Loading...
HomeMy WebLinkAboutNCS000208_Staff review form_20140707AN4�A NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Tracy E. Davis, PE, CPM Pat McCrory, Governor Director John E. Skvarla, III, Secretary STAFF REVIEW AND EVALUATION NPDES Stormwater Permit Facility Name: NPDES Permit Number: Facility Location: Type of Activity: SIC Code: Receiving Streams: River Basin: Stream Classification: Proposed Permit Requirements: Monitoring Data: Facility Location: Response Requested by (Date): Central Office Staff Contact Central Office Review Summary: WiRo Military Ocean Terminal — Sunny Point NCS000208 6280 Sunny Point Road, Southport, NC (Brunswick County) Packing and shipping of munitions for overseas transport Not Applicable Cape Fear River & Nigis Creek Cape Fear River Basin, Sub -basin 03-06-17 SC; Sw, HQW See attached draft permit. See Table I See Figure I January 18, 2008 Mike Randall, (919) 807-6374 1. Special Issues: Import/export/storageof ammunitions for DOD via truck, rail, and ship. Onsite rail, vehicle, and heavy equipment fueling, maintenance and repair. Have been malting modifications to reduce potential for exposure to stormwater. Many various potential sources for exposure. 2. Changes at the facility since previous permit: Oil and Grease to Non -Polar Oil & Grease by EPA Method1664 (SGT-11EM) 3. Receiving Waters: Cape Fear River & Nigis Creek Impaired 4. Threatened and Endangered Species: Federal endangered: Shortnose Sturgeon; Federal threatened: American Alligator and Green Turtle 5. Analytical and/or qualitative monitoring during this past permit cycle: The facility has at times exceeded benchmark limits for TSS and COD Page 1 of 2 NCSOOOXXX 6. Rationale for monitoring parameters: See attached staff report from previous proposed permit. 7. Permit Facility, and Owner Contacts updates: 8. Confirmed contact information with permittee and updated BIMS if necessary. 9. Obtained e-mail addresses for each contact and updated BIMS. 10. Annual Fees: Confirmed in BIMS that permittee does not owe fees. Recommendations: Based on the documents reviewed, the application information submitted on July 18, 2012 is sufficient to issue an Individual NPDES Stormwater Permit. Central Office recommends reissuance of this permit with the same monitoring as the previous cycle The proposed draft permit reflects the most recent individual stormwater permit template and boiler plate language, incorporating revisions that are similar to the industrial general permits issued during 2012-13. Prepared by (Signature) ,!� Date 20/� Stormwater Permitting Supervisor Date 7"11V for Bradley Bennett Concurrence by Regional Office�� Date RO DEMLR Supervisor ` Date Regional Office Staff Comments (attach additional pages as necessary) 'Se-e- e.- rra. Page 2 of 2