Loading...
HomeMy WebLinkAboutSWA000186_Design Calculations_20230302Stormwater Impact Analysis 6785 Reynolda Road Pfafftown, NC 27040 Project No. 22-271 Prepared for: COC Investments, LLC 2049 West Pine Street Mount Airy, NC 27030 PILOT SURVEYING & ENGINEERING 106 S. Depot Street Suite D Pilot Mountain, NC (336-422-6741) www.pilotse.com Contact: cory@pilotse.com Table of Contents ProjectNarrative....................................................................................................................................................... 3 SupportingInformation............................................................................................................................................. 4 Hydrology& Summary.............................................................................................................................................. 5 Detention Summary & Water Quality Calculations................................................................................................... 6 HydrographsModeling Report.................................................................................................................................. 7 Pre Development Drainage Area Map...................................................................................................................... 8 Post Development Drainage Area Map..................................................................................................................... 9 OutletProtection..................................................................................................................................................... 10 Anti -Float Block Calculations................................................................................................................................... 11 HydraflowModeling Summary................................................................................................................................ 12 Erosion Control Calculations................................................................................................................................... 13 Page 2 of 13 Project Narrative The proposed project consists of the construction of six new outdoor self storage buildings and an office. The site is located on Reynolda Road in Pfafftown, North Carolina. Existing conditions onsite consist of an existing junk yard on the eastern side of the site with two additional existing buildings along Reynolda Road, one of which is to be removed. The site generally drains from east to west with a small portion of the developing area draining to the east. There is a small stream running south to north located on the western side of the property; no impacts are proposed. In order to mitigate stormwater impacts from the construction of the project, one above ground wet pond has been designed to treat runoff from the site in accordance with the North Carolina Stormwater Manual and to detain post -development flow rates to be equal or less than pre - development flow rates for the 2-, 10- and 25- year storm events. A multi -phase erosion control plan has been designed to provide the required erosion and sediment control protection during construction. Measures generally include silt fence, silt fence outlets, utilization of the wet pond as a skimmer basin during construction and other inlet and gravel protection measures. Phase one of the erosion control plan has been developed to install perimeter measures and remove only the amount of existing site infrastructure necessary to install the wet pond and skimmer and clear and grub the area to be developed. Stage two progresses with the installation of infrastructure, and addresses erosion control once the site has reached finished grade and installation of storm drainage piping and fill has been placed. In conclusion, as proposed the development as designed will meet stormwater quality requirements and detention requirements as the pond meets the 2-, 10, and 25- year detention from predevelopment to post development rates. Detention Summary POA # 2-Yr Storm cfs 10-Yr Storm cfs 25-Yr Storm cfs 1 5.59 2.69 -529/(o 18.89 14.34 -24% 28.71 26.41 -8% 2 1.63 1.51 -7% 5.16 3.99 -23% 7.76 5.74 -26% Page 3 of 13 Supporting Information Page 4 of 13 556530 36' 11' 21" N 36o 11' 8" N 556580 556630 556680 556730 Map Scale: 1:1,980 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 25 50 100 150 Feet 0 50 100 200 300 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Forsyth County, North Carolina (Pre_DA1) 5565M 556630 556680 5%730 556780 556780 v 556830 36o 11' 21" N 36o 11' 8" N 556830 v 12/12/2022 Pagel of 4 Hydrologic Soil Group —Forsyth County, North Carolina (Pre_DA1) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Forsyth County, North Carolina Survey Area Data: Version 24, Sep 8, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 17, 2020—Nov 3, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Pre_DA1 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CIB Clifford sandy loam, 2 to A 2.0 19.0% 6 percent slopes FaD Fairview fine sandy B 0.1 0.6% loam, 10 to 15 percent slopes PoC Poplar Forest fine sandy B 4.3 40.4% loam, 6 to 10 percent slopes PoF Poplar Forest fine sandy B 3.7 34.4% loam, 15 to 45 percent slopes TmB Tomlin loam, 2 to 6 B 0.6 5.6% percent slopes Totals for Area of Interest 10.7 100.0% USDA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Pre_DA1 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 0 556680 36o 11' 20" N g 0 r 36o 11' 11" N Hydrologic Soil Group —Forsyth County, North Carolina (Pre_DA2) 556710 556740 556770 556800 556830 556680 556710 556740 556770 556800 556830 b Map Scale: 1:1,420 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 20 40 80 120 Feet 0 50 100 200 300 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 556M 36o 11' 20" N g 0 36o 11' 11" N 556890 12/12/2022 Pagel of 4 Hydrologic Soil Group —Forsyth County, North Carolina (Pre_DA2) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Forsyth County, North Carolina Survey Area Data: Version 24, Sep 8, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 17, 2020—Nov 3, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Pre_DA2 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CIB Clifford sandy loam, 2 to A 0.1 2.8% 6 percent slopes PcF2 Pacolet clay loam, 15 to B 0.2 10.2% 45 percent slopes, moderately eroded PoC Poplar Forest fine sandy B 0.1 4.3% loam, 6 to 10 percent slopes TmB Tomlin loam, 2 to 6 B 1.8 82.6% percent slopes Totals for Area of Interest 2.2 100.0% USDA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Pre_DA2 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 v 556600 36o 11' 20" N I 0 36o 11' 9" N 556600 556640 556680 556720 556760 v Map Scale: 1:1,740 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 25 50 100 150 Feet 0 50 100 200 300 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Forsyth County, North Carolina (Post_DA1_2SCM) 556640 556680 556720 556760 556840 36o 11' 20" N 36o 1V9"N 556940 12/12/2022 Pagel of 4 Hydrologic Soil Group —Forsyth County, North Carolina (Post_DA1_2SCM) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Forsyth County, North Carolina Survey Area Data: Version 24, Sep 8, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 17, 2020—Nov 3, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Post_DA1_2SCM Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CIB Clifford sandy loam, 2 to A 2.2 21.7% 6 percent slopes PoC Poplar Forest fine sandy B 3.8 37.3% loam, 6 to 10 percent slopes PoF Poplar Forest fine sandy B 2.8 27.3% loam, 15 to 45 percent slopes TmB Tomlin loam, 2 to 6 B 1.4 13.7% percent slopes Totals for Area of Interest 10.3 100.0% USDA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Post_DA1_2SCM Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 12/12/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 3: Hydrologic Soil Group —Forsyth County, North Carolina 3: (Post_DA1 _Byp) o 556530 556550 556570 556590 556610 556630 556650 556670 36o 11' 19" N I 36o 11' 19" N PoF FaD Ap o - 5 r 0 o _ 4 y o IW� o 1 Soil N1aN may not M valiel at this scale. 360 11' 12" N - I 360 11' 12" N 556530 556550 .70 556590 556510 556630 556650 556670 o b Map Scale: 1:1,040 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 15 30 60 90 $ Feet 0 50 100 200 300 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Pagel of 4 Hydrologic Soil Group —Forsyth County, North Carolina (Post_DA1 _Byp) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Forsyth County, North Carolina Survey Area Data: Version 24, Sep 8, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 17, 2020—Nov 3, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Post_DA1 _Byp Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI FaD Fairview fine sandy B 0.1 4.1 % loam, 10 to 15 percent slopes PoC Poplar Forest fine sandy B 0.5 35.8% loam, 6 to 10 percent slopes PoF Poplar Forest fine sandy B 0.9 60.1 % loam, 15 to 45 percent slopes Totals for Area of Interest 1.6 100.0% USDA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Post_DA1 _Byp Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 0 556680 36o 11' 20" N g 0 r 36o 11' 11" N Hydrologic Soil Group —Forsyth County, North Carolina (Post_DA2_Byp) 556710 556740 556770 556800 556830 556680 556710 556740 556770 556800 556830 b Map Scale: 1:1,420 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 20 40 80 120 Feet 0 50 100 200 300 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 556M 36o 11' 20" N g 0 36o 11' 11" N 556890 12/13/2022 Pagel of 4 Hydrologic Soil Group —Forsyth County, North Carolina (Post_DA2_Byp) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Forsyth County, North Carolina Survey Area Data: Version 24, Sep 8, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 17, 2020—Nov 3, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Post_DA2_Byp Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CIB Clifford sandy loam, 2 to A 0.1 4.5% 6 percent slopes PcF2 Pacolet clay loam, 15 to B 0.2 16.4% 45 percent slopes, moderately eroded PoC Poplar Forest fine sandy B 0.1 6.8% loam, 6 to 10 percent slopes TmB Tomlin loam, 2 to 6 B 1.0 72.2% percent slopes Totals for Area of Interest 1.3 100.0% USDA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Forsyth County, North Carolina Post_DA2_Byp Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 12/12/22, 11:08 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 1' Location name: Pfafftown, North Carolina, USA* Latitude: 36.1871°, Longitude:-80.3679° 6W� Elevation: 948.23 ft** 'source: ESRI Maps "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.43 5.27 6.22 6.86 7.66 8.18 8.68 9.12 9.64 10. 00 (4.09-4.81) 1 (4.87-5.74) 11 (5.74-6.77) 11 (6.32-7.46) 1 (7.01-8.32) 1 (7.44-8.90) 11 (7.84-9.44) 1 (8.18-9.96) 1 (8.53-10.6) 11 (8.76-11.0) 3.54 4.22 4.97 5.50 6.10 6.52 6.89 7.22 7.62 7.87 10-min (3.27-3.84) 1 (3.90-4.59) 11 (4.59-5.42) 11 (5.06-5.97) 1 (5.58-6.62) 1 (5.93-7.09) 11 (6.23-7.51) 1 (6.48-7.90) 1 (6.75-8.36) 11 (6.90-8.68) 2.95 3.53 4.20 4.63 5.15 5.50 5.81 6.08 6.39 6.58 15-min (2.73-3.20) 1 (3.27-3.84) 11 (3.87-4.57) 11 (4.26-5.04) 1 (4.72-5.60) 1 (5.00-5.98) 11 (5.25-6.32) 1 (5.45-6.64) 1 (5.66-7.02) 11 (5.77-7.26) 2.02 2.44 2.98 3.36 3.82 4.14 4.45 4.73 5.09 5.33 30-min (1.87-2.19) 1 (2.26-2.66) 11 (2.75-3.25) 11 (3.09-3.65) 1 (3.49-4.14) 1 (3.77-4.51) 11 (4.02-4.84) 1 (4.24-5.17) 1 (4.51-5.58) 11 (4.67-5.88) 1.26 1.53 1.91 2.19 2.54 2.81 3.06 3.32 3.65 3.89 60-min (1.1 7-1.37) 1 (1.42-1.67) (1.76-2.08) 11 (2.01-2.38) 1 (2.33-2.76) 1 (2.55-3.05) (2.77-3.34) 1 (2.98-3.63) 1 (3.23-4.00) 11 (3.41-4.29) 0.742 0.902 7 1.14 1.31 1.55 1.73 7 1.91 2.09 2.34 7 2.53 2-hr (0.684-0.810) (0.831-0.986) (1.04-1.24) 11 (1.20-1.43) 1 (1.41-1.68) 1 (1.56-1.88) 11 (1.71-2.09) 1 (1.86-2.29) 1 (2.05-2.57) 11 (2.19-2.79) 0.531 0.647 0.815 0.943 1.12 115 1.38 112 1.71 1.85 3-hr (0.490-0.581) (0.597-0.708) (0.751-0.890) (0.864-1.03) 1 (1.01-1.21) 1 (1.13-1.36) 11 (1.24-1.51) 1 (1.35-1.66) 1 (1.49-1.87) 11 (1.60-2.04) 0.327 0.396 0.499 0.579 0.688 0.777 0.867 0.960 1.09 1.19 6-hr (0.301-0.357) (0.366-0.434) (0.459-0.546) (0.530-0.632) (0.626-0.750) (0.700-0.846) (0.775-0.944) (0.847-1.05) 1 (0.946-1.19) (1.02-1.31) 0.196 0.237 0.299 0.349 0.418 0.475 0.535 0.597 0.686 0.757 12-hr (0.180-0.214) (0.218-0.260) (0.275-0.327) (0.319-0.380) (0.379-0.454) (0.427-0.514) (0.476-0.578) (0.525-0.646) (0.592-0.743) (0.643-0.822) 0.118 0.143 0.181 0.210 0.252 0.286 0.322 0.360 0.413 0.457 24-hr (0.110-0.128) (0.132-0.155) (0.167-0.195) (0.194-0.227) (0.231-0.272) (0.262-0.309) (0.293-0.348) (0.325-0.389) (0.370-0.447) (0.406-0.495) 0.069 0.084 0.104 0.121 0.144 0.162 0.180 0.200 0.227 0.249 2{iay (0.064-0.075) (0.078-0.090) (0.097-0.113) (0.112-0.130) (0.132-0.154) (0.149-0.174) (0.165-0.194) (0.182-0.216) (0.206-0.245) (0.224-0.270) 0.049 0.059 0.074 0.085 0.101 0.114 0.127 0.140 0.160 0.175 3tlay (0.046-0.053) (0.055-0.063) (0.069-0.079) (0.079-0.091) (0.093-0.108) (0.105-0.122) (0.116-0.136) (0.128-0.151) (0.144-0.172) (0.157-0.189) 0.039 0.047 0.058 0.067 0.080 0.090 0.100 0.111 0.126 0.138 4tlay (0.036-0.042) (0.044-0.050) (0.054-0.062) (0.063-0.072) (0.074-0.085) (0.083-0.096) (0.092-0.107) (0.101-0.119) (0.114-0.136) (0.124-0.149) 0.025 0.030 0.037 0.042 0.050 0.056 0.062 0.068 0.077 0.084 7{iay (0.024-0.027) (0.028-0.032) (0.035-0.040) (0.040-0.045) (0.046-0.053) (0.052-0.060) (0.057-0.066) (0.063-0.073) (0.070-0.083) (0.076-0.090) 0.020 0.024 F029 0.033 0.039 0.043 0.047 0.052 0.058 0.063 10-day (0.019-0.022) (0.023-0.026) (0.027-0.031) (0.031-0.035) (0.036-0.041) (0.040-0.046) (0.044-0.050) (0.048-0.055) (0.053-0.062) (0.057-0.067) 0.014 0.016 0.019 0.022 0.025 0.027 0.030 0.033 0.036 0.039 20-day (0.013-0.014) (0.015-0.017) (0.018-0.020) (0.020-0.023) (0.023-0.026) (0.026-0.029) (0.028-0.032) (0.030-0.035) (0.033-0.039) (0.036-0.042) 0.011 0.013 0.015 0.017 0.019 0.021 0.023 0.024 0.026 0.028 30-day (0.011-0.012) (0.013-0.014) (0.015-0.016) (0.016-0.018) (0.018-0.020) (0.020-0.022) (0.021-0.024) (0.023-0.025) (0.025-0.028) (0.026-0.029) 0.009 0.011 0.013 0.014 0.016 0.017 0.018 0.019 0.021 0.022 45-day (0.009-0.010) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.019-0.022) (0.020-0.023) 0.008 0.010 0.011 0.012 0.014 0.014 0.015 0.016 0.017 0.018 60-day (0.008-0.009) (0.010-0.010) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.016) (0.015-0.017) (0.016-0.018) 1 (0.017-0.019) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PIMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1871 & Ion =-80.3679&data=intensity&units=english&series=pds 1 /4 12/12/22, 11:08 PM Precipitation Frequency Data Server PD5-based intensity -duration -frequency (IDF) curves Latitude: 35.1871°, Longitude: -30.3679' M 61616IM1 1.000 41 C 3fa OX 0.0011 t t Jr t L N N O r{4 N rq rq rq N rq N Alb A q r, O O O Ln O ,1 r-I rn ro 1-4N rn v Ln Duration 10.000 1.000 ZI m .c 0.100 0 49 0.010 a 0.001 1 1 1 1 1 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT): Tue Dec 13 04:08=33 2022 Back to Top Maps & aerials Small scale terrain Average recurrence ml erva I {years} — 1 2 — 5 10 — 25 60 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — d-dmy — 3C-rnw — 7-d ay — 6 Wain — 1 o-day — 2fir — 20-day — 3-rr — 30-day — Bfir — 45-day — 12-n r — 60-day 24-nr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=36.1871 &Ion=-80.3679&data=intensity&units=engIish&series=pds 2/4 12/12/22, 11:08 PM Precipitation Frequency Data Server sta I f' ?Q irlli ,Pfaltown , Large scale terrain * Lynchburg Al Blacksburg Roanoke Bristol winston- • . Uuii7am k reenshoro • r:•ii r_1it,=17e11 Ral2igl' Itp •Asl7erille NORTH C A R 0 L I N A 100km Charlotte Fayetteville 6 mi ja- Large scale map Lynchburg Blacksburg ;,Roanoke l r' ort Bristol Johnson Gity in! l"Greensboroarham J,Raieigh Carolina ' f arl Otte 100km Fettevi Ile Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1871 & Ion =-80.3679&data=intensity&units=english&series=pds 3/4 12/12/22, 11:08 PM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1871 & Ion =-80.3679&data=intensity&units=english&series=pds 4/4 12/12/22, 11:08 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Pfafftown, North Carolina, USA*�' Latitude: 36.1871°, Longitude:-80.3679° Elevation: 948.23 ft** 'source: ESRI Maps "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular 11 PDS-based point precipitation freauencv estimates with 90% confidence intervals (in inches)' 11 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.369 0.439 0.518 0.572 0.638 0.682 0.723 0.760 0.803 0.833 (0.341-0.401) (0.406-0.478) (0.478-0.564) (0.527-0.622) (0.584-0.693) (0.620-0.742) (0.653-0.787) (0.682-0.830) (0.711-0.881) (0.730-0.91 0.590 0.703 0.829 0.916 1.02 1.09 1.15 1.20 1.27 1.31 10-min (0.545-0.640) (0.650-0.765) (0.765-0.903) (0.843-0.995) (0.930-1.10) (0.988-1.18) 1 (1.04-1.25) 11 (1.08-1.32) 1 (1.13-1.39) 11 (1.15-1.45) 0.738 0.883 1.05 1.16 1.29 1.38 1.45 1.52 1.60 1.65 15-min (0.682-0.800) (0.817-0.961) (0.968-1.14) 11 (1.07-1.26) 11 (1.18-1.40) 1 (1.25-1.50) 1 (1.31-1.58) 11 (1.36-1.66) 1 (1.42-1.75) 11 (1.44-1.82) 1.01 1.22 1.49 1.68 1.91 2.07 2.22 2.37 2.54 2.67 30-min (0.934-1.10) (1.13-1.33) (1.38-1.62) (1.55-1.82) (1.75-2.07) (1.88-2.25) (2.01-2.42) (2.12-2.59) (2.25-2.79) (2.34-2.94) 1.26 1.63 1.91 2.19 2.64 2.81 3.06 3.32 3.66 3.89 60-min (1.17-1.37) (1.42-1.67) (1.76-2.08) (2.01-2.38) (2.33-2.76) (2.55-3.05) (2.77-3.34) (2.98-3.63) (3.23-4.00) (3.41-4.29) 1.49 1.81 2.27 2.62 3.09 3.46 3.82 4.18 4.68 6.06 2-hr (1.37-1.62) (1.66-1.97) (2.09-2.48) (2.40-2.86) (2.81-3.37) (3.12-3.77) (3.42-4.17) (3.71-4.58) (4.09-5.14) (4.37-5.58) 1.60 1.94 2.45 2.83 3.35 3.75 4.16 4.57 5.12 5.56 3-hr (1.47-1.74) (1.79-2.13) (2.25-2.67) (2.60-3.09) (3.04-3.65) (3.39-4.08) (3.72-4.53) (4.05-4.99) (4.48-5.62) (4.80-6.12) 1.96 2.37 2.99 3.47 4.12 4.66 6.19 6.76 6.63 7.14 6-hr (1.81-2.14) (2.19-2.60) (2.75-3.27) (3.18-3.78) (3.75-4.49) (4.19-5.07) (4.64-5.65) (5.07-6.26) (5.66-7.13) (6.11-7.83) 2.36 2.86 3.61 4.20 6.04 6.72 6.44 7.19 8.26 9.13 12-hr (2.17-2.58) (2.63-3.13) (3.31-3.94) (3.85-4.58) (4.57-5.47) (5.15-6.19) (5.73-6.97) (6.32-7.79) (7.13-8.96) (7.75-9.90) 2.84 3.43 4.33 5.05 6.05 6.87 7.73 8.64 9.92 11.0 24-hr (2.63-3.07) (3.18-3.72) (4.00-4.69) (4.66-5.46) (5.55-6.54) (6.28-7.42) (7.03-8.35) (7.80-9.34) (8.89-10.7) (9.76-11.9) 3.33 4.01 6.01 6.80 6.89 7.76 8.66 9.60 10.9 12.0 2{iay (3.09-3.58) (3.73-4.32) (4.66-5.40) (5.38-6.24) (6.36-7.41) (7.14-8.35) (7.94-9.33) (8.75-10.4) (9.87-11.8) (10.7-13.0) 3.63 4.26 6.30 6.13 7.26 8.18 9.13 10.1 11.6 12.6 3tlay (3.29-3.79) (3.96-4.57) (4.93-5.69) (5.69-6.57) (6.72-7.79) (7.54-8.78) (8.37-9.81) (9.23-10.9) (10.4-12.4) (11.3-13.6) 3.73 4.49 5.59 6.45 7.64 8.60 9.59 10.6 12.1 13.2 4tlay (3.49-4.00) (4.20-4.82) (5.21-5.98) (6.00-6.90) (7.08-8.18) (7.93-9.22) (8.81-10.3) (9.70-11.4) (10.9-13.0) (11.9-14.3) 4.26 6.10 6.24 7.14 8.38 9.37 10.4 11.6 12.9 14.1 7{iay (3.99-4.55) (4.77-5.45) (5.83-6.66) (6.66-7.62) (7.79-8.94) (8.67-10.0) (9.59-11.1) (10.5-12.3) (11.8-13.9) (12.7-15.2) 4.86 6.79 7.01 7.96 9.26 10.3 11.3 12.4 13.9 16.1 10tlay (4.57-5.17) (5.45-6.17) (6.58-7.45) (7.46-8.47) (8.65-9.84) (9.57-10.9) (10.5-12.1) (11.5-13.3) (12.7-14.9) (13.7-16.2) 6.54 7.75 9.21 10.4 11.9 13.2 14.4 15.6 17.3 18.6 20tlay (6.18-6.93) (7.33-8.21) (8.70-9.76) (9.78-11.0) (11.2-12.6) (12.3-13.9) (13.4-15.3) (14.5-16.6) (16.0-18.5) (17.1-19.9) 8.11 9.66 11.1 12.3 13.9 16.1 16.2 17.4 18.9 20.1 30tlay (7.72-8.52) (9.09-10.0) (10.6-11.7) (11.7-12.9) (13.2-14.6) (14.2-15.8) (15.3-17.1) (16.4-18.3) (17.7-20.0) (18.7-21.2) 10.2 12.0 13.8 16.1 16.9 18.2 19.4 20.7 22.3 23.6 45tlay (9.78-10.7) (11.5-12.6) (13.2-14.4) (14.4-15.8) (16.0-17.6) (17.3-19.0) (18.4-20.4) (19.5-21.7) (21.0-23.4) (22.0-24.8) 12.2 14.3 16.2 17.6 19.5 20.8 22.1 23.4 25.0 26.2 60tlay (11.7-12.7) (13.7-14.9) (15.5-16.9) (16.9-18.4) (18.6-20.3) (19.9-21.8) (21.1-23.2) (22.2-24.5) (23.6-26.2) (24.7-27.5) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PIMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1871 & Ion =-80.3679&data=depth&units=english&series=pds 1 /4 12/12/22, 11:08 PM Precipitation Frequency Data Server Pas -based depth -duration -frequency (DDF) curves Latitude: 36.1871`, Longitude: -80-3679' M:11 25 c t 20 4- a di U 15 49 10 CL a 5 0 t t Jr t L N N O r{4 N rq rq rq N rq N �5 lb A q O O O Ln O ,1 r-I rn ro � N rn v Ln Duration 30 25 c s 20 a m a 15 A, 49 a ,� 10 CL a y f ------------ .... ............ 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, VoIume 2, Version 3 Created (GMT): Tue Dec 13 04:07:57 2022 Back to Top Maps & aerials Small scale terrain Average recurrence ml erva I f years} — 1 — 5 — 14 — 25 64 100 200 500 1000 Duration — 6-min — 2-day — 14-min — 3-day 15-min — d-dmy — 3C-rnw — 7-d ay — 6 Wain — 10-day — 2fir — 20-day — 3-rr — 30-day — Bfir — 45-day — 12-n r — 60-day 24-nr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=36.1871 &Ion=-80.3679&data=depth&units=engIish&series=pds 2/4 12/12/22, 11:08 PM Precipitation Frequency Data Server sta I f' ?Q irlli ,Pfaltown , Large scale terrain * Lynchburg Al Blacksburg Roanoke Bristol winston- • . Uuii7am k reenshoro • r:•ii r_1it,=17e11 Ral2igl' Itp •Asl7erille NORTH C A R 0 L I N A 100km Charlotte Fayetteville 6 mi ja- Large scale map Lynchburg Blacksburg ;,Roanoke l r' ort Bristol Johnson Gity in! l"Greensboroarham J,Raieigh Carolina ' f arl Otte 100km Fettevi Ile Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1871 & Ion =-80.3679&data=depth&units=english&series=pds 3/4 12/12/22, 11:08 PM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1871 & Ion =-80.3679&data=depth&units=english&series=pds 4/4 Hydrology & Summary Page 5 of 13 PRE -DEVELOPMENT HYDROLOGIC CALCULATIONS For: COC INVESTMENTS, LLC 2049 WEST PINE STREET MOUNT AIRY, NC 27030 Pfafftown Self Storage .PILOT SURVEYING & ENGINEERING Project Number: 22-271 By: Cory George, PE, PLS 106 S. Depot Street Suite D Pilot Mountain, NC 27041 PILOT URVEYING .4N❑ I'i. �,.i F.GRING Project Name: Pfafftown Self Storage Project Numbe 22-271 SUMMARY PRE DEVELOPMENT SUMMARY Date: 12/14/2022 Calculated By: JCG Subbasin ID Drainage Area Breakdown [acres] Impervious Open Wooded Total Area [acres] SCS CN Tc [min] DA-1 1.31 6.61 2.79 10.71 60 11.92 DA-2 0.00 2.15 0.00 2.15 60 5.00 12.86 P1LOT .l1R VEYING ANG ENGINE EPING Project Name: Pfafftown Self Storage Project Number: 22-271 Subbasin ID: DA-1 SCS CURVE NUMBERS (REF: SCS TR-55). HYDROLOGIC CALCULATIONS HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG A = 19% HSG B = 81% HSG C = 0% HSG D = 0% Cover Condition SCS CN Comments Impervious 98 Open 57 Assume good condition Wooded 50 Assume good condition Pond 100 SITE IMPERVIOUS BREAKDOWN Contributing Area Area [sf] Area [ac] Building 0.00 Offsite 0.00 Parking 0.00 Misc 57,267 1.31 Total 57,267 1.31 WATERSHED BREAKDOWN Date: 12/14/2022 Calculated By: JCG Contributing Area SCS CN Area [sf] Area [ac] Comments Impervious Open 98 57,267 1.31 57 287,723 6.61 Assume good condition Wooded 50 121,357 2.79 Assume good condition Open Water 100 0 0.00 Total Area =1 10.71 Jacres =1 0.0167 sq mi Composite SCS CN = 60 % Impervious = 12.28% TIME OF CONCENTRATION REF: SCS TR-55 . Segment 1: Overland Flow Length = Upstream Invert = Downstream Invert = Slope = Manning's n = P (2-year/24-hour) = Segment Time = 100 ft ft ft ft/ft 948.50 941.00 0.0750 0.24 den- 3.43 inch 1 8.12 Imin Segment 2: Concentrated Flow Length = 725 ft Upstream Invert = 941.00 ft Downstream Invert = 897.00 ft Slope = 0.0607 ft/ft Paved? = No Velocity = 3.97 ft/sec Segment Time = 3.04 min Segment 3: Channel Flow Length = Upstream Invert = Downstream Invert = Slope = Manning's n = i Flow Area = Wetted Perimeter = Channel Velocity = Segment Time = Segment 4: Channel o� Length = Upstream Invert = Downstream Invert = Slope = Manning's n = Flow Area = Wetted Perimeter = Channel Velocity = Segment Time = wn, ft (REF: Natural Channel Desi ft Design criteria for stabilized ft is 3.5-6 ft/sec ft/ft Assumed Bottom Width=� natural c anne Assumed Depth= ft ft min Time of Concentration = 11.92 min (REF: Natural Channel Desi Design cn ena tor stabilized is 3.5-6 ff/sec Assumed Bo om Width= Assumed Depth= P1LOT .l1R VEYING ANG ENGINE EPING Project Name: Pfafftown Self Storage Project Number: 22-271 Subbasin ID: DA-2 SCS CURVE NUMBERS (REF: SCS TR-55). HYDROLOGIC CALCULATIONS HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG A - 3% HSG B HSG C - 0% HSG D - 0% Cover Condition SCS CN Comments Impervious j8 Open 60 Assume good condition Wooded 54 Assume good condition Pond 100 SITE IMPERVIOUS BREAKDOWN Contributine Area Area isfl Area lacl Building Roads 0 0 0.00 0.00 Parking 0 0.00 Misc 0 0.00 Total 0 0.00 WATERSHED BREAKDOWN Contributiniz Area Date: 12/14/2022 Calculated By: JCG SCS CN Area Isfl Area facl Comments Impervious Open 78 U 0.00 60 93,806 2.15 Assume good condition Wooded 54 0 0.00 Assume good condition Open Water 100 0 0.00 Total Area = 2.15 acres = 0.0034 sq mi Composite SCS CN = 60 % Impervious TIME OF CONCENTRATION REF: SCS TR-55 . Length = 100 ft Upstream Invert = 948.50 ft Downstream Invert = 947.00 ft Slope = 0.0150 ft/ft Manning's n = 0.01 gravel & bare soil P (2-year/24-hour) = 3.43 inches (Pfafftown, Segment Time =1 1.31 Imin Length = 144 ft Upstream Invert = 947.00 ft Downstream Invert = 943.00 ft Slope = 0.0278 ft/ft Paved? = No Velocity = 2.69 ft sec Segment Time 0.89 min Time of Concentration = 5.00 min dNPILOT �� SfIRVEYING ANO ENGINEERING Project Name: Pfafftown Self Storage Project Numbe 22-271 POST DEVELOPMENT SUMMARY Date: 12/14/2022 Calculated By: JCG SUMMARY Subbasin ID Drainage Area Breakdown [acres] Total Area SCS CN Tc [min] Impervious Open Wooded [acres] DA1- to SCM 4.89 4.71 0.70 10.30 76 5.00 DA1- BYP 0.06 0.21 1.19 1.46 58 9.01 DA2 - BYP 0.13 1.22 0.00 1.34 64 5.00 111.766 PI LOT SURVEYING I1N° ENGINEERING Project Name: Pfafftown Self Storage Project Number: 22-271 Subbasin ID: DA1 - to SCM SCS CURVE NUMBERS (REF: SCS TR-55). HSG HYDROLOGIC CALCULATIONS A 98 B 98 C 98 D 98 HSG A = 22% HSG B = 78% HSG C = 0% HSG D = 0% Cover Condition SCS CN Date: 12/14/2022 Calculated By: JCG pen wooaea rona 39 30 100 61 55 100 74 70 100 80 77 100 Comments Impervious 98 Open 56 Assume good condition Wooded 50 Assume good condition Pond 100 - OFF SITE IMPERVIOUS BREAKDOWN Contributing Area Area fsfl Area facl Building 0 0.00 Offsite 0 0.00 Parking 0 0.00 Misc 212,827 4.89 Total 212,827 4.89 WATERSHED BREAKDOWN Contributing Area SCS CN Area fsfl Area facl Comments Impervious 212,827 4.89 Open 56 205,293 4.71 Assume good condition Wooded 50 30,587 0.70 Assume good condition Open Water 100 0 0.00 Total Area = 10.30 acres 0.0161 �sq mi Composite SCS CN =� 76 % Impervious TIME OF CONCENTRATION (REF: SCS TR-55). Time of Concentration = 5.00 min PILOT a............. Project Name: Pfafftown Self Storage Project Number: 22-245 Subbasin ID: DA1- BYP SCS CURVE NUMBERS (REF: SCS TR-55) HYDROLOGIC CALCULATIONS Date: 12/14/2022 Calculated By: JCG HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG A = HSG B = HSG C = MO% HSG D = Cover Condition SCS CN Comments Impervious 98 1 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 OFF SITE IMPERVIOUS BREAKDOWN Contributing Area Area [sf] Area [ac] Building 0 0.06 Offsite 0 0.00 Parking 0 0.00 Misc 2,768 0.06 Total 2,768 0.06 WATERSHED BREAKDOWN Contributing Area SCS CN Area [sf] Area [ac] Comments Impervious 98 2,768 0.06 1 - Open 61 8,951 0.21 Assume good condition Wooded 55 51,951 1.19 Assume good condition Open Water 100 0 0.00 Total Area = 1.46 acres = 0.0023 sq mi Composite SCS CN = 58 % Impervious = 4.35% TIME OF CONCENTRATION (REF: SCS TR-55). Length = Upstream Invert= Downstream Invert= Slope = Manning's n = P (2-year/24-hour) = Segment Time = 100 934.50 926.00 0.0850 0.24 3.43 7.73 ft ft ft ft/ft dense inche< min ft ft ft ft/ft ft/sec min egment 2: Concentrated Flow Length = Upstream Invert= Downstream Invert= Slope = Paved? = Velocity = Segment Time = 134 926.00 902.00 0.1791 No 6.83 0.33 Length = Upstream Invert = Downstream Invert = Slope = Manning's n = Flow Area = Wetted Perimeter = Channel Velocity = Segment Time =1 298 ft (REF: Natural Channel Design Handbook) ft Design criteria for stabilized channel ft is 3.5-6 ft/sec ft/ft Assumed Bottom Width= 1 4.00 ft natural channel Assumed Depth= 1.50 ft ft ft ft Imin 902.00 893.00 0.0302 0.045 6.00 7.00 5.19 0.96 Time of Concentration = 9.01 min Project Name: Pfafftown Self Storage Project Number: 22-245 Subbasin ID: DA2 - BYP SCS CURVE NUMBERS HYDROLOGIC CALCULATIONS Date: 12/14/2022 Calculated By: 1CG (REF: SCS TR-55). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG A= 5% HSG B= 95% HSG C= 0% HSG D = 0% Cover Condition SCS CN Comments Impervious 98 Open 60 Assume good condition Wooded 54 Assume good condition Pond 100 OFF SITE IMPERVIOUS BREAKDOWN Contributing Area Area [sf] Area [ac] Building 0 0.00 Offsite 0 0.00 Parking 0 0.00 Misc 5,526 0.13 Total 5,526 0.13 WATERSHED BREAKDOWN Contributing Area SCS CN Area [sf] Area [ac] Comments Impervious 98 5,526 0.13 Open 60 52,950 1.22 Assume good condition Wooded 54 0 0.00 Assume good condition Open Water 100 0 0.00 Total Area = 1.34 acres = 0.0021 sq mi Composite SCS CN = 64 % Impervious = TIME OF CONCENTRATION REF: SCS TR-55 . Segment 1: Overland Flow Length = 100 ft Upstream Invert= 949.00 ft Downstream Invert = 946.50 ft Slope = 0.0250 ft/ft Manning's n = 0.01 gravel & bare soil P (2-year/24-hour) = 3.43 inches (Pfafftown, NCJ Segment Time= 1.07 min Segment 2: Concentrated Flow Length = 85 Upstream Invert= 946.50 Downstream Invert = 943.00 Slope = 0.0412 Paved? = No Velocity = 3.27 Segment Time = 0.43 ft ft ft ft/ft min Time of Concentration = 5.00 min Detention Summary & Water Quality Calculations Page 6 of 13 STORMWATER MANAGEMENT CALCUATIONS For: COC Investments, LLC 2049 West Pine Street Mount Airy, NC 27030 Pfafftown Self Storage PILOT SURVEYING & ENGINEERING Project Number: 22-271 By: Cory George, PE, PLS 106 S. Depot Street Suite D Pilot Mountain, NC 27041 Detention Summary Project Name: Pfafftown Self Storage roject Number: 22-271 Detention Summary Date: 12/15/2022 Calculated By: JCG Point of 1 2 Year Storm [cfs] 10 Year Storm [cfs] 25 Year Storm [cfs] Analvsis Pre Post % Incr. Pre I Post I % Incr. Pre I Post I % Incr. 1 1 5.59 1 2.69 1 -52% 1 18.89 1 14.34 1 -24% 1 28.71 1 26.41 1 -8% 2 1 1.63 1 1.51 1 -7% 1 5.16 1 3.99 1 -23% 1 7.76 1 5.74 1 -26% Detention Summary - 1 Year 24 Hour Storm Point of 1 Year Storm [cfs] Analysis Pre Post % Incr. 1 2.20 0.66 -70% SCM Summary Drainage Area = 10.30 ac Impervious Area = 4.89 ac % Impervious 47% Top of Dam = 915.00 ft Normal Pool =1 909.00 Ift Riser Size = 4'x4' Riser Crest =1 912.50 Ift Em. Spillway Crest = 913.50 ft Em. Spillway Width =1 15.00 Ift Barrel Diameter = 24 in # of Barrells = 1 Invert In = 905.00 ft Invert Out = 904.00 ft Length = 78 ft Slope = 1.3% Routing Summary Return Inflow Outflow Max Freeboard Period cfs cfs WSE ft 2 25.23 2.54 910.79 4.21 10 49.12 12.33 912.01 2.99 25 64.63 23.35 912.77 2.23 100 91.38 45.88 913.63 1.37 Forebay Stage Storage Project Name: Pfafftown Self Storage Project Number: 22-271 Stage - Storage Function - Forebay Contour Contour Stage Area (feet) (feet) (SF) Date: 12/14/2022 Calculated By: JCG Average Incremental Accumulated Estimated Contour Contour Contour Stage Area Volume Volume w/ S-S Fxn (SF) (CF) (CF) (feet) 904.00 0.00 216 906.00 2.00 1000 608 1216 1216 2.01 907.00 3.00 1435 1218 1218 2434 2.97 908.00 4.00 1895 1665 1665 4099 3.98 909.00 5.00 2409 2152 2152 6251 5.04 Storage vs. Stage 7000 6000 y = 348.98x1.7836 5000 RZ = 0.9994 LL 4000 v 1 `o 3000 Y `^ 2000 1000 0 1.00 2.00 3.00 4.00 5.00 6.00 0.00 Stage (feet) KS -1 349 b - 1.7836 Main Pool Volume Project Name: Pfafftown Self Storage Project Number: 22-271 Stage - Storage Function - Main Pool Contour Contour Stage Area (feet) (feet) (SF) Average Incremental Contour Contour Area Volume (SF) (CF) Date: 12/14/2022 Calculated By: JCG Accumulated Estimated Contour Stage Volume w/ S-S Fxn (CF) (feet) 901.00 0.00 2073 904.00 3.00 3810 2942 8825 8825 3.05 905.00 4.00 4464 4137 4137 12962 3.97 906.00 5.00 5163 4814 4814 17775 4.93 907.00 6.00 5898 5531 5531 23306 5.93 908.00 7.00 6657 6278 6278 29583 6.98 909.00 8.00 8606 7632 1 7632 1 37215 1 8.17 Storage vs. Stage 40000 35000 y = 1730.1x1.461 30000 RZ = 0.9978 U 25000 20000 aio �o 0 15000 i+ 10000 5000 0 0.00 2.00 4.00 6.00 8.00 10.00 Stage (feet) KS —1 1730 b=1 1.4610 Total Stage Storage Project Name: Pfafftown Self Storage Project Number: 22-271 SCM ID: WP-1 Stage - Storage Function - Total Above NP Contour Contour Stage Area (feet) (feet) (SF) Date: 12/14/2022 Calculated By: JCG Average Incremental Accumulated Estimated Contour Contour Contour Stage Area Volume Volume w/ S-S Fxn (SF) (CF) (CF) (feet) 909.00 0.00 11669 910.00 1.00 13056 12363 12363 12363 1.01 912.00 3.00 16002 14529 29058 41421 2.94 913.00 4.00 17559 16781 16781 58201 3.98 914.00 5.00 19173 18366 18366 76567 5.08 915.00 1 6.00 1 20841 1 20007 20007 96574 6.25 Storage vs. Stage 120000 100000 y = 12184x1.14 LL 80000 RZ = 0.9985 60000 ajo �o N 40000 20000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Stage (feet) KS -1 12273 b - 1.1262 Main Pool Surface Area and Volume Calculc- Project Name: Pfafftown Self Storage Date: ######### Project Number: 22-271 Calculated By: JCG Determination of Design Volume DV = 3,630*(R p)*(R v)*(A) where, DV = design volume (cubic feet) R v = 0.05+0.009(1) where 1 is percent impervious cover A = area in acres R p = design storm depth (in inches) Total area, A = 10.30 acres Impervious area = 4.89 acres Percent impervious cover, I = 47.48 Design Storm Depth, Rp = 1.00 inches R`, = 0.48 DV=J 17,845 cf. Forebay Volume Calculation Forebay Volume = M7,215 cf MainPool Volume = cf VFB Of VMP = 15-20% Required SA/DA Table Method Vol. of Main Pool @ NSE, Vpp = 37,215 cf. SA of Main Pool @ NSE, SA = 8,606 cf. Average Depth, Dag = 4.32 ft 4.00 4.32 5.00 Low Bound 40% 1.24 1.09 Site Impervious 47% 1.44 1.38 1.25 High Bound 50% 1.51 1.31 SA/DA Ratio Required = 1.38 Drainage Area, A Main Pool Surface Area Required = 0.14 ac 6,196 sf Main Pool Surface Area Provided = 8,606 sf Table 1: Piedmont and Mountain SA/DA Table (Adapted from Driscoll, 1986) Percent Impervious Cover Permanet Pool Average Depth (ft) 3.0 4.0 5.0 6.0 7.0 >_ 8.0 10% 0.51 0.43 0.37 0.30 0.27 0.25 20% 0.84 0.69 0.61 0.51 0.44 0.40 30% 1.17 0.94 0.84 0.72 0.61 0.56 40 % 1.51 1.24 1.09 0.91 0.78 0.71 50% 1.79 1.51 1.31 1.13 0.95 0.87 60% 2.09 1.77 1.49 1.31 1.12 1.03 70% 2.51 2.09 1.80 1.56 1.34 1.17 80% 2.92 2.41 2.07 1.82 1.62 1.40 90% 3.25 2.64 2.31 2.04 1.84 1.59 100% 3.55 2.79 2.52 2.34 2.04 1.75 Design Volume Depth DV = 17,845 Ks = 12273 b= 1.13 Depth of DV in Pond = 1.39 ft Normal Pool Elevation = 909.00 Elevation of DV = 910.39 Drawdown Calcuation (Average Head) Orifice Diameter, D = 2 in No. of Orifices = 1 Depth of DV in Pond = 1.39 ft Average Head on Orifice = 0.66 ft Orifice Coefficient = 0.6 Area of Orifice = 0.022 sf Average Flow Rate = 0.085 cfs Drawdown Time = 2.43 days Hydrographs Modeling Report Page 7 of 13 Hy d raf I ow Table of C o nteenf\2022\22-271 - Joe Dobbin - Pfafftown Storage\Design\Hydrographs\Wet_Pond2.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 2 - Year SummaryReport......................................................................................................................... 1 HydrographReports ................................................................................................................... 2 Hydrograph No. 1, SCS Runoff, Pre - DA#1............................................................................ 2 Hydrograph No. 2, SCS Runoff, Pre - DA#2............................................................................ 3 Hydrograph No. 3, SCS Runoff, Post - DA#1 to SCM.............................................................. 4 Hydrograph No. 4, SCS Runoff, Post - DA#1 BYP.................................................................. 5 Hydrograph No. 5, SCS Runoff, Post - DA#2 BYP.................................................................. 6 Hydrograph No. 6, Reservoir, SCM Routing............................................................................ 7 PondReport - SCM............................................................................................................. 8 Hydrograph No. 7, Combine, Post - POA#1............................................................................. 9 10 -Year SummaryReport ....................................................................................................................... 10 HydrographReports................................................................................................................. 11 Hydrograph No. 1, SCS Runoff, Pre - DA#1.......................................................................... 11 Hydrograph No. 2, SCS Runoff, Pre - DA#2.......................................................................... 12 Hydrograph No. 3, SCS Runoff, Post - DA#1 to SCM............................................................ 13 Hydrograph No. 4, SCS Runoff, Post - DA#1 BYP................................................................ 14 Hydrograph No. 5, SCS Runoff, Post - DA#2 BYP................................................................ 15 Hydrograph No. 6, Reservoir, SCM Routing.......................................................................... 16 Hydrograph No. 7, Combine, Post - POA#1........................................................................... 17 25 - Year SummaryReport ....................................................................................................................... 18 HydrographReports................................................................................................................. 19 Hydrograph No. 1, SCS Runoff, Pre - DA#1.......................................................................... 19 Hydrograph No. 2, SCS Runoff, Pre - DA#2.......................................................................... 20 Hydrograph No. 3, SCS Runoff, Post - DA#1 to SCM............................................................ 21 Hydrograph No. 4, SCS Runoff, Post - DA#1 BYP................................................................ 22 Hydrograph No. 5, SCS Runoff, Post - DA#2 BYP................................................................ 23 Hydrograph No. 6, Reservoir, SCM Routing.......................................................................... 24 Hydrograph No. 7, Combine, Post - POA#1........................................................................... 25 100 - Year SummaryReport ....................................................................................................................... 26 HydrographReports................................................................................................................. 27 Hydrograph No. 1, SCS Runoff, Pre - DA#1.......................................................................... 27 Hydrograph No. 2, SCS Runoff, Pre - DA#2.......................................................................... 28 Hydrograph No. 3, SCS Runoff, Post - DA#1 to SCM............................................................ 29 Hydrograph No. 4, SCS Runoff, Post - DA#1 BYP................................................................ 30 Hydrograph No. 5, SCS Runoff, Post - DA#2 BYP................................................................ 31 Hydrograph No. 6, Reservoir, SCM Routing.......................................................................... 32 Hydrograph No. 7, Combine, Post - POA#1........................................................................... 33 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.587 1 723 19,197 ------ ------ ------ Pre - DA#1 2 SCS Runoff 1.629 1 719 4,037 ------ ------ ------ Pre - DA#2 3 SCS Runoff 25.23 1 718 50,694 ------ ------ ------ Post - DA#1 to SCM 4 SCS Runoff 0.688 1 721 2,256 ------ ------ ------ Post - DA#1 BYP 5 SCS Runoff 1.512 1 718 3,361 ------ ------ ------ Post - DA#2 BYP 6 Reservoir 2.542 1 747 40,500 3 910.79 23,239 SCM Routing 7 Combine 2.688 1 746 42,756 4,6 ------ ------ Post - POA#1 P:\Projects\2022\22-271 - Joe Dobbin - Pfaf obdetBtnr1RgeQeQ0hkydrographs gW&WXay;,p1.2 / 14 / 2022 Hydrograph Report 2 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 1 Pre - DA#1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 10.710 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.43 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - DA#1 Hyd. No. 1 -- 2 Year 0 120 240 360 480 600 720 — Hyd No. 1 840 Wednesday, 12 / 14 / 2022 = 5.587 cfs = 723 min = 19,197 cuft = 60 = 0 ft = 12.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 ' 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report K Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 2 Pre - DA#2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 2.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.43 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - DA#2 Hyd. No. 2 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Wednesday, 12 / 14 / 2022 = 1.629 cfs = 719 min = 4,037 cuft = 60 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 3 Post - DA#1 to SCM Hydrograph type = SCS Runoff Peak discharge = 25.23 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 50,694 cuft Drainage area = 10.300 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.43 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 16.00 12.00 4.00 Post - DA#1 to SCM Hyd. No. 3 -- 2 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) I- Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 4 Post - DA#1 BYP Hydrograph type = SCS Runoff Peak discharge = 0.688 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 2,256 cuft Drainage area = 1.460 ac Curve number = 58 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.00 min Total precip. = 3.43 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Post - DA#1 BYP Hyd. No. 4 -- 2 Year Q (cfs) 1.00 0.90 M :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 5 Post - DA#2 BYP Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 1.340 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.43 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post - DA#2 BYP Hyd. No. 5 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 5 Wednesday, 12 / 14 / 2022 = 1.512 cfs = 718 min = 3,361 cuft = 64 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report I U Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 6 SCM Routing Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 3 - Post - DA#1 to SCM Reservoir name = SCM Storage Indication method used. Q (cfs) 28.00 24.00 16.00 12.00 4.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage SCM Routing Hyd. No. 6 -- 2 Year Wednesday, 12 / 14 / 2022 = 2.542 cfs = 747 min = 40,500 cuft = 910.79 ft = 23,239 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 ' 1' � ' ' 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 6 — Hyd No. 3 ® Total storage used = 23,239 cult Pond Report $ Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Pond No. 1 - SCM Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 909.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 909.00 11,669 0 0 1.00 910.00 13,056 12,355 12,355 2.00 911.00 14,501 13,771 26,126 3.00 912.00 16,002 15,244 41,369 4.00 913.00 17,559 16,773 58,142 5.00 914.00 19,172 18,358 76,500 6.00 915.00 20,841 19,999 96,499 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 24.00 2.00 6.00 0.00 Crest Len (ft) = 16.00 15.00 0.00 0.00 Span (in) = 24.00 2.00 18.00 0.00 Crest El. (ft) = 912.50 913.50 0.00 0.00 No. Barrels = 1 1 3 0 WeirCoeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 904.00 909.00 910.50 0.00 Weir Type = 1 Broad --- --- Length (ft) = 78.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 909.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 1.00 12,355 910.00 30.25 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.101 2.00 26,126 911.00 30.25 is 0.15 is 5.42 is --- 0.00 0.00 --- --- --- --- 5.562 3.00 41,369 912.00 30.25 is 0.18 is 12.11 is --- 0.00 0.00 --- --- --- --- 12.29 4.00 58,142 913.00 35.26 is 0.17 is 16.25 is --- 18.84 0.00 --- --- --- --- 35.26 5.00 76,500 914.00 45.10 is 0.03 is 3.59 is --- 41.47 s 13.79 --- --- --- --- 58.88 6.00 96,499 915.00 47.75 is 0.02 is 1.93 is --- 45.78 s 71.65 --- --- --- --- 119.38 Hydrograph Report 9 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 7 Post - POA#1 Hydrograph type = Combine Peak discharge = 2.688 cfs Storm frequency = 2 yrs Time to peak = 746 min Time interval = 1 min Hyd. volume = 42,756 cuft Inflow hyds. = 4, 6 Contrib. drain. area = 1.460 ac Q (cfs) 3.00 2.00 1.00 e Post - POA#1 Hyd. No. 7 -- 2 Year Q (cfs) 3.00 2.00 1.00 I J I ----L I I I 1 0.00 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 7 Hyd No. 4 Hyd No. 6 Hydrograph Summary Report 10 Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 18.86 1 722 50,913 ------ ------ ------ Pre - DA#1 2 SCS Runoff 5.161 1 718 10,707 ------ ------ ------ Pre - DA#2 3 SCS Runoff 49.12 1 718 99,354 ------ ------ ------ Post - DA#1 to SCM 4 SCS Runoff 2.617 1 720 6,341 ------ ------ ------ Post - DA#1 BYP 5 SCS Runoff 3.989 1 718 8,092 ------ ------ ------ Post - DA#2 BYP 6 Reservoir 12.33 1 726 89,024 3 912.01 41,512 SCM Routing 7 Combine 14.34 1 723 95,365 4,6 ------ ------ Post - POA#1 P:\Projects\2022\22-271 - Joe Dobbin - Pfaf obdetBtnfflgdQedigr)Kk#drographs gW&WXay;,p1.2 / 14 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 1 Pre - DA#1 Hydrograph type = SCS Runoff Peak discharge = 18.86 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 50,913 cuft Drainage area = 10.710 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 5.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 • Me 3.00 Pre - DA#1 Hyd. No. 1 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 • rs 3.00 0.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 2 Pre - DA#2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.05 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - DA#2 Hyd. No. 2 -- 10 Year 0.00 ' ' ' ' 1 'N L 0 120 240 360 480 600 720 — Hyd No. 2 840 Wednesday, 12 / 14 / 2022 = 5.161 cfs = 718 min = 10,707 cuft = 60 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 13 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 3 Post - DA#1 to SCM Hydrograph type = SCS Runoff Peak discharge = 49.12 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 99,354 cuft Drainage area = 10.300 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post - DA#1 to SCM Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 14 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 4 Post - DA#1 BYP Hydrograph type = SCS Runoff Peak discharge = 2.617 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 6,341 cuft Drainage area = 1.460 ac Curve number = 58 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.00 min Total precip. = 5.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post - DA#1 BYP Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 15 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 5 Post - DA#2 BYP Hydrograph type = SCS Runoff Peak discharge = 3.989 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 8,092 cuft Drainage area = 1.340 ac Curve number = 64 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post - DA#2 BYP Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 6 SCM Routing Hydrograph type = Reservoir Peak discharge = 12.33 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 89,024 cuft Inflow hyd. No. = 3 - Post - DA#1 to SCM Max. Elevation = 912.01 ft Reservoir name = SCM Max. Storage = 41,512 cuft Storage Indication method used. SCM Routing Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) — Hyd No. 6 Hyd No. 3 ® Total storage used = 41,512 cult Hydrograph Report 17 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 7 Post - POA#1 Hydrograph type = Combine Peak discharge = 14.34 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 95,365 cuft Inflow hyds. = 4, 6 Contrib. drain. area = 1.460 ac Post - POA#1 Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 Hyd No. 4 Hyd No. 6 Hydrograph Summary Report 18 Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 28.71 1 722 74,792 ------ ------ ------ Pre - DA#1 2 SCS Runoff 7.761 1 718 15,729 ------ ------ ------ Pre - DA#2 3 SCS Runoff 64.63 1 718 131,993 ------ ------ ------ Post - DA#1 to SCM 4 SCS Runoff 4.077 1 720 9,476 ------ ------ ------ Post - DA#1 BYP 5 SCS Runoff 5.738 1 718 11,533 ------ ------ ------ Post - DA#2 BYP 6 Reservoir 23.35 1 724 121,612 3 912.77 54,361 SCM Routing 7 Combine 26.41 1 724 131,088 4,6 ------ ------ Post - POA#1 P:\Projects\2022\22-271 - Joe Dobbin - Pfaf obdetBtnrlRgeQe!i§r)Kk#drographs gW&WXay;,p1.2 / 14 / 2022 Hydrograph Report 19 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 1 Pre - DA#1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 10.710 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.05 in Storm duration = 24 hrs Q (cfs) 30.00 25.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - DA#1 Hyd. No. 1 -- 25 Year 0.00 ' 1 1 1�--r I 0 120 240 360 480 600 720 — Hyd No. 1 840 Wednesday, 12 / 14 / 2022 = 28.71 cfs = 722 min = 74,792 cuft = 60 = 0 ft = 12.00 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 _ —1 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 2 Pre - DA#2 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 2.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.05 in Storm duration = 24 hrs Q (cfs) 8.00 M 4.00 2.00 0.00 0 120 240 360 480 600 720 — Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - DA#2 Hyd. No. 2 -- 25 Year 840 Wednesday, 12 / 14 / 2022 = 7.761 cfs = 718 min = 15,729 cuft = 60 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 8.00 M 4.00 r M� 0.00 960 1080 1200 1320 1440 1560 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 3 Post - DA#1 to SCM Hydrograph type = SCS Runoff Peak discharge = 64.63 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 131,993 cuft Drainage area = 10.300 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 70.00 50.00 40.00 30.00 10.00 Q (cfs) 70.00 •1 01 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 3 Time (min) Hydrograph Report 22 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 4 Post - DA#1 BYP Hydrograph type = SCS Runoff Peak discharge = 4.077 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 9,476 cuft Drainage area = 1.460 ac Curve number = 58 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.00 min Total precip. = 6.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post - DA#1 BYP Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 23 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 5 Post - DA#2 BYP Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 1.340 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.05 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post - DA#2 BYP Hyd. No. 5 -- 25 Year 0.00 ' 1 1 11 - 0 120 240 360 480 600 720 — Hyd No. 5 840 Wednesday, 12 / 14 / 2022 = 5.738 cfs = 718 min = 11, 533 cuft = 64 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 6 SCM Routing Hydrograph type = Reservoir Peak discharge = 23.35 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 121,612 cuft Inflow hyd. No. = 3 - Post - DA#1 to SCM Max. Elevation = 912.77 ft Reservoir name = SCM Max. Storage = 54,361 cuft Storage Indication method used. Q (cfs) 70.00 50.00 40.00 30.00 10.00 SCM Routing Hyd. No. 6 -- 25 Year Q (cfs) 70.00 *1 01 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 6 — Hyd No. 3 ® Total storage used = 54,361 cult Hydrograph Report 25 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 7 Post - POA#1 Hydrograph type = Combine Peak discharge = 26.41 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 131,088 cuft Inflow hyds. = 4, 6 Contrib. drain. area = 1.460 ac Post - POA#1 Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 — Hyd No. 4 Hyd No. 6 Hydrograph Summary Report 26 Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 47.05 1 721 119,870 ------ ------ ------ Pre - DA#1 2 SCS Runoff 12.55 1 718 25,209 ------ ------ ------ Pre - DA#2 3 SCS Runoff 91.38 1 717 189,426 ------ ------ ------ Post - DA#1 to SCM 4 SCS Runoff 6.808 1 720 15,465 ------ ------ ------ Post - DA#1 BYP 5 SCS Runoff 8.894 1 718 17,893 ------ ------ ------ Post - DA#2 BYP 6 Reservoir 45.88 1 723 179,003 3 913.63 69,788 SCM Routing 7 Combine 51.74 1 722 194,468 4,6 ------ ------ Post - POA#1 P:\Projects\2022\22-271 - Joe Dobbin - Pfaf obdetBtnr1RgeQediO6i\Y1ydrographs gW&WXay;,p1.2 / 14 / 2022 Hydrograph Report 27 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 1 Pre - DA#1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 10.710 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.73 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - DA#1 Hyd. No. 1 -- 100 Year 0.00 i i i I - I I I I - 0 120 240 360 480 600 720 — Hyd No. 1 Wednesday, 12 / 14 / 2022 = 47.05 cfs = 721 min = 119,870 cuft = 60 = 0 ft = 12.00 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 MWITil 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 28 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 2 Pre - DA#2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 2.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.73 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 M . M@ 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - DA#2 Hyd. No. 2 -- 100 Year Wednesday, 12 / 14 / 2022 = 12.55 cfs = 718 min = 25,209 cuft = 60 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 M ee 4.00 ItM 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 3 Post - DA#1 to SCM Hydrograph type = SCS Runoff Peak discharge = 91.38 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 189,426 cuft Drainage area = 10.300 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 3 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 4 Post - DA#1 BYP Hydrograph type = SCS Runoff Peak discharge = 6.808 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 15,465 cuft Drainage area = 1.460 ac Curve number = 58 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.00 min Total precip. = 7.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 . 11 5.00 4.00 3.00 2.00 1.00 Post - DA#1 BYP Hyd. No. 4 -- 100 Year Q (cfs) 7.00 . Me 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1J -- ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 31 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 5 Post - DA#2 BYP Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 1.340 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.73 in Storm duration = 24 hrs Q (cfs) 10.00 WE 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post - DA#2 BYP Hyd. No. 5 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 5 Wednesday, 12 / 14 / 2022 = 8.894 cfs = 718 min = 17,893 cuft = 64 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 10.00 WE ItM 4.00 ItM 0.00 960 1080 1200 1320 1440 1560 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 6 SCM Routing Hydrograph type = Reservoir Peak discharge = 45.88 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 179,003 cuft Inflow hyd. No. = 3 - Post - DA#1 to SCM Max. Elevation = 913.63 ft Reservoir name = SCM Max. Storage = 69,788 cuft Storage Indication method used. Q (cfs) 100.00 90.00 :1 11 70.00 60.00 50.00 40.00 30.00 SCM Routing Hyd. No. 6 -- 100 Year Q (cfs) 100.00 90.00 :1 11 70.00 60.00 50.00 40.00 30.00 1 11 1���"�� 1 11 1 1 �1 •1 �:1 •11 1 :�1 •.1 1:1 11 1 ��1 •1 Hydrograph Report 33 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 12 / 14 / 2022 Hyd. No. 7 Post - POA#1 Hydrograph type = Combine Peak discharge = 51.74 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 194,468 cuft Inflow hyds. = 4, 6 Contrib. drain. area = 1.460 ac Post - POA#1 Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 — Hyd No. 4 Hyd No. 6 Pre Development Drainage Area Map Page 8 of 13 1 2 3 CI �1 l�J 7 F E 0 A Q 0 N N N_ Q U 0) co L `^2 _ VJ c 0 d c O 0 a) 0A N N N N N O N U N .o r POINT OF ANALYSIS #1 UNANALYZED AREA 7 W OD D�R / 2.15 AC CN:6(/ TC. 5'MIN � \ TC PAl'I`i I \ I \ \ T11 92 MIN ETC PAT IM�ERVIOUSA�\ j v POINT OF ANALYSIS #2 UNANALYZED AREA 0 Jonatha n Cory George Digitally signed by Jonathan Cory George Date: 2022.12.14 22:36:23-05'00' 50 0 25 50 100 SCALE: 1" = 50' u� W cnW z 0 N r- z� z N FMz� WQco • o~ z� z oc) cn ~O o � J O Y LUao J . W m °O 3 - z0 a En CARD<'�'' o ..�•FEssio•..il, �; SEAL 042031 J LU W M N LU z z W(a Z ~ z va'O O N w z 0 W � za � W� H �a a LU Z WQ �w 0 w� oa � Wa LL a� LL o Q LL a SCALE: 1"=50' DATE: 12-14-2022 DRAWN BY: JCG PROJECT NO. 22-271 SHEET NO. PRE 1 2 3 0 5 6 7 0 Post Development Drainage Area Map Page 9 of 13 1 2 1 3 1 4 1 5 1 6 1 7 F E 0 A DF ANALYSIS #2 1 J 4 4IN In 01 0 Jonathan Digitally signed by Jonathan Cory Cory George Date: 2022.12.14 George 22:35:23-05'00' 50 0 25 50 100 SCALE: 1" = 50' Wcc W W z0 Il_ z r- � Z N FMzV U Q W • o~ z� z oco c �:!o U O N O V J (Z y O J � . LU W m °O 3 - > Z O 3 m CC O rl ��1/� V� CARD</��'�, O ..• FEssio''•.'L ; 0 SEAL _ 042031 = FNG I N S ,y , i z O CO w ry JWcM W � � N V W W z F- a� W ;a z�~ z va'O Ow N z O W O �� � o LU Z wa � LU 0 o a 0 FL IL o � LL ao Q LL a SCALE: 1"=50' DATE: 12-14-2022 DRAWN BY: JCG PROJECT NO. 22-271 SHEET NO. POST 1 2 3 0 5 0 7 0 Outlet Protection Page 10 of 13 User Input Data Calculated Value Reference Data Designed By: JCG Date: 9/12/2022 Checked By: JCG Date: 9/12/2022 Company: Pilot S&E Project Name: Pfafftown Self Storage Project No.: 22-271 Site Location (City/Town) Pfafftown, NC Culvert Id. EW-100 Total Drainage Area (acres) 10.3 Step 1. Determine the tad ater depth fiord channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tailuater depth is less than half the outlet pipe diameter, it is classified nu'rdmum tailwater condition_ Hit is greater than half the pipe diameter, it is classified maxisi lLmi condition_ Pipes that outlet onto Wide $at areas with no defined chatuiel are assumed to have a mini,num tailuwater condition unless reliable flood stage elevations Show otherwise_ Outlet pipe diameter, Do (in.) 24 Tailwater depth (in.) 0 Minimum/Maximum tailwater? Min TW (Fig. 8.06a) Discharge (cfs) 12.33 Velocity (ft./s) 8.12 Step 2. Based on the tailv4 ater conditions determined in step 1 _ enter Figure $_06a or Figure 8_06b, and determine d50 riprag size and miniunun apron length (L). The d_y size is the niediau stone size in a well -graded riprag apron_ Step 3. Detennine apron width at the pipe outlet, the apron shape, and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Figure 8.06a Riprap d50, (ft.) 0.5 Minimum apron length, La (ft.) 12 Apron width at pipe outlet (ft.) 6 Apron shape Trap Apron width at outlet end (ft.) 14 ,Step 4. Determine the maximum stone diameter: dr,=1.5xd5o Minimum TW Max Stone Diameter, dmax (ft.) 0.75 Step 5. Determine the apron thickness: Apron Thickness(ft.) Apron thickness = 1.5 x d,. Maximum TW Figure 8.06b 0 2 Maximum TW 0 Minimum TW Maximum TW 1.125 0 Step 6. Fit the riprap apron to the site by making it level for the munimtun length, L. , from Figure 8-06a or Figure 8-06b- Extend the apron farther dowrnstream and along channel batiks iLmtil stability is assured- Keep the apron as straight as possible and align it with the flow of the receiving stream_ Make any necessary alignment bends near the pipe outlet so that the entrance into the recei'-img stream is straight - Some locations may require lining of the entire channel cross section to asstue stabilit-v- It may be necessary to increase the size of riprap -where protection of the channel side slopes is necessary (Appiondix 8.05)- Where overfalls exist at pipe outlets or fiovvs are excessive, a phuige pool should be considered, see page 8-06-8- Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<0.5 diameter) Discharge (0Isec) Curves may not be extrapolated. Figure 8.05a 0,Dsign of autie t protection protection Irom a round pipe flowing full, minirnum taiiwatcr condition (Tw c 0.5 diameter). Rev. 12.93 8.06.3 Anti -Float Block Calculations Page 11 of 13 PILOT .dLe, 0 -N-1 SURVEYING AND ENGINEERING ANTI -FLOAT BLOCK CALCULATIONS Project Name: Pfafftown Self Storage Project Number: 22-271 Input Information Inside Length =1 4.00 Ift Inside Width = 4.00 ft Wall Thickness = 6.00 lin Inside Height of Riser = 7.50 ft Weight of Concrete =1 142.00 Ipcf Trash Rack Inputs Concrete Present Date: 12/14/2022 Calculated By: JCG Base Length = 5.00 ft Base Width = 5.00 ft Base Thickness = 6.00 in OD of Outlet Pipe = 30.00 in Drain Pipe =1 8.00 lin Bottom Length / Width = Ulft ft Top Length / Width = ft Height = Trash Rack Displacement = 38 cf Riser Structure = 67.5 cf Riser Base =1 12.5 Jcf Outlet Pipe Opening = 2.45 cf Drain Pipe Opening =1 0.17 Jcf Total Concrete Less Openings = 77.37 cf Weight of Concrete = 10986.70 Ibs Water Displacement Anti Float Design Concrete Displacement = 77.37 cf Trash Rack Displacement = 38.00 cf Air Displacement = 122.63 cf Total Displacement= 238.00 cf Unit Weight of Water = 62.40 Ibs Weight of Water Displaced = 14851.20 Ibs Additional Weight Need = 3864.50 Ibs Safety Factor = 1.15 Additional Weight Required = 4444.18 Ibs Additional Concrete Required = 31.30 cf Anti -Float Block Length = 7.00 ft Anti -Float Block Width = 7.00 ft Anti -Float Block Thickness = 12.00 in Anti -Float Block Displacement = 49.00 cf Anti -Float Block Weight = 6958.00 Ibs Total Concrete Present = 126.37 cf Total Concrete Weight = 17944.70 Ibs Weight of Water Displaced = 14851.20 Ibs Calculated Safety Factor = 1.21 Hydraflow Modeling Summary Page 12 of 13 IT. 111,111111111111 Ouffall 0 4 —�-�6 Ouffall I 3 Project File: Pfafflown_Storage.stm Number of lines: 15 1 Date: 12/14/2022 Storm Sewers v2022.00 ,� -iT*TM I I R -� •• Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) M (min) (ft) M (ft) (in) (n) (K) (ft) 1 End 143.688 33.088 DrGrt 0.00 0.14 0.95 5.0 944.50 1.25 946.30 18 Cir 0.013 0.50 951.10 Pipe - 3 2 1 68.432 3.002 DrGrt 0.00 0.20 0.95 5.0 946.40 1.17 947.20 15 Cir 0.013 1.14 951.02 Pipe - 2 3 2 59.930 45.849 DrGrt 0.00 0.18 0.95 5.0 947.30 1.17 948.00 15 Cir 0.013 1.00 950.70 Pipe - 1 4 End 99.126 1.928 DrGrt 0.00 0.00 0.95 5.0 944.00 1.01 945.00 15 Cir 0.013 0.56 951.25 Pipe - 15 5 4 66.000 18.841 DrGrt 0.00 0.16 0.95 5.0 945.10 1.06 945.80 15 Cir 0.013 0.50 951.06 Pipe - 14 6 5 66.000 0.000 DrGrt 0.00 0.16 0.95 5.0 945.90 1.21 946.70 15 Cir 0.013 1.00 951.06 Pipe - 13 7 End 35.000 22.708 MH 0.00 0.00 0.00 5.0 937.00 3.71 938.30 24 Cir 0.013 1.00 949.50 Pipe - 8 8 7 113.000 86.588 MH 0.00 0.00 0.00 5.0 938.50 1.15 939.80 24 Cir 0.013 1.00 949.50 Pipe - 7 9 8 128.510 -89.780 DrGrt 0.00 0.24 0.95 5.0 940.00 1.40 941.80 24 Cir 0.013 2.25 951.06 Pipe - 6 10 9 66.000 0.000 DrGrt 0.00 0.24 0.95 5.0 941.90 1.14 942.65 24 Cir 0.013 1.50 951.06 Pipe - 5 11 10 93360 0.000 DrGrt 0.00 1.27 0.75 5.0 942.75 1.07 943.75 18 Cir 0.013 1.00 947.75 Pipe - 4 12 9 153.000 -90.000 DrGrt 0.00 0.23 0.95 5.0 941.90 1.05 943.50 15 Cir 0.013 1.00 951.28 Pipe - 12 13 10 153.000 -90.000 DrGrt 0.00 0.23 0.95 5.0 942.75 1.14 944.50 15 Cir 0.013 1.00 951.28 Pipe - 11 14 9 158.000 90.000 DrGrt 0.00 0.22 0.95 5.0 941.90 1.01 943.50 15 Cir 0.013 1.00 951.28 Pipe - 10 15 10 165.500 90.000 DrGrt 0.00 0.25 0.95 5.0 942.75 1.06 944.50 15 Cir 0.013 1.00 951.20 Pipe - 9 Pfafftown Self Storage Number of lines: 15 Date: 12/14/2022 Storm Sewers v2022.00 ILZ L I � 11, li Page 1 Struct Structure ID Junction Rim Structure Line Out Line In No. Type Elev Shape Length Width Size Shape Invert Size Shape Invert (ft) (ft) (ft) (in) (ft) (in) (ft) 1 DI-102 DropGrate 951.10 Rect 4.00 4.00 18 Cir 946.30 15 Cir 946.40 2 DI-101 DropGrate 951.02 Rect 4.00 4.00 15 Cir 947.20 15 Cir 947.30 3 DI-100 DropGrate 950.70 Rect 4.00 4.00 15 Cir 948.00 4 DI-302 DropGrate 951.25 Rect 4.00 4.00 15 Cir 945.00 15 Cir 945.10 5 DI-301 DropGrate 951.06 Rect 4.00 4.00 15 Cir 945.80 15 Cir 945.90 6 DI-300 DropGrate 951.06 Rect 4.00 4.00 15 Cir 946.70 7 MH-204 Manhole 949.50 Rect 0.00 4.00 24 Cir 938.30 24 Cir 938.50 8 MH-203 Manhole 949.50 Rect 0.00 4.00 24 Cir 939.80 24 Cir 940.00 9 DI-202 DropGrate 951.06 Rect 4.00 4.00 24 Cir 941.80 24 Cir 941.90 15 Cir 941.90 15 Cir 941.90 10 DI-201 DropGrate 951.06 Rect 4.00 4.00 24 Cir 942.65 18 Cir 942.75 15 Cir 942.75 15 Cir 942.75 11 DI-200 DropGrate 947.75 Rect 4.00 4.00 18 Cir 943.75 12 DI-209 DropGrate 951.28 Rect 4.00 4.00 15 Cir 943.50 13 DI-208 DropGrate 951.28 Rect 4.00 4.00 15 Cir 944.50 14 DI-207 DropGrate 951.28 Rect 4.00 4.00 15 Cir 943.50 15 DI-206 DropGrate 951.20 Rect 4.00 4.00 15 Cir 944.50 L Pfafftown Self Storage - ------ Number of Structures: 15 ------ [ Run Date: 12/1412022 Storm Sewers v2022.00 ,� -iT*TM I I R -� • Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 Pipe - 3 3.21 18 Cir 143.688 944.50 946.30 1.253 945.04 946.98 0.13 946.98 End DropGrate 2 Pipe - 2 2.39 15 Cir 68.432 946.40 947.20 1.169 946.98 947.82 n/a 947.82 1 DropGrate 3 Pipe - 1 1.17 15 Cir 59.930 947.30 948.00 1.168 947.82 948.43 n/a 948.43 j 2 DropGrate 4 Pipe - 15 1.95 15 Cir 99.126 944.00 945.00 1.009 944.56 945.56 0.12 945.56 End DropGrate 5 Pipe - 14 2.00 15 Cir 66.000 945.10 945.80 1.061 945.57 946.36 0.11 946.36 4 DropGrate 6 Pipe - 13 1.04 15 Cir 66.000 945.90 946.70 1.212 946.36 947.10 n/a 947.10 j 5 DropGrate 7 Pipe - 8 14.14 24 Cir 35.000 937.00 938.30 3.714 938.35 939.65 n/a 939.65 End Manhole 8 Pipe - 7 1432 24 Cir 113.000 938.50 939.80 1.150 939.65 941.16 0.61 941.16 7 Manhole 9 Pipe - 6 14.52 24 Cir 128.510 940.00 941.80 1.401 941.16 943.17 1.40 943.17 8 DropGrate 10 Pipe - 5 10.47 24 Cir 66.000 941.90 942.65 1.136 943.17 943.81 n/a 943.81 j 9 DropGrate 11 Pipe - 4 6.53 18 Cir 93.360 942.75 943.75 1.071 943.81 944.74 n/a 944.74 j 10 DropGrate 12 Pipe - 12 1.50 15 Cir 153.000 941.90 943.50 1.046 943.17 943.98 n/a 943.98 j 9 DropGrate 13 Pipe - 11 1.50 15 Cir 153.000 942.75 944.50 1.144 943.81 944.98 n/a 944.98 j 10 DropGrate 14 Pipe - 10 1.43 15 Cir 158.000 941.90 943.50 1.013 943.17 943.97 n/a 943.97 j 9 DropGrate 15 Pipe - 9 1.63 15 Cir 165.500 942.75 944.50 1.057 943.81 945.01 n/a 945.01 j 10 DropGrate Pfafftown Self Storage Number of lines: 15 Run Date: 12/1412022 NOTES: Return period= 10Yrs. ;j -Line contains hyd. jump. Storm Sewers v2022.00 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 I End 143.688 0.14 0.52 0.95 0.13 0.49 5.0 6.6 6.5 3.21 1175 4.88 18 1.25 944.50 946.30 945.04 946.98 946.00 951.10 Pipe - 3 2 1 68.432 0.20 0.38 0.95 0.19 0.36 5.0 6.0 6.6 2.39 6.98 4.11 15 1.17 946.40 947.20 946.98 947.82 951.10 951.02 Pipe - 2 3 2 59.930 0.18 0.18 0.95 0.17 0.17 5.0 5.0 6.9 1.17 6.98 2.81 15 1.17 947.30 948.00 947.82 948.43 951.02 950.70 Pipe - 1 4 End 99126 0.00 0.32 0.95 0.00 0.30 5.0 7.0 6.4 1.95 6A9 3.70 15 1.01 944.00 945.00 944.56 945.56 944.00 951.25 Pipe - 15 5 4 66.000 0.16 0.32 0.95 0.15 0.30 5.0 6.3 6.6 MO 6.65 4.23 15 1.06 945.10 945.80 945.57 946.36 951.25 951.06 Pipe - 14 6 5 66.000 0.16 0.16 0.95 0.15 0.15 5.0 5.0 6.9 1.04 7.11 2.80 15 1.21 945.90 946.70 946.36 947.10 951.06 951.06 Pipe - 13 7 End 35.000 0.00 2.68 0.00 0.00 2.29 5.0 8.3 6.2 14.14 43.59 6.25 24 3.71 937.00 938.30 938.35 939.65 940.52 949.50 Pipe - 8 8 7 113.000 0.00 2.68 0.00 0.00 2.29 5.0 7.9 6.2 14.32 24.26 6.96 24 1.15 938.50 939.80 939.65 941.16 949.50 949.50 Pipe - 7 9 8 128.510 0.24 2.68 0.95 0.23 2.29 5.0 7A 6.3 14.52 26.77 6.99 24 1.40 940.00 941.80 941.16 943.17 949.50 951.06 Pipe - 6 10 9 66.000 0.24 1.99 0.95 0.23 1.64 5.0 7.1 6.4 10A7 24.11 5.26 24 1.14 941.90 942.65 943.17 943.81 951.06 951.06 Pipe - 5 11 10 93.360 1.27 1.27 0.75 0.95 0.95 5.0 5.0 6.9 6.53 10.87 5.10 18 1.07 942.75 943.75 943.81 944.74 951.06 947.75 Pipe - 4 12 9 153.000 0.23 0.23 0.95 0.22 0.22 5.0 5.0 6.9 1.50 6.60 2.32 15 1.05 941.90 943.50 943.17 943.98 951.06 951.28 Pipe - 12 13 10 153.000 0.23 0.23 0.95 0.22 0.22 5.0 5.0 6.9 1.50 6.91 2.38 15 1.14 942.75 944.50 943.81 944.98 951.06 951.28 Pipe - 11 14 9 158.000 0.22 0.22 0.95 0.21 0.21 5.0 5.0 6.9 1.43 6.50 2.27 15 1.01 941.90 943.50 943.17 943.97 951.06 951.28 Pipe - 10 15 10 165.500 0.25 0.25 0.95 0.24 0.24 5.0 5.0 6.9 1.63 6.64 2.48 15 1.06 942.75 944.50 943.81 945.01 951.06 951.20 Pipe - 9 Pfafftown Self Storage Number of lines: 15 Run Date: 12/14/2022 NOTES:Intensity = 136.50 (Inlet time + 21,50) 10.91; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2022.00 Erosion Control Calculations Page 13 of 13 EROSION CONTROL CALCULATIONS For: C®C Investments, LLC 4049 West Pine Street Mount Airy, NC 27030 Pfafftown Self Storage -PILOT SURVEYING & ENGINEERING Project Number: 22-271 By: Cory George, PE, PLS 106 S. Depot Street Suite D Pilot Mountain, NC 27041 �� PILOT �' SIIR VEYING �N❑ ENGINEERINE. Runoff Calculations - Rational Method Project Name: Pfafftown Self Storage Project Number: 22-271 Subbasin ID: Skimmer Runoff Coefficients Date: 12/14/2022 Calculated I JCG Land Use C Land Use C Business- Lawns - Downtown areas 0.70-0.95 Sandy soil, flat, 2% 0.05-0.10 Neighborhood areas 0.50-0.70 Sandy soil, ave_, 0.10-0.15 2-7% Residential: Sandy soil, steep. 0.15-0.20 Single-family areas 0.30-0.50 7% Multi units, detached 0.40-0.60 Heavy soil, flat, 2% 0.13-0.17 Multi units, Attached 0_60-0.75 Heavy sail, ave_, 0.1" 22 Suburban 0.25-0.40 2-7% Industrial- Heavy soil, steep, 70� 0.25-0.35 Light areas 0.50-0.80 Heavy areas 0-fi0-0-90 Agricultural land: Parks, cemeteries 0.10-0.25 Bare packed soil Smooth 0.30-0.60 Playgrounds 0.20-0.35 Rough 0.20-0.50 Cultivated rows Railroad yard areas 0.20-0.40 Heavy soil no crop 0.30-0.60 Heavy soil with Unimproved areas 0.1" 30 Crop 0.20-0.50 Streets- Sandy soil no crop 0.20-0.40 Asphalt 0.70-095 Sandy soil with Concrete 0.80-0.95 Crop 0.10-0.25 Brick 0.70-0.85 Pasture Heavy soil 0.1" 45 Drives and walks 0.75-0.85 Sandy soil 0.05-0.25 Woodlands 0.45-0.25 Roofs 0.75-0.85 NOTE: The designer must use judgement to select the appropriate C value within the range for the appropriate land use. Generally, larger anus with permeable soils, fiat slopes, and dense vegetation should have lowest C values. Smaller areas with slowly permeable soils, steep slopes, and sparse vegetation should be assigned highest C values_ Source: American Society of Civil Engineers Watershed Breakdown Cnntrihutinn Area Coefficient Area rarl Comments Subarea A 0.25 0.000 0.60 6.935 Wooded, steep Subarea B Bare Soil (DA) Subarea C 0.30 1.304 Grass, 2-7% Subarea D 0.85 1.251 Impervious Total Area = 9.490 acres Weighted Runoff Coefficient = 0.59 Time of Concentration Reference USDA TR-55 Segment 1: Overland Flow Length = 100 ft Upstream Invert = 948.50 ft Downstream Invert = 941.00 ft Slope = 0.0750 ft/ft Manning's n = 0.02 Bare Earth P (2-year/24-hour) =1 3.43 linches Segment Time =1 1.11 min Segment 2: Concentrated Flow Length = 483 ft Upstream Invert= 941.00 ft Downstream Invert= 918.00 ft Slope = 0.0476 ft/ft Paved? = No Velocity = 3.52 ft/sec Segment Time = 2.29 min Time of Concentration = 3.40 min Rainfall Intensity (in/hr) Reference NOAA Atlas 14 Peak Flow Rates Ration Method Return Interval ears Duration min 2 1 10 1 25 1 100 5 6.86 1 7.66 1 8.68 = CLA Peak Flow Rates Weighted Runoff Coefficient = 0.59 Total Area = 9.490 ac Q2 = 29.5� cfs Q10 = 38.52 cfs Q25 = 43.01 cfs Qioo = 48.74 cfs '"% P1 LOT SURVEYING AN❑ ENGINEERING Erosion Control Calculations - Skimmer Basin Project Name: Pfafftown Self Storage Project Number: 22-271 Subbasin ID: SB-1 Stage - Storage - As Graded Date: 12/14/2022 Calculated By: JCG Contour Average Incremental Accumulated Contour Contour Contour Contour Stage Area Area Volume Volume (feet) (feet) (SF) (SF) (CF) (CF) 909 0 11,669 910 1 13,056 12,363 12,363 12,363 912 3 16,002 14,529 29,058 41,421 912.5 3.5 16,772 16,387 8,194 49,614 913 17,559 17,166 8,583 58,197 914 19,173 20,841 18,366 20,007 1 18,366 1 20,007 76,563 96,570 915 Required Volume = 9,405 Provided Volume = 49,614 Good Required Surface Area = 12,520 Provided Surface Area = 16,772 Good riser crest PILOT SURVEYING AND ENGINEERING Erosion Control Calculations - Skimmer Basin Project Name: Pfafftown Self Storage Project Number: 22-271 Subbasin ID: SB-1 Skimmer Basin Design Parameters Drainage Area = 6.245 acres Peak Flow, Q10 = 38.52 cfs Disturbed Area = 5.225 acres Required Basin Dimensions Min. Volume = 1800 cf per disturbed acre Req. Volume = 9405 cf Min. Surface Area = 325 sf per Q10 cfs Req. Surface Area = 12520 sf Volume Provided = 49614 cf, at riser crest Surface Area Provided =1 16772 Isf, at riser crest Skimmer Orifice Calculations Min. Drawdown Time = 2 days Dewater Volume = 9405 cf Daily Flow Req, Qd = 4703 cfd Skimmer Size = Iin Min. Orifice Size = 2.23 in Orifice Size = 2 in Drawdown Time = 2.49 days Date: 12/14/2022 Calculated E JCG Skimmer Size (in) I Head on Skimmer (ft) 1.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.333 6 0.417 8 0.5 1 2 1 3 1 4 1 5 1 6 1 7 F E BERNIE JACKSON PIN: 5899-50-2399 DEED BK: 2137 PG: 1095 BERNIE JACKSON PIN: 5899-50-2287 DEED BK: 2137 PG: 1096 KARAN GUARINO PIN: 5899-50-2174 DEED BK: 3505 PG: 366 FORSYTH VENTURES, INC r/ r����� ���� PROPOSED TREE SAVE AREA � ���� PIN: 5899-90-1759 EXISTING PROPERTY LINE (TYP.) I I I OUTL T\S RUA�TSRE ` / \ \ / _ DEED BK: 1822 PG: 213 t. \ 0-F E\_ ` \ \ �\S�I�MER_WI " OR FI E � �— \\� \� �\ \ \� \ o �� o,�\ HEADWALL \ \ \\ \ ` \ / / I I / / ' l( r \ �Iv IIT P�R RY RSION D'ITC �M,I / I / �� I \ l SOUTHEAST LAND HOLDING LLC -� ///— ��\ • \ \ \\ PIN: 5896-3202 \ \ \ DEED BK: 3143 PG: 1530 miu SOW; Zz'/ QD TEMP R�RY \ p \ \ \ SLOPE DRAIN \ \ \ \ I \ \ \ 24" DPE \ PH SE� DRAIN_A'GE AREA I 9.49 ACRES — I LIMITS OF DISTURBANCE (TYP.) / 4/6 IME OF O�NC PPATH �Jonalhan KARAN GUARINO L \7AT IN \ I \ PIN:5898-59-5909 \ \ \ o\ \ \ \ Cory DEED BK: 3505 PG: 366 George / A \\ 1 I I I / EXISTING GUY LINE (TYP.) IST L G BUILDING ING TO�REMAI c% 4% EXISTING POWER POLE (TYP.) �EBRIS T �\ MOVED / I \ � RAVEL TO R MW / Digitally signed by Jonathan Cory George Date: 2022.12.14 22:13:20-05'00' EX. CONCRET€TOBEE RE OWED /. �. \ . EX. DEBRIS TO BE REMOVED J TOTAL DISTURBED AREA: 8.83 ACRES 'k- EXIS G WATER ' / VA YP.) � E'x, I - -�to" Concrete�loc-v— LEGEND ��d, / ■ _ndArick Retail Building .. \ \/ / EXISTING IRON MON. 01 \ ~ \ . . . . EX. C CRETE TO BE REMOVED ® SET 5/8" REBAR \ \ \ CALCULATED POINT . . . .� . . . \ . . 0 TRAVERSE STATION CONCRETE MONUMENT // �✓ • EX. POWER POLE TO BE MOVED (TYP.) ® PK NAIL EXISTING WATER METER (TYP.) ,J` \ / Z R/W MONUMENT . .A . . . . . . . . . . BUILDING TO BE REMOVED 9 R.R. SPIKE \ / ` EX. F E O BE Q STONE 61 REMgVE P.) �\ . . . . . . EX. CONCRETE TO REMAIN ® WATER METER • • • • SEWER CLEANOUT d R �� Rqr d / `` \ / �� EXISTING B ILDING TO REMAIN QS SEWER MANHOLE d d d STORM MANHOLE \ FIRE HYDRANT SEWARp CR \ ... � UTILITY POLE SR- 1460 1 6OFT WIDTH PUBLIC R/W �`s6>1/ SINGLE POLE SIGN —R/W AR/W R/W R/W ��d 8 EX. OVERHEA \ \ POWER TO BE REMOVED (TYP.) \ TS m \ \ w \ N pd WATER VALVE O WELL GUY WIRE BOUNDARY LINE LINE NOT SURVEYED — R/W— RIGHT OF WAY — — — — EASEMENT — P — OVERHEAD ELEC — E — UNDERGRD ELEC — w — WATER LINE SS SEWER LINE — GAS— GAS LINE — SD — STORM LINE DITCH CNTRLINE — x —CHAIN LNK FNCE 50 0 25 50 100 SCALE: 1" = 50' z 0 LD w Of w z 0 Wcc W W z0 � N '� z V z � r- CN � z N U Q� W ~z� • O co O �z/ O U J N 0 U a o J C15 . m�3 �W z 0 — (1 O CL En �•�� �N CA/�O SEAL 042031 = v .4/ llllll J W 10 M W N 1)LU LU Z W�a Z� III.- Z O N W a 0 z O H LL LL LL a SCALE: ill =50' DATE: 12-13-2022 DRAWN BY: JCG PROJECT NO. 22-271 SHEET NO. DA-1 1 2 3 1 4 5 0 7 0