Loading...
HomeMy WebLinkAbout20221671 Ver 1_20230303_WoodfinNC_EROSION CONTROL_stamped_20230306c: G C H C C.; z C V a LL C.; z LL C C C Cr c Cr c Cr c C: z G Q C \L I- C.; Q z C: U LL C LL C C G Cz.'. U c Q z LL C.; z LL LL a_ _ H v C: z LL ILL C: LL ILL z C; U C n U LL U LL EROSION CONTROL SEQUENCE PHASE 1 PROCEED AS FOLLOWS: 1. HOLD PRE —CONSTRUCTION MEETING TO IDENTIFY SITE CONSTRAINTS, CONSTRUCTION ROUTING, AND STAGING. 2. INSTALL CONSTRUCTION ENTRANCE AND CONSTRUCTION ACCESS. 3. INSTALL PERIMETER EC MEASURES AROUND AREAS TO BE DEMO—ED, INCLUDING SILT FENCE. 4. BREAK AND REMOVE HARD SURFACE AS NEEDED TO INSTALL ACCESS TO RIVER. 5. CUT ACCESS ROAD TO BUILD WAVE AND HAUL OFF MATERIAL. 6. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 7. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF WORK. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINISHED SURFACE TREATMENT IS APPLIED. 8. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC AND WHITEWATER PACKAGE DETAILS. 9. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. NOTE 1: THESE PLANS ARE CONCEPTUAL AND IN. ENDED TO ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE TO COMPLETE THE IN -STREAM WORK SCOPE. THFo CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INST LING AND MAINTAINING WATER CONTROL IN A SAFE CONDITION BASED ON ACTUAk SITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE S BMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIES. NOTE 2: THE WEATHER FORECAST SHOULD BE MONO ORED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL HAT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND F LLOWED BY SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING. NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HO THE JOBSITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVELS INCL DING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED.. X*-.J.F A__VL 1\ 0 *IF N Ow SILT FENCE (SEE EQUINOX DETAILS) _ SS SS 0 ���_ 04, ■ a 701 �- - ■ ■ - O Ok CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.10) CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS I 0 [—' O O 0 -ri O 0 n SILT FENCE (SEE O EQUINOX DETAILS) ri 0 s 01, C I \ 01 NO — SS ,N, N d i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name- Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 1 Revisions: s —sss \ _ o FOC _ FOC 0 �— Ow Ow _ PHASE 1 LIMITS OF MO WORK 1.07 ACRES I / M° O / /M Drawn By: �►� �� Riley Adams Checked By: FOC Scott Shipley Date: March 3, 2023 Status: Issued For Permitting Ow Stamp- NEs..... '-- SEA ENGINE`Q��.��: Scale - ill = 40' Sheet- WWEC.1 c: G C H C C: C C LL z z LL C C G Cr c Cr c Cr c C: z G C LL L C: Q C: U LL C C C C G_ z (; Ff LL c z LL C: z LL LL a_ _ H C v C: z LL LL z C: LL z z U LL C n U LL U LL U C: EROSION CONTROL SEQUENCE RIGHT PORTION OF THE WAVE STRUCTURE IN THE DRY FROM THE FAR EDGE OF THE CENTRAL LOW PHASE 2 FLOW PLATE TO THE TOP OF THE RIGHT BANK PROCEED AS FOLLOWS: INCLUDING BOULDER TERRACING, BEACH AND TAKEOUT AREA. 1. INSTALL COFFERDAM FOR WATER CONTROL SURROUNDING RIVER RIGHT WORK ZONE USING 5. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS SUPER SACK CONSTRUCTION DETAIL AS A GUIDE. THE WATERWAY DURING GROUTING OPERATIONS FOR SUPER SACKS TO BE FILLED WITH GRAVEL OR THE WAVE STRUCTURE. SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 6. UPON COMPLETION OF THE RIVER RIGHT PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 2. ALLOW WATER WITHIN ENCLOSED WORK AREA TO 3—DAY GROUT CURE TIME PER PROJECT SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF SPECIFICATIONS, COMPLETE FINAL CHANNEL WORK AREA. GRADING. REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO 3. INSTALL SUMP IN LOW CORNER OF CLOSED OFF BACKWATER. WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET 7. RECONFIGURE SUPER SACK COFFER DAM TO INSTALL DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS CENTRAL PORTION OF WAVE FEATURE. REFER TO SILT FENCE AND/OR SETTLING PONDS IN NEXT SHEET. DESIGNATED UPLAND AREA. 4. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF THE RIVER NOTE 1: THESE PLANS ARE CONCEPTUAL AND INANDED TO ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE TO COMPLETE THE IN -STREAM WORK SCOPE. THE ONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIES. NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL T�AT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND FOLQLOWED BY SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURTG. NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOBSITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUI MENT FROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO I$ FORECASTED.. k:s ✓ OW S~ ss — ss --- S i CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.10) S 04, ok ■ -n O -n 0 c� o I I O c� -n O n -n O �I 0 I 0 I -n O -n O I I O c: v SUPER SACK COFFERDAM ' (SEE TYP. DETAIL ON SHEET WWEC.9) SILT FENCE (SEE / EQUINOX DETAILS) 0 0 SUMP (SEE TYP. DETAIL ON SHEET WWEC.10) INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.9) I IPUMP PLATFORM & DISCHARGE HOSE Fd 00 Ve# rs —_ SS 1` i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 2 Revisions: S SSS 6r►� FOC FOC _ r M, 0c O UVV - _ VVV � Mo I o/ Mo Drawn By: �►� �� Riley Adams Checked By: Foy Scott Shipley �\ Date: �\ March 3, 2023 Status: Issued For Permitting OW -- Stamp: 4V3 o l9l SEAL Scale: 1 " = 40' Sheet: WNEC.2 C: C C C C.; z C U a LL C.; z z LL C C C Cr c Cr c Cr c U C: z Q C \L Ff Q C; LL C LL C C C: U LL C z LL z LL LL a_ _ H C V C: ILL LL z C: LL z z C: V LL C n V LL V a V EROSION CONTROL SEQUENCE PHASE 3 PROCEED AS FOLLOWS: 1. INSTALL LOW WATER ACCESS TO CENTRAL WORK ZONE IN THE WET FROM RIVER RIGHT BANK UTILIZING CULVERTS BETWEEN ABANDONED RAILROAD BRIDGE PIERS TO BUILD TEMPORARY ROAD. 2. INSTALL COFFERDAM FOR WATER CONTROL IN CENTRAL WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 3. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA. 4. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF WATER PUMPED BACK INTO THE RIVER FROM THE SUMP. 5. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE TO COMPLETE THE IN -STREAM WORK SCOPE. THE 0NTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER CONTROL IN A SAFE CONDITION BASED ON ACTUAL RITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIES. NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING. NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOBSITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIFVENT FROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED.. tD ow SS SS — Ss S 04, THE CENTRAL PORTION OF THE WAVE STRUCTURE IN THE DRY FROM THE RIVER RIGHT MEDIUM FLOW PLATE TO THE EDGE OF THE BYPASS CHANNEL INCLUDING THE ISLAND. 6. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS. 7. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL GRADING AND REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 8. REMOVE 3 OF THE 4 WALLS OF THE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. THE DOWNSTREAM SUPER SACK WALL WILL REMAIN AND BE USED LATER DURING REMOVAL OF THE TEMPORARY LOW WATER ACCESS ROAD. RECONFIGURE SUPER SACK COFFER DAM TO INSTALL THE RIVER LEFT PORTION OF WAVE FEATURE. REFER TO NEXT SHEET. Ik��04- -n O 0 0 — O n -n O ■ ri O 0 -n O 0 1 ■ a 4 . _T.... .�� BMW •.i._.�.�_.Aeta .��.s� t��a�1 c.�_f�.�._ �. � � I CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.10) ■- DRY WORK AREA SUPER SACK COFFERDAM o (SEE TYP. DETAIL ON n SHEET WWEC.9) - O n -n O -n O � s A [—' 7 \ N i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park F` C � PHASE 3 LIMITS OF D WORK x ACRES G) I —I C I -o m IStatus: Erosion Control/Water Control/Construction Sequence Drawings for Permitting TEMPORARY LOW-WATER STREAM CROSSING CONSTRUCTED OVER EXISTING RAILROAD , PIERS. SEE DETAIL ON SHEET WWEC.10 FROM PUMP PLATFORM & NORTH CAROLINA DEQ EROSION AND DISCHARGE HOSE SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CHAPTER 6). SUMP (SEE TYP. DETAIL ON SHEET WWEC.10) INLET PROTECTION 0 Drawing Name: (SEE TYP. DETAIL ON ` Wave Construction Sequence 2 SHEET WWEC.9) I! oOw�OW � Mo /M0, M° �� Revisions: s s — ss — SS _ o FOC _ FOC Drawn By: �►� �� Riley Adams Checked By' FOC Scott Shipley Date: March 3, 2023 Status: Issued For Permitting ow Stamp: CARO SEA l Scale: Sheet - ill = 40' WWEC.3 c: G C a z C C; z C U C LL z z LL C C Cr c Cr c Cr (IN C U C: z G Q C LL H Q z C: U LL C z LL C C G C: U LL C Q z LL z LL I LL a_ 2 H C LL LL z C: LL z z C; U LL C n LL LL C: EROSION CONTROL SEQUENCE PHASE 4 PROCEED AS FOLLOWS: 1. INSTALL COFFERDAM FOR WATER CONTROL SURROUNDING RIVER LEFT WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 2. EXTEND LOW WATER ACCESS TO RIVER LEFT WORK ZONE IN THE WET UTILIZING CULVERTS BETWEEN ABANDONED RAILROAD BRIDGE PIERS TO BUILD TEMPORARY ROAD. 3. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA. 4. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE AND/OR SETTLING PONDS IN DESIGNATED UPLAND AREA. 5. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF THE BYPASS CHANNEL IN THE DRY FROM THE ISLAND TO THE TOP OF RIVER LEFT BANK INCLUDING BOULDER TERRACING AND BANK STABILIZATION DOWNSTREAM OF BYPASS. 6. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS FOR THE BYPASS STRUCTURE. 7. UPON COMPLETION OF THE RIVER LEFT PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3-DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL CHANNEL GRADING. RESTORE LEFT BANK TO PRE -CONSTRUCTION CONDITION. SEED AND STAKE EROSION CONTROL BLANKETS ON DISTURBED SLOPES PER DETAILS IN WHITEWATER PLAN SET. REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 8. REMOVE/RECONFIGURE SUPER SACK COFFER DAM FOR THE FIRST PHASE OF TEMPORARY LOW WATER ACCESS ROAD REMOVAL. NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED To ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTIY N PHASING SEQUENCE TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIES. NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED �Y SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING. 1 NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOB ITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT F�ROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED.. 1� O i Ok, z s CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.9) ■ ■ 0 I -n O 0 -n O -n O n O Ci 0 SILT FENCE (SEE EQUINOX DETAILS) SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.9) J PHASE 4 LIMITS OF WORK x ACRES SUPER SACK COFFERDAM FROM CENTRAL CONSTRUCTION ZONE PARTIALLY LEFT IN PLACE FOR TEMPORARY ROAD REMOVAL. I DRY WORK AREA �i ♦ .. �.,�•!\�•:����\.t\�������i•!.[\��!���bt'ic�'�7•►`i ���`� ��'��`�i•\.t���!�.�UY't!���,��'�,\�ii ���`Y,(i��'��`��t\►`t!������ii•\.t•��!.�" ���w i� ��"��i\li!.[!{�'i��Y.[\�♦[��i��`\.t•\�[!,���1�.��al.[•��!�.�\,'\�,t��,,��Y,i•\�t��-���\y[!�.7•��.,,�y�u����\qt•\.t•��.,,�a\,t.��[!��-��♦ ' -.�y�!r. t!:��'�`�'.t•!`[!:�'i��!.t��'[!��'i�`►`���^�,t•.�!,�y.�i\�t!.�'i�.\'d•�.7•��.,,�y,t\!�!;�i�•�.t•��!.�a\,t\�.[��.���\.7•►`t•��.,,��. ���� � �tp!�i��\�(��'[1,���.y.�������\\q��t!,�a\Ni��1'd•�♦�!.�'�'�`\.t\!���i�•\.(i�tS�r�'\�t\\�[��.���\.t•�.t•��.,,��\,t\\.��.,.�a �� w �••�.a\ t�����Ui���,�y,[•A.[•�.���\.[•�`[!,t.uV�[•���,�\,[•A t•{�.�, �V�[• �. A t• ,�� A.(• �� a �� ��.�� / /�• ����!.[•��!�.\[•�t•,��,�4',t•\�(•�,���.,,��\,•\.t•����\.f•\.t•��.��.�\y[•�.t!��s��'`\.u��t•���J\Yt•�.t!� ,,�. - PUMP PLATFORM & DISCHARGE HOSE. SEE DETAILS & NOTES SUMP (SEE TYP. DETAIL ON SHEET WWEC.10) INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.9) i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client - Town of Woodfin, NC Project Name- Woodfin Wave at Riverside Park Status - Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name - Wave Construction Sequence 4 00 Revisions: SS S SS tD SS8L o UVV VVV � Mo I o/ Mo FOC FOC _ P- r M, 0c Drawn By- �►� �� Riley Adams Checked By- FOC Scott Shipley �\ Date- �\ March 3, 2023 Status. Issued For Permitting -- Stamp. `R. ESSR�4/ //". SEA OE........... 0 Scale- Sheet- 1 = 40' WWEC.4 c: G C a 1-- 2 C: z C Ff LL z z LL C C c c, : c C n C; z G_ Q C \L H Q z C: U LL C z LL C C C z C: LL c a z LL z LL I LL a_ 2 H C U C: z LL LL z C: LL z z U LL C n U LL U LL U C: EROSION CONTROL SEQUENCE PHASE 5 PROCEED AS FOLLOWS: 1. RECONFIGURE/EXTEND IN —PLACE SUPER SACK COFFER DAM AROUND TEMPORARY LOW WATER ACCESS ROAD IN THE CENTRAL PORTION OF THE RIVER. TO CREATE AN AREA OF SLACK WATER. 2. PARTIALLY REMOVE THE TEMPORARY LOW WATER ACCESS ROAD AND ABANDONED BRIDGE PIERS IN THE CENTRAL PORTION OF THE RIVER CHANNEL IN THE WET. THE SUPER SACK COFFER DAM IS INTENDED TO MINIMIZE CURRENT THROUGH THE WORK AREA DURING ROAD REMOVAL TO LIMIT TURBIDITY AND SEDIMENT DISCHARGE DOWNSTREAM. 3. RECONFIGURE THE SUPER SACK COFFER DAM IN PREPARATION FOR REMOVAL OF THE REMAINING PORTION OF THE TEMPORARY LOW WATER ACCESS ROAD. REFER TO NEXT SHEET. NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE I TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER i CONTROL IN A SAFE CONDITION BASED ON ACTUA� SITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIES. NOTE 2: THE WEATHER FORECAST SHOULD BE MON TORED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING. NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOI THE JOBSITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO;IS FORECASTED.. O\N SA�S- I n S 04, ok ■ ■ �i O n -n 0 I I _ -n O c� -n O "n 0 �I I 0 � o -n 0 -n O I I O c: SUPER SACK COFFERDAM FROM CENTRAL AND RIVER LEFT CONSTRUCTION ZONES PARTIALLY LEFT IN PLACE FOR TEMPORARY ROAD REMOVAL. 61 J G i PHASE 5 LIMITS OF WORK x ACRES WWI zo �Y,io MWE • SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.9) 1 TEMPORARY LOW-WATER STREAM CROSSING AND ABANDONED RAILROAD PIERS REMOVED. REMOVAL TO BE COMPLETED IN THE WET, USING SUPER SACK COFFER DAM TO CREATE SLACK WATER AREA TO MINIMIZE TURBIDITY AND SEDIMENT DISCHARGE DOWNSTREAM. TEMPORARY LOW-WATER STREAM CROSSING CONSTRUCTED OVER EXISTING RAILROAD PIERS. SEE DETAIL ON SHEET WWEC.7 FROM NORTH CAROLINA DEQ EROSION AND I SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CHAPTER 6). i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 5 6►� 00 Revisions: SS S SS ss-- s- �t O 0VV VVV � Mo I o/ Mo FOC FOC ----- C Drawn By' �►� �� Riley Adams 1 92 Checked By: Foy Scott Shipley �\ Date: �\ March 3, 2023 Status: Issued For Permitting -- Stamp: CARO \� pF ol9l•y SEA 0 R�S Scale: 1 " = 40' Sheet: WNEC.5 c: G C a z C C: z C C LL z z C C Cr c Cr c Cr n c n U C: z a C LL H Q z C: LL C z LL C C C z C: LL C Q z LL C: z LL I LL a_ 2 H C U C: z LL LL z C: LL z z V LL C n LL U LL U C: EROSION CONTROL SEQUENCE PHASE 6 PROCEED AS FOLLOWS: 1. RECONFIGURE/EXTEND IN —PLACE SUPER SACK COFFER DAM AROUND TEMPORARY LOW WATER ACCESS ROAD ALONG THE RIVER RIGHT SIDE OF THE RIVER. TO CREATE AN AREA OF SLACK WATER. 2. COMPLETELY REMOVE THE TEMPORARY LOW WATER ACCESS ROAD AND ABANDONED BRIDGE PIERS ON THE RIGHT SIDE OF THE RIVER CHANNEL IN THE WET. THE SUPER SACK COFFER DAM IS INTENDED TO MINIMIZE CURRENT THROUGH THE WORK AREA DURING ROAD REMOVAL TO LIMIT TURBIDITY AND SEDIMENT DISCHARGE DOWNSTREAM. 3. REMOVE THE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE UBMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIE NOTE 2: THE WEATHER FORECAST SHOULD BE MOIJTORED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIA THAT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND OLLOWED BY SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR C RING. NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HO THE JOBSITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVELS INC UDING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND E UIPMENT FROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIq IS FORECASTED.. S 04, ok ■ ■ -n O -n 0 I I I -n O c� -n O 0 -n O �I I 0 0 -n O -n O n I I O c: NG Wmp a PHASE 6 LIMITS OF WORK x ACRES �Y,io MWE • J SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.9) TEMPORARY LOW-WATER STREAM CROSSING AND ABANDONED RAILROAD PIERS REMOVED. REMOVAL TO BE COMPLETED IN THE WET, USING SUPER SACK COFFER DAM TO CREATE SLACK WATER AREA TO MINIMIZE TURBIDITY I AND SEDIMENT DISCHARGE DOWNSTREAM. i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 6 6.� 00 Revisions: SS S SS ss -- s ' �t FOC FOC ----- C O UVV - _ VVV � Mo I o/ Mo Drawn By' �►� Riley Adams �� 92 Checked By: Foy Scott Shipley �\ Date: �\ March 3, 2023 Status: Issued For Permitting OW -- Stamp: CARO \� �'QQ`pF ol9l•y %; SEAL 0 Scale: 1 " = 40' Sheet: WNEC.6 C: C C 1-- 2 C: z C C LL z z LL C C C Cr c Cr c Cr c U C: z Q LL H C: Q z C: U LL C z C C z C: LL c a z LL C: z LL LL a_ _ H C ILL C: tY LL ILL z c Q C: U LL C n U LL U LL U C: EROSION CONTROL SEQUENCE PHASE 7 PROCEED AS FOLLOWS: 1. INSTALL EC MEASURES AROUND AREAS TO BE DEMO-ED, INCLUDING SILT FENCE ADJACENT TO PUT -IN WORK AREA. 2. BREAK AND REMOVE HARD SURFACE AS NEEDED TO INSTALL ACCESS TO RIVER. 3. CUT ACCESS ROAD TO BUILD RIVER PUT -IN AREA. 4. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 5. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC AND WHITEWATER PACKAGE DETAILS. 6. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. 7. INSTALL COFFERDAM FOR WATER CONTROL _ SURROUNDING PUT -IN WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 8. INSTALL PUT -IN AREA BANK PROTECTION AND BEACH AREA. 9. REMOVE ALL EQUIPMENT AND MATERIALS FROM THE RIVER. REMOVE THE TEMPORARY ACCESS ROADS TO THE PUT -IN AREA AND TO THE WAVE AREA. 10. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF WORK. COORDINATE REMOVAL OF ACCESS ROADS WITH UPLAND SCOPE OF WORK. SEE EQUINOX DRAWING SET. NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE TO COMPLETE THE IN -STREAM WORK SCOPE. THETONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INSTAL ING AND MAINTAINING WATER CONTROL IN A SAFE CONDITION BASED ON ACTUAL)SITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE SU18IMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIES. NOTE 2: THE WEATHER FORECAST SHOULD BE MONIT RED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL T AT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING. NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW HE JOBSITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVELS INCL DING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED.. SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.9) , SILT FENCE (SEE EQUINOX DETAILS) 1 PHASE 7 LIMITS OF WORK x ACRES I COVER EXPOSED AREAS OF CONSTRUCTION ROUTE IN STONE CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS ok A A11; ■ 0 WET WORK AREA. (CONTRACTOR MAY CHOOSE TO USE PUMPS TO DRY WORK AREA USING SIMILAR METHOD TO WAVE CONSTRUCTION AREAS). ■ SS n • — SS — SS — SS SS i a i — > 00 SS S SS O SS SS — SS — SS SS — SS SS S 0) i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 4 Revisions: S SS 6r►� FOC C4 6►� FOC FOC FOC C FOC REMOVE CONSTRUCTION ACCESS ROAD AND COMPLETE UPLAND INSTALLATIONS. REFER TO EQUINOX DRAWING MO —OW OW — SET. / OW � O —OW SOW SOW /M I Mo o/ /M Drawn By' Riley Adams Checked By: Scott Shipley Date: March 3, 2023 Status: Issued For Permitting Stamp: ol9l.y SEAL - Scale: 1 " = 40' Sheet: WNEC.7 c: c C C C.; z C C LL z z LL C C Cr c Cr c Cr c C: z G_ Q C \L C.; Q z L V LL C z LL C C C z C: LL c a z LL L z LL LL a_ C V C: z LL ILL C: LL z z V LL C ('N LL V a V EROSION CONTROL SEQUENCE PHASE 8 PROCEED AS FOLLOWS: 1. IN —STREAM WORK COMPLETE. NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS. CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND APPROVAL BY PERMITTING AGENCIES. NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING. NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOBSITE WILL BE SECURED IN THE EVENT OF RISING WATER LEVE S INCLUDING HOW TO EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED.. COMPLETED PUT -IN AREA ■ ■ ■ a IF, 2 -„ O 0 .40 b:} O Ow o� • �S - SS SS SS SS — S � SS SS ___ S . r 4 SS FOC FOC FOC Fnc O S 0 ok, 9 s -- 'rl NO "XI COMPLETED BYPASS CHANNEL COMPLETED WAVE FEATURE Q— s — ss — _ SS SS — 0) s� �S — SS I SS C Q) FOC FUG _ FOC C roc 7 Foc W 77'­-� I'll v i 02%1--y i WHITEWA S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 8 6.� 00 Revisions: \: — SS S SS Ss -- S ' �t FOC___ FOC _ P__ r M, Oc MO UVV - _ O'v"V �— rVV C Mo I o/ /M Mo Drawn By: �►� �� Riley Adams Checked By: FOC Scott Shipley �\ Date: �\ March 3, 2023 Status: Issued For Permitting OW -- Stamp: SEA O ENGINE\Q�,.�'�� R�S Scale: Sheet - ill = 40' WWEC.8 C; G C z if V C a LL C.; z z LL C C C Cr C Cr C Cr n C n V U z G_ Q C LL Q z U V LL C z C C C G U V LL C Q z LL z LL LL a_ 2 U C U z LL LL z U z LL c z z U V LL C n LL V a LL V C.; RIVER CHANNEL COFFERDAM NOTES: (1) WRAP "SUPER SACKS" WITH IMPERVIOUS PLASTIC LINER TO PREVENT SEEPAGE. (2) BACKFILL THE DOWNSTREAM SIDE OF THE COFFERDAM WITH NATIVE ADJACENT ALLUVIUM. (5) USE "SUPER SACKS" AS A BUTTRESS AS REQUIRED. "SUPER SACK" COFFERDAM TYPICAL DETAILS PLAN GENERAL EROSION & SEDIMENT CONTROL NOTES: (1) THE IMPLEMENTATION OF EROSION AND SEDIMENT CONTROL MEASURES AND BEST MANAGEMENT PRACTICES INCLUDING CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING ARE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED. (2) THE DETAILS SHOWN ON THIS SHEET ARE AN EXAMPLE OF ACCEPTABLE METHODS TO USE DURING CONSTRUCTION OF THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND SUBMITTING A COFFERDAM PLAN TO INCLUDE SUFFICIENT DETAIL OF MEANS AND METHODS SATISFACTORILY MEETING THE PROJECT SPECIFICATIONS AND PERMIT REQUIREMENTS. COFFERDAMS MAY CONSIST OF OTHER METHODS INCLUDING (BUT NOT LIMITED TO) SECLUSION FENCING, SAND BAGS, BULK BAGS, SUPER SACKS, SHEET PILE AND INFLATABLE BLADDERS. COFFERDAMS SHALL INCLUDE PLASTING LINER OR FINE MESH SILT FENCE TO REDUCE TURBIDITY AND FINES FROM ENTERING THE FREE FLOWING PORTION OF LIVE WATER. (5) ALL PUMP INTAKES SHALL BE SCREENED FOR FISH PROTECTION AS REQUIRED BY REGULATORY AGENCIES. (4) DEWATERING PUMP DISCHARGE FROM WITHIN COFFERDAM WORK AREAS SHALL BE RELEASED ONTO FLOODPLAIN AREAS AWAY FROM WETLANDS AND CONSTRUCTION ACTIVITIES. DISCHARGE SHALL NOT CAUSE EROSION OF TOPSOIL AND SHALL SHEET FLOW OVER THE FLOODPLAIN BEFORE RETURNING TO LIVE WATER DOWNSTREAM OF THE WORK AREA. ALL RETURN FLOWS MUST MEET PERMIT REQUIREMENTS FOR TURBIDITY. (5) ALL EARTHWORK AND WOOD STRUCTURES CONSTRUCTION WITHIN THE ORDINARY HIGH CHANNEL SHALL CONFORM TO WATER QUALITY STANDARDS ESTABLISHED BY THE REGULATORY AGENCY PERMITS FOR THIS PROJECT. SCALE:NTS 3' DIAMETER SUPER SACKS WITH SECUREEY CLOSED TOP WATER SURFACE SUPPLEMENT SUPER (ELEV. VARIES) SACKS WITH SAND BAGS AS NEEDED. - 0900► 1� 1 RIVER CHANNEL BACKFILL WITH WRAP SUPER SACKS GRAVEL &COBBLES WITH IMPERVIOUS LINER AND BACKFILL LINER "SUPER SACK" COFFERDAM DOUBLE STACK SECTION SCALE:NTS BACKFILL WITH — GRAVEL & COBBLES WORK AREA 3' DIAMETER SUPER SACKS WITH SECURELY CLOSED TOP WATER SURFACE (ELEV. VARIES) RIVER CHANNEL WRAP SUPER SACKS WITH IMPERVIOUS LINER AND BACKFILL LINER "SUPER SACK" COFFERDAM SINGLE STACK SECTION SCALE:NTS %AIAT=n OI In=Ar = IKIC`T/AI I 1A —n —1 1 — /`l1 — —A /A(`(`llnfl K— ALTERNATE COFFER DAM TYP. WATER -FILLED BLADDER OR PUMP IF NECESSARY TYPICAL COFFER DAM WATER CONTROL S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park RIVER FLOW RIVER BANK Status: Erosion Control/Water DIMENSIONS OF CHANNEL TO q Control/Construction Sequence ALLOW FOR A MINIMUM FLOW Drawings for Permitting )FFER DAM Drawing Name: Erosion Control Details 1 Revisions- 1 Drawn By: Riley Adams Checked By- LLLLL LLLLL Scott Shipley LLLLL COFFER DAM LLLLL LLLLL Date HAY BALES March 3, 2023 (PURE HAY) Status - Issued For Permitting SECTION NTS �,� PLAN NTS Stam p- Scale: NTS Sheet: WNEC.9 G C H C C.; z C (f C a LL C.; z z IL C C Cr c Cr Cr n C CN z LL Q U LL C z c C C z C: U LL C Q z IL C.; z LL LLL a_ _ U C U C: z tY LL LL z C: LL z z C: U LL C n U LL U LL U C.; PUMP SUCTION LINE OR SUBMERSIBLE PUMP CENTERED IN BUCKET GRAVEL (CDOT SECT. DEWATERING POND ALREADY FILLED WITH WATER SECTION PUMP SUCTION LINE OR SUBMERSIBLE PUMP CENTERED IN BUCKET 12" MIN. AROUND ON ALL SIDES OF BUCKET 12" MIN. BELOW BUCKET NTS 'LASTIC 5—GALLON BUCKET WITH MANY 8" HOLES DRILLED IN SIDES ,ASH TO #3 703. #3) LOWEST SUBGRADE ELEVATION TO BE DEWATERED NOTE: SUMP PITS SHOULD BE DEEP 2' MIN, ENOUGH THAT THERE IS REASONABLE SETTLING OF SUSPENDED MATERIAL. • o 0 • o o PLASTIC 5—GALLON BUCKET WITH • o MANY 8" HOLES DRILLED IN SIDES • AND BOTTOM )o 0 o AASHTO #3 GRAVEL (CDOT SECT. 703. #3) DEWATERING SUMP FOR SUBMERSED PUMP SECTION NTS NCC ##57 w NC DOT #5 or #57 washed store — 4 Flow Strearn Channel' apac-Ity of pipe culvert together Incnkfull flow .21 diameter cif pipe or 1 whichever is greater Filter Cloth TEMPORARY STREAM CROSSING/ACCESS ROAD DETAIL NTS Clas R Erasion Stone SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA el:1fll1PUi.Yll Illly_1tya 12" - 3H:1 V SIDE SLOPES 2'0' MIN PLASTIC SHEETING OR GEOMEMBRANE, MIN. 10-MIL THICKNESS GROUND SURFACE ORANGE CONSTRUCTION FENCE AROUND WASHOUT STRUCTURE COMPACTED EMBANKMENT MATERIAL, TYP. 8'X8' MIN. OR AS REQUIRED TO CONTAIN CONCRETE WASTE SECTION H—H' BERM AROUND PERIMETER. COMPACTED EMBANKMENT MATERIAL, TYP. -III=1 � I —I � I� If=III=III uIITiITil H -III—I I I —I I I� �El I I=I I I —I I �' 8 —Min -III—I 1PTi=ITi—III I II ORANGE CONSTRUCTION FENCE HE PLAN VIEW NOTES: 1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE; PLACED A MINIMUM 50' FROM STATE WATERS. 2. VEHICLE TRACKING CONTROL IS REQUIRED AT CONCRETE WASHOUT ENTRANCE IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. 3. A PLASTIC SHEETING OR GEOMEMBRANE LINER SHALL BE PLACED. MINIMUM 10-MIL THICKNESS.. 4. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND/OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR WASTE CONCRETE. 5. WASTE MATERIAL FROM CONCRETE WASHOUT OPERATIONS MUST BE REMOVED AND LEGALLY DISPOSED OF WHEN IT HAS ACCUMULATED TWO-THIRDS OF THE WET STORAGE CAPACITY OF THE STRUCTURE AND AT THE END OF CONSTRUCTION. 6. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CLIENT. 7. NO STORMWATER RUN-OFF SHALL DRAIN INTO CONCRETE WASHOUT AREA. CONCRETE WASHOUT AREA DETAIL NTS S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Erosion Control Details 2 Revisions: 1 Drawn By: Riley Adams Checked By: Scott Shipley Date: March 3, 2023 Status: Issued For Permitting Stamp: CA Ro SEA �HGINE`Q�,.�'�� �R���S Scale: NTS Sheet: WWEC.10