Loading...
HomeMy WebLinkAbout20221671 Ver 1_20221220_WoodfinNC_90PERCENT_FINAL_20230306C: i W 2 ►_ c C\ C\ C\ C\ c C\ L z G_ Q C L� a L LL C z LL C C G LL C ILL LL a_ _ (I; C C: (I; C: z ILL ILL z L LL C z z C: (I; ILL C C C\ ILL (I; a ILL (I; WOODFIN RIVERSIDE PARK TOWN OF WOODFIN, NORTH CAROLINA DECEMBER 20,2022 GENERAL NOTES: 1. THE CONTRACTOR SHALL LOCATE ALL UTILITIES ON -SITE, COORDINATE CONSTRUCTION WITH ALL UTILITY OWNERS AND BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION. THE CONTRACTOR MUST SCHEDULE ANY REQUIRED UTILITY ADJUSTMENTS WITH THE UTILITY OWNER TO ELIMINATE CONFLICTS. 2. THE CONTRACTOR SHALL CONFORM TO ALL PLAN AND SPECIFICATIONS SHOWN HEREIN AND NOTIFY THE ENGINEER (S20) IMMEDIATELY UPON THE DISCOVERY OF CONFLICTS OR CHANGES NOT CONSISTENT WITH THE CONTRACT DOCUMENTS. 3. THE CONTRACTOR SHALL HAVE COPIES OF ANY REQUIRED PERMITS ON SITE AT ALL TIMES AND COMPLY WITH REQUIREMENTS OF PERMITS AT ALL TIMES. THESE MAY INCLUDE LOCAL, STATE AND FEDERAL PERMITS. 4. THE CONTRACTOR IS RESPONSIBLE FOR, BUT NOT LIMITED TO, SUBMITTING PLANS FOR DELIVERY AND STORAGE OF MATERIALS AND SITE EQUIPMENT AS WELL AS FOR SITE ACCESS, EROSION CONTROL, TRAFFIC CONTROL (ROAD, TRAIL, RAILROAD AND/OR WATER TRAFFIC), WATER CONTROL AND DE -WATERING PLANS, AND SAFETY PLAN PRIOR TO CONSTRUCTION. 5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING SITE INFRASTRUCTURE AND VEGETATION AS DIRECTED BY THE OWNER, INCLUDING BUT NOT LIMITED TO ANY CONCRETE, ASPHALT, SITE CIRCULATION PATHS, CURB AND GUTTER, TREES, SHRUBS, GRASSES AND ALL SOFT OR HARDSCAPE OUTSIDE OF THE IMMEDIATE CONSTRUCTION AREA AND ITS REPLACEMENT IN THE EVENT OF DAMAGE TO EQUAL OR BETTER CONDITION. 6. IN AREAS OF DISTURBANCE, THE CONTRACTOR SHALL REMOVE AND STOCKPILE THE TOP 6" OF TOPSOIL AND REPLACE AND RE -VEGETATE AFTER CONSTRUCTION. SALVAGED TOPSOIL SHALL BE STOCKPILED IN AREAS THAT SHALL NOT INTERFERE WITH CONSTRUCTION PHASES AND AT LEAST 15 FEET AWAY FROM AREAS OF CONCENTRATED FLOWS OR PAVEMENT. THE SLOPES OF THE STOCKPILE SHALL NOT EXCEED 2:1 HORIZONTAL TO VERTICAL. A SILT FENCE OR OTHER ADEQUATE EROSION CONTROL SHALL BE INSTALLED AROUND THE PERIMETER OF EACH STOCKPILE. TOPSOIL FROM ANY RIPARIAN AREAS SHALL BE STOCKPILED SEPARATELY FROM OTHER TOPSOIL AND SHALL BE REINSTALLED IN RIPARIAN AREAS. 7. THE CONTRACTOR SHALL FOLLOW ALL PERMIT REQUIREMENTS RELATED TO HISTORIC PROTECTIONS. IN THE EVENT THAT ANY PREVIOUSLY UNKNOWN HISTORIC OR ARCHEOLOGICAL REMAINS ARE IDENTIFIED DURING CONSTRUCTION, THE CONTRACTOR MUST IMMEDIATELY STOP WORK AND NOTIFY BOTH THE OWNER'S REPRESENTATIVE AND S20 OF THESE ITEMS AND WORK MAY NOT COMMENCE UNTIL WRITTEN APPROVAL IS GIVEN TO PROCEED. 8. THE CONTRACTOR MUST BE AVAILABLE AND PROVIDE ALL NECESSARY RESOURCES FOR PERIODIC INSPECTIONS FROM ANY INVOLVED REGULATORY AGENCIES AT ANYTIME DURING THE CONSTRUCTION TIME PERIOD. THIS PERIOD INCLUDES PRE -CONSTRUCTION AND POST -CONSTRUCTION. 9. IT IS EXPRESSLY UNDERSTOOD AND AGREED, BY AND BETWEEN THE CONTRACTOR AND THE LAND OWNER, THAT THE ESTABLISHED CONSTRUCTION SCHEDULE IS ADEQUATE FOR THE COMPLETION OF THE WORK DESCRIBED HEREIN, TAKING INTO CONSIDERATION THE CLIMATIC AND OTHER FACTORS PREVAILING IN THE LOCALITY OF THE WORK. EVERY EFFORT SHALL BE MADE BY THE CONTRACTOR TO COMPLETE THE PROJECT WITHIN THE ESTABLISHED CONSTRUCTION WINDOW SHOWN IN THE BID, QUOTE OR PROPOSAL. THE ESTABLISHED CONSTRUCTION SCHEDULE ANTICIPATES "NORMAL" WEATHER AND CLIMATE CONDITIONS IN AND AROUND THE VICINITY OF THE PROJECT SITE DURING THE TIMES OF YEAR THAT THE CONSTRUCTION WILL BE CARRIED OUT. 10. THE CONTRACTOR MUST MEET ALL REQUIREMENTS FOR BMP'S AS DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS. 11. THE CONTRACTOR IS RESPONSIBLE FOR MONITORING ALL SITE SAFETY REQUIREMENTS AND REGULATIONS THROUGH THE ENTIRE DURATION OF ON -SITE CONSTRUCTION ACTIVITIES. 12. ANY ADDITIONAL COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR. 13. THE CONTRACTOR IS RESPONSIBLE FOR MANAGING A SAFE SITE IN ACCORDANCE WITH LOCAL CODES AND REGULATIONS. IN THE EVENT OF: A FUEL OR CHEMICAL SPILL - CALL 911 AN INJURY THAT REQUIRES URGENT MEDICAL ATTENTION - CALL 911 VICINITY MAP NTS LOCATION MAP CALL UTILITY NOTIFICATION orthg1l OWN rwlina,� WWVM.116$11.IYf0 00 � N C:) CD � o M N 0 o C4 N SHEET INDEX WW-0.0 SHEET INDEX & GENERAL NOTES zz� WW-0.1 PROJECT COMPONENTS zz WW-0.2 EXISTING CONDITIONS SITE PLAN zz WW-0.3 PROPOSED SITE PLAN zz� WW-0.4 PROPOSED GRADING PLAN & PROFILE zz WW-0.5 PERSPECTIVE VIEW Z�z WW-1.0 FEATURE 1 SITE PLAN ZO WW-1.1 FEATURE 1 GRADING PLAN & PROFILE zz WW-1.2 FEATURE 1 DETAILS zz WW-1.3 BYPASS DETAILS zz WW-1.4 ADDITIONAL CHANNEL SECTIONS zz WW-2.0 IN -STREAM DETAILS (1) zz WW-2.1 IN -STREAM DETAILS (2) zz� WW-2.2 IN -STREAM DETAILS (3) zz WW-2.3 IN -STREAM DETAILS (4) z WW-2.4 IN -STREAM DETAILS (5) W WW-2.5 IN -STREAM DETAILS (6) z WW-2.6 IN -STREAM DETAILS (7) z WW-2.7 IN -STREAM DETAILS (8) Z� WW-2.8 IN -STREAM DETAILS (9) z WW-2.9 IN -STREAM DETAILS (10) z WW-2.10 IN -STREAM DETAILS (11) z WW-2.11 IN -STREAM DETAILS (12) z KEY ISSUED FOR INFORMATION FZ ISSUED FOR INFORMATION, z_1 AND COORDINATION COORDINATION, AND PRICING nISSUED FOR CONSTRUCTION n ISSUED FOR PRICING CONTACT INFORMATION: MR. SCOTT SHIPLEY, S20 PRINCIPAL PHONE: (303) 819-3985 S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name: Sheet Index & General Notes Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: NTS Sheet: W W-0.0 imp vz-:rI- 00 -vr- Im 3=0 0-0$ WWI• 400, 01010 f AMIAL 4mz4w m =ADM Mm V;23M N N � 0• � a® 0 4� r-- -4 L -A F-02-�Mlq 400, I? 040 ftft �r k 211 C; G wi i WE (I; LL C Q z LL z LL i LL 2 (I; Q (I; H Z LL C: C C (I; H Z LL C: C C LL a_ (I; H H C c (I; C: Z LL LL Z C: Z LL C z Q z C: (I; LL C C C\ (I; LL (I; a LL (I; C: C: G_ C z Q G L z z LL C C C C n n n n C n z G 'a c LL L Q z C: V C z LL C G Ur V LL C Q z LL z LL LL a_ V `C,' V C: z LL LL LL z c a z L V C C ('N V LL U LL V c: GENERAL NOTES: 1. REFER TO EROSION CONTROL DRAWING SET FOR PROPOSED STAGING AREAS, SITE ACCESS PLAN, WATER CONTROL AND BMP LAYOUT AND DETAILS. i U O a m-0 '' 1g"00 5 G) o O + +� o � O o p RwER Oi RENGH BROA F TERRACED BOULDER BANK PROTECTION FLOW DEFLECTORS O ACCESS PATH BY EQUINOX o O O HOLLJFIELD1,kOAD ILDER BANK TOP OF BANK D B R'S CSOf f,RETE CONTROLP. V a O o C o o CO— = —co_ o H + O EL ALIGN o NT / N N�+�M o O N N + toO N N N + N + �O M O Q FLOW DIFFUSER ( P. a C TERRACED BOULDER BANK PROTECTIO / EUPLAND Y-EQUINOX --. O 0 C0 ABILIZE EXISTING BANK DROCK IS NO SENT RI D &PLANTED RIPRAP NMEN o O L0 BYP}-Noo + + c� N—+ ++ --NS0 On w o O ' o o O O }O�+o o�oo o� o0 0 FISH 13YPA S O I j- HANNEL ISLAND o APPR IM TE TOE OF C TOFF WAL -SOUND BE ROCK O RIPRA SCOUR PR TECTION 19 0 0 0 0 � � 0 C3 N + +�+. O 0 —O + L0 � Li') O o 00 + O — ��}—d + +�� _� d d' 1 IC,4 C0C) M M BOULDER ACCESS STAIRS, - co �s M-1. ---SCOUR Pq OL (BEDROC R OVAL) WA FEATURE 1 O� T E-OUT BEACH FLOW DEF O � AC-CIESS PATH BYE UINOX - PARCEL BOUNDARIES �\ O I ABANDONED RAILROAD CROSSING PIER RE TO DESIGN GRADE o � 7] RAILROAD ROW PROVIDED BY KEE SURVEYING FRENCH BROAD RIVER O : WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name: Proposed Site Plan O� RIVERSIDE PARK UPLAND Revisions: DESIGN BY EQUINOX 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale- 1 If = 40' Sheet: WW-0.3 C: G_ C Q G L z LL C G c c / U U z G LL C.; Q z U U LL C / z LL C G Cz.'. LL C Q z LL / C.; z LL LL a_ _ U U / U z a LL LL z L z LL C z Q z L U LL C C n U / LL / U LL U C: 4 7777;7F1926 � D MID- NN SLAND iF 1999.00 D D 0 p) O p RwERD> o—� RENGH BROA F _ PUT -IN AREA Ov ACCESS PATH BY EQUINOX 1940 0 1930 a > u1 W 1920 0 0+00 0+25 0+50 0+75 1+00 0 0 0 0 0 0 0 0 + + + + c RIVERSIDE PARK UPLAND DESIGN BY EQUINOX STN 2+81 FLOW =:> EL. 1926.66 TIE INTO EXISTING GRADE--"' O ASS AL /1YP 00 of + +_+ + _+ + + _+ 0 0 0 0 0 o 0 o Q 0 M i -CAI i CO+ + + 00 co MM co + O co 4 M — 0 o �] o o LO LO ocl)—N—o �D o o +-N 0 0 0 0 0 00 WAVE FEATURE 1 0 0 0 -N-M-� LO LO LO D T��E-�OUT BEACH + / O LO ACCESS PA BY EQUINOX 0 n FRENCH BROAD RIVER D ABANDONED RAILROAD BRIDGE PIERS TO BE REMOVED TO FINAL GRADE. ANY METAL ENCOUNTERED TO BE REMOVED FROM RIVER. RIVERSIDE PARK UPLAND DESIGN BY EQUINOX 1940 1930 0 0 > u1 WAVE FEATURE 1 1920 J W \—STN 3+51 ABANDONED RAILROAD BRIDGE PIERS EL. 1924.15 EXIT POOL LOWERED TO FINAL DESIGN GRADE 1910 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75 4+00 4+25 4+50 4+75 5+00 5+25 5+50 5+75 6+00 6+25 6+50 6+75 7+00 7+25 7+50 7�+5/8 STATION CHANNEL PROFILE STN 3+31 EL. 1929.75 STN 3+46 DEL. 1927.91 BYPASS PROFILE 1940 TIE INTO EXISTING GRADE STN 1000+99 STN 1000+36 EL. 1928.95 Z EL. 1929.75 0 1930 H STN 4+19 STN 5+08 EL.1924.18 EL.1927.32 STN 4+35 DEL. 1926.53 1940 STN 1002+52 EL. 1926.20 FLOW 1930 0 H Q Q > > � 1920 BYPASS RAMP 1920 W W TIE INTO EXISTING GRADE L j EXISTING GRADE PROPOSED GRADE 1910 1910 1001 1000+25 1000+50 1000+75 1001+00 1001+25 1001+50 1001+75 1001 1002+25 100?1��02+58 STATION EXISTING GRADE PROPOSED GRADE --TIE INTO EXISTING GRADE FLOW %b32 v : WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name. Proposed Grading Plan & Profile Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale. Sheet. 1 " = 40' (Plan) WW-0.4 1" = 30' (Profiles) C: G_ C z Q G L z z LL C C G c c C: z G_ Q C LL Q z L v LL C LL C LL G Cz.'. U C Q z LL C.; z LL LL a_ U C U C: z LL LL z L z LL C z Q z C: U LL C C U LL LL PERSPECTIVE VIEW NTS RIVERSIDE PARK DESIGN BY EQUINOX O O m� BACK 4 OVERFLOW HIGH FLOW MED WATER CONTROL FLOW WAVE FEATURE APPROACH PADS � MED LOW FLOW TERRACED BOULDER FLOW H/GH BANK PROTECTION FLOW - • - WAVE FLOW PLATE OVERFLOW FLOW DIFFUSERS MED-HIGH W TAKE-OUT BEACH SCOUR POOL LOW MED-HIG FLOW FLOW MID -CHANNEL ISLAND FISH BYPASS TERRACED BOULDER BANK PROTECTION BURIED AND PLANTED RIPRAP OR BEDROCK ABANDONED RAILROAD CROSSING : WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name: Perspective View Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: NTS Sheet: WW-0.5 C� 0 z_ Q- 5 UM z z LL 0 O O 0 N N N N O N i z Q ry 0 LL] U 5 z LL] 0 z LL 0 O O J Q z LL U z LLI J J > LL] g z LL, U O 0 U) z LL] 75 U O 0 00.1 LL] U) O U U) C� z ry LL] LL] z / z LL] 0 z Q, z LL] o � O N U) LL] J Fy U) ry LL] TERRACED OULDER BANK PROTECTION T P OF BANK OR AS DIRECTED BY ER'S REPRESENTATIVE TO T EDGE OF RAILROAD PROPERTY LINE 2 INV NTING WHIT WAT R S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name: Feature 1 Site Plan Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: Sheet- 1 " = 15' WW-1.0 2+ G_ C z Q G z z LL C G_ C n n n n C n i V U z i C LL Q U LL C z LL C C i U LL C z LL z LL i LL a_ _ U C V C: z a LL LL z U LL z z U LL C C n U LL U v c: 3+03 PT# 829, EL. 193 .87 PT# 828, EL. 19 4.12 PT# 827, EL. 19 5.17 PT# 826, EL. 193 95� 3+22 - PT# 837, EL. 1937.04� PT# 838 ±�915.75 PT# 839, EL. 1935.75 PT# 840, EL. 1934.75 PT# 841, EL. 1933.50 PT# 61, EL. 1935.31 PT# 860, 1931.73 + 4 6 PT# 883, EL. 193 .30- PT# 882, EL. 1937.10� 3+80 61, EL. 1933. # 9 LN31.47 193274 -PT# 9 PT# 91 O\SL. 1930.87 PT# 830, 862, EL. 1933.81 F# 863, EL. 1932.30 912, EL. 1927.78� 831, EL. PT# 843;� PT# 1018, EL. 1933.38 PT# 1014, EL. 1 903, EL. 1927.99 PT# 832, EL. 1929.25 PT# 848, EL. 1929.75 1933.20 APT# 846, EL. 1931.90 EL. 1931.32 0 O PT# 913, EL. 1926 PT# 834, EL. 1929.25 PT# 835, EL. 1929.12 0 PT# 833, EL. 1929 5 j PT# 849, EL. 19 .75 PT# 853, EL. 1933.20 PTA 850, EL. 1931.32 3+30 PT# 1028, EL. 1925.92 74 PT# .1927.38 PT# 91 , EL. 19730.96 916, EL. 9\, PT# 962, EL. 1932.45 P # 772, EL. 1930.95�� =PT#932, EL. 9� '1012, EL. 1931. 1� P # 918, EL. 1939.14 779, EL. 1933.95 PT# 778, EL. 1935.30 �PT# 894, EL. 192 # 851, EL. 1931.90 PT# 1026, EL. 1933.34 APT 3 1 i L \-PT# 7, EL. 1931.95 T L PT# 4, 1934.18 �1�7��; ��. .95 PT# 781, L. 1929.75 J PT 97 L. 1931.95 PT# EL. 1932.30 # 791, L. 19 .30 1000+50 PT# 988, EL. 31.95 P 790, EL. 34.30 �� 3+40 �� PT# 990, E . 1931.82 PT# 789, L. 1933.3 PT# 1020, EL. 1 9.01 PT 023, EL. 1929.01 PT 1 8.371��PT 1 37 PT# 1019, EL. 1 1016, EL. 1932.71 PT# 895, EL. 1927.91 PT# 867 EL. 1929.31 PT# 896, EL. 1924.15 W 65, . - # 864, EL. 1930.26 884, E . 1933.63 98 , E L. 1932.1 859, EL. 1936-2 T# 886, EL. 1928,27 i -PT# 92?,,P-L 1929. 0 P 927, EL 93 .65 PT# 92 , EL. 1934.76 APT# 929, L. 1929.78 365, EL. 1 +19r PT# 930; EC 1929.91 10� PT# 920, EL. 93 7�� PT# 966,E . 19 .68� 60 PT# 36, L.1936.87 PT# 935, EL. 1929.64 4+1 T# 96 , EL. 1935.45 PT# 819, EL. 19 9.65 P # 967, EL. 19 4. 2 'Q 10 '-0 moo .1930.. 1 3+ PT# 964, EL. 1924.15 i � 3+ PT# 887, EL. 1924.15 APPROXIMATE TOE OF CUTOFF WALL PT# 1013, EL. 1926.53— A� '92 06, F "9 26, •moo PT# 981, 9.9 PT# 98 , EL. 1 33.02 # 9 . 1933.50 T# 997, EL. 1929.75 PT# 785, EL. 1929.25� 6 1000 42 , F # 973, EL. 1 31.81 48 PT# 1025, EL. 1933.25 1000+60 P # 993, EL. 1931.57� T# 987, EL. 929.63� rPT# 994, EL. 1931.5 PT# 873, EL. 1929.31 0 9 �PT# 1027, EL. 1932.71 00 66 I 1 1000+70 PT# 773, EL. 1931.83-/ PT# 963, EL. 1924.15 PT# 9 6, E . 1929.6'3 T# 774, EL. 1932.7 PT# 875, EL. S PT# 775, EL. 193 .03 / T# 776, EL. 1935.18 � 1000+80 PT# 878, EL. 1 14 889, EL. 7.21 - PT# 996, EL. 1929.53 PT# 99 , EL. 1929.53 PT# 804, EL. 19 5.0 4 P 890, EL. 193 . PT# 96, EL. 1931.12 1000+90 PT# 1 33.69 EL. 19 PT# 795 EL 31 2 P # 802, EL. 1932. 7 PT# 888, EL. 1924.15� T 797, EL. 1929.45 PT# 799, EL. 192 .4 PT# 801, EL. 1931.05 PT# 897, EL. 1924.15 10 0 96 -r, I ft. 1929PT# 800, .1 31. \ � PT# 958, EL. 1928.95� P # - .9 PT# 992, EL. 1931.04 PT# 970 EL 1928 95 PT# 985, EL. 1929.29� IL� v : WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client - Town of Woodfin, NC Project Name: Woodfin Riverside Park PT# 817, EL. 1934.95 1001+10 PT# 806, EL. 1933.4 T 808, EL. 1 30. 0 PT# 810, EL. 28.94 PT# 1015, EL. EL. 1931.01 PT# 978, EL. 9.45�` l 1 0 + 1001+20 \ \ 1.48 Status. PT# 984, EL. 1930.36 �PT# 812, EL. 19 .32 P 18 5�L. 1930. 90% Design PT# 9 , EL. 1926.58 PT# 983, . 1929.71 PT# 977, L. 9 \ PT# 816, EL. 34. 1001+30 PT# 921 EL. 1928.00 O \ O O +ao � PT# 1004, EL. 1929 18_ � O \ 001+50 001+60 /-\ PT# 818, EL 1927.32 1001+8 4+7 1001+ 0 +80 1002+00 4+9 ❑ A� A A A� 1002+10 5+00 �2 F 2 26 1002+20 1002+30 \ CHANNEL PROFILE 1940 - STN 3+31 WAVE PLATE EXISTING GRADE EL. 1929.75 M LO Ln WATER CONTROL PAD 00 + STN 3+22 STN 3+46 t N EL. 1929.75 EL. 1927.91 It rn Z 1930 STN 2+81 . '.:: '' STN 3+51 z w w O EL. 1926.66 6.8% ,:... ;.: �...::.< .: ,.. EL.1924.15 FLOW STN 3+20 0.0% EL. 1929.25 W TIE INTO STN 4+35 LU EXISTING GRADE EXIT POOL EL. 1926.53 1920 PROPOSED GRADE CUTOFF WALL TOE EL. 1923.75 SOUND BEDROCK OR 3' THICK RIPRAP SCOUR PAD EXTENDING 25' WAVE FEATURE 1 DOWNSTREAM FROM CUTOFF WALL (SEE TYP. DETAILS) CUTOFF WALL TOE EL. 1915.91 1910 2+50 2+75 3+00 3+25 3+50 3+75 4+00 4+25 4+50 STATION 4+75 1940 1940 STN 1000+36 EL. 1929.75 STN 5+08 STN 1000+00 EL. 192 1930 O O 1930 EL.1925.92 A0.% W Lu STN 1000+31 BYPASS PROFILE WATER STN 1000+99 STN 1001+12 CONTROL EL.1928.95 EL.1928.00 PAD STN 1000+96 PROPOSED GRADE EL. 1929.45 TIE INTO EXISTING GRADE -0.5% E:*-7.4°j 3.4% FLOW o STN 1001 +47 J J J BYPASS RAMP EL. 1929.18 EXISTING RAILROAD W Lu EL. 1929.25 CROSSING 1920 1920 (SEE TYP. DETAILS) SOUND BEDROCK OR 3' THICK RIPRAP EXISTING GRADE SCOUR PAD EXTENDING 25' CUTOFF WALL TOE EL. 1923.75 DOWNSTREAM FROM CUTOFF WALL TIE INTO EXISTING GRADE CUTOFF WALL TOE EL. 1917.45 1910 1910 5+00 5+10 1000+00 1000+25 1000+50 1000+75 1001+00 1001+25 1001+50 1001+75 1002+00 STATION 1002+25 PT# 823, EL. 1930.95 1940 1930 Z O u1 J 1920 W Drawing Name - Feature 1 Grading Plan & Profile Revisions- 0 Drawn By. Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp- NOT FOR CONSTRUCTION T� 1910 Scale- Sheet- 1002+15802+58 if WW_ 1 1 1" = 20' (Profiles) 909, EL. 1932.74 -PT# 911. EL. 1931.47 PT# 912, EL. 1927.78 PT# 913, EL. 1927.66 PT# 903, EL. 1927.99 PT# 914, EL. 1927.74 3+03 G_ C z Q G z LL C GU. C n n C n U z G_ Q C LL Q / z U U LL C / z LL c C G CU U LL C Q z LL / C.; z LL LL a_ _ U C v C: z a LL LL z U z LL c z Q U U LL C C n U / LL LL U PT# 829, EL. 1932.87 PT# 828, EL. 1934.12 PT# 827, EL. 1935.17 PT# 826, EL. 1936.95� 3+22 PT# 837, EL. 1937.04� 3+31 X- PT# 838, EL. 1935.75 PT# 839, EL. 1935.75 PT# 840, EL. 1934.75 PT# 841, EL. 1933.50 PT#861, EL. 1935.31 PT# 860, EL. 1936.73� 3+46 PT# 883, EL. 1935.30 PT# 882, EL. 1937.10 3+80 X X PT# 910, EL. 1930.87 830, EL. 1932.64 EL. 1933.81 863, EL. 1932.30 # 864, EL. 1930.26 PT# 884, EL. 1933.63 PT# 885, EL. 1932.12 PT# 831, EL. 1930.36 PT# 843, EL. 1933.20� 46.45FT PT# 1017, EL. 1933.87 PT# 1018, EL. 1933.38 3+10 CONCRETE WATER CONTROL CONCRETE LOW FLOW NOTCH PAD WITH UNISTRUT INSERTS SEE WITH UNISTRUT INSERTS SEE SECTION WW-2.X FOR DETAILS SECTION WW-2.X FOR DETAILS PT# 834, EL. 1929.25 PT# 832, EL. 1929.25 PT# 893 EL 1929 25 PT# 833, EL. 1929.75 ` 844, EL. 1933.20 PT# 845, EL. 1933.00 — 20.00FT — — 5.30FT 0 2 H G LL o _ D 12.00FT o G rn a a N 0 O0 a 0 PT# 1019, EL. 1 1.5FT TALL FLOW DIFFUSER. SEE PT# EL. 19 2.71 21, SECTION WW-2.X FOR DETAILS. PT# 867, EL. 1930.93 PT# 866,E 30. i PT# 865, EL. 1930.21 APPROXIMATE TOE OF CUTOFF WALL PT# 848, EL. 1929.75 `' " 0 38.00FT o a PT# 849, EL. 1929.75 PT# 846, EL. 1931.90 o PT# 850, EL. 1931.32 PT# 847, EL. 1931.32 3+30' °' 23.40FT 36.00FT 23.40FT �P>T# 8g4, EL. 1929.E PT# 851, EL. 1931.90— Qp .. _ ' c ° .. .. 00 ^y ° ;c. c LL a ; ° G 3+40 ° o a 0 PT# 1020, EL. 19 01. �� . x a . �P. # 023, EL. 1929.01 0 PT# 1021, EL. 19 S.37 o� P # 022, EL. 1928.37 x . 30.00FT a _ 27.20FT / _ 27.20FT / PT# 869, EL. 1929.48 3+ 0 PT# 872, EL. 1929.48\` PT# 871, EL. 1927.91 PT# 870, EL. # 887, EL. 1924.15 STATION 3+22.38 APPROACH POOL 1960 1955 1950 M 1945 < D 1940 0 1935 Z 1930 1925 1920 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 OFFSET STATION 3+31.20 UPSTREAM CREST 1960 1955 1950 M r— 1945 M D 1940 0 1935 Z 1930 1925 1920 1960 1955 1950 1945 1940 1935 1930 1925 1920 1960 1955 1950 1945 1940 0% 1935 1930 1925 1920 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 OFFSET i rn m PT# 853, EL. 1933.20- PT# 852, EL. 1933.00 — 20.00FT — 5.30FT LL 0 oN 12.00FT 21.35FT 192 PT# 874, EL. 1930 PT# 897, EL. 1924.15 PT# 888, EL. 1924.15J REMOVABLE WAVE PLATE SEE SECTION WW-2.X FOF DETAILS / STATION 3+45.60 1960 1955 1950 M r 1945 M D1940 0 1935 Z 1930 1925 1920 Mid -channel Island Proposed Grade [PT# 878, EL, 1930,14 PT# 872, EL. 1929.48-7 Grouted Boulders PT# 874, EL. 1930.93 PT# 876, EL. 1930.20 0% 11 3% 1% PT# 873, EL. 1929.31-J PT# 871, EL. 1927.91 .21 PT# 835, EL. 1929.12 X APT# 854, EL. 1933.20 PT# 1024, EL. 1933.87 PT# 1026, EL. 1933.34 PT# 1025, EL. 1933.25 —1.5FT TALL FLOW DIFFUSER. SEE SECTION WW-2.X FOR DETAILS. -PT# 1027, EL. 1932.71 PT# 876, EL. 1930 20-- 69.00FT — 69.60FT PT# 889, EL. 1927.21 DOWNSTREAM CREST a, PT# 860, EL. 1936.73 N PT# 861, EL. 1935.31 Low Flow Concrete Pad PT# 862, EL. 1933.81 J PT# 863, EL. 1932.30 w PT# 869, EL. 1929.48 PT# 864, EL. 1930.26 LO 0') PT# 867, EL. 1930.93 �* PT# 866, EL. 1930.21 -1% -3% 0% 0% ILO/0— PT# 868, EL. 1929.31 See Equinox Drawings 870, EL. 1927.91 for Riverside Park Scope -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 OFFSET STATION 3+80.00 EXIT POOL 1950 1945 1940 M r— 1935 M D 1930 0 1925 Z 1920 1915 1910 PT# 836, EL. 1929.94 PT# 856, EL. 1 PT# 878, EL. 1930.1 PT# 890, EL. 1930.23 1960 1955 1950 1945 1940 1935 1930 1925 1920 1950 1945 1940 1935 1930 1925 1920 1915 1910 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 OFFSET N rn acri = o o G � D 0 1 0 66 - w J rn n N rn : WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name: Feature 1 Detailed Plan Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1" = 10' (Plan) 1" = 25' (Sections Sheet: WW-1.2 G_ C z Q z LL C G_ C n n n C n i U, C: G LL Q LL C LL C C i LL C z LL A. i LL a_ (I; C C (I; C: LL LL z L z LL c z Q z C; (I; LL C C n (I; LL a U, LL (I; TERRACED BOULDER BANK PROTECTION. SEE SE -2.X FOR DETAILS L—PT4 778, EL. 1935.30 1933.95PTt01 L. 1931.91 PT# 772, EL. 19 SOP ODER ISL ND EVA ON 1933.00 PT# 792, EL. 1929.25 CONC RETE ATER PT# 786, CON ROL P D. SEE SECTION -2.X FOR DETAIL . 0 0 PT# 997. EL. 1929.75 PT# 785, EL. h 929.25 TOP FBOULDER ISLAND ELEVATIO 1934.50 PT# 979, EL. 1933.50 PT# 980, EL. 1933.02 PT# 981 „ EL. 1929.95 EXISTING RAI OAD ABUTMENT PT# 806, EL. 1 7Z XZ TO BE REMO ED PT# 817, EL. 1934.95 794, EL. 1934.18 PT# 801, EL. 1931.05 _—r I +r f ZVI , r-L. I ZVJO.OU PT# 776, EL. 1935.18 PT# 790, EL. 1934.30 �C PT# 804 EL 1935.04 PT# 803, EL. 1933.69 PT# 802, EL. 1932.17 —PT# 7 EL. 1933.30 _APT# 774 EL. 1932.7 67.32FT PT# 788, EL. 932.30 PT# 773 EL 1931 83 ROUGHENED FISH BYPASS RAMP 55H:1V (Approx. (HIGH FLOW AREA) . PT# 1-� I I l � l PT# 994, EL. 1931.57— T# 787, EL. 1931 PT# 98 L. 1931 �95_ 1 29: 6 D 4, PT# 990, EL. 1931.82 49.00FT - PT# 987, EL. 1929.63— �p e 0 O L0 0 o 0 O 0 ai o 0 D. r e 0 D N e PT#781, EL. 1929.75 D' p > A _PT # 9 , PT# 971, 1931.95 PT# 782, EL. IH 0 PT# 993, EL. 1931.57J 0\ N ROUGHENED FISH BY SS RAMP (HIGH OW AREA) PT# 783, EL. 193 .30 26H:1V (App rox. CV PT# 799, EL. 1 PT# 995, El 1 ROUGHENED FISH BYPASS RAMP V (Approx. (LOW FLOW NOTCH) o 00 rn LL —0 0 0 00 v- 0 0 0 53.76FT ROUGHENED FISH V (Approx. BYPASS RAMP (LOW FLOW NOTCH) PT# 986, 9.63 rPT# 996, EL. 1 2 + C 40.50FT C STATION 1000+36.28 1950 1945 M r 1940 M D1935 0 1930 z 1925 1920 C� \ PT# L.1929. : PT# 796, EL. 1931.124 55H:1V (Approx.) PT# 795, EL. 1931.24� 75.65FT MID -CHANNEL ISLAND C� 87.86FT 1950 1945 1940 1935 1930 1925 1920 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 OFFSET STATION 1000+42.23 1950 1945 r 1940 M D 1935 0 1930 z 1925 1920 1950 1945 1940 1935 1930 1925 1920 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 OFFSET - PT# 823,EL. 1930.95 P 816, EL. 4.93 / 814 .1931 / PT., 822 . 1931.45 PT# 815, EL..130.05 APPROXIMATE TOE OF CUTOFF WALL 0° 6 EL. 1. 1 93 P OF BOULDER ISLAND z ELEVATION 1935.50 ° ° PT# 821 L. 1925.5 5, .1 �0 9° 92, L1 3 . TOP OF BOULDER ISLAND ELEVATION 1933.50 C a °a J°a0 19 91 E 8.00 ° T# 812, EL. 1928.32 O _ 0 0 0 L0 (D oC-00 rn + + + + +00O o00 O L 1 .9 ---- PT# 1004, EL. 1929.18 0 ° 0 APPROXIMATE LOCATIOTF RAISED BO LDER CLUSTERS TO PROMOTE FISH PASSA FINAL ° LOCATION AND ELEVATION TO BE IDE TIFIED 0 BY PROJECT FISHERIES ECOLOGIST OR S20 REPRESENTATIVE. 970 8. TOP OF BOULD ISLAND ELEVATION 1934.00 975, EL. 1930. rn (.0 26H:1V (Approx. �/ � 0 P # 808, EL. 1930.50 O 9 192 .7S p STATION 1000+66.49 1950 1945 M r 1940 M D1935 0 1930 z 1925 1920 1950 1945 1940 1935 1930 1925 1920 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 OFFSET STATION 1000+95.96 1950 1945 r 1940 M D 1935 0 1930 z 1925 1920 1950 1945 1940 1935 1930 1925 1920 -50 -40 -30 -20 -10 0 10 20 30 40 50 -50 -40 -30 -20 -10 0 10 20 30 40 50 OFFSET LTIE-IN TO EXISTING GRADE. REFER TO ROFILES AND SECTIONS FOR APPROXIMATE TIE IN STATIONING OR IE-IN AS DIRECTED B S20 REP NTATIVE. O O o 0 0 + + l) + _+ + —N 0 0 0 00 o o 0 J I TOP OF BOULDER ISLAND ELEVATION 1933.00 BOULDERI SECTION V STATION 1001 +20.26 1950 1945 M r 1940 M D1935 0 1930 z 1925 1920 1950 1945 1940 1935 1930 1925 1920 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 OFFSET RAILROAD PROPERTY ROWLINE STABILIZE EXISTING BANK WHERE BEDROCK IS NOT PRESENT USING BU IE LANTED RIPRAP. SEE SECTION WW-2.X FOR DETAILS. 00 L0 + -N- O O : WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name: Bypass Detailed Plan Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1" = 10' (Plan) 1 " = 25' (Sections Sheet: WW-1.3 o � STATION 3+03 1950 M I— M 1940 D 1930 z 1920 PT# 918, EL. 1939.14 Tie Into Existing Bank. PT# 961, EL. 1933.92 Review Tie -In with S20 Representative. PLLPT# d Gde PT# 909, EL. 1932.74 PT# 917, EL. 1930.96 PT# 911, EL. 1931.47 PT# 916, EL. 1927.99 PT# 914, EL. 1927.74 3, EL. 1927.66 PT# 903, EL. 1927.99 PT# 910, EL. 1930.87 PT# 915, EL. 1927.38 PT# 912, EL. 1927.78 Existing Grade -220 -200 -180 -160 -140 -120 -100 -80 STATION 4+19 1950 M I— M 1940 D 0 1930 z 1920 BYPASS PT# 905, EL. 1924.18 CHANNEL Proposed Grade PT# 922, EL. 1926.58 921, EL. 1928.00 Existing Grade -120 -100 -80 STATION 4+60 1950 M I- 1940 D 0 1930 z 1920 -60 -40 -20 0 20 40 60 80 OFFSET PT# 928, EL. 1927.00 Bedrock Removal (Typ.) PT# 925, EL. 1934.76 PT# 926, EL. 1933.16 PT# 927, EL. 1931.65 PT# 930, EL. 1929.91 -60 -40 -20 0 20 40 60 80 100 120 140 OFFSET 1950 1940 1930 1920 1950 1940 1930 1920 100 120 140 PT# 824, EL. 1934.62 PT# 823, EL. 1930.95 PT# 936, EL. 1936.87PT# 968, EL. 1935.45 PT# 822, EL. 1931.45 PT# 933, EL. 1926.19 PT# 934, EL. 1928.75 PT# 967, EL. 1934.22 Proposed Grade PT# 818, EL. 1927.32 PT# 906, EL. 1926.00 PT# 966, EL. 1932.68 PT# 920, EL. 1931.17 PT# 821, EL. 1925.54 Bedrock Removal (Typ.) Tie Into Existing Bank. PT# 819, EL. 1929.65 Review Tie -In with S20 Representative. Existing Grade -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 STATION 5+08 1950 PT# 945, EL. 1936.53 m Tie Into Existing Sound Bank Material/Bedrock m 1940 or Install Buried and Planted Riprap per Typical Details. Review Tie -In with S20 Representative. PPT# 942, EL. 1927.32 T# 944, EL. 1930.54 0 1930 -- �-�===== PT# 943, EL. 1926.44- z 1920 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 OFFSET Existing Grade Abandoned Railroad Crossing Pier Removal Proposed Grade ui_Pro 1 V VW PT# 1029, EL. 0.00 PT# 937, EL. 1935.80 PT# 1030, EL. 0.00 1940 941, EL. 1927.32 PT# 907, EL. 1926.74 PT# 1031, EL. 0.00 1930 Flow Deflector A e%r%^ -60 -40 -20 0 20 40 60 80 OFFSET 1v4u 100 120 140 160 1950 1940 1930 1920 REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name: Additional Channel Sections Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status. Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: Sheet - ill = 20' WW-1.4 L z z LL C C C c c V C: z G_ Q C LL a z L v c z LL C C C G (z.'. V LL C LL LL a_ U C U C: z LL LL z L z LL C z Q z C: U LL C C ON U LL ILL D WW-2.1 C WW-2.1 B WW-2.1 LOW, MEDIUM AND HIGH FLOW PLATE �W- APPROXIMATE CENTERLINE OF ';I OPFS VARY RY STRUCTURF_ SFF NOTE: WHITEWATER STRUCTURES, STRUCTURES, RECREATION FEATURES, GROUTED ROCK RAMPS ARE SYNONYMOUS TERMS WITHIN THIS DRAWING SET AND SPECIFICATIONS RECREATIONAL FEATURE (TYP. PLAN SCALE: NTS C% REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (1) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1"-5' Sheet: W W-2.0 C: G_ C z Q G L z z LL C C C C ON ON ON ON C ON U G C LL Q z U U LL C z LL C C C G L U LL C Q z LL C.; z LL LL a_ 2 H C U U LL LL z U z LL C z Q z U U LL C C CN U LL LL GROUT 2" BELOW BOULDER SURFACE OR AS DIRECTED CONCRETE LOW FLOW NOTCH GROUT 2" BELOW BOULDER SURFACE OR AS DIRECTED BY S20 REPRESENTATIVE AND PRESS CLEAN COBBLE WITH UNISTRUT INSERTS. SEE SECTION BY S20 REPRESENTATIVE AND PRESS CLEAN COBBLE INTO GROUT. WASH EXCESS GROUT OFF BOULDERS. B-B' AND DETAILS 2 AND 3. INTO GROUT. WASH EXCESS GROUT OFF BOULDERS. a BYPASS CHANNEL SLAN D 1 BEDDING: CLEAN 3"-4" COBBLE, 12" THICK WATER SURFACE VARIES CONCRETE WATER CONTROL PAD. SEE DETAIL 2. BACKFILL TRENCH 'II"lIII v WITH 18" D50 RIPRAP. IIIIIIIIIIIII III=1 I I=1 BACKFILL CONCRETE CUTOFF WALL WITH- ' =III=III=11 Y-4" CLEAN COBBLE ill,; lllll TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. SECTION CHANNEL WIDTH VARIES HIGH FLOW/OVERFLOW CREST OF DROP STRUCTURE SLOPE VgRIES OF R EACH FLOW PLATE C__7�> UNISTRUT CHANNEL \,NO. 5 EPDXY COATED REBAR CAST INTO SLAB. @ 12" CENTERS E.W., SEE DETAIL 3. SEE DETAIL 3. SCALE: NTS CONCRETE LOW FLOW NOTCH SLAB. SEE DETAIL 3 3' MIN. DIAMETER BOULDERS GROUT --- I I -I � I -I � I -I � I -III -III -I I -I � I -I � I -III -III -III -III -III -III -III -III -III -III- ------ =1 1=1 1= 1=1 III-= II1=11 II1=111=111=111=111='- ' --II1=111=111=111=111=11I-III-II I I 1=1 I I 11=1 11=1 11=1 11=1 �'- "'=1 11=1 11=1 11=1 11=1 11=1 11=1 -i I I-1 I I I I -I 11=1 11=1 11= "=1 11=1 11=1 11=1 11=1 I I- � � 1=1 11=1 11=1 11=1 I I PREPARE SUBGRADE. il-III-III-III-II REFER TO SPECIFICATIONS ll-III-III-III=1 CONTINUOUS MIRAFI 180N =III-III-III-III=1 -III=III=III=III- � FILTER FABRIC INTIMATE '1=III-III-III-III- '1(- CONTACT WITH SUBGRADE 111=III=III=III=III= REMOVE AND REPLACE IF =III-III-III-III-III- -1(- SUBGRADE DOES NOT MEET -III-III-III-III-III- -I-I-I(- CLEAN 3"-4" COBBLE SPECIFICATIONS -III-III I -III -III - BEDDING, 12" THICK il- =III-III-III- 1=111=111=111-I I I ' II1=11=11=11�-111-111-1 UNDISTURBED OR =1 1=1I1=1111I fl PREPARED SUBGRADE --III= RECREATIONAL FEATURE (CONCRETE LOW FLOW NOTCH) PROFILE SCALE: NTS BOULDER BANK TERRACING (3FT DIAM. MINIMUM) lil 1i1=1i1=1i1=1i1=1i1=1i1' ONTINUOUS MIRAFI 180N -I I -I 1=1 I -III -III -I I- Ii1-Ii1-Ii1-Ii1-Ii1-Ii1=1 FILTER FABRIC INTIMATE IIIi11111i1111i1=1i1_Ii CONTACT WITH SUBGRADE RAISED FLOW DIFFUSER BOULDERS. SEE SITE PLANS FOR LOCATIONS, DIMENSIONS AND ELEVATIONS. ROUNDED STRUCTURAL BOULDERS (3FT DIAM. MINIMUM) SOUND BEDROCK, UNDISTURBED ALLUVIAL MATERIAL, OR PREPARED SUBGRADE PER SPECIFICATIONS. FLOW INTIMATE CONTACT BETWEEN BOULDERS 1.5' MIN. 4" DIAM. PERFORATED PVC WEEP DRAINS, WRAPPED IN MIRAFI 180N FILTER FABRIC. WEEP DRAINS TO BE PLACED EVERY 6' ACROSS ENTIRE STRUCTURE WIDTH ARMOR SCOUR PAD WITH 18" D50 RIPRAP, 3' THICK, TYP. (SEE DETAIL 9) I I-III-1 11=1 11=1 11=1 11=1 I III=III-ICI-ICI _ BACKFILL TRENCH WITH -III-III-III-III-III-I 11= 18" D 5 0 RIPRAP. =1 11=1 11=1 11=1 11=1 11=_I I i =III=III=III=III= - STOCKPILE LARGEST III=III=III=III=III BOULDERS FOR PLACEMENT -III-III-III=1 11= ' II-1 1-1 1-1 1= AT TOE TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. IF BEDROCK IS ENCOUNTERED, KEY TOE BOULDER INTO BEDROCK 1FT MINIMUM, PIN WITH REBAR AND GROUT. S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name- Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (2) Revisions- 0 Drawn By - Riley Adams Checked By - Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp - NOT FOR CONSTRUCTION Scale- 1"-5' Sheet: WW-2.1 C: G_ C z Q G L z z LL C C C c n n n n C n G C LL H Q U U LL C z LL C C C G L U LL C Q z LL C.; z LL i LL a_ 2 U C C.; U U z LL LL z L z LL C z Q z U U LL C C CN U LL LL WATER SURFACE VARIES BACKFILL TRENCH WITH 18" D50 RIPRAP. TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE CLEAN 3"-4" COBBLE BEDDING, 12" THICK PREPARE SUBGRADE. REFER TO SPECIFICATIONS REMOVE AND REPLACE IF SUBGRADE DOES NOT MEET SPECIFICATIONS RECREATIONAL FEATURE (FLOW PLATE TYP.) PROFILE WATER SURFACE VARIES BACKFILL TRENCH WITH 18" D50 RIPRAP. TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE SLOPE VARIES FOR EACH FLOW PLATE CLEAN 3"-4" COBBLE BEDDING, 12" THICK FLOW 3' MIN. DIAMETER BOULDERS GROUT UNDISTURBED OR PREPARED SUBGRADE RAISED BOULDERS FOR FLOW DIFFUSER. SEE SITE/DETAIL PLANS FOR DIMENSIONS. .ate ram_•-�-�-• •-�-- PREPARE SUBGRADE. REFER TO SPECIFICATIONS REMOVE AND REPLACE IF SUBGRADE DOES NOT MEET SPECIFICATIONS UNDISTURBED OR PREPARED SUBGRADE RECREATIONAL FEATURE (PLATE WITH FLOW DIFFUSER) PROFILE INTIMATE CONTACT BETWEEN BOULDERS 1.5' MIN. 4" DIAM. PERFORATED PVC WEEP DRAINS, WRAPPED IN MIRAFI 180N FILTER FABRIC. WEEP DRAINS TO BE PLACED EVERY 6' ACROSS ENTIRE STRUCTURE WIDTH SCALE:NTS 3' MIN. DIAMETER BOULDERS GROUT ARMOR SCOUR PAD WITH 18" D50 RIPRAP, 3' THICK, TYP. (SEE DETAIL 9) BACKFILL TRENCH WITH 18" D50 RIPRAP. STOCKPILE LARGEST BOULDERS FOR PLACEMENT AT TOE TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. IF BEDROCK IS ENCOUNTERED, KEY TOE BOULDER INTO BEDROCK 1 FT MINIMUM, PIN WITH REBAR AND GROUT. FLOW � INTIMATE CONTACT BETWEEN BOULDERS 1.5' MIN. 4" DIAM. PERFORATED PVC WEEP DRAINS, WRAPPED IN MIRAFI 180N FILTER FABRIC. WEEP DRAINS TO BE PLACED EVERY 6' ACROSS ENTIRE STRUCTURE WIDTH SCALE: NTS TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. IF BEDROCK IS ENCOUNTERED, KEY TOE BOULDER INTO BEDROCK 1 FT MINIMUM, PIN WITH REBAR AND GROUT. S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (3) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale- 1 -51 Sheet: W W-2.2 C: G_ C z Q G z z I1 C C c n n n n C n C: G Q C LL Q C: LL C z c C C L U LL C Q z I1 C.; z LL LLLL a_ 2 H C C.; U C: z LL z C: LL z Q z C: U LL C C CN v LL ILL REINFORCEMENT MAY BE LOCALLY DISPLACED A MAXIMUM OF 1.96" (50mm) IF IN CONFLICT WITH UNISTRUT 2" MINIMUM UNISTRUT CLEARANCE TO EDGE OF CONCRETE (TYP.) NO. 5 EPDXY COATED HOOK BARS @ 12" CENTERS. 24" LAP WITH SLAB BAR. NO. 5 EPDXY COATED REBAR @ 12" CENTERS E.W. g,_0„ FLOW UNISTRUT CHANNEL CAST INTO SLAB. REFER TO INSTALLATION & LAYOUT NOTES 1" CHAMFER ON ;POSED CONCRETE EDGES (TYP.) O UNISTRUT INSTALLATION NOTES: 0 0 JOINT BETWEEN APPROACH SLAB UNLESS OTHERWISE NOTED OR DEVIATION APPROVED IN WRITING: O O O O O O O O AND LOW FLOW NOTCH SLAB. INSTALL BOND BREAKER PER 1. ALL CHANNEL INSERTS TO BE UNISTRUT TYPE P3270 - 0.83" x 1.6" HOT -DIPPED STEEL, o� OQ OOD OOSPECIFICATIONS. AND SUITABLE FOR STANDARD FIXINGS USING UNISTRUT NUTS. TYPICAL MANUFACTURERS 0 0 3' MIN. DIAMETER BOULDERS STOCK LENGTHS ARE 20 LONG. O O O O O 2. UNISTRUT SHALL BE INSTALLED FLUSH WITH TOP OF CONCRETE SLAB AND WITH PLASTIC BACKFILL TRENCH WITH GROUT GUARD IN PLACE TO PREVENT CONCRETE INTRUSION DURING PLACEMENT. ANY OPENINGS - co 0 0 0 0 0 0 18" D50 RIPRAP. o o NOT COVERED BY PLASTIC GUARD SHALL BE TAPED. (SEE DETAIL 5) O O O O O 3. WHERE UNISTRUT IS BUTTED END TO END THE UPSTREAM END OF THE LOWER UNISTRUT CONCRETE o� � �Q o SHALL BE ROUNDED TO REMOVE ANY SHARP/PROJECTING STEELWORK. CUTOFF WALL o o O O O O O O 4. ALL STAINLESS STEEL ELEMENTS TO BE ISOLATED FROM OTHER METALLIC COMPONENTS TO O O O O O PREVENT BIMETALLIC CORROSION. 3" MINIMUM — COVER (TYP.) - o' o — 5. AT JOINTS BETWEEN CONCRETE SLABS, UNISTRUT INSERTS TO BE DISCONTINUOUS AND O O O O O GROUNDED. �, > — CONTINUOUS MIRAFI 180N FILTER 6. UNISTRUT SHALL BE CUT TO MAINTAIN A MINIMUM OF 2 CLEARANCE TO THE EDGE OF _ FABRIC INTIMATE CONTACT WITH SLABS AND/OR WALLS. O O O O O O SUBGRADE 7. RAPIDBLOCS/FLOW PLATE MAY BE ADJUSTED IN THE FIELD AS DIRECTED BY AN S20 REPRESENTATIVE. O - - o �oQo�oQo�o — SOUND BEDROCK, UNDISTURBED BACKFILL CONCRETE — ALLUVIAL MATERIAL, OR PREPARED CUTOFF WALL WITH - SUBGRADE PER SPECIFICATIONS. 3"-4" CLEAN COBBLE TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. - IF BEDROCK IS ENCOUNTERED, KEY TOE (- BOULDER INTO BEDROCK 1 FT MINIMUM, PIN WITH REBAR AND GROUT. 2 TYPICAL CONCRETE WATER CONTROL SLAB & CUTOFF WALL DETAIL PROFILE SCALE: NTS %b32 v : WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (4) SEE SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT SEE LAYOUT LAYOUT Revisions: NOTE 2 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 2 0 250mm 500mm 500mm 500mm 500mm 500mm 500mm 500mm 500mm 500mm 500mm 250mm UNISTRUT CHANNEL CAST INTO SLAB. REFER To UNISTRUT LAYOUT NOTES: INSTALLATION & LAYOUT NOTES. UNLESS OTHERWISE NOTED OR DEVIATION APPROVED IN WRITING: NO. 5 EPDXY COATED REBAR @ 1. UNISTRUT INSERTS SHALL GENERALLY HAVE 19.68" (500mm) CENTER TO CENTER SPACING 12" CENTERS E.W. UNLESS OTHERWISE NOTED. Drawn By: 2. UNISTRUT INSERTS SHALL BE LAID OUT 9.84" (250mm) FROM THE EDGE OF SLAB OR WALL Riley Adams REINFORCEMENT MAY BE LOCALLY TO THE CENTER OF THE FIRST INSERT. SUBSEQUENT INSERTS INSTALLED ACROSS SLAB DISPLACED A MAXIMUM OF 1.96" Checked By: (50mm) IF IN CONFLICT WITH UNISTRUT SHALL BE 19.68 (500mm) CENTER TO CENTER SPACING UNLESS OTHERWISE NOTED OR Scott Shipley DIRECTED BY AN S20 REPRESENTATIVE. 3" MINIMUM 3. ALL UNISTRUT INSERTS ARE TO BE LAID PARALLEL TO EACH OTHER AS INDICATED. Date:December 20, 2022 COVER (TYP.) 4. THE LAYOUT OF UNISTRUT INSERTS SPECIFIED IN THIS PLAN SET SHALL NOT BE ALTERED Status: WITHOUT CONSULTATION AND APPROVAL. AN S20 REPRESENTATIVE SHALL BE PROVIDED Issued For Permitting 3' MIN. DIAMETER BOULDERS THE OPPORTUNITY TO REVIEW UNISTRUT LAYOUT PRIOR TO PLACEMENT OF CONCRETE. _ QUESTIONS AND CLARIFICATION SHOULD BE CONFIRMED BY AN S20 REPRESENTATIVE PRIOR CONTINUOUS MIRAFI 180N FILTER TO INSTALLATION. Stamp - FABRIC INTIMATE CONTACT WITH 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUBGRADE QOOQOOQOOQOOQOOQOOQOOQOOOQO SOUND BEDROCK, UNDISTURBED ALLUVIAL MATERIAL, OR PREPARED NOT FOR CONSTRUCTION SUBGRADE PER SPECIFICATIONS. II III III ��� ail II'— 3 TYPICAL UNISTRUT & CONCRETE SLAB DETAIL Scale: Sheet: SECTION SCALE: NTS 111-51 WW-2.3 C: G_ C z Q G L z z ILL C G C ON ON ON ON C ON U U z G_ Q C \L Q z U U LL C z ILL C C C G CU U LL C Q z ILL C.; z LL LL a_ H U C: z LL LL z L z LL C z Q z U U LL C C CN U LL ILL CONTRACTOR MAY INSTALL LIFTING LUGS IF NECESSARY FOR HANDLING. ANY INSERTS SHALL CONSIST OF CORROSION RESISTANT MATERIALS 3/8" UNISTRUT ATTACHMENT (OR COATINGS). INSERTS SHALL BE HARDWARE. SEE SECTION FOR PATCHED WITH GROUT AFTER ADDITIONAL DETAIL. INSTALLATION OF WAVE PLATES. 3.5 REINFORCEMENT MAY BE LOCALLY DISPLACED A MAXIMUM OF 1.96" (50mm) IF IN CONFLICT WITH TIE —DOWN HARDWARE. ROUND ALL EXPOSED EDGES (TYP.) REMOVABLE WAVE PLATE DETAILS IaW-11►1 CONTRACTOR MAY INSTALL RE TO INSERTS FOR LIFTING DEVICE IF 3/8" WASHER AND HEX NUT BE STAINLESS STEEL ALL TIE —DOWN HARDWARE HAVE ROUND ALL EXPOSED EDGES NECESSARY. ANY INSERTS SHALL (NOTE 1) CORROSION RESISTANT (TYP.) INCLUDE CORROSION RESISTANT COATING OR MATERIALS. INSERTS 3/8" ALL THREAD (NOTE 1) COATING. SHALL BE PATCHED WITH GROUT AFTER INSTALLATION OF WAVE 3/8" SPRING NUT TACK WELDED PLATES. TO ALL THREAD (NOTE 1) REMOVABLE WAVE PLATE DETAILS SECTION UNISTRUT CHANNEL CAST INTO SLAB. SEE DETAIL NO. 5 EPI REBAR @ ROUND ALL EXPOSED EDGES (TYP.) NO. 5 EPDXY COATED N REBAR @ 12" CENTERS E.W. 2" MIN. COVER (TYP.) NO. 5 EPDXY COATED HOOK BARS. 24" LAP WITH SLAB BAR. SCALE: N 16 7 75ft _L EXPOSED EDGES NO. 5 EPDXY COATED HOOK BARS. 24" LAP WITH SLAB BAR. ROUND ALL EXPOSED EDGES (TYP.) S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (5) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1"-5' Sheet: W W-2.4 C: G_ C z Q G L z z LL C C C c ON ON ON ON c ON U C: z G_ Q C LL a z L v LL C z LL C C C G Cz.'. U LL C Q z LL C.; z LL LL a_ U C U C: z LL LL z L z LL C z Q z C: U LL C C U LL ILL F WW-2 BYPASS CHANNEL (TYP. PLAN E' Ww-2.6 SCALE:NTS S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: F, 90% Design WW-2. Drawing Name - In -Stream Details (6) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1"-5' Sheet: WW-2.5 C: G_ C z Q G C.; z LL C G_ c n n n n C n U U z G_ Q C LL Q z U U LL C z LI C C G L LL C z LL C.; z LL LL a_ C U U LL LL z z LL Q U U C C n U LL LL ROUNDED STRUCTURAL BOULDERS (3FT DIAM. MINIMUM) BEDDING: CLEAN 3"-4" COBBLE, 12" THICK CONCRETE WATER CONTROL PAD. SEE DETAIL GROUT 12" BELOW BOULDER SURFACE BUT NO LESS THAN HALF THE HEIGHT OF ANY BOULDER OR AS DIRECTED BY S20 REPRESENTATIVE. PRESS CLEAN COBBLE INTO GROUT. CHANNEL WIDTH VARIES MEDIUM/HIGH FLOW ._ LOW FLOW IIII= III III=III -III III_III IIIII III - III III III -III III III I -III III III= III III III III III III III III III I � =III III III III III=III III III III III III III_III III III III III III III-_ -1II III -III III .III -III .IIL-III III III-11- � � � � CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE WATER SURFACE VARIES BACKFILL TRENCH �IIIIIIIIIII� WITH 18" D50 RIPRAP. III=11. ;III-1� BACKFILL CONCRETE -III CUTOFF WALL WITH 1 -1 3"-4" CLEAN COBBLE TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. BYPASS CHANNEL (TYP. SECTION L � 3' MIN. DIAMETER BOULDERS L SITE PLAN \ TAILS FOR SLOPE O � O� RAISED BOULDERS FOR FLOW DIFFUSER. SEE SITE/DETAIL PLANS FOR DIMENSIONS. ill=1=1=1=1=1 11= -' "=I I I=111=111=111=111— "—III-III-III=F II_ II1=1I1=1I1=1II— PREPARE SUBGRADE. 1-III=III=III-III CLEAN 3"-4" COBBLE REFER TO SPECIFICATIONS 11-III-III-III-11 BEDDING, 12" THICK IIIIIIIIIIIIIIIIIIIIIIII I I 1=1 I I_I 11=1 UNDISTURBED OR 11-III III REMOVE AND REPLACE IF -III-III III= PREPARED SUBGRADE SUBGRADE DOES NOT MEET -III III III III= SPECIFICATIONS III -I -IIII CONTINUOUS MIRAFI 18ON FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE WATER SURFACE VARIES BACKFILL TRENCH WITH 18" D50 RIPRAP. TOE BOULDERS PLACED TO DEPTH IDENTIFIED ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE BYPASS CHANNEL - LOW FLOW (TYP.) PROFILE SEE SITE PLANS OETAILSWR SLOPE � � O O� O� L CLEAN 3"-4" COBBLE BEDDING, 12" THICK RAISED BOULDERS FOR FLOW DIFFUSER. SEE SITE/DETAIL PLANS FOR DIMENSIONS. PREPARE SUBGRADE. REFER TO SPECIFICATIONS REMOVE AND REPLACE IF SUBGRADE DOES NOT MEET SPECIFICATIONS UNDISTURBED OR PREPARED SUBGRADE BYPASS CHANNEL - MED/HIGH FLOW (TYP.) PROFILE •��a�� Tel SOUND BEDROCK, UNDISTURBED ALLUVIAL MATERIAL, OR PREPARED SUBGRADE PER SPECIFICATIONS. SCALE:NTS GROUT OINTIMATE CONTACT BETWEEN BOULDERS 1.5' MIN. ISLAND MAIN CHANNEL 7 G O APPROXIMATE LOCATION OF RAISED BOULDERS TO SUPPORT FISH PASSAGE SHOWN ON BYPASS SITE/DETAILS PLAN. FINAL LAYOUT OF RAISED BOULDERS TO BE COORDINATED ON SITE BY S20 REPRESENTATIVE AND PROJECT FISHERIES ECOLOGIST. FLOW I 4" DIAM. PERFORATED PVC WEEP DRAINS, WRAPPED IN MIRAFI 180N FILTER FABRIC. WEEP DRAINS TO BE PLACED EVERY 6' I:I ACROSS ENTIRE STRUCTURE WIDTH � ARMOR SCOUR PAD WITH 18" D50 RIPRAP, 3' THICK, TYP. (SEE DETAIL 9) O OQOQO O BACKFILL TRENCH WITH 18" D50 RIPRAP. IIII O -- _-___= Yrr- 1=1 1=11 111=111=11 I III III III-1 I I III-1 I I III-1 I I- III --III III -III I I I_I I I III -III I III III -III III- I I_I I I-' _' STOCKPILE LARGEST III -III - -=111 I - III III III=1 I I I I 1=1 I I_I I BOULDERS FOR PLACEMENT III=III_ - I III -I III- 1I I -I III III- I11=1I1 111=1I1 111=1I1 11I- � I -III III III -III III=111- I I I-1 I I III-1 I I I I I_I I I, :' AT TOE ill _III III -III- III -III -III -III- - = TOE BOULDERS PLACED TO DEPTH IDENTIFIED III=III=111=111=III=III-III=II1=111=1IE-III-III- 1-1 11=1 11=1 11=1 _ __ _III=III-III=III-III=' 11=1 11=1 11=1 11=1 11=1 11=1 i'- ON GRADING PLAN/PROFILES UNLESS 11=III OTHERWISE DIRECTED BY S20 REPRESENTATIVE. 111111111111ii111,;,III=' IF BEDROCK IS ENCOUNTERED, KEY TOE BOULDER INTO BEDROCK 1 FT MINIMUM, PIN WITH REBAR AND GROUT. SCALE:NTS S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client - Town of Woodfin, NC Project Name- Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (7) Revisions- 0 - 3' MIN. DIAMETER BOULDERS FLOW - GROUT Drawn By: Riley Adams INTIMATE CONTACT BETWEEN Checked By - BOULDERS 1.5' MIN. Scott Shipley 4" DIAM. PERFORATED PVC WEEP DRAINS, WRAPPED Date: IN MIRAFI 18ON FILTER FABRIC. WEEP DRAINS TO BE December 20, 2022 PLACED EVERY 6' ACROSS ENTIRE STRUCTURE WIDTH � O O Status - ARMOR SCOUR PAD WITH Issued For Permitting 18" D50 RIPRAP, 3' THICK, TYP. (SEE DETAIL 9) O-11=111=111111=11 Stamp- .. - BACKFILL TRENCH WITH ' III- -III III -III III=1 I I III=1 I I I I 1=' III=III III III III III III III=1' 18" D50 RIPRAP. III -III = 1 III III III III III III -I I i- IIIIIIIIIIIIIII- =III=III=III=III=III=III=IIULIII STOCKPILE LARGEST MrOrKLI11=1111=111=111 BOULDERS FOR PLACEMENT ===AT TOE _ _ -1i = IT-1il NOT FOR CONSTRUCTION -I 1 �-111-111-IT-III-III-III-III-IT-I � I-= _ - '' 1=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 I I -III -I i' =i11=III=III=III=III=III=III-11 TOE BOULDERS PLACED TO DEPTH IDENTIFIED 1TI-_III 111=1i-' ON GRADING PLAN/PROFILES UNLESS OTHERWISE DIRECTED BY S20 REPRESENTATIVE. IF BEDROCK IS ENCOUNTERED, KEY TOE BOULDER INTO BEDROCK 1 FT MINIMUM, PIN WITH REBAR AND GROUT. SCALE:NTS Scale- 1"-5' Sheet: WW-2.6 C: G_ C z Q G z z LL C C C c n C n U C: z G_ Q C LL H Q z C: U LL C z LL C C C G Cz.'. U LL C Q z LL C.; z LL LL a_ _ H H C U C: z LL LL z z LL C z Q z C: U LL C C U LL ILL ARMOR DEFLECTOR WITH 18" RIPRAP, 3' THICK EXTENDING SHOWN ON SITE/GRADING PL TO BANK RAIDING PLAN BY S20 COBBLE AND SAND FILL J KEY TOE BOULDERS INTO BE[ OR PREPARED SUBGRADE DEFLECTOR (TYP. ) PLAN SCALE: NTS 3' MINIMUM DIAM. TOE BOULDERS CHANNEL INVERT ARMOR PERIMETER OF DEFLECTOR WITH 18" D50 RIPRAP, 3' THICK EXTENDING AS SHOWN ON SITE/GRADING PLANS CONTINUOUS MIRAFI 180N FILTER FABRIC — INTIMATE CONTACT WITH UNDISTURBED CUT BEDROCK OR PREPARED SUBGRADE SECTION TIE DEFLECTOR INTO BANK TERRACING PER GRADING PLAN AND AS SPECIFIED BY S20 REPRESENTATIVE FINISH GRADE: SEE UPLAND GRADING PLAN(S) FOR MATERIAL TYPE BEYOND RECREATION CHANNEL TOP OF BANK. CONTINUOUS MIRAFI 180N FILTER FABRIC — INTIMATE CONTACT WITH UNDISTURBED CUT BEDROCK OR PREPARED SUBGRADE DEFLECTOR (TYP. PROFILE 3' MINIMUM DIAM. TOE BOULDERS FINISH GRADE: SEE UPLAND GRADING PLAN(S) FOR MATERIAL TYPE BEYOND RECREATION CHANNEL TOP OF BANK. COBBLE AND SAND FILL WATER SURFACE VARIES BEDDING: CLEAN Y-4" COBBLE, 12" THICK SCALE: NTS COBBLE AND SAND FILL WATER SURFACE VARIES CHANNEL INVERT ov vow o _ ARMOR DEFLECTOR WITH 18" D50 RIPRAP, — 3' THICK EXTENDING AS SHOWN ON III III SITE/GRADING PLANS BEDDING: CLEAN Y-4" COBBLE, 12" THICK SCALE:NTS S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (7) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1"-5' Sheet: WW-2.6 L z z LL C C C c n n n C n U z G_ Q C LL a z L v LL C z LL C C C G Cz.'. U LL C LL LL a_ _ U C U C: z LL LL z L z LL C z Q z C: U LL C C n U LL LL 3' MIN. DIAMETER BOULDERS (TYP.) KEY TOE BOULDERS INTO BEDROCK OR PREPARED SUBGRADE BEACH PLAN BEACH SECTION K r_� FLOW K' BOULDER ARCH, 3' MIN. DIAMETER BOULDERS (TYP.) SAND FILL BOULDERS BURIED TO GRADE TO ANCHOR FFABRIC. D RECTION IOFS20 REPRESENTR REPRESENTATIVE. BOULDERS BURIED TO GRADE FOR RETENTION OF BEACH FILL MATERIAL. INSTALL PER DIRECTION OF S20 REPRESENTATIVE. UNLESS BEDROCK IS EXPOSED OR OTHERWISE NOTED, GRADE CHANNEL WITH ALLUVIAL MATERIAL OR PIT RUN. SCALE:NTS UNLESS BEDROCK IS EXPOSED OR OTHERWISE NOTED, GRADE CHANNEL WITH ALLUVIAL MATERIAL OR PIT RUN. KEY TOE BOULDERS INTO BEDROCK OR PREPARED SUBGRADE SCALE: NTS %b32 v S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (8) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1"-5' Sheet: W W-2.7 L z z LL C C C Cz.'. U LL C Q z LL C.; z LL LL a_ U C U C: z LL LL z L z LL C z Q z C: U LL C C U LL LL COMPACT PIT RUN II VOIDS FOR EACH LIF OF RIPRAP PLACED COURSE OF RIPRAP ARMORING TO SPECIFIED THICKNES CLEAN 3"-4" COBBL BEDDING, 6" THICK UNDISTURBED . PREPARED SUBGRADE RIPRAP ARMORING TYP. DETAIL RECESS UPPER COURSES BEHIND LOWER BOULDERS 3' MIN. DIAMETER BOULDERS (TYP.), SEE GRADING PLANS AND SECTIONS FOR NUMBER OF TERRACES AND STEP HEIGHTS STEP HEIGHT 20" MAXIMUM OR AS DIRECTED BY OWNER'S REPRESENTATIVE CHANNEL INVERT BACKFILL TOE WITH 18" D50 RIPRAP MATERIAL, SEE DETAIL 9 BOULDER TERRACING BANK PROTECTION (TYP. SECTION MKIIC'11 nnnnr FINISH GRADE, SEE UPLAND PLANS FOR GRADING/PLANTING DETAILS BEYOND TOP OF BANK CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE CLEAN 3"-4" COBBLE BEDDING, 6" THICK UNDISTURBED OR PREPARED SUBGRADE SCALE: NTS TREAD WIDTH VARIES, 1'-3' (TYP.) BOULDER STEPS, FINAL STAIR DIMENSIONS TO BE APPROVED BY OWNER'S REPRESENTATIVE IN COMPLIANCE WITH LOCAL CODES CHANNEL INVERT BACKFILL TOE WITH 18" D50 RIPRAP MATERIAL, SEE DETAIL 9 IF PLANTING POCKETS ARE - UTILIZED THEY SHALL BE LOCATED PER S20/OWNER'S REPRESENTATIVE DIRECTION 3' MIN. DIAMETER BOULDERS (TYP.), SEE GRADING PLANS AND SECTIONS FOR NUMBER OF TERRACES AND STEP HEIGHTS STEP HEIGHT 20" MAXIMUM OR AS DIRECTED BY OWNER'S REPRESENTATIVE CHANNEL INVERT BACKFILL TOE WITH 18" D50 RIPRAP MATERIAL, SEE DETAIL 9 FINISH GRADE, SEE UPLAND PLANS FOR GRADING/PLANTING DETAILS BEYOND TOP OF BANK CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE CLEAN 3"-4" COBBLE BEDDING, 6" THICK UNDISTURBED OR PREPARED SUBGRADE 11 BOULDER ACCESS STAIRS SECTION SCALE: NTS RECESS UPPER COURSES BEHIND LOWER BOULDERS 111112M NATIVE SOIL/TOPSOIL UNDISTURBED OR PREPARED SUBGRADE BOULDER TERRACING WITH PLANTER POCKET (TYP. SECTION FINISH GRADE, SEE UPLAND PLANS FOR GRADING/PLANTING DETAILS BEYOND TOP OF BANK CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE CLEAN 3"-4" COBBLE BEDDING, 6" THICK JI:HLt: IN I J S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (9) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale- 1 -51 Sheet: W W-2.8 LL C.; z LL LL a_ _ U H CC.,' U C: LL LL z C: z LL C z Q z C: U LL C n U LL LL i C: WOOD STAKE DETAIL TOP TRENCH ROLLMAX BIONET C70OBN - EROSION CONTROL BLANKET OR APPROVED EQUAL, SEE DETAIL 14 12" NATIVE SOIL/TOPSOIL LIFT APPROXIMATE OHWL 2 1 MAX WATER LEVEL. VARIES CHANNEL INVERT 190iI' �soiW B A C K FI LL TOE WITH 18 I-III-III=III-III-III-III-I -I =1 1=�1 1=�1 1=�1 1--=I -I--1 1-- D50 RIPRAP MATERIAL, - ---1III= 1= - SEE DETAIL 9 3' MIN. DIAMETER STAKE SEDIMENT CONTROL TOE BOULDER (TYP.) LOGS ALONG TOE OF BANK TO SECURE EROSION CONTROL BLANKET, SEE DETAIL 15 13 BURIED PLANTED RIPRAP BANK STABILIZATION DRIVE STAKE SO THAT SCREW FIRMLY PINS THE FABRIC TO THE GROUND FABRIC OR BLANKET TYP. 24"x2"x2" PENCIL POINT WOOD STAKE 12"x12" (MIN.) KEY TRENCH. (UNLESS OTHERWISE SPECIFIED ON OTHER DETAILS) FABRIC OR BLANKET TYP. 24"x2"x2" WOOD STAKE (SEE WOOD STAKE DETAIL) SEAM OVERLAP EROSION CONTROL FABRIC DETAIL INSTALL WILLOW STAKES IN 2' TO 3' APART IN A TRIANGULAR PATTERN AS DIRECTED BY AN S20 REPRESENTATIVE TIE INTO BANK OF EXISTING FLOODPLAIN BENCH 18" D50 RIPRAP MATERIAL, SEE DETAIL 9 UNDISTURBED OR PREPARED SUBGRADE CLEAN 3"-4" COBBLE BEDDING, 12" THICK CONTINUOUS MIRAFI 180N FILTER FABRIC INTIMATE CONTACT WITH SUBGRADE � 90 FL 0 2" MIN. PROFILE VIEW FABRIC OR BLANKET TYP. 9"OVERLAP (MIN).24"x2"x2" WOOD STAKE (SEE WOOD STAKE DETAIL) NOTE: FOLD SEAMS SO THAT UPSLOPE FLOW PIECE FOLDS OVER DOWNSLOPE PIECE TOE TRENCH A URIC OR BLANKET TYP. VIPACTED FILL 24"x2"x2" WOOD STAKE (SEE WOOD STAKE DETAIL) r SCALE: NTS 12" DIAMETER TRENCH LOG 2" INTO GROUND 9" DIAMETER TRENCH LOG 2" INTO GROUND PROFILE VIEW 24"x2"x2" WOOD STAKE o3 (SEE WOOD STAKE DETAIL) MIN. OVERLAP NOTES: 1. WHERE FEASIBLE, FABRIC WILL BE ROLLED OUT AND INSTALLED PARALLEL WITH THE STREAM. 2. UPSTREAM FABRIC PIECES WILL OVERLAP DOWNSTREAM PIECES AND UPSLOPE PIECES WILL OVERLAP DOWNSLOPE PIECES. 3. FOLD OVERLAPPING SEAMS AT LEAST TWICE AND THEN STAKE. 4. AFTER INITIAL STAKING, STAKE FABRIC AS NECESSARY SO THAT IT IS COMPLETELY FLUSH WITH THE GROUND SURFACE. 5. SEED, RAKE, MULCH FINISHED GRADE PRIOR TO LAYING FABRIC. 6. SEE, RAKE, MULCH KEY TRENCHES PRIOR TO CLOSING FABRIC. EROSION CONTROL FABRIC DETAILS SCALE: NTS 1.0' MINIMUM NOTES: MI%ROCONCENTRA\ED 12" DIAMETER PROFILE VIEW FOR MAJOR CONCENTRATED FLOWS, USE A ROCK CHECK DAM 24" SPACING (ALTERNATING) u u PLAN VIEW 24" SPACING (CENTERED) 24" SPACING (ALTERNATING) FE C PLAN VIEW u u PLAN VIEW USE 2 STAKES AT 90° ANGLE TO EACH OTHER AT LOG ENDS USE 2 STAKES AT 90° ANGLE TO EACH OTHER AT LOG ENDS USE 2 STAKES AT 90° ANGLE TO EACH OTHER AT LOG ENDS 1. STAKES SHALL BE 1-1/2" x 1-1/2" x 24" MINIMUM AND EMBEDDED INTO GROUND A MINIMUM OF 12". 2. SEDIMENT CONTROL LOG SHALL BE TRENCHED 2" INTO GROUND. 3. FOR CONTINUOUS CONTROL, ADJACENT SEDIMENT CONTROL LOGS SHALL BE PLACED FIRMLY TOGETHER WITH NO GAPS. 4. SEDIMENT SHALL BE CLEANED/ REMOVED WHEN SEDIMENT DEPTH IS 1/2 THE HEIGHT OF THE SEDIMENT CONTROL LOG. SEDIMENT CONTROL LOG DETAILS SCALE:NTS S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park Status: 90% Design Drawing Name - In -Stream Details (10) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1"-5' Sheet: W W-2.9 2. LL z LL LL a_ _ U C U C: z LL LL z L z LL C z Q z C: U LL C C ON U LL LL SCALE:NTS S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Riverside Park ('11 n1 n nnrTr-M Mrl 11 nrP'1/n\ BOULDER ARMORING SIZE VARIES 3' TYPICAL WATER SURFACE VARIES Status: W 90% Design KEY ARMOR BEDROCK OR CHANNEL INVERT BEDDING: 3" TO 4 AND S SUBGRAL/L./ LJLLJI ARMORING AROUND IN -STREAM BOULDER(S) (TYP. SECTION 18" D50 RIPRAP ARMORING KEY BOULDERS INTO BEDROCK SCALE: NTS Drawing Name - In -Stream Details (12) Revisions- 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: December 20, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1" - 5' Sheep. W W-2.11