trenches 6 inches deep and wide along channel edges (above water line) in which to bury the outside RECP edges. Place the first RECP at the downstream end of the channel. Place the end of the first RECP in the terminal trench and pin it at 1 foot intervals along the bottom of the trench. Note: The RECP should be placed upside down in the trench with the roll on the downstream side of the bench. Once pinned and backfilled, the RECP is deployed by wrapping over the top of the trench and unrolling upstream. If the channel is wider than the provided rolls, place ends of adjacent rolls in the terminal trench, overlapping the adjacent rolls a minimum of 3 inches. Pin at 1 foot intervals, backfill, and compact. Unroll the RECP in the upstream direction until reaching the first intermittent trench. Fold the RECP back over itself, positioning the roll on the downstream side of the trench, and allowing the mat to conform to the trench. Then pin the RECP (two layers) to the bottom of the trench, backfill, and compact. Continue up the channel (wrapping over the top of the intermittent trench) repeating this step at other intermittent trenches, until reaching the upper terminal trench. At the upper terminal trench, allow the RECP to conform to the trench, secure with pins or staples. backfill, compact and then bring the mat back over the top of the trench and onto the existing mat (2 to 3 feet overlap in the downstream direction), and pin at 1 foot intervals across the RECP. When starting installation of a new roll, begin in a trench or shingle -lap ends of rolls a minimum of I foot with upstream RECP on top to prevent uplifting. Place the outside edges of the RECP(s) in longitudinal trenches, pin, backfill, and compact. Anchoring Devices --I 1 gauge, at least 6 inches length by I inch width staples or 12 inch minimum length wooden stakes are recommended for anchoring the RECP to the ground. Drive staples or pins so that the top of the staple or pin is flush with the ground surface. Anchor each RECP every 3 feet along its center. Longitudinal overlaps must be sufficient to accommodate a row of anchors and uniform along the entire length of overlap and anchored every- 3 feet along the overlap length. Roll ends may be spliced by overlapping 1 foot (in the direction of water flow), with the upstream/upslope mat placed on top of the downstream/ downslope RECP. This overlap should be anchored at I foot spacing across the RECP. When installing multiple width mats heat seamed in the factory, all factory seams and field overlaps should be similarly anchored. PERMANENT DIVERSION BERM NTS TEMPORARY/PERMANENT DIVERSION DITCH NTS ado A C Pipe Outlet to Flat Area - No Well-defined Channel Pipe Outlet to Well-defined Channel Notes 1. La is the length of the riprap apron. 2. d =1.5 times the maximum stone diameter but not less than 6". 3. In a well-defined channel ex- tend the apron up the channel banks to an elevation of 6" above the maximum tailwater depth or to the top of the bank, whichever is less. 4. A filter blanket or filter fabric should be installed between the riprap and soil foundation. Construction 1. Ensure that the subgrade for the filter and riprap follows the required lines and grades shown in the plan. Compact any fill required in the subgrade to the Specifications density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the riprap thickness. 2. The riprap and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the riprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap so the top layer is above the downstream layer a minimum of 1 foot. If the damage is extensive, replace the entire filter cloth. 4. Riprap maybe placed by equipment, but take care to avoid damaging the filter. S. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather -resistant and well graded. 7. Construct the apron on zero grade with no overfill at the end. Make the top of the riprap at the downstream end level with the receiving area or slightly below it. 8. Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length. If a curve is needed to fit site Q La conditions, place it in the upper section of the apron. 9. Imm ediately after construction, stabilize all disturbed areas withvegetation (Practices 6.10, Temporary Seeding, and 6.11, Permanent Seecii'ng). q> III -II dill �d III- c �li��lllll IflISection AA _li _ g1J="IiIN Maintenance Inspect riprap outlet structures weekly and after significant (1 /2 inch or greater) Filter rainfall events to see if any erosion around or below the riprap has taken place, blanket or if stones have been dislodged. Immediately make all needed repairs to Figure 6.41c Riprap outlet protection (modified from Va Swccf. prevent further damage. References Surface Stabilization 6.10, Temporary Seeding 6.41.4 6.11, Permanent Seeding 6.15, Riprap Appendix 8.06, Design of Riprap Outlet Protection Rice, C.E., Kadavy, K.0 "Riprap Design for Pipe Spillways at -1 < TW/D < 0.7" Presented at the December 13, 1994International Winter Meeting, American Society of Agricultural Engineers, Paper Number 942541. Rice, C.E. and K.C. Kadavy. 1994, Plunge Pool Design at Submerged Pipe Spillway Outlets. Transactions of the ASAE 37(4):1167-1173. FHWA. 1983. Hydralic Design of Energy Dissipaters for Culverts and Channels. Hydraulic Engineering Circular Number 14. OUTLET PROTECTION NTS RAFTING AND DESIGN O SERVICES, INC. 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a Z J W 19 W oW J a a ZH W p Z C� to W J Z 0 O n o0W"Z _� U ZI_ Z O 0 Wv vJ Z 0m _ >Z 0 U J W o� Q REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 1 3 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 Sediment Basin # 1 Sediment Basin # 2A Sediment Basin # 2B Sediment Basin # 2C Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 Q10 = 11.69 A= 3.70 Q25 = 13.16 A= 3.70 Q10 = 38.87 A= 12.30 Q25 = 43.74 A= 12.30 Q10 = 14.22 A= 4.50 Q25 = 16.00 A= 4.50 Q10 = 13.27 A= 4.20 Q25 = 14.94 A= 4.20 2-Yr Storm 2-Yr Storm 2-Yr Storm 2-Yr Storm Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 1= 6.10 1= 6.10 1= 6.10 1= 6.10 Q2 = 9.03 A= 3.70 Q2 = 30.01 A= 12.30 Q2 = 10.98 A= 4.50 Q2 = 10.25 A= 4.20 Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area SA=Q25 x 435 sf/cfs Q25 = 13.16 SA=Q25 x 435 sf/cfs Q25 = 43.74 SA=Q25 x 435 sf/cfs Q25 = 16.00 SA=Q25 x 435 sf/cfs Q25 = 14.94 SA= 5723.38 ft2 SA= 19026.38 ft2 SA= 6960.87 ft2 SA= 6496.81 ft2 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Top = 60.00 x 120.00 = 7200 ft2 Top = 104.00 x 208.00 = 21632 ft2 Top = 65.00 x 130.00 = 8450 ft2 Top = 64.00 x 128.00 = 8192 ft2 Weir = 54.00 x 108.00 = 5832 ft2 Weir = 98.00 x 196.00 = 19208 ft2 Weir = 59.00 x 118.00 = 6962 ft2 Weir = 58.00 x 116.00 = 6728 ft2 Bottom = 45 x 90 = 4050 ft2 Bottom = 89 x 178 = 15842 ft2 Bottom = 50 x 100 = 5000 ft2 Bottom = 49 x 98 = 4802 ft2 Volume Required Volume Required Volume Required Volume Required VR=Ax1800 cf/ac A= 3.70 ac VR=Ax1800 cf/ac A= 12.30 ac VR=Ax1800 cf/ac A= 4.50 ac VR=Ax1800 cf/ac A= 4.20 ac VR= 6660.00 ft 3 VR= 22140.00 ft 3 VR= 8100.00 ft 3 VR= 7560.00 ft 3 Volume Proposed Volume Proposed Volume Proposed Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 5832.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 19208.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 6962.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 6728.00 sf Bottom= 4050.00 sf Bottom= 15842.00 sf Bottom= 5000.00 sf Bottom= 4802.00 sf VP= 14823.00 ft 3 D= 3.00 ft VP= 52575.00 ft 3 D= 3.00 ft VP= 17943.00 ft 3 D= 3.00 ft VP= 17295.00 ft 3 D= 3.00 ft Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Sediment Basin # 3A Sediment Basin # 3B Sediment Basin # 3C Sediment Basin # 311) Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q2S = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 Q10 = 18.33 A= 5.80 Q25 = 20.62 A= 5.80 Q10 = 36.34 A= 11.50 Q25 = 40.89 A= 11.50 Q10 = 12.32 A= 3.90 Q25 = 13.87 A= 3.90 Q10 = 15.48 A= 4.90 Q25 = 17.42 A= 4.90 2-Yr Storm 2-Yr Storm 2-Yr Storm 2-Yr Storm Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 1= 6.10 1= 6.10 1= 6.10 l 6.10 Q2 = 14.15 A= 5.80 Q2 = 28.06 A= 11.50 Q2 = 9.52 A= 3.90 Q2 = 11.96 A= 4.90 20700.00 Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area SA=Q25 x 435 sf/cfs Q25 = 20.62 SA=Q2S x 435 sf/cfs Q25 = 40.89 SA=Q21 x 435 sf/cfs Q25 = 13.87 SA=Q2S x 435 sf/cfs Q25 = 17.42 SA= 8971.79 ft2 SA= 17788.89 ft2 SA= 6032.75 ft2 SA= 7579.61 ft2 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Top = 73.00 x 146.00 = 10658 ft2 Top = 101.00 x 202.00 = 20402 ft2 Top = 61.00 x 122.00 = 7442 ft2 Top = 68.00 x 136.00 = 9248 ft2 Weir = 67.00 x 134.00 = 8978 ft2 Weir = 95.00 x 190.00 = 18050 ft2 Weir = 55.00 x 110.00 = 6050 ft2 Weir = 62.00 x 124.00 = 7688 ft2 Bottom = 58 x 116 = 6728 ft2 Bottom = 86 x 172 = 14792 ft2 Bottom = 46 x 92 = 4232 ft2 Bottom = 53 x 106 = 5618 ft2 Volume Required Volume Required Volume Required Volume Required VR=Ax1800 cf/ac A= 5.80 ac VR=Ax1800 cf/ac A= 11.50 ac VR=Ax1800 cf/ac A= 3.90 ac VR=Ax1800 cf/ac A= 4.90 ac VR= 10440.00 ft 3 VR= 20700.00 ft 3 VR= 7020.00 ft 3 VR= 8820.00 ft 3 Volume Proposed Volume Proposed Volume Proposed Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 8978.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 18050.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 6050.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 7688.00 sf Bottom= 6728.00 sf Bottom= 14792.00 sf Bottom= 4232.00 sf Bottom= 5618.00 sf VP= 23559.00 ft 3 l 3.00 ft VP= 49263.00 ft 3 l 3.00 ft VP= 15423.00 ft 3 l 3.00 ft VP= 19959.00 ft 3 D= 3.00 ft Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation RAFTING AND DESIGN SERVICES, INC. O 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a z O W Op�H0� I.. t� D DC) C� O W Q Z J W o� Z H U) W J Z IL O ., 3: _� Wvz WZZz gel�O W O _ z a I- Q J Q U J I- z O v z O � o 0. W O v! REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 14 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 00, 2 Sediment Basin # 3E Sediment Basin # 3F Sediment Basin # 3G Sediment Basin # 3H Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10 = CIA C= 0.40 Q25 =CIA C= 0.40 Q10 = CIA C= 0.40 Q25 =CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 Q10 = 36.02 A= 11.40 Q25 = 40.54 A= 11.40 Q10 = 21.49 A= 6.80 Q25 = 24.18 A= 6.80 Q10 = 11.06 A= 3.50 Q25 = 12.45 A= 3.50 Q10 = 5.06 A= 1.60 Q25 = 5.69 A= 1.60 2-Yr Storm 2-Yr Storm 2-Yr Storm 2-Yr Storm Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 1= 6.10 1= 6.10 1= 6.10 1= 6.10 Q2 = 27.82 A= 11.40 Q2 = 16.59 A= 6.80 Q2 = 8.54 A= 3.50 Q2 = 3.90 A= 1.60 Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area SA=Q25 x 435 sf/cfs Q25 = 40.54 SA=Q25 x 435 sf/cfs Q25 = 24.18 SA=Q25 x 435 sf/cfs Q25 = 12.45 SA=QzS x 435 sf/cfs Q25 = 5.69 SA= 17634.20 ft 2 SA= 10518.65 ft 2 SA= 5414.01 ft2 SA= 2474.98 ft2 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Top = 101.00 x 202.00 = 20402 ft 2 Top = 79.00 x 158.00 = 12482 ft 2 Top = 59.00 x 118.00 = 6962 ft 2 Top = 42.00 x 84.00 - 3528 ft 2 Weir = 95.00 x 190.00 = 18050 ft 2 Weir = 73.00 x 146.00 = 10658 ft 2 Weir = 53.00 x 106.00 = 5618 ft 2 Weir = 36.00 x 72.00 = 2592 ft 2 Bottom = 86 x 172 = 14792 ft 2 Bottom = 64 x 128 = 8192 ft 2 Bottom = 44 x 88 = 3872 ft2 Bottom = 27 x 54 = 1458 ft 2 Volume Required Volume Required Volume Required Volume Required VR=Ax1800 cf/ac A= 11.40 ac VR=Ax1800 cf/ac A= 6.80 ac VR=Ax1800 cf/ac A= 3.50 ac VR=Ax1800 cf/ac A= 1.60 ac VR= 20520.00 ft 3 VR= 12240.00 ft 3 VR= 6300.00 ft3 VR= 2880.00 ft 3 Volume Proposed Volume Proposed Volume Proposed Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 18050.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 10658.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 5618.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 2592.00 sf Bottom= 14792.00 sf Bottom= 8192.00 sf Bottom= 3872.00 sf Bottom= 1458.00 sf VP= 49263.00 ft 3 D= 3.00 ft VP= 28275.00 ft 3 D= 3.00 ft VP= 14235.00 ft 3 D= 3.00 ft VP= 6075.00 ft 3 D= 3.00 ft Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Sediment Basin # 4A Sediment Basin # 4B Sediment Basin # 4C Sediment Basin # 5A Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 Q10 = 22.44 A= 7.10 Q25 = 25.25 A= 7.10 Q10 = 3.79 A= 1.20 Q25 = 4.27 A= 1.20 Q10 = 5.37 A= 1.70 025 = 6.05 A= 1.70 Q10 = 12.32 A= 3.90 Q25 = 13.87 A= 3.90 2-Yr Storm 2-Yr Storm 2-Yr Storm 2-Yr Storm Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 1= 6.10 1= 6.10 1= 6.10 1= .10 Q2 = 17.32 A= 7.10 Q2 = 2.93 A= 1.20 Q2 = 4.15 A= 1.70 Qz = 9.52 A= 3 3.90 Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area SA=Q25 x 435 sf/cfs Q25 = 25.25 SA=Q25 x 435 sf/cfs Q25 = 4.27 SA=Q25 x 435 sf/cfs Q25 = 6.05 SA=Q25 x 435 sf/cfs Q25 - 13.87 SA= 10982.71 ft 2 SA= 1856.23 ft2 SA= 2629.66 ft 2 SA= 6032.75 ft 2 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Top = 81.00 x 162.00 = 13122 ft2 Top = 37.00 x 74.00 = 2738 ft 2 Top = 43.00 x 86.00 = 3698 ft2 Top = 61.00 x 122.00 = 7442 ft 2 Weir = 75.00 x 150.00 = 11250 ft2 Weir = 31.00 x 62.00 = 1922 ft 2 Weir = 37.00 x 74.00 = 2738 ft2 Weir = 55.00 x 110.00 = 6050 ft2 Bottom = 66 x 132 = 8712 ft 2 Bottom = 22 x 44 = 968 ft 2 Bottom = 28 x 56 = 1568 ft 2 Bottom = 46 x 92 = 4232 ft 2 Volume Required Volume Required Volume Required Volume Required VR=Ax1800 cf/ac A= 7.10 ac VR=Ax1800 cf/ac A= 1.20 ac VR=Ax1800 cf/ac A= 1.70 ac VR=Ax1800 cf/ac A= 3.90 ac V - - 12780.00 ft R V - - 2160.00 ft R V - - 3060.00 ft R 3 VR= 7020.00 ft Volume Proposed Volume Proposed Volume Proposed Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 11250.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 1922.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 2738.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 6050.00 sf Bottom= 8712.00 sf Bottom= 968.00 sf Bottom= 1568.00 sf Bottom= 4232.00 sf VP= 29943.00 ft D= 3.00 ft VP= 4335.00 ft D= 3.00 ft VP= 6459.00 ft D= 3.00 ft VP= 15423.00 ft3 D= 3.00 ft Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation or RAFTING AND DESIGN Z? SERVICES, INC. O 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a z O W 0 ~ t� D DC) C� O W Q Z J W o� (1) Z H U) W J Z IL O ., 3: _� Wvz OC Z z n �O _ O W z a I- Q J Q U J I- z O v z O � o 0. Lu \� L.L O v! REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 15 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 00, 2 Sediment Basin # 5B Sediment Basin # 5C Sediment Basin # 5D Sediment Basin # 5E Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 Q10 = 10.74 A= 3.40 Q25 = 12.09 A= 3.40 Q10 = 13.90 A= 4.40 Q25 = 15.65 A= 4.40 Q10 = 10.43 A= 3.30 Q25 = 11.73 A= 3.30 Q10 = 14.85 A= 4.70 Q25 = 16.71 A= 4.70 2-Yr Storm 2-Yr Storm 2-Yr Storm 2-Yr Storm Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 1= 6.10 1= 6.10 1= 6.10 1= 6.10 Q2 = 8.30 A= 3.40 Q2 = 10.74 A= 4.40 Q2 = 8.05 A= 3.30 Q2 = 11.47 A= 4.70 Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area SA=Q25 x 435 sf/cfs Q25 = 12.09 SA=Q25 x 435 sf/cfs Q25 = 15.65 SA=Q25 x 435 sf/cfs Q25 = 11.73 SA=Q25 x 435 sf/cfs Q25 = 16.71 SA= 5259.32 ft 2 SA= 6806.18 ft2 SA= 5104.64 ft 2 SA= 7270.24 ft 2 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Top = 58.00 x 116.00 = 6728 ft 2 Top = 65.00 x 130.00 = 8450 ft 2 Top = 57.00 x 114.00 = 6498 ft 2 Top = 67.00 x 134.00 = 8978 ft 2 Weir = 52.00 x 104.00 = 5408 ft 2 Weir = 59.00 x 118.00 = 6962 ft 2 Weir = 51.00 x 102.00 = 5202 ft 2 Weir = 61.00 x 122.00 = 7442 ft 2 Bottom = 43 x 86 = 3698 ft 2 Bottom = 50 x 100 = 5000 ft 2 Bottom = 42 x 84 = 3528 ft 2 Bottom = 52 x 104 = 5408 ft 2 Volume Required Volume Required Volume Required Volume Required VR=Ax1800 cf/ac A= 3.40 ac VR=Ax1800 cf/ac A= 4.40 ac VR=Ax1800 cf/ac A= 3.30 ac VR=Ax1800 cf/ac A= 4.70 ac 3 VR= 6120.00 ft VR= 7920.00 ft 3 VR= 5940.00 t VR= 8460.00 t Volume Proposed Volume Proposed Volume Proposed Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 5408.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 6962.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 5202.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 7442.00 sf Bottom= 3698.00 sf Bottom= 5000.00 sf Bottom= 3528.00 sf Bottom= 5408.00 sf VP= 13659.00 ft 3 D= 3.00 ft VP= 17943.00 ft 3 D= 3.00 ft VP= 13095.00 ft 3 D= 3.00 ft VP= 19275.00 ft 3 D= 3.00 ft Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Sediment Basin # 5F Sediment Basin # 5G Sediment Basin # 5H Sediment Basin # 51 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm 10-Yr Storm 25-Yr Storm Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 Q10 = CIA C= 0.40 Q25 = CIA C= 0.40 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 1= 7.90 1= 8.89 Q10 = 6.00 A= 1.90 Q25 = 6.76 A= 1.90 Q10 = 22.44 A= 7.10 Q25 = 25.25 A= 7.10 Q10 = 6.32 A= 2.00 Q215 = 7.11 A= 2.00 Q10 = 7.90 A= 2.50 Q25 = 8.89 A= 2.50 2-Yr Storm 2-Yr Storm 2-Yr Storm 2-Yr Storm Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 Q2 = CIA C= 0.40 1= 6.10 1= 6.10 1= 6.10 1= 6.10 Q2 = 4.64 A= 1.90 Q2 = 17.32 A= 7.10 Q2 = 4.88 A= 2.00 Q2 = 6.10 A= 2.50 Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area Calculate Required Surface Area SA=Q25 x 435 sf/cfs Q25 = 6.76 SA=Q25 x 435 sf/cfs Q25 = 25.25 SA=Q25 x 435 sf/cfs Q25 = 7.11 SA=Q25 x 435 sf/cfs Q25 = 8.89 SA= 2939.03 ft 2 SA= 10982.71 ft2 SA= 3093.72 ft 2 SA= 3867.15 ft 2 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Side Slopes = 3.00 :1 Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Pond Depth= 3.00 ft Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Basin Dims (Per SA) Top = 45.00 x 90.00 = 4050 ft' Top = 81.00 x 162.00 = 13122 ft 2 Top = 46.00 x 92.00 = 4232 ft' Top = 50.00 x 100.00 = 5000 ft2 Weir = 39.00 x 78.00 = 3042 ft 2 Weir = 75.00 x 150.00 = 11250 ft 2 Weir = 40.00 x 80.00 = 3200 ft 2 Weir = 44.00 x 88.00 = 3872 ft 2 Bottom = 30 x 60 = 1800 ft 2 Bottom = 66 x 132 = 8712 ft2 Bottom = 31 x 62 = 1922 ft 2 Bottom = 35 x 70 = 2450 ft2 Volume Required Volume Required Volume Required Volume Required VR=Ax1800 cf/ac A= 1.90 ac VR=Ax1800 cf/ac A= 7.10 ac VR=Ax1800 cf/ac A= 2.00 ac VR=Ax1800 cf/ac A= 2.50 ac VR= 3420.00 ft 3 VR= 12780.00 ft 3 VR= 3600.00 ft 3 VR= 4500.00 ft 3 Volume Proposed Volume Proposed Volume Proposed Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 3042.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 11250.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 3200.00 sf VP=((Top Area + Bottom Area)/2)xD Top= 3872.00 sf Bottom= 1800.00 sf Bottom= 8712.00 sf Bottom= 1922.00 sf Bottom= 2450.00 sf VP= 7263.00 ft 3 D= 3.00 ft VP= 29943.00 ft 3 D= 3.00 ft VP= 7683.00 ft 3 D= 3.00 ft VP= 9483.00 ft 3 D= 3.00 ft Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation Basin has no outlet - to be permanent pond dug out with excavation or RAFTING AND DESIGN Z? SERVICES, INC. O 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a z O W 0 1.. t� D DC) C� O W Q Z J W o� 0 (1) Z H U) W J Z IL O ., 3: _� Wvz W z �Z n ne 3: O W O _ z a I- Q J Q U J I- z O v z O C/) o 0. W \� L.L O v) REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 16 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 00, 2 Temporary Diversion # 1 => DA # 101 Temporary Diversion # RL 3 => DA # 103 Temporary Diversion # 5 => DA # 105 Temporary Diversion # 7 => DA # 107 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm zs = CIA C= 0.50 Q25 = CIA C= 0.50 Qzs = CIA C= 0.50 Qzs = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 10.22 A= 2.30 ac Q25 = 25.78 A= 5.80 ac Q25 = 7.11 A= 1.60 ac Q25 = 7.56 A= 1.70 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 2.00 Channel Bottom W= 0 Channel Bottom W= 3 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.64 Velocity= 1.64 Velocity= 1.50 Velocity= 1.52 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwater= 1.44 ft dwater= 1.44 ft clmter= 1.24 ft clmter= 1.27 ft T= 0.089856 Ibs/ft2 S= 0.001 ft/ft T= 0.089856 Ibs/ft2 s= 0.001 ft/ft T= 0.077376 Ibs/ft2 s= 0.001 ft/ft T= 0.079248 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 2 => DA # 102 Temporary Diversion # 4 => DA # 104 Temporary Diversion # 6 => DA # 106 Temporary Diversion # 8 => DA # 108 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm zs = CIA C= 0.50 Qzs = CIA C= 0.50 Qzs = CIA C= 0.50 Qzs = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 1.78 A= 0.40 ac Q25 = 24.89 A= 5.60 ac Q25 = 8.00 A= 1.80 ac Q25 = 6.22 A= 1.40 ac Channel Slope= 0.10 Channel Slope= -W 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 1.50 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 2.00 Channel Bottom W= 0 Channel Bottom W= 3 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.05 Velocity= 2.04 Velocity= 1.54 Velocity= 1.45 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwater= 0.75 ft dwater= 1.58 ft dwater= 1.3 ft dwater= 1.18 ft T= 0.0468 Ibs/ft2 s= 0.001 ft/ft T= 0.098592 Ibs/ft2 s= 0.001 ft/ft T= 0.08112 Ibs/ft2 s= 0.001 ft/ft T= 0.073632 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 9 => DA # 109 Temporary Diversion # 11 => DA # 111 Temporary Diversion # 13 => DA # 113 Temporary Diversion # 15 => DA # 115 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 7.56 A= 1.70 ac Q25 = 2.67 A= 0.60 ac Q25 = 11.11 A= 2.50 ac Q25 = 6.67 A= 1.50 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 1.50 Channel Depth= 2.00 Channel Depth= 2.00 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.52 Velocity= 1.16 Velocity= 1.68 Velocity= 1.48 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwater 1.27 ft dwater= 0.86 ft water- 1.47 ft dwater 1.21 ft T= 0.079248 Ibs/ft2 S= 0.001 ft/ft T= 0.053664 Ibs/ft2 s= 0.001 ft/ft T= 0.091728 Ibs/ft2 s= 0.001 ft/ft T= 0.075504 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 10 => DA # 110 Temporary Diversion # 12 => DA # 112 Temporary Diversion # 14 => DA # 114 Temporary Diversion # 16 => DA # 116 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm zs = CIA C= 0.50 Q21 = CIA C= 0.50 Qzs = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 16.89 A= 3.80 ac Q25 = 33.78 A= 7.60 ac Q25 = 2.67 A= 0.60 ac Q25 = 11.56 A= 2.60 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 1.50 Channel Depth= 1.50 Channel Bottom W= 2 Channel Bottom W= 4 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.86 Velocity= 2.18 Velocity= 1.16 Velocity= 1.70 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwater= 1.44 ft dwater= 1.7 ft dwater= 0.86 ft dwater= 1.49 ft T= 0.089856 Ibs/ft2 s= 0.001 ft/ft T= 0.10608 Ibs/ft2 s= 0.001 ft/ft T= 0.053664 Ibs/ft2 s= 0.001 ft/ft T= 0.092976 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass or RAFTING AND DESIGNZ? SERVICES, INC. O 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a z O W o� Op�H0� I.. t� D D�W C� O W Q Z J W o� (J a a Z H U) W J Z IL O ., _� vZv Z Z Z �O O W _O z a I- Q J D Q U J I- z O z O C/) 0. W I..L O V ) REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 17 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 00, a� c g Y U O N _O L6 O N N O N Q Y w 0 U c m g Y U O m 2 00 O N N O N N N O N 2 Temporary Diversion # 17 => DA # 117 Temporary Diversion # 19 => DA # 119 Temporary Diversion # 21 => DA # 121 Temporary Diversion # 23 => DA # 123 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 40.01 A= 9.00 ac Q25 = 7.11 A= 1.60 ac Q25 = 9.33 A= 2.10 ac Q25 = 0.44 A= 0.10 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.50 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 2.00 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 2.28 Velocity= 1.50 Velocity= 1.61 Velocity= 0.74 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T= ds y y= 62.4 lbs T=y s y= 62.4 lbs T=y s y= 62.4 lbs cl-t.r 1.84 ft cl-ter 1.24 ft dw, w= 1.37 ft dwatef 0.43 ft T= 0.114816 Ibs/ft2 s= 0.001 ft/ft T= 0.077376 Ibs/ft2 s= 0.001 ft/ft T= 0.085488 Ibs/ft2 5= 0.001 ft/ft T= 0.026832 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass ■■ Permanent= Bermudagrass Temporary Diversion # 18 => DA # 118 Temporary Diversion # 20 => DA # 120 Temporary Diversion # 22 => DA # 122 Temporary Diversion # 24 => DA # 124 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q21 = 5.33 A= 1.20 ac Q25 = 8.00 A= 1.80 ac Q21 = 3.56 A= 0.80 ac Q25 = 4.89 A= 1.10 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 2.00 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.39 Velocity= 1.54 Velocity= 1.24 Velocity= 1.36 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandyloarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandyloarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs cl-w= 1.11 ft dl_ter 1.3 ft dwaw= 0.96 ft dl-ter= 1.08 ft T= 0.069264 Ibs/ft2 s= 0.001 ft/ft T= 0.08112 Ibs/ft2 S= 0.001 ft/ft T= 0.059904 Ibs/ft2 s= 0.001 ft/ft T= 0.067392 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN11 Temporary= NAG S75 BN Temporary= NAG S75 BN 11 Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 25 => DA # 125 Temporary Diversion # 27 => DA # 127 Temporary Diversion # 29 => DA # 129 Temporary Diversion # 31 => DA # 131 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Q21 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 13.34 A= 3.00 ac Q25 = 18.22 A= 4.10 ac Q25 = 1.33 A= 0.30 ac Q25 = 2.22 A= 0.50 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 1.50 Channel Depth= 1.50 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.77 Velocity= 1.89 Velocity= 0.91 Velocity= 1.10 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 1.57 ft dwate 1.49 ft dwate 0.59 ft dwate,= 0.8 ft T= 0.097968 Ibs/ft2 s= 0.001 ft/ft T= 0.092976 Ibs/ft2 s= 0.001 ft/ft T= 0.036816 Ibs/ft2 s= 0.001 ft/ft T= 0.04992 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN ' Temporary= NAG S75 BN Temporary= NAG S75 BN � Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 2> => DA # 126 Temporary Diversion # -� => DA # 128 Temporary Diversion # 30 => DA # r 130 Temporary Diversion # 32 => DA # 132 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 9.33 A= 2.10 ac Q25 = 5.33 A= 1.20 ac Q21 = 3.11 A= 0.70 ac Q25 = 13.34 A= 3.00 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 1.50 Channel Depth= 2.00 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.59 Velocity= 1.40 Velocity= 1.21 Velocity= 1.76 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Soil Type @ sandy loan Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4lbs T=yds y= 62.4lbs T=yds y= 62.4lbs T=yds y= 62.4lbs cl-w= 1.38 ft dwater= 1.11 ft dwaW=k 0.91 ft dwater- 1.57 ft T= 0.086112 Ibs/ft2 s= 0.001 ft/ft T= 0.069264 Ibs/ft2 S= 0.001 ft/ft T= 0.056784 Ibs/ft2 5= 0.001 ft/ft T= 0.097968 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN ' Temporary= NAG S75 BN Temporary= NAG S75 BN 41 Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass or RAFTING AND DESIGN Z? SERVICES, INC. O 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a z O W o� 0 ~ t� D DC) C� O W Q Z J W o� (J a a 0 (1) Z H U) W J Z IL O ., 3: _� WvZv Z � 3: O O W _O z a I- Q J D Q U J I- z O Z O C/) 0. W I..L O V ) REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 1 8 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 [0, a> c g Y U O N _O L6 O N N O N Q Y w 0 U c m g Y U O m 2 00 0 N N O N N N O N 2 Temporary Diversion # 33 => DA # 133 Temporary Diversion # => DA # ' 135 ' Temporary Diversion # 37 => DA # 137 Temporary Diversion # 39 => DA # 139 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm zs = CIA C= 0.50 Q25 = CIA C= 0.50 Qzs = CIA C= 0.50 Qzs = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Qzs = 8.00 A= 1.80 ac Qzs = 2.22 A= 0.50 ac Q25 = 15.11 A= 3.40 ac Qzs = 4.45 A= 1.00 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 2.00 Channel Depth= 1.50 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.54 Velocity= 1.11 Velocity= 1.81 Velocity= 1.33 Soil Type C@ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs cl-tef 1.3 ft d_tef 0.8 ft dWd1ef 1.65 ft dwdLef 1.04 ft T= 0.08112 Ibs/ft2 s= 0.001 ft/ft T= 0.04992 Ibs/ft2 s= 0.001 ft/ft T= 0.10296 Ibs/ft2 s=a 0.001 ft/ft T= 0.064896 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG 575 BN 9M Temporary= NAG S75 BN Temporary= NAG S75 BN 41 Temporary= NAG 575 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 34 => DA # ' 134 Temporary Diversion # 36 => DA # 136 Temporary Diversion # "A' => DA # IbLaIIIIIIIIIIIIIII Temporary Diversion # 40 => DA # 140 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Qzs = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 8.45 A= 1.90 ac Q25 = 3.56 A= 0.80 ac Q25 = 6.22 A= 1.40 ac Q25 = 3.11 A= 0.70 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 1.50 Channel Depth= 1.50 Channel Depth= 1.50 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.55 Velocity= 1.24 Velocity= 1.24 Velocity= 1.21 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4lbs T=yds y= 62.4lbs T=yds y= 62.41bs T=yds y= 62.4lbs dwater= 1.33 ft dwater= 0.96 ft dwater= Oft dwater= 0.91 ft T= 0.082992 Ibs/ft2 s= 0.001 ft/ft T= 0.059904 Ibs/ft2 s= 0.001 ft/ft T= 0.059904 Ibs/ft2 s= 0.001 ft/ft T= 0.056784 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN Temporary= NAG S75 BN Temporary= NAG S75 BN qJ Temporary= NAG S75 BN _A Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 41 => DA # 141 Temporary Diversion # 43 => DA # 143 Temporary Diversion # 45 => DA # 145 Temporary Diversion # 47 => DA # 147 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Qzs = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 10.67 A= 2.40 ac Q25 = 4.89 A= 1.10 ac Q25 = 3.11 A= 0.70 ac Q25 = 3.56 A= 0.80 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 1.50 Channel Depth= 1.50 Channel Depth= 1.50 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.65 Velocity= 1.36 Velocity= 1.21 Velocity= 1.24 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs cl-te 1.45 ft dwater= 1.08 ft dwate _ft dwater= 0.96 ft T= 0.09048 Ibs/ft2 s= 0.001 ft/ft T= 0.067392 Ibs/ft2 s= 0.001 ft/ft T= 0.056784 Ibs/ft2 s= 0.001 ft/ft T= 0.059904 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG 575 BN � Temporary= NAG S75 BN Temporary= NAG 575 BN 19 Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Temporary Diversion # 42 => DA # 142 Temporary Diversion # 44 => DA # 144 Temporary Diversion # 46 => DA # . 146 Temporary Diversion # 48 => DA # 148 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Yr Storm 25-Yr Storm 25-Yr Storm 25-Yr Storm Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 6.22 A= 1.40 ac Q25 = 3.11 A= 0.70 ac Q25 = 4.00 A= 0.90 ac Q25 = 5.78 A= 1.30 ac Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Slope= 0.10 Channel Depth= 2.00 Channel Depth= 1.50 Channel Depth= 1.50 Channel Depth= 2.00 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Channel Bottom W= 0 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Side Slopes= 3.00 Velocity= 1.44 Velocity= 1.21 Velocity= 1.29 Velocity= 1.42 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Channel Lining Channel Lining Channel Lining Shear Calculation Shear Calculation Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T= ds y y= 62.4 lbs T=y s y= 62.4 lbs T=y s y= 62.4 lbs dwater= 1.18 ft dwater= 0.91 ft dwater=-ft dwater= 1.15 ft T= 0.073632 Ibs/ft2 s= 0.001 ft/ft T= 0.056784 Ibs/ft2 s= 0.001 ft/ft T= 0.0624 Ibs/ft2 5= 0.001 ft/ft T= 0.07176 Ibs/ft2 s= 0.001 ft/ft Temporary= NAG S75 BN M Temporary= NAG S75 BN Temporary= NAG 575 BN 19 Temporary= NAG S75 BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass Permanent= Bermudagrass or RAFTING AND DESIGN Z? SERVICES, INC. O 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a z O W o� Op�H0(1) ~ t� D�W C� O W Q Z J W o� v a a Z H t) W J Z IL O ., _� vz OC Z Z z �O O W _O z a I- Q J � Q U J I- z O v z O C/) 0. W I..L O V ) REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB C 19 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 [0, a> c g Y U O N _O L6 O N N O N Q Y w O U c @ g Y U O 2 00 0 N N O N N N O N 2 Temporary Diversion # 49 => DA # 149 CULVERT #1 CULVERT #3 Calculate Flow - Rational Method Calculate Flow - Rational Method Calculate Flow - Rational Method 25-Vr storm 25-Yr Storm 25-Yr Storm Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 Q25 = CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr 1= 8.89 in/hr Qzs = 5.78 A= 1.30 ac Q25 = 6.22 A= 1.40 ac Q25 = 16.89 A= 3.80 ac Channel Slope= 0.10 Channel Depth= 2.00 Channel Bottom W= 0 Per Manning Equation Per Manning Equation Side Slopes= 3.00 Velocity= 1.42 Soil Type @ sandy loarr slopes= 0-5 Pipe Diameter 18.00 " Allowable Flow= 8.04 cfs OK Pipe Diameter 24.00 " Allowable Flow= 17.30 cfs OK Pipe Slope= 0.50% Pipe Slope= 0.50% Channel Lining Shear calculation Outlet Protection #1 Outlet Protection #2 T=yds y= 62.4 Ibs New York Method 8.06.5 Manual New York Method 8.06.5 Manual d-ter= 1.15 ft T= 0.07176 Ibs/ftZ s= 0.001 ft/ft Pipe Diameter 18.00 " La= 7.5 Pipe Diameter 24.00 " La= 8 Temporary= NAG S75 BN Velocity= 4.5 ft/s W= 4.5 Velocity= 5.5 ft/s W= 6 Permanent= Bermudagra� Zone= 1 Stone Diameter= Class A Zone= 1 Stone Diameter= Class A CULVERT #2 Temporary Diversion # 50 => DA # 150 Calculate Flow - Rational Method 25-Yr Storm Calculate Flow - Rational Method 25-Vr Storm Q25 = CIA C= 0.50 Q21=CIA C= 0.50 1= 8.89 in/hr 1= 8.89 in/hr Q25 = 8.00 A= 1.80 ac QZs = 19.56 A= 4.40 ac Channel Slope= 0.10 Channel Depth= 2.00 Per Manning Equation Channel Bottom W= 2 Side Slopes= 3.00 Pipe Diameter 18.00 " Allowable Flow= 8.04 cfs OK Velocity= 1.92 Soil Type @ sandy loarr Slopes= 0-5 Pipe Slope= 0.50% Channel Lining Outlet Protection #2 Shear Calculation New York Method 8.06.5 Manual T=yds y= 62.4 Ibs d-te 1.54 ft Pipe Diameter 18.00 " La= 7.5 T= 0.096096 Ibs/ftZ s= 0.001 ft/ft Velocity= 4.5 ft/s W= 4.5 Zone= 1 Stone Diameter= Class A Temporary= NAG S75 BN Permanent= Bermudagras RAFTING AND DESIGN SERVICES, INC. O 6728 CARBONTON ROAD Sanford, North Carolina 27330 (919) 499-8759 phone draftinganddesign@ymail.com W Z a z O W o� ~ t� D DC) C� O J W Q Z J W o� (J a a R 19 X Z H U) W J Z IL O ., 3: _� Wvz WZZz gel � O W O - m >? a I- Q J � J I- z O v z o C/) O 0� w O REVISIONS PRELIMINARY NOT FOR CONSTRUCTION Scale: Drawn by: NTS MTB Sheet: Designed by: MTB CZ 0 of 21 Reviewed by: MTB Project Number: Date: 2022-08 FEB 2023 3 00, a� c g Y U O N _O L6 O N N O N Q Y w 0 U c @ g Y U O 2 00 0 N N O N N N O N 2