HomeMy WebLinkAbout20221671 Ver 1_20230303_WoodfinNC_EROSION CONTROL_stamped_20230306c:
G
C
H
C
C.;
z
C
V
a
LL
C.;
z
LL
C
C
C
Cr
c
Cr
c
Cr
c
C:
z
G
Q
C
\L
I-
C.;
Q
z
C:
U
LL
C
LL
C
C
G
Cz.'.
U
c
Q
z
LL
C.;
z
LL
LL
a_
_
H
v
C:
z
LL
ILL
C:
LL
ILL
z
C;
U
C
n
U
LL
U
LL
EROSION CONTROL SEQUENCE
PHASE 1
PROCEED AS FOLLOWS:
1. HOLD PRE —CONSTRUCTION MEETING TO
IDENTIFY SITE CONSTRAINTS, CONSTRUCTION
ROUTING, AND STAGING.
2. INSTALL CONSTRUCTION ENTRANCE AND
CONSTRUCTION ACCESS.
3. INSTALL PERIMETER EC MEASURES AROUND
AREAS TO BE DEMO—ED, INCLUDING SILT
FENCE.
4. BREAK AND REMOVE HARD SURFACE AS
NEEDED TO INSTALL ACCESS TO RIVER.
5. CUT ACCESS ROAD TO BUILD WAVE AND HAUL
OFF MATERIAL.
6. CLEAR AND GRUB ONLY AREAS ADJACENT TO
WAVE CONSTRUCTION ACCESS.
7. ENSURE A STABLE AND VEGETATED SURFACE
BEFORE MOVING TO THE NEXT PHASE OF
WORK. LEAVE EROSION CONTROL MEASURES IN
PLACE UNTIL FINISHED SURFACE TREATMENT IS
APPLIED.
8. MAINTAIN EROSION CONTROL DEVICES AS
NOTED IN EC AND WHITEWATER PACKAGE
DETAILS.
9. INSTALL ADDITIONAL MEASURES AS NEEDED TO
KEEP SEDIMENT ON SITE.
NOTE 1: THESE PLANS ARE CONCEPTUAL AND IN. ENDED TO ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE
TO COMPLETE THE IN -STREAM WORK SCOPE. THFo CONTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INST LING AND MAINTAINING WATER
CONTROL IN A SAFE CONDITION BASED ON ACTUAk SITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE S BMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIES.
NOTE 2: THE WEATHER FORECAST SHOULD BE MONO ORED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL HAT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND F LLOWED BY SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING.
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HO THE JOBSITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVELS INCL DING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED..
X*-.J.F A__VL 1\ 0 *IF N
Ow
SILT FENCE (SEE
EQUINOX DETAILS) _ SS SS
0 ���_
04,
■
a
701
�- - ■ ■ -
O
Ok
CONCRETE WASHOUT TO
BE LOCATED NEAR STAGING
AREA (SEE TYP. DETAIL ON
SHEET WWEC.10)
CONSTRUCTION ENTRANCE,
SEE EQUINOX DETAILS
I
0
[—'
O
O
0
-ri
O
0
n SILT FENCE (SEE
O EQUINOX DETAILS)
ri
0 s
01,
C I \
01
NO
— SS
,N,
N
d
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name-
Woodfin Wave at Riverside Park
Status:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name:
Wave Construction Sequence 1
Revisions:
s —sss
\ _ o
FOC _
FOC
0 �— Ow Ow _
PHASE 1 LIMITS OF MO
WORK 1.07 ACRES I /
M°
O /
/M
Drawn By:
�►� �� Riley Adams
Checked By:
FOC Scott Shipley
Date:
March 3, 2023
Status:
Issued For Permitting
Ow
Stamp-
NEs..... '--
SEA
ENGINE`Q��.��:
Scale -
ill = 40'
Sheet-
WWEC.1
c:
G
C
H
C
C:
C
C
LL
z
z
LL
C
C
G
Cr
c
Cr
c
Cr
c
C:
z
G
C
LL L
C:
Q
C:
U
LL
C
C
C
C
G_
z
(;
Ff
LL
c
z
LL
C:
z
LL
LL
a_
_
H
C
v
C:
z
LL
LL
z
C:
LL
z
z
U
LL
C
n
U
LL
U
LL
U
C:
EROSION CONTROL SEQUENCE
RIGHT PORTION OF THE WAVE STRUCTURE IN THE
DRY FROM THE FAR EDGE OF THE CENTRAL LOW
PHASE 2
FLOW PLATE TO THE TOP OF THE RIGHT BANK
PROCEED AS FOLLOWS:
INCLUDING BOULDER TERRACING, BEACH AND
TAKEOUT AREA.
1. INSTALL COFFERDAM FOR WATER CONTROL
SURROUNDING RIVER RIGHT WORK ZONE USING
5. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS
SUPER SACK CONSTRUCTION DETAIL AS A GUIDE.
THE WATERWAY DURING GROUTING OPERATIONS FOR
SUPER SACKS TO BE FILLED WITH GRAVEL OR
THE WAVE STRUCTURE.
SMALL COBBLE BASED ON CONTRACTOR
PREFERENCE.
6. UPON COMPLETION OF THE RIVER RIGHT PORTION OF
THE WAVE STRUCTURE INSTALLATION AND MIN.
2. ALLOW WATER WITHIN ENCLOSED WORK AREA TO
3—DAY GROUT CURE TIME PER PROJECT
SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF
SPECIFICATIONS, COMPLETE FINAL CHANNEL
WORK AREA.
GRADING. REMOVE ALL EQUIPMENT AND FINALLY THE
SUMP FROM THE WORK ZONE ALLOWING IT TO
3. INSTALL SUMP IN LOW CORNER OF CLOSED OFF
BACKWATER.
WORK ZONE AND INSTALL INLET PROTECTION
MEASURES SHOWN IN WHITEWATER PLAN SET
7. RECONFIGURE SUPER SACK COFFER DAM TO INSTALL
DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS
CENTRAL PORTION OF WAVE FEATURE. REFER TO
SILT FENCE AND/OR SETTLING PONDS IN
NEXT SHEET.
DESIGNATED UPLAND AREA.
4. ONCE WATER CONTROL AND EROSION CONTROL
MEASURES ARE IN PLACE AND FUNCTIONING
PROPERLY, COMPLETE CONSTRUCTION OF THE RIVER
NOTE 1: THESE PLANS ARE CONCEPTUAL AND INANDED TO ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE
TO COMPLETE THE IN -STREAM WORK SCOPE. THE ONTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER
CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIES.
NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL T�AT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND FOLQLOWED BY SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURTG.
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOBSITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUI MENT FROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO I$ FORECASTED..
k:s ✓ OW
S~
ss — ss --- S i
CONCRETE WASHOUT TO
BE LOCATED NEAR STAGING
AREA (SEE TYP. DETAIL ON
SHEET WWEC.10)
S
04,
ok
■
-n
O
-n
0
c� o
I
I
O
c�
-n
O
n
-n
O
�I
0
I
0
I
-n
O
-n
O
I
I
O
c:
v
SUPER SACK COFFERDAM '
(SEE TYP. DETAIL ON
SHEET WWEC.9)
SILT FENCE (SEE /
EQUINOX DETAILS)
0
0
SUMP (SEE TYP. DETAIL
ON SHEET WWEC.10)
INLET PROTECTION
(SEE TYP. DETAIL ON
SHEET WWEC.9)
I
IPUMP PLATFORM &
DISCHARGE HOSE
Fd
00
Ve#
rs —_ SS
1`
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
Status:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name:
Wave Construction Sequence 2
Revisions:
S SSS
6r►�
FOC
FOC _
r M, 0c
O UVV - _
VVV
� Mo
I o/
Mo
Drawn By:
�►� �� Riley Adams
Checked By:
Foy Scott Shipley
�\ Date:
�\ March 3, 2023
Status:
Issued For Permitting
OW --
Stamp:
4V3 o l9l
SEAL
Scale:
1 " = 40'
Sheet:
WNEC.2
C:
C
C
C
C.;
z
C
U
a
LL
C.;
z
z
LL
C
C
C
Cr
c
Cr
c
Cr
c
U
C:
z
Q
C
\L
Ff
Q
C;
LL
C
LL
C
C
C:
U
LL
C
z
LL
z
LL
LL
a_
_
H
C
V
C:
ILL
LL
z
C:
LL
z
z
C:
V
LL
C
n
V
LL
V
a
V
EROSION CONTROL SEQUENCE
PHASE 3
PROCEED AS FOLLOWS:
1. INSTALL LOW WATER ACCESS TO CENTRAL WORK ZONE IN THE WET
FROM RIVER RIGHT BANK UTILIZING CULVERTS BETWEEN
ABANDONED RAILROAD BRIDGE PIERS TO BUILD TEMPORARY ROAD.
2. INSTALL COFFERDAM FOR WATER CONTROL IN CENTRAL WORK
ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN
WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL
OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE.
3. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO
PRELIMINARY PUMP DOWN OF WORK AREA.
4. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND
INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER
PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT
FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF
WATER PUMPED BACK INTO THE RIVER FROM THE SUMP.
5. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN
PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF
NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE
TO COMPLETE THE IN -STREAM WORK SCOPE. THE 0NTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER
CONTROL IN A SAFE CONDITION BASED ON ACTUAL RITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIES.
NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING.
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOBSITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIFVENT FROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED..
tD ow
SS SS
— Ss S
04,
THE CENTRAL PORTION OF THE WAVE STRUCTURE IN THE DRY
FROM THE RIVER RIGHT MEDIUM FLOW PLATE TO THE EDGE OF THE
BYPASS CHANNEL INCLUDING THE ISLAND.
6. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY
DURING GROUTING OPERATIONS.
7. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE
STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER
PROJECT SPECIFICATIONS, COMPLETE FINAL GRADING AND REMOVE
ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE
ALLOWING IT TO BACKWATER.
8. REMOVE 3 OF THE 4 WALLS OF THE SUPER SACK COFFER DAM
AND ALL MATERIALS FROM THE RIVER. THE DOWNSTREAM SUPER
SACK WALL WILL REMAIN AND BE USED LATER DURING REMOVAL
OF THE TEMPORARY LOW WATER ACCESS ROAD. RECONFIGURE
SUPER SACK COFFER DAM TO INSTALL THE RIVER LEFT PORTION
OF WAVE FEATURE. REFER TO NEXT SHEET.
Ik��04-
-n
O
0 0 —
O
n
-n
O
■
ri
O
0
-n
O
0
1
■ a
4
. _T.... .��
BMW
•.i._.�.�_.Aeta .��.s� t��a�1 c.�_f�.�._ �. � �
I
CONCRETE WASHOUT TO BE
LOCATED NEAR STAGING AREA (SEE
TYP. DETAIL ON SHEET WWEC.10)
■-
DRY WORK AREA
SUPER SACK COFFERDAM
o (SEE TYP. DETAIL ON
n SHEET WWEC.9)
-
O
n
-n
O
-n
O
� s
A
[—'
7 \
N
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
F`
C �
PHASE 3 LIMITS OF
D
WORK x ACRES
G)
I
—I
C
I
-o m
IStatus:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
TEMPORARY LOW-WATER STREAM CROSSING
CONSTRUCTED OVER EXISTING RAILROAD
,
PIERS. SEE DETAIL ON SHEET WWEC.10 FROM
PUMP PLATFORM &
NORTH CAROLINA DEQ EROSION AND
DISCHARGE HOSE
SEDIMENT CONTROL PLANNING AND DESIGN
MANUAL (CHAPTER 6).
SUMP (SEE TYP. DETAIL
ON SHEET WWEC.10)
INLET PROTECTION
0
Drawing Name:
(SEE TYP. DETAIL ON
`
Wave Construction Sequence 2
SHEET WWEC.9)
I! oOw�OW
� Mo
/M0,
M°
�� Revisions:
s s — ss
— SS
_ o
FOC _
FOC
Drawn By:
�►� �� Riley Adams
Checked By'
FOC Scott Shipley
Date:
March 3, 2023
Status:
Issued For Permitting
ow
Stamp:
CARO
SEA l
Scale: Sheet -
ill = 40' WWEC.3
c:
G
C
a
z
C
C;
z
C
U
C
LL
z
z
LL
C
C
Cr
c
Cr
c
Cr
(IN
C
U
C:
z
G
Q
C
LL
H
Q
z
C:
U
LL
C
z
LL
C
C
G
C:
U
LL
C
Q
z
LL
z
LL
I
LL
a_
2
H
C
LL
LL
z
C:
LL
z
z
C;
U
LL
C
n
LL
LL
C:
EROSION CONTROL SEQUENCE
PHASE 4
PROCEED AS FOLLOWS:
1. INSTALL COFFERDAM FOR WATER CONTROL SURROUNDING RIVER LEFT WORK ZONE
USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET.
SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON
CONTRACTOR PREFERENCE.
2. EXTEND LOW WATER ACCESS TO RIVER LEFT WORK ZONE IN THE WET UTILIZING
CULVERTS BETWEEN ABANDONED RAILROAD BRIDGE PIERS TO BUILD TEMPORARY
ROAD.
3. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY
PUMP DOWN OF WORK AREA.
4. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET
PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL
ADDITIONAL MEASURES SUCH AS SILT FENCE AND/OR SETTLING PONDS IN
DESIGNATED UPLAND AREA.
5. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND
FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF THE BYPASS CHANNEL IN
THE DRY FROM THE ISLAND TO THE TOP OF RIVER LEFT BANK INCLUDING
BOULDER TERRACING AND BANK STABILIZATION DOWNSTREAM OF BYPASS.
6. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING
GROUTING OPERATIONS FOR THE BYPASS STRUCTURE.
7. UPON COMPLETION OF THE RIVER LEFT PORTION OF THE WAVE STRUCTURE
INSTALLATION AND MIN. 3-DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS,
COMPLETE FINAL CHANNEL GRADING. RESTORE LEFT BANK TO PRE -CONSTRUCTION
CONDITION. SEED AND STAKE EROSION CONTROL BLANKETS ON DISTURBED SLOPES
PER DETAILS IN WHITEWATER PLAN SET. REMOVE ALL EQUIPMENT AND FINALLY
THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER.
8. REMOVE/RECONFIGURE SUPER SACK COFFER DAM FOR THE FIRST PHASE OF
TEMPORARY LOW WATER ACCESS ROAD REMOVAL.
NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED To ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTIY N PHASING SEQUENCE
TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER
CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIES.
NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED �Y SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING.
1
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOB ITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT F�ROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED..
1� O
i Ok, z
s CONCRETE WASHOUT TO
BE LOCATED NEAR
STAGING AREA (SEE TYP.
DETAIL ON SHEET WWEC.9)
■
■
0
I
-n
O
0
-n
O
-n
O
n
O
Ci
0
SILT FENCE (SEE
EQUINOX DETAILS)
SUPER SACK COFFERDAM
(SEE TYP. DETAIL ON
SHEET WWEC.9)
J
PHASE 4 LIMITS OF
WORK x ACRES
SUPER SACK COFFERDAM FROM
CENTRAL CONSTRUCTION ZONE
PARTIALLY LEFT IN PLACE FOR
TEMPORARY ROAD REMOVAL.
I
DRY WORK AREA
�i ♦ .. �.,�•!\�•:����\.t\�������i•!.[\��!���bt'ic�'�7•►`i ���`� ��'��`�i•\.t���!�.�UY't!���,��'�,\�ii ���`Y,(i��'��`��t\►`t!������ii•\.t•��!.�"
���w i� ��"��i\li!.[!{�'i��Y.[\�♦[��i��`\.t•\�[!,���1�.��al.[•��!�.�\,'\�,t��,,��Y,i•\�t��-���\y[!�.7•��.,,�y�u����\qt•\.t•��.,,�a\,t.��[!��-��♦ '
-.�y�!r. t!:��'�`�'.t•!`[!:�'i��!.t��'[!��'i�`►`���^�,t•.�!,�y.�i\�t!.�'i�.\'d•�.7•��.,,�y,t\!�!;�i�•�.t•��!.�a\,t\�.[��.���\.7•►`t•��.,,��.
���� � �tp!�i��\�(��'[1,���.y.�������\\q��t!,�a\Ni��1'd•�♦�!.�'�'�`\.t\!���i�•\.(i�tS�r�'\�t\\�[��.���\.t•�.t•��.,,��\,t\\.��.,.�a
�� w �••�.a\ t�����Ui���,�y,[•A.[•�.���\.[•�`[!,t.uV�[•���,�\,[•A t•{�.�, �V�[• �. A t• ,�� A.(• �� a ��
��.�� / /�• ����!.[•��!�.\[•�t•,��,�4',t•\�(•�,���.,,��\,•\.t•����\.f•\.t•��.��.�\y[•�.t!��s��'`\.u��t•���J\Yt•�.t!� ,,�. -
PUMP PLATFORM & DISCHARGE
HOSE. SEE DETAILS & NOTES
SUMP (SEE TYP. DETAIL
ON SHEET WWEC.10)
INLET PROTECTION
(SEE TYP. DETAIL ON
SHEET WWEC.9)
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client -
Town of Woodfin, NC
Project Name-
Woodfin Wave at Riverside Park
Status -
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name -
Wave Construction Sequence 4
00 Revisions:
SS S SS tD
SS8L
o UVV
VVV
� Mo
I o/
Mo
FOC
FOC _ P-
r M, 0c
Drawn By-
�►� �� Riley Adams
Checked By-
FOC Scott Shipley
�\ Date-
�\ March 3, 2023
Status.
Issued For Permitting
--
Stamp.
`R. ESSR�4/ //".
SEA
OE...........
0
Scale- Sheet-
1 = 40' WWEC.4
c:
G
C
a
1--
2
C:
z
C
Ff
LL
z
z
LL
C
C
c
c, :
c
C
n
C;
z
G_
Q
C
\L
H
Q
z
C:
U
LL
C
z
LL
C
C
C
z
C:
LL
c
a
z
LL
z
LL
I
LL
a_
2
H
C
U
C:
z
LL
LL
z
C:
LL
z
z
U
LL
C
n
U
LL
U
LL
U
C:
EROSION CONTROL SEQUENCE
PHASE 5
PROCEED AS FOLLOWS:
1. RECONFIGURE/EXTEND IN —PLACE SUPER SACK COFFER DAM AROUND TEMPORARY
LOW WATER ACCESS ROAD IN THE CENTRAL PORTION OF THE RIVER. TO CREATE
AN AREA OF SLACK WATER.
2. PARTIALLY REMOVE THE TEMPORARY LOW WATER ACCESS ROAD AND ABANDONED
BRIDGE PIERS IN THE CENTRAL PORTION OF THE RIVER CHANNEL IN THE WET. THE
SUPER SACK COFFER DAM IS INTENDED TO MINIMIZE CURRENT THROUGH THE WORK
AREA DURING ROAD REMOVAL TO LIMIT TURBIDITY AND SEDIMENT DISCHARGE
DOWNSTREAM.
3. RECONFIGURE THE SUPER SACK COFFER DAM IN PREPARATION FOR REMOVAL OF
THE REMAINING PORTION OF THE TEMPORARY LOW WATER ACCESS ROAD. REFER TO
NEXT SHEET.
NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE I
TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER i
CONTROL IN A SAFE CONDITION BASED ON ACTUA� SITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIES.
NOTE 2: THE WEATHER FORECAST SHOULD BE MON TORED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING.
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOI THE JOBSITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVELS INCLUDING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO;IS FORECASTED..
O\N
SA�S-
I
n
S
04,
ok
■
■
�i
O
n
-n
0
I
I
_
-n
O
c�
-n
O
"n
0
�I
I
0
�
o
-n
0
-n
O
I
I
O
c:
SUPER SACK COFFERDAM FROM CENTRAL
AND RIVER LEFT CONSTRUCTION ZONES
PARTIALLY LEFT IN PLACE FOR
TEMPORARY ROAD REMOVAL.
61
J
G
i
PHASE 5 LIMITS OF
WORK x ACRES
WWI zo
�Y,io
MWE
•
SUPER SACK COFFERDAM
(SEE TYP. DETAIL ON
SHEET WWEC.9)
1
TEMPORARY LOW-WATER STREAM CROSSING
AND ABANDONED RAILROAD PIERS REMOVED.
REMOVAL TO BE COMPLETED IN THE WET,
USING SUPER SACK COFFER DAM TO CREATE
SLACK WATER AREA TO MINIMIZE TURBIDITY
AND SEDIMENT DISCHARGE DOWNSTREAM.
TEMPORARY LOW-WATER STREAM CROSSING
CONSTRUCTED OVER EXISTING RAILROAD
PIERS. SEE DETAIL ON SHEET WWEC.7 FROM
NORTH CAROLINA DEQ EROSION AND
I
SEDIMENT CONTROL PLANNING AND DESIGN
MANUAL (CHAPTER 6).
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
Status:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name:
Wave Construction Sequence 5
6►�
00 Revisions:
SS S SS
ss-- s- �t
O 0VV
VVV
� Mo
I o/
Mo
FOC
FOC -----
C
Drawn By'
�►� �� Riley Adams
1 92
Checked By:
Foy Scott Shipley
�\ Date:
�\ March 3, 2023
Status:
Issued For Permitting
--
Stamp:
CARO
\� pF ol9l•y
SEA
0
R�S
Scale:
1 " = 40'
Sheet:
WNEC.5
c:
G
C
a
z
C
C:
z
C
C
LL
z
z
C
C
Cr
c
Cr
c
Cr
n
c
n
U
C:
z
a
C
LL
H
Q
z
C:
LL
C
z
LL
C
C
C
z
C:
LL
C
Q
z
LL
C:
z
LL
I
LL
a_
2
H
C
U
C:
z
LL
LL
z
C:
LL
z
z
V
LL
C
n
LL
U
LL
U
C:
EROSION CONTROL SEQUENCE
PHASE 6
PROCEED AS FOLLOWS:
1. RECONFIGURE/EXTEND IN —PLACE SUPER SACK COFFER DAM AROUND TEMPORARY
LOW WATER ACCESS ROAD ALONG THE RIVER RIGHT SIDE OF THE RIVER. TO
CREATE AN AREA OF SLACK WATER.
2. COMPLETELY REMOVE THE TEMPORARY LOW WATER ACCESS ROAD AND
ABANDONED BRIDGE PIERS ON THE RIGHT SIDE OF THE RIVER CHANNEL IN THE
WET. THE SUPER SACK COFFER DAM IS INTENDED TO MINIMIZE CURRENT THROUGH
THE WORK AREA DURING ROAD REMOVAL TO LIMIT TURBIDITY AND SEDIMENT
DISCHARGE DOWNSTREAM.
3. REMOVE THE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER.
NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE
TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER
CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE UBMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIE
NOTE 2: THE WEATHER FORECAST SHOULD BE MOIJTORED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIA THAT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND OLLOWED BY SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR C RING.
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HO THE JOBSITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVELS INC UDING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND E UIPMENT FROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIq IS FORECASTED..
S
04,
ok
■
■
-n
O
-n
0
I
I
I
-n
O
c�
-n
O
0
-n
O
�I
I
0
0
-n
O
-n
O
n
I
I
O
c:
NG
Wmp
a
PHASE 6 LIMITS OF
WORK x ACRES
�Y,io
MWE
•
J
SUPER SACK COFFERDAM
(SEE TYP. DETAIL ON
SHEET WWEC.9)
TEMPORARY LOW-WATER STREAM CROSSING
AND ABANDONED RAILROAD PIERS REMOVED.
REMOVAL TO BE COMPLETED IN THE WET,
USING SUPER SACK COFFER DAM TO CREATE
SLACK WATER AREA TO MINIMIZE TURBIDITY I
AND SEDIMENT DISCHARGE DOWNSTREAM.
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
Status:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name:
Wave Construction Sequence 6
6.�
00 Revisions:
SS S SS
ss -- s ' �t
FOC
FOC -----
C
O UVV - _
VVV
� Mo
I o/
Mo
Drawn By'
�►� Riley Adams
�� 92
Checked By:
Foy Scott Shipley
�\ Date:
�\ March 3, 2023
Status:
Issued For Permitting
OW --
Stamp:
CARO
\� �'QQ`pF ol9l•y %;
SEAL
0
Scale:
1 " = 40'
Sheet:
WNEC.6
C:
C
C
1--
2
C:
z
C
C
LL
z
z
LL
C
C
C
Cr
c
Cr
c
Cr
c
U
C:
z
Q
LL
H
C:
Q
z
C:
U
LL
C
z
C
C
z
C:
LL
c
a
z
LL
C:
z
LL
LL
a_
_
H
C
ILL
C:
tY
LL
ILL
z
c
Q
C:
U
LL
C
n
U
LL
U
LL
U
C:
EROSION CONTROL SEQUENCE
PHASE 7
PROCEED AS FOLLOWS:
1. INSTALL EC MEASURES AROUND AREAS TO BE
DEMO-ED, INCLUDING SILT FENCE ADJACENT
TO PUT -IN WORK AREA.
2. BREAK AND REMOVE HARD SURFACE AS
NEEDED TO INSTALL ACCESS TO RIVER.
3. CUT ACCESS ROAD TO BUILD RIVER PUT -IN
AREA.
4. CLEAR AND GRUB ONLY AREAS ADJACENT TO
WAVE CONSTRUCTION ACCESS.
5. MAINTAIN EROSION CONTROL DEVICES AS
NOTED IN EC AND WHITEWATER PACKAGE
DETAILS.
6. INSTALL ADDITIONAL MEASURES AS NEEDED TO
KEEP SEDIMENT ON SITE.
7. INSTALL COFFERDAM FOR WATER CONTROL _
SURROUNDING PUT -IN WORK ZONE USING
SUPER SACK CONSTRUCTION DETAIL PROVIDED
IN WHITEWATER PLAN SET. SUPER SACKS TO
BE FILLED WITH GRAVEL OR SMALL COBBLE
BASED ON CONTRACTOR PREFERENCE.
8. INSTALL PUT -IN AREA BANK PROTECTION AND
BEACH AREA.
9. REMOVE ALL EQUIPMENT AND MATERIALS FROM
THE RIVER. REMOVE THE TEMPORARY ACCESS
ROADS TO THE PUT -IN AREA AND TO THE
WAVE AREA.
10. ENSURE A STABLE AND VEGETATED SURFACE
BEFORE MOVING TO THE NEXT PHASE OF
WORK. COORDINATE REMOVAL OF ACCESS
ROADS WITH UPLAND SCOPE OF WORK. SEE
EQUINOX DRAWING SET.
NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE
TO COMPLETE THE IN -STREAM WORK SCOPE. THETONTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INSTAL ING AND MAINTAINING WATER
CONTROL IN A SAFE CONDITION BASED ON ACTUAL)SITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE SU18IMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIES.
NOTE 2: THE WEATHER FORECAST SHOULD BE MONIT RED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL T AT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING.
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW HE JOBSITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVELS INCL DING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED..
SUPER SACK COFFERDAM
(SEE TYP. DETAIL ON
SHEET WWEC.9) ,
SILT FENCE (SEE
EQUINOX DETAILS)
1
PHASE 7 LIMITS OF
WORK x ACRES I
COVER EXPOSED AREAS
OF CONSTRUCTION
ROUTE IN STONE
CONSTRUCTION ENTRANCE,
SEE EQUINOX DETAILS
ok
A A11;
■
0
WET WORK AREA. (CONTRACTOR
MAY CHOOSE TO USE PUMPS TO
DRY WORK AREA USING SIMILAR
METHOD TO WAVE CONSTRUCTION
AREAS).
■
SS
n
• — SS — SS —
SS SS
i
a
i
— > 00
SS S SS
O SS SS —
SS — SS
SS — SS
SS S
0)
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
Status:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name:
Wave Construction Sequence 4
Revisions:
S SS
6r►�
FOC C4
6►�
FOC FOC
FOC
C
FOC
REMOVE CONSTRUCTION
ACCESS ROAD AND COMPLETE
UPLAND INSTALLATIONS.
REFER TO EQUINOX DRAWING MO —OW OW —
SET. / OW
�
O —OW SOW SOW
/M
I Mo
o/
/M
Drawn By'
Riley Adams
Checked By:
Scott Shipley
Date:
March 3, 2023
Status:
Issued For Permitting
Stamp:
ol9l.y
SEAL
-
Scale:
1 " = 40'
Sheet:
WNEC.7
c:
c
C
C
C.;
z
C
C
LL
z
z
LL
C
C
Cr
c
Cr
c
Cr
c
C:
z
G_
Q
C
\L
C.;
Q
z
L
V
LL
C
z
LL
C
C
C
z
C:
LL
c
a
z
LL
L
z
LL
LL
a_
C
V
C:
z
LL
ILL
C:
LL
z
z
V
LL
C
('N
LL
V
a
V
EROSION CONTROL SEQUENCE
PHASE 8
PROCEED AS FOLLOWS:
1. IN —STREAM WORK COMPLETE.
NOTE 1: THESE PLANS ARE CONCEPTUAL AND INTENDED TO ILLUSTRATE A
SUGGESTED WATER CONTROL METHOD AND CONSTRUCTION PHASING SEQUENCE
TO COMPLETE THE IN -STREAM WORK SCOPE. THE CONTRACTOR IS RESPONSIBLE
FOR SUBMITTING A WATER CONTROL PLAN, INSTALLING AND MAINTAINING WATER
CONTROL IN A SAFE CONDITION BASED ON ACTUAL SITE CONDITIONS.
CONTRACTOR WATER CONTROL PLAN SHALL BE SUBMITTED TO ENGINEER FOR
REVIEW AND APPROVAL BY PERMITTING AGENCIES.
NOTE 2: THE WEATHER FORECAST SHOULD BE MONITORED CLOSELY PRIOR TO
AND DURING ALL IN -STREAM WORK. IT IS ESSENTIAL THAT CONCRETE PLACEMENTS
BE COMPLETED DURING LOW FLOW WINDOWS AND FOLLOWED BY SEVERAL DAYS
OF LOW FLOWS TO ENSURE DRY CONDITIONS FOR CURING.
NOTE 3: THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A HIGH WATER
CONTINGENCY PLAN. THIS PLAN SHOULD OUTLINE HOW THE JOBSITE WILL BE
SECURED IN THE EVENT OF RISING WATER LEVE S INCLUDING HOW TO
EFFICIENTLY REMOVE PERSONNEL, MATERIALS AND EQUIPMENT FROM THE
IN -STREAM WORK AREA WHEN A HIGH WATER SCENARIO IS FORECASTED..
COMPLETED PUT -IN AREA
■
■
■
a
IF, 2
-„
O
0
.40
b:} O Ow o� • �S - SS SS SS
SS —
S �
SS
SS ___ S . r 4
SS
FOC FOC
FOC Fnc
O
S
0
ok,
9 s --
'rl
NO
"XI
COMPLETED BYPASS
CHANNEL
COMPLETED WAVE
FEATURE
Q— s — ss —
_ SS
SS —
0)
s�
�S — SS I
SS
C Q) FOC FUG _ FOC C
roc 7
Foc
W
77'-� I'll
v
i
02%1--y
i WHITEWA
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
Status:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name:
Wave Construction Sequence 8
6.�
00 Revisions:
\: — SS S SS
Ss -- S ' �t
FOC___
FOC _ P__
r M, Oc
MO UVV - _
O'v"V
�— rVV
C Mo
I o/
/M
Mo
Drawn By:
�►� �� Riley Adams
Checked By:
FOC Scott Shipley
�\ Date:
�\ March 3, 2023
Status:
Issued For Permitting
OW --
Stamp:
SEA
O ENGINE\Q�,.�'��
R�S
Scale: Sheet -
ill = 40' WWEC.8
C;
G
C
z
if
V
C
a
LL
C.;
z
z
LL
C
C
C
Cr
C
Cr
C
Cr
n
C
n
V
U
z
G_
Q
C
LL
Q
z
U
V
LL
C
z
C
C
C
G
U
V
LL
C
Q
z
LL
z
LL
LL
a_
2
U
C
U
z
LL
LL
z
U
z
LL
c
z
z
U
V
LL
C
n
LL
V
a
LL
V
C.;
RIVER CHANNEL
COFFERDAM NOTES:
(1) WRAP "SUPER SACKS" WITH IMPERVIOUS PLASTIC LINER TO PREVENT SEEPAGE.
(2) BACKFILL THE DOWNSTREAM SIDE OF THE COFFERDAM WITH NATIVE ADJACENT ALLUVIUM.
(5) USE "SUPER SACKS" AS A BUTTRESS AS REQUIRED.
"SUPER SACK" COFFERDAM TYPICAL DETAILS
PLAN
GENERAL EROSION & SEDIMENT CONTROL NOTES:
(1) THE IMPLEMENTATION OF EROSION AND SEDIMENT CONTROL MEASURES
AND BEST MANAGEMENT PRACTICES INCLUDING CONSTRUCTION,
MAINTENANCE, REPLACEMENT AND UPGRADING ARE THE RESPONSIBILITY OF
THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND
APPROVED.
(2) THE DETAILS SHOWN ON THIS SHEET ARE AN EXAMPLE OF ACCEPTABLE
METHODS TO USE DURING CONSTRUCTION OF THIS PROJECT. THE
CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND SUBMITTING A
COFFERDAM PLAN TO INCLUDE SUFFICIENT DETAIL OF MEANS AND
METHODS SATISFACTORILY MEETING THE PROJECT SPECIFICATIONS AND
PERMIT REQUIREMENTS. COFFERDAMS MAY CONSIST OF OTHER METHODS
INCLUDING (BUT NOT LIMITED TO) SECLUSION FENCING, SAND BAGS, BULK
BAGS, SUPER SACKS, SHEET PILE AND INFLATABLE BLADDERS.
COFFERDAMS SHALL INCLUDE PLASTING LINER OR FINE MESH SILT FENCE
TO REDUCE TURBIDITY AND FINES FROM ENTERING THE FREE FLOWING
PORTION OF LIVE WATER.
(5) ALL PUMP INTAKES SHALL BE SCREENED FOR FISH PROTECTION AS
REQUIRED BY REGULATORY AGENCIES.
(4) DEWATERING PUMP DISCHARGE FROM WITHIN COFFERDAM WORK AREAS
SHALL BE RELEASED ONTO FLOODPLAIN AREAS AWAY FROM WETLANDS AND
CONSTRUCTION ACTIVITIES. DISCHARGE SHALL NOT CAUSE EROSION OF
TOPSOIL AND SHALL SHEET FLOW OVER THE FLOODPLAIN BEFORE
RETURNING TO LIVE WATER DOWNSTREAM OF THE WORK AREA. ALL
RETURN FLOWS MUST MEET PERMIT REQUIREMENTS FOR TURBIDITY.
(5) ALL EARTHWORK AND WOOD STRUCTURES CONSTRUCTION WITHIN THE
ORDINARY HIGH CHANNEL SHALL CONFORM TO WATER QUALITY STANDARDS
ESTABLISHED BY THE REGULATORY AGENCY PERMITS FOR THIS PROJECT.
SCALE:NTS
3' DIAMETER SUPER SACKS
WITH SECUREEY CLOSED TOP
WATER SURFACE
SUPPLEMENT SUPER (ELEV. VARIES)
SACKS WITH SAND
BAGS AS NEEDED. -
0900► 1� 1
RIVER CHANNEL
BACKFILL WITH WRAP SUPER SACKS
GRAVEL &COBBLES WITH IMPERVIOUS LINER
AND BACKFILL LINER
"SUPER SACK" COFFERDAM DOUBLE STACK
SECTION SCALE:NTS
BACKFILL WITH —
GRAVEL & COBBLES
WORK AREA
3' DIAMETER
SUPER SACKS WITH
SECURELY CLOSED TOP
WATER SURFACE
(ELEV. VARIES)
RIVER CHANNEL
WRAP SUPER SACKS
WITH IMPERVIOUS LINER
AND BACKFILL LINER
"SUPER SACK" COFFERDAM SINGLE STACK
SECTION
SCALE:NTS
%AIAT=n OI In=Ar = IKIC`T/AI I 1A —n —1 1 — /`l1 — —A /A(`(`llnfl K—
ALTERNATE COFFER DAM TYP. WATER -FILLED BLADDER
OR PUMP IF NECESSARY
TYPICAL COFFER DAM WATER CONTROL
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
RIVER FLOW
RIVER BANK
Status:
Erosion Control/Water
DIMENSIONS OF CHANNEL TO q
Control/Construction Sequence
ALLOW FOR A MINIMUM FLOW Drawings for Permitting
)FFER DAM
Drawing Name:
Erosion Control Details 1
Revisions-
1
Drawn By:
Riley Adams
Checked By-
LLLLL
LLLLL
Scott Shipley
LLLLL COFFER DAM
LLLLL
LLLLL
Date
HAY BALES March 3, 2023
(PURE HAY)
Status -
Issued For Permitting
SECTION NTS �,� PLAN NTS Stam
p-
Scale:
NTS
Sheet:
WNEC.9
G
C
H
C
C.;
z
C
(f
C
a
LL
C.;
z
z
IL
C
C
Cr
c
Cr
Cr
n
C
CN
z
LL
Q
U
LL
C
z
c
C
C
z
C:
U
LL
C
Q
z
IL
C.;
z
LL
LLL
a_
_
U
C
U
C:
z
tY
LL
LL
z
C:
LL
z
z
C:
U
LL
C
n
U
LL
U
LL
U
C.;
PUMP SUCTION LINE
OR SUBMERSIBLE PUMP
CENTERED IN BUCKET
GRAVEL (CDOT SECT.
DEWATERING POND ALREADY FILLED WITH WATER
SECTION
PUMP SUCTION LINE
OR SUBMERSIBLE PUMP
CENTERED IN BUCKET
12" MIN. AROUND ON
ALL SIDES OF BUCKET
12" MIN.
BELOW BUCKET
NTS
'LASTIC 5—GALLON BUCKET WITH
MANY 8" HOLES DRILLED IN SIDES
,ASH TO #3
703. #3)
LOWEST SUBGRADE
ELEVATION TO BE DEWATERED
NOTE: SUMP PITS SHOULD BE DEEP
2' MIN, ENOUGH THAT THERE IS REASONABLE
SETTLING OF SUSPENDED MATERIAL.
• o 0
• o o PLASTIC 5—GALLON BUCKET WITH
• o MANY 8" HOLES DRILLED IN SIDES
• AND BOTTOM
)o 0 o AASHTO #3 GRAVEL
(CDOT SECT. 703. #3)
DEWATERING SUMP FOR SUBMERSED PUMP
SECTION
NTS
NCC
##57 w
NC DOT #5 or #57
washed store
—
4
Flow
Strearn
Channel'
apac-Ity of pipe culvert
together Incnkfull flow
.21 diameter cif pipe or 1
whichever is greater Filter Cloth
TEMPORARY STREAM CROSSING/ACCESS ROAD
DETAIL
NTS
Clas R Erasion
Stone
SIGN TO INDICATE THE LOCATION OF
THE CONCRETE WASHOUT AREA
el:1fll1PUi.Yll Illly_1tya
12" -
3H:1 V
SIDE SLOPES 2'0' MIN
PLASTIC SHEETING OR GEOMEMBRANE,
MIN. 10-MIL THICKNESS
GROUND SURFACE
ORANGE CONSTRUCTION FENCE
AROUND WASHOUT STRUCTURE
COMPACTED EMBANKMENT
MATERIAL, TYP.
8'X8' MIN.
OR AS REQUIRED TO CONTAIN
CONCRETE WASTE
SECTION H—H'
BERM AROUND PERIMETER.
COMPACTED EMBANKMENT
MATERIAL, TYP.
-III=1 � I —I � I�
If=III=III
uIITiITil
H -III—I I I —I I I�
�El I I=I I I —I I
�' 8 —Min -III—I
1PTi=ITi—III
I II
ORANGE
CONSTRUCTION FENCE
HE
PLAN VIEW
NOTES:
1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE; PLACED A
MINIMUM 50' FROM STATE WATERS.
2. VEHICLE TRACKING CONTROL IS REQUIRED AT CONCRETE WASHOUT ENTRANCE IF ACCESS TO CONCRETE WASHOUT
AREA IS OFF PAVEMENT.
3. A PLASTIC SHEETING OR GEOMEMBRANE LINER SHALL BE PLACED. MINIMUM 10-MIL THICKNESS..
4. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND/OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY
FOR WASTE CONCRETE.
5. WASTE MATERIAL FROM CONCRETE WASHOUT OPERATIONS MUST BE REMOVED AND LEGALLY DISPOSED OF WHEN IT
HAS ACCUMULATED TWO-THIRDS OF THE WET STORAGE CAPACITY OF THE STRUCTURE AND AT THE END OF
CONSTRUCTION.
6. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR
OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CLIENT.
7. NO STORMWATER RUN-OFF SHALL DRAIN INTO CONCRETE WASHOUT AREA.
CONCRETE WASHOUT AREA
DETAIL
NTS
S20 Design and Engineering
Scott Shipley, P.E.
318 Mcconnell Drive
Lyons CO, 80540,
USA
(303) 819-3985
Client:
Town of Woodfin, NC
Project Name:
Woodfin Wave at Riverside Park
Status:
Erosion Control/Water
Control/Construction Sequence
Drawings for Permitting
Drawing Name:
Erosion Control Details 2
Revisions:
1
Drawn By:
Riley Adams
Checked By:
Scott Shipley
Date:
March 3, 2023
Status:
Issued For Permitting
Stamp:
CA Ro
SEA
�HGINE`Q�,.�'��
�R���S
Scale:
NTS
Sheet:
WWEC.10