HomeMy WebLinkAboutSW6221102_Supplement-EZ Form_20230228SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
Utility Improvements to Serve Ashley Heights
2
Project Area ac
91.286 _
3
Coastal Wetland Area ac
-
4
Surface Water Area ac
-
5
Is this project High or Low Density?
High
6
jDoes this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
N/A
8
Will the vegetated setback remain vegetated?
N/A
9
If BUA is pro2osed in the setback does it meet NCAC 02H.1003 4 c-d ?
No
10
Is streambank stabilization proposed on this.project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
1
0
12
Bioretention Cell
13
Wet Pond
2
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
_
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip (LS-FS)
0
20
_ _
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
28
Name and Title: _
Organization:
Street address:
Carlo Pardo, PE
Bowman North Carolina, Ltd.
29
4006 Barrett Drive, Suite 104
30
City, State, Zip:
Raleigh, NC 27609
31
Phone number(s):
Email:
919-553-6570
32
cpardo@bowman.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
,�1111flllllil"t.11
o s s '
a,y •. 4
SEAL
051571 -
1�+0 I E
1�a_
Signature of Designer
Date
DRAINAGE AREAS
1
Is this a hi h density project?
Yes
2
If so, number of drainage areas/SCMs
3
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
AREA INFORMATION
Entire Site
1
2
3
4
T e of SCM
-
Infiltration Basin
Wet Pond
Wet Pond
5
Total draina a area s ft
3976419 sf
519352 sf
590407 sf
2729441 sf
6
Onsite draina a areas ft
519052 sf
590407 sf
2619583 sf
7
Offsite draina a area s ft
300 sf
109858 sf
8
Total BUA in project (sq ft
768212 sf
102967 sf
133829 sf
641574 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
528000 sf
68000 sf
92000 sf
368000 sf
10permitting)
New BUA not on subdivided lots (subject to
s
240212 sf
34667 sf
41829 sf
163716 sf
11
10ffsite BUA (sq ft
300 sf
109858 sf
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
Sidewalk (sq ft
34418 sf
4896 sf
5822 sf
23700 sf
Roof (sq ft
Roadway s ft
205794 sf
29771 sf
36007 sf
140016 sf
Future (sq ft
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
19.32%
19.84%
22.67%
23.51%
19
Design storm inches
1.0 in
1.0 in
1.0 in
20
Design volume of SCM cu ft
10232 cf
43908 cf
163392 cf
21 Calculation method for design volume Simple Method Simple Method Simple Method
DDITIONAL INFORMATION
Please use this space to provide any additional information about the
r22drainage area(s):
INFILTRATION SYSTEM
1 Drainage area number
2 1 Minimum required treatment volume (cu ft)
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V or enter "Vertical' for
trenches)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
lWhat is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
18 1 Proposed slope of the subgrade surface (%) 0%
19 jAre terraces or baffles provided? No
20 1Tvpe of pretreatment: Forebay
Data
21
Was the soil investigated in the footprint and at the elevation of the
infiltrations stem?
Yes
22
SHWT elevation (fmsl)
434.00
23
Depth to SHWT per soils report (in)
120.00
24
Ground elevation at boring in soils report (fmsl)
444.00
25
Is a detailed hydrogeologic study attached if the separation is
between 1 and 2 feet?
N/A
26
ISoil infiltration rate (in/hr)
4.25
27
1 Factor of safety (FS) (2 is recommended):
2.00
Elevations
29
113ottom elevation (fmsl)
440 ft
30
IStorage elevation (fmsl)
441.2 ft
31
1 Bypass elevation (fmsl)
445.5 ft
Basins
32 1 Bottom surface area(ft) 7755 ft
33 Istorage elevation surface area(ft) 9300. ft
For Trenches Only
34
Length (ft)
35
Width (ft)
36
Perforated pipe diameter, if applicable (inches)
37
Number of laterals
38
Total length of perforated piping
39
Stone type, if applicable
40
Stone porosity (%)
41
Is stone free of fines?
42
Is the stone wrapped in geotextile fabric?
43
Has at least one inspection port been provided?
Volumes/Drawdown
44 IDesign volume of SCM (cu ft) 10232 cf
45 ITime to draw down (hours) 7.5 hrs
I 46 Please use this space to provide any additional information about I
the infiltration system(s):
26-The infiltration rate was intentially lowered to half of the 8.25 in/hr to
unt for clogginq of the soils that will happen over time.
Infiltration 1 10:32 AM 2/27/2023
WET POND
1 11 Drainage area number 2 3
21 Minimum required treatment volume (cu ft) 12497 cf 59491 cf
NERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
151
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
161
Does the SCM follow the device specific MDC?
Yes
Yes
17
Was the SCM designed b an NC licensedprofessional?
Yes
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
405.00
409.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
406.00
410.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
410.50
414.50
23
Elevation of the permanent pool (fmsl)
411.00
415.00
24
Elevation of the top of the vegetated shelf (fmsl)
411.50
415.50
25
Elevation of the temporary pool (fmsl)
412.40
417.10
26
Surface area of the main permanent pool (square feet)
21945
56230
27
Volume of the main permanent pool (cubic feet)
90710 cf
245796 cf
28
Average depth of the main pool (feet)
4.46 ft
4.61 ft
29
Average depth equation used
Equation 3
Equation 3
301
If using equation 3, main pool perimeter (feet)
577.0 ft
1051.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
3.0 ft
32
Volume of the forebay (cubic feet)
14673 cf
43558 cf
33
Is this 15-20% of the volume in the main pool?
Yes
Yes
34
Clean -out depth for forebay (inches)
36 in
48 in
35
Design volume of SCM (cu ft)
43908 cf
163392 cf
36
Is the outlet an orifice or a weir?
Orifice
Orifice
371
If orifice, orifice diameter (inches)
2.50 in
4.50 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
3.67
3.78
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
Yes
431
Depth of forebay at entrance (inches)
48 in
60 in
44
Depth of forebay at exit (inches)
36 in
48 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
46
Width of the vegetated shelf (feet)
6 ft
6 ft
47
Slope of vegetated shelf (H:V)
6:1
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
53
Species of turf that will be used on the dam and embankment
Hybrid Bermuda
Hybrid Bermuda
54
Hasa planting plan been provided for the vegetated shelf?
Yes
Yes
ADDITIONAL INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 1 10:32 AM 2/27/2023