Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6221102_Design Calculations_20230228
Storm wafer Management Report February 27, 2025 Utility Improvements Ashley Heights Reservation Road Hoke County, NC to Serve Prepared for: D&L Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Bowman North Carolina, Ltd. 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 (919) 553-6570 Firm#F-1445 0 10 111 !a-IfIM!'All OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUG SHWT NOAA POINT PRECIPITATION FREQUENCY ESTIMATES WATER QUANTITY/QUALITY - INFILTRATION BASIN SCM #1 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY/QUALITY - WET POND SCM #2 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY/QUALITY - WET POND SCM #3 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management overview for the residential project Ashley Heights on Reservation Road in Hoke County. The project site is currently undeveloped. The proposed site consists of 91286 acres. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710848800J with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are no existing stream or wetland features on the proposed property. There are three proposed storm water management facilities (one infiltration basin and two wet ponds and) outlined in this report and have been designed for post —development peak attenuation to treat the impervious areas of the development. The Infiltration Basin SCM 1 is designed to capture a drainage area of 11.92 ac with an impervious area of 2.36 ac. The Wet Pond SCM 2 is designed to capture a drainage area of 13.55 ac with an impervious area of 3.07 ac. The Wet Pond SCM 3 is designed to capture a drainage area of 62.66 ac with an impervious area of 14.73 ac. The balance of the site is open space and will by—pass the proposed SCMs. The SCMs are designed to treat a 1.0" storm event. Impervious Area Summary — Infiltration Basin SCM 1 Roadway 29,771 sf 0.68 ac Sidewalk 4,896 sf 0.11 ac Roof 17 lots @ 4,000 sf/lot 68,000 sf 1.56 ac Offsite 300 sf 0.01 ac Total IA to Pond 102,967 sf 1 2.36 ac Impervious Area Summary — Wet Pond SCM 2 Roadway 36,007 sf 0.83 ac Sidewalk 5,822 sf 0.13 ac Roof 23 lots @ 4,000 sf/lot 92,000 sf 2.11 ac Total IA to Pond 133,829 sf 3.07 ac Impervious Area Summary — Wet Pond SCM 3 Roadway 140,016 sf 3.21 ac Sidewalk 23,700 sf 0.55 ac Roof 92 lots @ 4,000 sf/lot 368,000 sf 8.45 ac Offsite 109,858 sf 2.52 ac Total IA to Pond 641,574 sf 1 14.73 ac Soils The County Soils Survey indicates that Candor Sand, Blaney Loamy Sand, Gilead Loamy Sand, and Vaucluse Loamy Sand are present on the site. FIGURES 648100 35o 6'0"N I 35o 5' 21" N 648100 648300 64KM 648700 648900 649100 Map Scale: 1:8,610 if printed on A landscape (11" x 8.5") sheet. Meters N 0 100 200 400 600 Feet 0 400 8D0 1E00 2400 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Hoke County, North Carolina 648300 648500 648700 648900 649100 649300 649500 W700 6493M 649500 W700 35o 60" N I 35o 521" N 649900 8/15/2022 Pagel of 4 Hydrologic Soil Group —Hoke County, North Carolina MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails 0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hoke County, North Carolina Survey Area Data: Version 19, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 28, 2019—Jul 30, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 8/15/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Blaney loamy sand, 2 to 8 percent slopes C 89.6 57.7% CaB Candor sand, 1 to 8 percent slopes A 51.9 33.4% GdB Gilead loamy sand, 2 to 8 percent slopes C 6.7 4.3% VaB Vaucluse loamy sand, 2 to 8 percent slopes C 7.1 4.5% Totals for Area of Interest 166.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 8/15/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Hoke County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 8/15/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 J -] -!J I "" --.,4... � � (��. � - I ! i' !'L• PRO -=CT S TE //F, ' i ,� �� � `1' - ' r � `� -.- - _ '�-.�l`•..._r /j �i- - Cam, . _._ -49 � o tiJ I ��L r National Flood Hazard Layer FI RMette 79o22'18"W 35o5'41"N s r � � 7 it HO KE [J TY ARE A OF MINIf1 AL FL E)D HAZARD 37037� s S � I lid i ~ \ +� f. 40 M • e '� "W f 0 250 500 1,000 1,500 Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A, V, A99 SPECIAL FLOOD With BFE or Depth ZoneAE, AO, AH, VE, AR HAZARD AREAS Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zonex Future Conditions 1% Annual 4 '- Chance Flood Hazard Zonex " Area with Reduced Flood Risk due to OTHER AREAS OF Levee. See Notes. zone FLOOD HAZARD " Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL - — - - Channel, Culvert, or Storm Sewer STRUCTURES I I I I I I I Levee, Dike, or Floodwall e zo.z Cross Sections with 1% Annual Chance 17,5 Water Surface Elevation a - - - Coastal Transect —sfa— Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature ❑ Digital Data Available AN 0 No Digital Data Available MAP PANELS El Unmapped QThe pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 8/2/2022 at 1:09 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data overtime. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for Feet 79021'41"W 3505'11"N unmapped and unmodernized areas cannot be used for 2, 000 1 ' �' 000 regulatory purposes. Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 ° % . FEMA 4 i s s eaiet"'rz"n ee o� E ap 1 1 i I t t t211 PROJECTSITE a- 409 fl \ Pine a s 03 Ra Rem o Hil �\ O n a rib Search X ® Legend Layers 107 Re .,r ion Rdl ..- XJQ 00 e R, co u�l R �o Surface Water Classifications: Stream Index. 14-2-14 Stream Name: Quewhiffle Creek Description: from sourceto Drowning Creek Classification: C Date of Class.: November 30, 1963 What does this Class. mean? View River Basin: Lumber 19 r� I� +r • 4 �rC7' yy` . (1 of 2} ■ P x 12-Digit HUC (Subwatershed) 12-DigitNarne- QuewhiffleCreek 12-Digit Code: 030402030205 10-Digit Name- Lower Drowning Creek 10-Digit Code: 0304020302 8-Digit Code- 0304-0203 River Basin: Lumber 12-Digit Area Jae): 14,411.16 Zoom to NaVonaI Geograpiiic. Esri, Garmin. MERE. UNEP-WCMC. USGS. NASA. ESA. P Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 Double D Engineering, PLLC Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines, NC 28387 July 27, 2022 Re: Seasonal High -Water Table Identification and Soil Infiltration Rates: Ashley Heights property, Aberdeen, NC; Hoke County NC parcels 584880001009 & 584980001002. Soil conditions and infiltration rates were evaluated and measured on the above -referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C-1 of the North Carolina Department of Environmental Quality Stormwater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with chroma colors of 2 or less (in Munsell color notation) in mottles or the horizon matrix, and at times, saturated soil conditions and/or free water within the soil profile. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table (SHWT). SATURATED HYDRAULIC CONDUCTIVITY (K�et) Soils evaluated on this property are typical of those within Blaney Soil series. These soils are moderately well drained soils with varying rates of permeability. Infiltration rates are measured to determine if soil conditions are suitable for the installation of stormwater infiltration devices. Infiltration rates are measured using a Johnson Constant Head Permeameter. Measurements are recorded at varying intervals until equilibrium was reached. The SHWT and Infiltration rates for the stormwater BMP devices are reported for each proposed location in the tables below. BMP Device Site #1 Test Location SHWT Mansell Color Ksat #1 Ksat #2 Ksat #3 (feet below Notation round surface Not Observed 0-2.5' 2.5'-10' BMP Site 1 within 10' of N/A Loamy Sand Loamy Sand / N/A Elevation 410' surface 12" / hour Sandy Loam 8.5" / hour Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 BMP Device Site #2 Test Location SHWT Munsell Color Ksat #1 Ksat #2 Ksat #3 (feet below Notation round surface Not Observed 0-3' 3'-9' 9'-12' BMP Site 2 within 12' of N/A Loamy Sand Loamy Sand / Sandy Clay Elevation 420' surface 12" / hour Sandy Loam Loam (heavy) 8.5" / hour 2.5" / hour BMP Device Site #3 Test Location SHWT Munsell Color Ksat #1 Ksat #2 Ksat #3 (feet below Notation round surface Not Observed 0-2' 2'-3' 3'-10' BMP Site 3 within 10' of N/A Sandy Loam Sandy Clay Loamy Sand / Elevation 444' surface 10" / hour 1.9" / hour Sandy Loam 8.5" / hour CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however, methods used to measure these rates can influence the results. Side walls of the bore hole are "smeared" by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both of these factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on -site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you, Scott Cole North Carolina Licensed Soil Scientist :0] Proposed Stormwater BMP Site 1 (Elevation 410') SHWT: Not observed within 10' of surface SHWT Elevatioin: -- Ksat 0-2.5' LS: 12" / hour Ksat 2.5' -10' LS/SL: 8.5" / hour Kll� v O o (.0 N v d, Q N O V Proposed Stormwater BMP Site 3 (Elevation 444') SHWT: Not observed within 10' of surface SHWT Elevatioin: -- Ksat 0-2' SL: 1/hour 1 Ksat 2'-3" SC: .9" /hour (/ Ksat X-10' LS/SL: 8.5" / hour Proposed Stormwater BMP Site 2 (Elevation 420') SHWT: Not observed within 12' of surface SHWT Elevatioin: -- Ksat 0-3' LS: 12" / hour Ksat 3'-9' LS/SL: 8.5" / hour Ksat 9'-12' SCL: 2.5" / hour I r %1 inch = 400 feet NOAA Atlas 14, Volume 2, Version 3 ,A Location name: Aberdeen, North Carolina, USA* '�e Latitude: 35.0919*, Longitude:-79.3674` Elevation: 442.48 ft** source: ESRI Maps kw " source: USGS "`" `"' POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular i PF graphical i Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 ���� 2 5 10 25 5D 100 200 500 1DOD 0.439 0.518 0.603 0.667 0.741 0.794 0.845 0.891 0.948 0.991 5-min (0.399-0.484) (0.472-0.572) (0.549-0.666) (0.605-0.734) (0.669-0.815) (0.716-0.872) (0.757-0.927) (0.795-0.978) (0.838-1.04) (0.870-1.09) 0.701 0.828 0.966 1.07 1.18 1.26 1.34 1.41 1.50 1.56 10-min (0.638-0.773) (0.755-0.915) (0.878-1.07) (0.967-1.17) ( 1.07-1.30) (1.14-1.39) (1.20-1.47) ( 1.26-1.55) (1.33-1.65) (1.37-1.72) 0.876 1.04 1.22 1.35 1.50 1.60 1.70 1.78 1.89 1.96 15-min (0.797-0.966) (0.949-1.15) 1 (1.11-1.35) 1 (1.22-1.49) 11 (1.35-1.65) 1 (1.44-1.76) 1 (1.52-1.86) 1 (1.59-1.96) (1.67-2.07) (1.72-2.15) 30-min 4.65 1.092 .33 1.314459 1.587.92 1.77-02515 2. 0 2?44 2. 17 2. 36.85 2. 8 3805 2. 50.30 2. 8-3.49 1.50 1.80 2.23 2.54 2.95 3.27 3.58 3.89 4.31 4.63 60-min (1.36-1.65) (1.65-1.99) (2.022.46) (2.31-2.80) (2.67-3.25) (2.95-3.59) (3.21-3.93) (3.47-4.27) (3.81-4.73) (4.06-5.09) 1.75 2.12 2.66 3.07 3.61 4.04 4.47 4.90 5.48 5.95 2-hr (1.59-1.96) (1.92-2.37) (2.40-2.96) (2.77-3.41) (3.24-4.02) 1 (3.61-4.49) 1 (3.96-4.96) 1 (4.32-5.44) (4.79-6.09) (5.15-6.61) 1.85 2.25 2.83 3.28 3.91 4.42 4.94 5.49 6.25 6.86 3-hr (1.68-2.07) 1 (2.04-2.51) 1 (2.56-3.15) 1 (2.96-3.66) 11 (3.51-4.35) 1 (3.94-4.91) 1 (4.37-5.48) 1 (4.81-6.08) (5.42-6.93) (5.89-7.61) 2.21 2.68 3.37 3.92 4.69 5.31 5.96 6.64 7.60 8.37 6-hr (2.01-2.46) (2.432.97) (3.06-3.73) (3.55-4.34) (4.21-5.17) (4.74-5.85) (5.27-6.56) (5.82-7.30) (6.58-8.34) (7.16-9.20) 2.61 3.16 4.00 4.68 5.63 6.42 7.25 8.13 9.40 10.4 12-hr (2.37-2.90) (2.87-3.51) (3.62-4.44) (4.22-5.19) (5.04-6.22) (5.70-7.07) (6.37-7.97) (7.08-8.94) (8.05-10.3) (8.81-11.4) 3.07 3.71 4.68 5.45 6.50 7.35 8.21 9.11 10.3 11.3 24-hr (2.84-3.32) (3.43-4.02) (4.33-5.07) (5.02-5.90) (5.98-7.04) (6.73-7.94) (7.51-8.88) (8.31-9.85) (9.39-11.2) (10.2-12.3) 3.57 4.30 5.39 6.25 7.43 8.37 9.33 10.3 11.7 12.8 2-day (3.32-3.85) (4.00-4.64) (5.01-5.82) (5.79-6.74) (6.86-8.00) (7.70-9.01) (8.57-10.1) (9.45-11.1 ) ( 10.6-12.6) (11.6-13.8) 3.79 4.56 5.68 6.56 7.78 8.75 9.75 10.8 12.2 13.3 3-day (3.53-4.07) (4.25-4.89) (5.29-6.09) (6.10-7.04) (7.21-8.34) (8.08-9.38) (8.97-10.5) 1 (9.88-11.6) (11.1-13.1) (12.1-14.3) 4.01 4.81 5.96 6.88 8.13 9.13 10.2 11.2 12.7 13.8 4-day (3.74-4.29) (4.50-5.15) (5.57-6.37) (6.41-7.34) (7.56-8.68) (8.45-9.74) (9.38-10.9) 1 (10.3-12.0) (11.6-13.6) (12.6-14.8) 4.63 5.53 6.77 7.75 9.11 10.2 11.3 12.4 14.0 15.2 7-day (4.33-4.95) (5.18-5.92) (6.32-7.25) (7.23-8.30) (8.46-9.74) (9.44-10.9) 1 (10.4-12.1) 1 (11.5-13.3) (12.8-15.0) (13.9-16.3) 6.32 10-day $ 4.99 5064 5.94 6?71 7. 6 8?09 8. 9417 9.37--10.6 10.4-11.8 11.3-13.0 12.13-14.1 13.1415.8 14.17--107.0 7.13 8.43 10.00 11.2 12.9 14.2 15.5 16.8 18.6 20.0 20-day (6.74-7.55) (7.97-8.94) (9.43-10.6) (10.6-11.9) (12.1-13.6) (13.3-15.0) 1 (14.5-16.4) 1 (15.7-17.8) (17.3-19.8) (18.5-21.3) 8.85 10.4 12.2 13.5 15.3 16.6 18.0 19.3 21.1 22.5 30-day (8.37-9.37) (9.87-11.0) (11.5-12.9) (12.8-14.3) (14.4-16.2) (15.7-17.6) 1 (16.9-19.1) 1 (18.1-20.5) (19.7-22.5) (21.0-24.0) 11.2 13.1 15.1 16.6 18.5 20.0 21.4 22.8 24.6 26.0 45-day (10 6-11.8) (12.5-13.9) (14.3-15.9) (15.7-17.5) (17.5-19.5) (18.8-21.1) 1 (20.1-22.6) 1 (21.4-24.1) (23.1-26.1) (24.3-27.6) 13.4 15.7 17.8 19.5 21.6 23.2 24.7 26.2 28.1 29.6 60-day (12.8-14.1) (14.9-16.5) (16.9-18.8) (18.5-20.5) (20.4-22.7) (21.9-24.4) (23.3-26.0) (24.7-27.6) (26.4-29.7) (27.7-31.3) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5 % . Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical 30 25 5 Pas -based depth -duration -frequency (DDT) curves Latitude: 35.G919`, Longitude:-79.3674' 1 - -- --- --------------- ---- • C L L L L L M r4 r4 F0 rV r4 r4 f4 r4 �Pi O If'1 O O r-I N N f1� � Ik O O O Li 7 O r rn kn N rn v ko L}LirBtlOn 30 25 = 20 15 rq a w 10 a 5 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years NOAA Atlas 14, Volume 2, Version 3 Created (GMTY Tue Aug 2 16:59.32 2022 Back to Top Maps & aerials Small scale terrain Average recurrence onlerval (years) 2 — 5 25 50 100 200 500 1000 Duration — 5- mrn — 2-day — 10-mm — 3-day 15-min — 4-day — 30-min — 7-day — 0-min — 10-day — 2fir — 20-day — 3fir — 30-day — "r — 45-day — 12-hr — 60-day — 24-hr }i 3km 2mi Large scale terrain Winston -Sal ern • • Durhai„ i Rocky Mat Green3laoro Raleigh ' A NORTH C.AROLINA �r `Charlotte rille I Jad LI T H C A R O L I N A IN ili„ingtcn �s 100km4 1 I 60mi Large scale map �n�to� al�rn t;reeashaea �Q rharn . Raleigh 'Rocky Mou v Gre North # Carolina �I /Fat teviHe I .iacN Wif — n � G 100km 60mi Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer WATER QUALITY/QUANTITY NFILTRATION BASIN SCM #1 uetiL �� Yw u9y w'�vur• ON'A1N[10O3MOF1 ONOI1VAH353tl r S IHDI3H CII37HSb e . 3AZI3S O L S LrI3W3A02IdWT i Li7TLfT SINE(] 1N3W3!JVNVW 83IVMVIHOiS ■ : s� 4, l� 1�� � `r { - _ti'' •� ... - ~.i-'�� ,1-Jl��i i ;: rp',4''-,. •'+'�'Js d�r,�'�' `+r'r ram_ .'i•.••`F \.•lti + r f 1t!_�'%S. ii'1�J��i .f I, �f•;Fr__ 'bA ►\`.-ICE �wL. � � ��5•ti'i��`''i•' ,��„• - ,,. 'y;!I �,;;• - �. r i i .• + ,'� NL t jj _ .. �ti.- •,�• ark t�:1`- _ �• �r �!1, � • •,� ;� �;,t. • - - •' '� � ' � � �' .' � - �-yam � ;� � � �� �;f ; � .. .'I --�.�I ,]i V I �- ••! '} ~� � •ice YY i'ti a �i r •r r `,:•,�-,�i�, '-; � • �,• .I,.;i `• . 1. f � , •} fit;.. , .- 1.'-• may. +b'• - ,` !. 1 I SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Utility Improvements to Serve Ashley Heights 2 Project Area ac 91.286 _ 3 Coastal Wetland Area ac - 4 Surface Water Area ac - 5 Is this project High or Low Density? High 6 jDoes this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is pro2osed in the setback does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this.project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 0 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 _ Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 _ _ Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 28 Name and Title: _ Organization: Street address: Carlo Pardo, PE Bowman North Carolina, Ltd. 29 4006 Barrett Drive, Suite 104 30 City, State, Zip: Raleigh, NC 27609 31 Phone number(s): Email: 919-553-6570 32 cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ,�1111flllllil"t.11 o s s ' a,y •. 4 SEAL 051571 - 1�+0 I E 1�a_ Signature of Designer Date DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so, number of drainage areas/SCMs 3 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site 1 2 3 4 T e of SCM - Infiltration Basin Wet Pond Wet Pond 5 Total draina a area s ft 3976419 sf 519352 sf 590407 sf 2729441 sf 6 Onsite draina a areas ft 519052 sf 590407 sf 2619583 sf 7 Offsite draina a area s ft 300 sf 109858 sf 8 Total BUA in project (sq ft 768212 sf 102967 sf 133829 sf 641574 sf 9permitting) New BUA on subdivided lots (subject to s ft 528000 sf 68000 sf 92000 sf 368000 sf 10permitting) New BUA not on subdivided lots (subject to s 240212 sf 34667 sf 41829 sf 163716 sf 11 10ffsite BUA (sq ft 300 sf 109858 sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 34418 sf 4896 sf 5822 sf 23700 sf Roof (sq ft Roadway s ft 205794 sf 29771 sf 36007 sf 140016 sf Future (sq ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19.32% 19.84% 22.67% 23.51% 19 Design storm inches 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 10232 cf 43908 cf 163392 cf 21 Calculation method for design volume Simple Method Simple Method Simple Method DDITIONAL INFORMATION Please use this space to provide any additional information about the r22drainage area(s): INFILTRATION SYSTEM 1 Drainage area number 2 1 Minimum required treatment volume (cu ft) ERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 lWhat is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensedprofessional? Yes 18 1 Proposed slope of the subgrade surface (%) 0% 19 jAre terraces or baffles provided? No 20 1Tvpe of pretreatment: Forebay Data 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation (fmsl) 434.00 23 Depth to SHWT per soils report (in) 120.00 24 Ground elevation at boring in soils report (fmsl) 444.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 ISoil infiltration rate (in/hr) 4.25 27 1 Factor of safety (FS) (2 is recommended): 2.00 Elevations 29 113ottom elevation (fmsl) 440 ft 30 IStorage elevation (fmsl) 441.2 ft 31 1 Bypass elevation (fmsl) 445.5 ft Basins 32 1 Bottom surface area(ft) 7755 ft 33 Istorage elevation surface area(ft) 9300. ft For Trenches Only 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity (%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 IDesign volume of SCM (cu ft) 10232 cf 45 ITime to draw down (hours) 7.5 hrs I 46 Please use this space to provide any additional information about I the infiltration system(s): 26-The infiltration rate was intentially lowered to half of the 8.25 in/hr to unt for clogginq of the soils that will happen over time. Infiltration 1 10:32 AM 2/27/2023 Bowman North Carolina, Ltd. Ashley Heights, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions (Infiltrtation Basin #1) Drainage Area (acres): 11.92 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor Sand 1.44 12% C BaB Blaney Loamy Sand 10.40 87% C GdB Gilead Loamy Sand 0.00 0% C VaB Vaucluse Loamy Sand 0.08 1% Existing Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good Stand A 1.44 25 3.0 Wooded - Good Stand C 10.48 70 61.5 Cumulative Curve # = 64.5 Bowman North Carolina, Ltd. Ashley Heights, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions (Infiltrtation Basin #1) Drainage Area (acres): 11.92 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor Sand 1.44 12% C BaB Blaney Loamy Sand 10.40 87% C GdB Gilead Loamy Sand 0.00 0% C VaB Vaucluse Loamy Sand 0.08 1% Proposed Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 0.83 39 2.7 Open Space - Good Condition C 7.06 74 43.8 Wooded - Good Stand A 0.61 25 1.3 Wooded - Good Stand C 1.05 70 6.2 Impervious Area A/C 2.36 98 19.4 Cumulative Curve # = 73.4 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin Drainage Area (DA) = 11.92 Acres 519352 sf Impervious Area (IA) = 2.36 Acres 102967 sf Percent Impervious (1) = 19.8 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.23 in/in Water Quality Volume = 0.227 ac-ft Water Quality Volume = 9,886 cf Water Quality Volume = 0.228 inches of runoff NOAA 1-year, 24-hour event = 3.07 inches Minimum Surface Area SA = (12-FS-DV)/(K-T) Factor of Safety (FS) = 2 Design Volume (DV) = 9886.5 cf Hydraulic Conductivity of Soil = 4.25 in/hr Max Dewatering Time = 72 hours SA = 775.4 sf Drawdown Time T = FS - (DV-12)/(K-SA) Factor of Safety (FS) = 2 Design Volume (DV) = 10232.0 cf Hydraulic Conductivity of Soil = 4.25 in/hr Surface Area Provided = 7755 sf Drawdown Time = 7.5 hours a•1 oop 00 Ile GRASS SPILL REFER TO DETAIL STORMWATER � i � / �\ THIS SHEET MANAGEMENT i EASEMENT � � ' J — � / #40 #00 #00 I OBSERVATION WELL (TYP.) STOP OF Ole %� �O �� EMBANKMENT Ole INLET PIPE WITH ELEV-447.0Ole Ole RIP —RAP APRON %Ile Ole 'Ole ��` -STORM DRAINAGE �I � BY OTHERS #00 #10 #00 I1&101 OCIUS 25 50 100 200 ( IN FEET ) 1 inch = 50 f t. PLAN VIEW STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) AREA CONTOUR(SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 440.0 7755 0 0 1.0 441.0 9040 8398 8398 1,2 441,2 9300 1834 10232 (WQV) 2.0 442.0 10375 7870 18102 3.0 443.0 11775 11075 29177 4.0 444.0 13225 12500 41677 5.0 445.0 14735 13980 55657 6,0 446.0 16300 15518 71174 7.0 447.0 17925 17113 88287 TOP OF EMBANKMENT = 447.0 100-YEAR STORM ELEVATION = 446.88 10-YEAR STORM ELEVATION = 445.51 SPILLWAY ELEVATION = 445.5 2-YEAR STORM ELEVATION = 442.85 1-YEAR STORM ELEVATION = 441.85 1.0" RAINFALL ELEVATION = 440.96 BOTTOM OF BASIN = 440.0 N SEASONAL HIGH WATER TABLE = 434.0 FILTER MIXTURE (FROM TOP) l'-0" OF CLEAN ASTM C-33 SAND (MEDIUM AGGREGATE SAND WITH A SIZE RANGE OF 0.02-INCH TO 0.04-INCH DIAMETER) LAYER OF GEOTEXTILE PERMEABLE FILTER FABRIC (MIRAFI N-SERIES OR EQUIVALENT) V-0" MIN. UNDISTURBED IN -SITU SOIL 7 /\\ V-0" CLEAN SAND INFILTRATION BASIN TYPICAL SECTION N TS RIP -RAP PRE-TREATMENT FOREBAY AT PIPE INLETS SEE DETAIL THIS SHEET FILTER FABRIC AT BOTTOM AND SIDES OF CLEAN SAND //�ij \ \\ \\ \\ \\ 0 0 0 0 GRASS SOD 4 FILTER FABRIC n V FLOW LONG TOP OF EMBANKMENT SPILLWAY Q(100) SLOPE(%) H B w SS CHANNEL LINING ELEVATION SPILLWAY ELEVATION STRAW WITH NET NAG SPILLWAY 42.07 CFS 5.00% L5' 10.0 19.0 3:1 SHOREMAX W/ P300 447,0 445.5 EXTEND LINING TO TOP OF SPILLWAY S\ H EXTEND LINING TO TOP OF SPILLWAY CHANNEL LINING C�D MATTING SHALL BE AS NOTED OR APPROVED EQUAL. B GRASS SPILLWAY DETAIL TOP OF EMBANKMENT-447.0 SPILLWAY ELEVATION-445.5 GRASS SOD ON SPILLWAY AND SIDE SLOPES Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 09 / 27 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 42.07 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 76,433 cuft Inflow hyd. No. = 2 - SCM Post-Developlibelservoir name = BMP Pond Max. Elevation = 446.88 ft Max. Storage = 86,201 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values -1.00% ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.93 99.99 << 445.65 ----- ----- ----- ----- 1.611 ----- ----- ----- 1.550 1.611 11.97 98.04 446.30 ----- ----- ----- ----- 18.52 ----- ----- ----- 1.651 18.52 12.00 77.71 446.71 ----- ----- ----- ----- 34.82 ----- ----- ----- 1.718 34.82 12.03 49.19 446.88 << ----- ----- ----- ----- 42.07 ----- ----- ----- 1.744 42.07 12.07 27.22 446.84 ----- ----- ----- ----- 40.53 ----- ----- ----- 1.739 40.53 12.10 16.96 446.72 ----- ----- ----- ----- 35.12 ----- ----- ----- 1.719 35.12 12.13 13.97 446.59 ----- ----- ----- ----- 29.63 ----- ----- ----- 1.698 29.63 12.17 13.40 446.48 ----- ----- ----- ----- 25.33 ----- ----- ----- 1.681 25.33 12.20 12.85 446.40 ----- ----- ----- ----- 22.07 ----- ----- ----- 1.667 22.07 12.23 12.30 446.33 ----- ----- ----- ----- 19.57 ----- ----- ----- 1.656 19.57 12.27 11.75 446.27 ----- ----- ----- ----- 17.57 ----- ----- ----- 1.647 17.57 12.30 11.19 446.22 ----- ----- ----- ----- 15.93 ----- ----- ----- 1.639 15.93 12.33 10.63 446.18 ----- ----- ----- ----- 14.57 ----- ----- ----- 1.632 14.57 12.37 10.07 446.14 ----- ----- ----- ----- 13.41 ----- ----- ----- 1.626 13.41 12.40 9.502 446.11 ----- ----- ----- ----- 12.36 ----- ----- ----- 1.621 12.37 12.43 8.933 446.08 ----- ----- ----- ----- 11.47 ----- ----- ----- 1.616 11.47 12.47 8.358 446.05 ----- ----- ----- ----- 10.65 ----- ----- ----- 1.612 10.65 12.50 7.783 446.02 ----- ----- ----- ----- 9.879 ----- ----- ----- 1.607 9.879 12.53 7.252 446.00 ----- ----- ----- ----- 9.149 ----- ----- ----- 1.603 9.149 12.57 6.854 445.97 ----- ----- ----- ----- 8.471 ----- ----- ----- 1.599 8.470 Continues on next page... 11 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.60 6.606 445.95 ----- ----- ----- ----- 7.858 ----- ----- ----- 1.596 7.858 12.63 6.448 445.93 ----- ----- ----- ----- 7.320 ----- ----- ----- 1.593 7.321 12.67 6.320 445.91 ----- ----- ----- ----- 6.857 ----- ----- ----- 1.590 6.857 12.70 6.191 445.90 ----- ----- ----- ----- 6.468 ----- ----- ----- 1.587 6.468 12.73 6.062 445.88 ----- ----- ----- ----- 6.152 ----- ----- ----- 1.585 6.153 12.77 5.933 445.87 ----- ----- ----- ----- 5.868 ----- ----- ----- 1.583 5.868 12.80 5.803 445.86 ----- ----- ----- ----- 5.609 ----- ----- ----- 1.582 5.609 12.83 5.673 445.85 ----- ----- ----- ----- 5.371 ----- ----- ----- 1.580 5.371 12.87 5.542 445.84 ----- ----- ----- ----- 5.151 ----- ----- ----- 1.579 5.151 12.90 5.412 445.83 ----- ----- ----- ----- 4.946 ----- ----- ----- 1.577 4.946 12.93 5.280 445.82 ----- ----- ----- ----- 4.753 ----- ----- ----- 1.576 4.754 12.97 5.149 445.81 ----- ----- ----- ----- 4.571 ----- ----- ----- 1.575 4.571 13.00 5.016 445.81 ----- ----- ----- ----- 4.397 ----- ----- ----- 1.574 4.397 13.03 4.891 445.80 ----- ----- ----- ----- 4.237 ----- ----- ----- 1.572 4.237 13.07 4.784 445.79 ----- ----- ----- ----- 4.101 ----- ----- ----- 1.571 4.101 13.10 4.697 445.78 ----- ----- ----- ----- 3.971 ----- ----- ----- 1.570 3.970 13.13 4.623 445.78 ----- ----- ----- ----- 3.847 ----- ----- ----- 1.569 3.847 13.17 4.553 445.77 ----- ----- ----- ----- 3.731 ----- ----- ----- 1.568 3.731 13.20 4.482 445.77 ----- ----- ----- ----- 3.622 ----- ----- ----- 1.568 3.622 13.23 4.411 445.76 ----- ----- ----- ----- 3.518 ----- ----- ----- 1.567 3.518 13.27 4.340 445.76 ----- ----- ----- ----- 3.419 ----- ----- ----- 1.566 3.419 13.30 4.269 445.75 ----- ----- ----- ----- 3.324 ----- ----- ----- 1.565 3.323 13.33 4.198 445.75 ----- ----- ----- ----- 3.232 ----- ----- ----- 1.565 3.232 13.37 4.127 445.74 ----- ----- ----- ----- 3.143 ----- ----- ----- 1.564 3.143 13.40 4.056 445.74 ----- ----- ----- ----- 3.057 ----- ----- ----- 1.563 3.057 13.43 3.985 445.73 ----- ----- ----- ----- 2.973 ----- ----- ----- 1.563 2.973 13.47 3.913 445.73 ----- ----- ----- ----- 2.891 ----- ----- ----- 1.562 2.891 13.50 3.841 445.72 ----- ----- ----- ----- 2.811 ----- ----- ----- 1.561 2.810 Continues on next page... 12 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.53 3.772 445.72 ----- ----- ----- ----- 2.732 ----- ----- ----- 1.561 2.731 13.57 3.708 445.72 ----- ----- ----- ----- 2.654 ----- ----- ----- 1.560 2.654 13.60 3.652 445.71 ----- ----- ----- ----- 2.579 ----- ----- ----- 1.559 2.579 13.63 3.599 445.71 ----- ----- ----- ----- 2.508 ----- ----- ----- 1.559 2.508 13.67 3.548 445.71 ----- ----- ----- ----- 2.439 ----- ----- ----- 1.558 2.439 13.70 3.497 445.70 ----- ----- ----- ----- 2.372 ----- ----- ----- 1.558 2.372 13.73 3.446 445.70 ----- ----- ----- ----- 2.312 ----- ----- ----- 1.557 2.312 13.77 3.395 445.70 ----- ----- ----- ----- 2.262 ----- ----- ----- 1.557 2.263 13.80 3.343 445.69 ----- ----- ----- ----- 2.213 ----- ----- ----- 1.556 2.213 13.83 3.292 445.69 ----- ----- ----- ----- 2.163 ----- ----- ----- 1.556 2.164 13.87 3.240 445.69 ----- ----- ----- ----- 2.114 ----- ----- ----- 1.555 2.114 13.90 3.189 445.68 ----- ----- ----- ----- 2.064 ----- ----- ----- 1.555 2.064 13.93 3.137 445.68 ----- ----- ----- ----- 2.014 ----- ----- ----- 1.554 2.014 13.97 3.085 445.68 ----- ----- ----- ----- 1.964 ----- ----- ----- 1.554 1.964 14.00 3.033 445.67 ----- ----- ----- ----- 1.913 ----- ----- ----- 1.553 1.913 14.03 2.985 445.67 ----- ----- ----- ----- 1.863 ----- ----- ----- 1.553 1.863 14.07 2.947 445.67 ----- ----- ----- ----- 1.814 ----- ----- ----- 1.552 1.814 14.10 2.920 445.66 ----- ----- ----- ----- 1.766 ----- ----- ----- 1.552 1.766 14.13 2.900 445.66 ----- ----- ----- ----- 1.722 ----- ----- ----- 1.551 1.721 14.17 2.883 445.66 ----- ----- ----- ----- 1.680 ----- ----- ----- 1.551 1.680 14.20 2.865 445.65 ----- ----- ----- ----- 1.640 ----- ----- ----- 1.550 1.640 14.23 2.847 445.65 ----- ----- ----- ----- 1.604 ----- ----- ----- 1.550 1.604 14.27 2.830 445.65 ----- ----- ----- ----- 1.569 ----- ----- ----- 1.550 1.569 14.30 2.812 445.65 ----- ----- ----- ----- 1.537 ----- ----- ----- 1.549 1.536 14.33 2.795 445.65 ----- ----- ----- ----- 1.505 ----- ----- ----- 1.549 1.505 14.37 2.777 445.64 ----- ----- ----- ----- 1.476 ----- ----- ----- 1.549 1.476 14.40 2.759 445.64 ----- ----- ----- ----- 1.448 ----- ----- ----- 1.548 1.448 14.43 2.741 445.64 ----- ----- ----- ----- 1.421 ----- ----- ----- 1.548 1.421 Continues on next page... 13 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.47 2.724 445.64 ----- ----- ----- ----- 1.395 ----- ----- ----- 1.548 1.395 14.50 2.706 445.64 ----- ----- ----- ----- 1.370 ----- ----- ----- 1.548 1.370 14.53 2.688 445.63 ----- ----- ----- ----- 1.346 ----- ----- ----- 1.547 1.346 14.57 2.670 445.63 ----- ----- ----- ----- 1.322 ----- ----- ----- 1.547 1.322 14.60 2.652 445.63 ----- ----- ----- ----- 1.299 ----- ----- ----- 1.547 1.299 14.63 2.635 445.63 ----- ----- ----- ----- 1.277 ----- ----- ----- 1.547 1.277 14.67 2.617 445.63 ----- ----- ----- ----- 1.255 ----- ----- ----- 1.546 1.255 14.70 2.599 445.63 ----- ----- ----- ----- 1.234 ----- ----- ----- 1.546 1.234 14.73 2.581 445.63 ----- ----- ----- ----- 1.213 ----- ----- ----- 1.546 1.213 14.77 2.563 445.62 ----- ----- ----- ----- 1.192 ----- ----- ----- 1.546 1.193 14.80 2.545 445.62 ----- ----- ----- ----- 1.172 ----- ----- ----- 1.546 1.172 14.83 2.527 445.62 ----- ----- ----- ----- 1.152 ----- ----- ----- 1.545 1.152 14.87 2.509 445.62 ----- ----- ----- ----- 1.132 ----- ----- ----- 1.545 1.133 14.90 2.491 445.62 ----- ----- ----- ----- 1.113 ----- ----- ----- 1.545 1.113 14.93 2.473 445.62 ----- ----- ----- ----- 1.094 ----- ----- ----- 1.545 1.094 14.97 2.455 445.62 ----- ----- ----- ----- 1.075 ----- ----- ----- 1.545 1.075 15.00 2.437 445.62 ----- ----- ----- ----- 1.056 ----- ----- ----- 1.544 1.056 15.03 2.419 445.61 ----- ----- ----- ----- 1.036 ----- ----- ----- 1.544 1.037 15.07 2.401 445.61 ----- ----- ----- ----- 1.018 ----- ----- ----- 1.544 1.018 15.10 2.383 445.61 ----- ----- ----- ----- 0.999 ----- ----- ----- 1.544 0.999 15.13 2.365 445.61 ----- ----- ----- ----- 0.980 ----- ----- ----- 1.544 0.981 15.17 2.347 445.61 ----- ----- ----- ----- 0.962 ----- ----- ----- 1.543 0.962 15.20 2.328 445.61 ----- ----- ----- ----- 0.944 ----- ----- ----- 1.543 0.944 15.23 2.310 445.61 ----- ----- ----- ----- 0.925 ----- ----- ----- 1.543 0.925 15.27 2.292 445.61 ----- ----- ----- ----- 0.907 ----- ----- ----- 1.543 0.907 15.30 2.274 445.60 ----- ----- ----- ----- 0.889 ----- ----- ----- 1.543 0.889 15.33 2.256 445.60 ----- ----- ----- ----- 0.870 ----- ----- ----- 1.542 0.870 15.37 2.238 445.60 ----- ----- ----- ----- 0.852 ----- ----- ----- 1.542 0.852 Continues on next page... 14 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.40 2.219 445.60 ----- ----- ----- ----- 0.834 ----- ----- ----- 1.542 0.834 15.43 2.201 445.60 ----- ----- ----- ----- 0.819 ----- ----- ----- 1.542 0.819 15.47 2.183 445.60 ----- ----- ----- ----- 0.808 ----- ----- ----- 1.542 0.808 15.50 2.164 445.60 ----- ----- ----- ----- 0.798 ----- ----- ----- 1.542 0.797 15.53 2.146 445.60 ----- ----- ----- ----- 0.786 ----- ----- ----- 1.541 0.786 15.57 2.128 445.59 ----- ----- ----- ----- 0.774 ----- ----- ----- 1.541 0.774 15.60 2.110 445.59 ----- ----- ----- ----- 0.762 ----- ----- ----- 1.541 0.762 15.63 2.091 445.59 ----- ----- ----- ----- 0.750 ----- ----- ----- 1.541 0.750 15.67 2.073 445.59 ----- ----- ----- ----- 0.737 ----- ----- ----- 1.540 0.737 15.70 2.055 445.59 ----- ----- ----- ----- 0.724 ----- ----- ----- 1.540 0.724 15.73 2.036 445.59 ----- ----- ----- ----- 0.710 ----- ----- ----- 1.540 0.710 15.77 2.018 445.58 ----- ----- ----- ----- 0.697 ----- ----- ----- 1.540 0.697 15.80 2.000 445.58 ----- ----- ----- ----- 0.683 ----- ----- ----- 1.539 0.683 15.83 1.981 445.58 ----- ----- ----- ----- 0.668 ----- ----- ----- 1.539 0.668 15.87 1.963 445.58 ----- ----- ----- ----- 0.654 ----- ----- ----- 1.539 0.654 15.90 1.944 445.58 ----- ----- ----- ----- 0.639 ----- ----- ----- 1.539 0.639 15.93 1.926 445.58 ----- ----- ----- ----- 0.624 ----- ----- ----- 1.538 0.624 15.97 1.907 445.57 ----- ----- ----- ----- 0.609 ----- ----- ----- 1.538 0.609 16.00 1.889 445.57 ----- ----- ----- ----- 0.594 ----- ----- ----- 1.538 0.594 16.03 1.872 445.57 ----- ----- ----- ----- 0.578 ----- ----- ----- 1.537 0.578 16.07 1.858 445.57 ----- ----- ----- ----- 0.563 ----- ----- ----- 1.537 0.563 16.10 1.849 445.57 ----- ----- ----- ----- 0.548 ----- ----- ----- 1.537 0.548 16.13 1.841 445.56 ----- ----- ----- ----- 0.533 ----- ----- ----- 1.537 0.533 16.17 1.835 445.56 ----- ----- ----- ----- 0.519 ----- ----- ----- 1.536 0.519 16.20 1.828 445.56 ----- ----- ----- ----- 0.505 ----- ----- ----- 1.536 0.505 16.23 1.822 445.56 ----- ----- ----- ----- 0.492 ----- ----- ----- 1.536 0.492 16.27 1.816 445.56 ----- ----- ----- ----- 0.479 ----- ----- ----- 1.536 0.479 16.30 1.809 445.56 ----- ----- ----- ----- 0.466 ----- ----- ----- 1.535 0.466 Continues on next page... Post Through SCM 15 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A (hrs) cfs ft cfs cfs cfs cfs cfs 16.33 1.803 445.56 ----- ----- ----- ----- 0.454 16.37 1.796 445.55 ----- ----- ----- ----- 0.443 16.40 1.790 445.55 ----- ----- ----- ----- 0.431 End Wr B Wr C Wr D Exfil Outflow cfs cfs cfs cfs cfs ----- ----- ----- 1.535 0.454 ----- ----- ----- 1.535 0.442 ----- ----- ----- 1.535 0.431 9/27/22, 11:52 AM NORTH AMERICAN GREEN SPILLWAY ANALYSIS > > > Grass Spillway Name Grass Spillway Discharge 42.07 Peak Flow Period 5 Channel Slope 0.05 Channel Bottom Width 10 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% ECMDS 7.0 North American Green 5401 St. Wendel -Cynthia na Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECM DS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 42.07 cfs 7.43 ft/s 0.54 ft 0.028 8.5 Ibs/ft2 1.68 Ibs/ft2 5.07 STABLE F P300 Unvegetated Underlying Straight 42.07 cfs 7.43 ft/s 0.54 ft 0.028 5.68 Ibs/ft2 1.53 Ibs/ft2 3.71 STABLE F Substrate Shoremax w/ Straight 42.07 cfs 6.2 ft/s 0.64 ft 0.037 14 Ibs/ft2 1.99 Ibs/ft2 7.03 STABLE F P300 Reinforced Vegetation Underlying Straight 42.07 cfs 6.2 ft/s 0.64 ft 0.037 8.5 Ibs/ft2 1.79 Ibs/ft2 4.74 STABLE F Substrate https://ecmds.com/project/l 51829/spillway-analysis/231870/show 1 /1 Pond Report s Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Pond No. 1 - BMP Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 440.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 440.00 7,755 0 0 1.00 441.00 9,040 8,398 8,398 1.20 441.20 9,300 1,834 10,232 2.00 442.00 10,375 7,870 18,102 3.00 443.00 11,775 11,075 29,177 4.00 444.00 13,225 12,500 41,677 5.00 445.00 14,735 13,980 55,657 6.00 446.00 16,300 15,518 71,174 7.00 447.00 17,925 17,113 88,287 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 445.50 0.00 0.00 0.00 No. Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 4.250 (by Contour) Multi -Stage = n/a No Yes No TW Elev. (ft) = 0.00 Stage (ft) 8.00 AM 4.00 ►41I17 0.00 ' 0.00 5.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 10.00 15.00 20.00 25.00 30.00 35.00 40.00 Elev (ft) 448.00 446.00 444.00 440.00 45.00 50.00 Discharge (cfs) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.374 2 726 22,452 ------ ------ ------ SCM Pre -Developed 2 SCS Runoff 18.58 2 718 37,377 ------ ------ ------ SCM Post -Developed 3 Reservoir 0.000 2 1226 0 2 441.85 16,631 Post Through SCM 5 SCS Runoff 3.543 2 150 17,513 ------ ------ ------ 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 166 0 5 440.96 8,056 1.0inPost Through SCM Infiltration 1.gpw Return Period: 1 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.07 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 1 Year Wednesday, 09 / 28 / 2022 = 5.374 cfs = 726 min = 22,452 cuft = 64.5 = 0 ft = 17.02 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1 " ' ' ' ' ' ' ` ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.07 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Post -Developed Hyd. No. 2 -- 1 Year Wednesday, 09 / 28 / 2022 = 18.58 cfs = 718 min = 37,377 cuft = 73.4 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 1226 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 441.85 ft Reservoir name = BMP Pond Max. Storage = 16,631 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) — Hyd No. 3 — Hyd No. 2 Total storage used = 16,631 cult A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 5 1.0 Post -Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 3.543 cfs Storm frequency = 1 yrs Time to peak = 150 min Time interval = 2 min Hyd. volume = 17,513 cuft Drainage area = 11.920 ac Curve number = 73.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.21 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 4.00 3.00 rM 1.00 0.00 ' 1 0 60 — Hyd No. 5 1.0 Post -Developed to SCM Hyd. No. 5 -- 1 Year Q (cfs) 4.00 3.00 2.00 1.00 I' ' ' ' ' ` ' 0.00 120 180 240 300 360 420 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 6 1.OinPost Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 166 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post -Developed to SCWax. Elevation = 440.96 ft Reservoir name = BMP Pond Max. Storage = 8,056 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 4.00 3.00 r M 1.00 1.OinPost Through SCM Hyd. No. 6 -- 1 Year 0.00 1 I= I I I I I 0 120 240 360 480 600 720 840 960 1080 — Hyd No. 6 Hyd No. 5 Total storage used = 8,056 cuft Q (cfs) 4.00 3.00 2.00 1.00 0.00 1200 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 10.03 2 726 36,309 ------ ------ ------ SCM Pre -Developed 2 SCS Runoff 27.35 2 718 54,696 ------ ------ ------ SCM Post -Developed 3 Reservoir 0.000 2 1552 0 2 442.85 27,553 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 440.00 0.000 1.0inPost Through SCM Infiltration 1.gpw Return Period: 2 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.71 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 2 Year Wednesday, 09 / 28 / 2022 = 10.03 cfs = 726 min = 36,309 cuft = 64.5 = 0 ft = 17.02 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.71 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Post -Developed Hyd. No. 2 -- 2 Year Wednesday, 09 / 28 / 2022 = 27.35 cfs = 718 min = 54,696 cuft = 73.4 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 1552 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 442.85 ft Reservoir name = BMP Pond Max. Storage = 27,553 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 28.00 24.00 20.00 16.00 12.00 Post Through SCM Hyd. No. 3 -- 2 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 EFIV-11 "I 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) — Hyd No. 3 — Hyd No. 2 Total storage used = 27,553 cult Hydrograph Summary Report 15 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 25.57 2 726 83,068 ------ ------ ------ SCM Pre -Developed 2 SCS Runoff 53.72 2 716 108,481 ------ ------ ------ SCM Post -Developed 3 Reservoir 0.076 2 868 189 2 445.51 63,558 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 440.00 0.000 1.0inPost Through SCM Infiltration 1.gpw Return Period: 10 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 10 Year Wednesday, 09 / 28 / 2022 = 25.57 cfs = 726 min = 83,068 cuft = 64.5 = 0 ft = 17.02 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs) 60.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Post -Developed Hyd. No. 2 -- 10 Year Wednesday, 09 / 28 / 2022 = 53.72 cfs = 716 min = 108,481 cuft = 73.4 = Oft = 5.00 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1--W-- ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.076 cfs Storm frequency = 10 yrs Time to peak = 868 min Time interval = 2 min Hyd. volume = 189 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 445.51 ft Reservoir name = BMP Pond Max. Storage = 63,558 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 Time (min) — Hyd No. 3 Hyd No. 2 Total storage used = 63,558 cult Hydrograph Summary Report 21 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 55.21 2 724 173,383 ------ ------ ------ SCM Pre -Developed 2 SCS Runoff 99.99 2 716 204,588 ------ ------ ------ SCM Post -Developed 3 Reservoir 42.07 2 722 76,436 2 446.88 86,199 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 440.00 0.000 1.0inPost Through SCM Infiltration 1.gpw Return Period: 100 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs Q (cfs) 60.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 100 Year Wednesday, 09 / 28 / 2022 = 55.21 cfs = 724 min = 173,383 cuft = 64.5 = 0 ft = 17.02 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 0- ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 11.920 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs Q (cfs) 100.00 40.00 20.00 0.00 ' 0 120 240 — Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Post -Developed Hyd. No. 2 -- 100 Year 360 480 600 720 840 Wednesday, 09 / 28 / 2022 = 99.99 cfs = 716 min = 204,588 cuft = 73.4 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 100.00 40.00 20.00 0.00 960 1080 1200 1320 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 42.07 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 76,436 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 446.88 ft Reservoir name = BMP Pond Max. Storage = 86,199 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) — Hyd No. 3 Hyd No. 2 Total storage used = 86,199 cult OF CONCENTRATION ng Conditions DA OPEN CHANNEL SHALLOW CONIC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT1 Manning's Equation: Tc = (0.007ml-y0.8)/(P2"0.5)(s"0.4) 2-year24-hr �SEGMENTI Tc = L / 60'V V = 1.49R21IS112/ n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's T' Length Elev2 Elev3 Slope Condition Vavg T12 Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T�, T IL Tc(minimum) Tlag Basin fl fl/fl TP-40 in fl flAt TR-55 Fig. 3-1 fl/sec Flow Area (fl-2) (fl fl fl fl/fl (fps) 10 min 0.67c hrs 1 100 460.1 455.4 0.047 3.71 0.24 9.42 844 455.4 444 0.01351 Unpaved 1.85 7.60 17.02 17.02 0.17 1 WATER QUALITY/QUANTITY WET POND SCM #2 ON GV0HNOIIVAU3S3F1 �+ 3 N cur'Js = d' •' 5 ,,:. ... SLHDIWIA31HSt ueumo8 p� anuas of ssHaw�nouawr �ir-Hin r SlIVA0A3W30V VI831VMW801S � a • e� � � � � � SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Utility Improvements to Serve Ashley Heights 2 Project Area ac 91.286 _ 3 Coastal Wetland Area ac - 4 Surface Water Area ac - 5 Is this project High or Low Density? High 6 jDoes this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is pro2osed in the setback does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this.project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 0 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 _ Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 _ _ Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 28 Name and Title: _ Organization: Street address: Carlo Pardo, PE Bowman North Carolina, Ltd. 29 4006 Barrett Drive, Suite 104 30 City, State, Zip: Raleigh, NC 27609 31 Phone number(s): Email: 919-553-6570 32 cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ,�1111flllllil"t.11 o s s ' a,y •. 4 SEAL 051571 - 1�+0 I E 1�a_ Signature of Designer Date DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so, number of drainage areas/SCMs 3 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site 1 2 3 4 T e of SCM - Infiltration Basin Wet Pond Wet Pond 5 Total draina a area s ft 3976419 sf 519352 sf 590407 sf 2729441 sf 6 Onsite draina a areas ft 519052 sf 590407 sf 2619583 sf 7 Offsite draina a area s ft 300 sf 109858 sf 8 Total BUA in project (sq ft 768212 sf 102967 sf 133829 sf 641574 sf 9permitting) New BUA on subdivided lots (subject to s ft 528000 sf 68000 sf 92000 sf 368000 sf 10permitting) New BUA not on subdivided lots (subject to s 240212 sf 34667 sf 41829 sf 163716 sf 11 10ffsite BUA (sq ft 300 sf 109858 sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 34418 sf 4896 sf 5822 sf 23700 sf Roof (sq ft Roadway s ft 205794 sf 29771 sf 36007 sf 140016 sf Future (sq ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19.32% 19.84% 22.67% 23.51% 19 Design storm inches 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 10232 cf 43908 cf 163392 cf 21 Calculation method for design volume Simple Method Simple Method Simple Method DDITIONAL INFORMATION Please use this space to provide any additional information about the r22drainage area(s): WET POND 1 11 Drainage area number 2 3 21 Minimum required treatment volume (cu ft) 12497 cf 59491 cf NERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 151 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 161 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed b an NC licensedprofessional? Yes Yes WET POND MDC FROM 02H .1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 405.00 409.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 406.00 410.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 410.50 414.50 23 Elevation of the permanent pool (fmsl) 411.00 415.00 24 Elevation of the top of the vegetated shelf (fmsl) 411.50 415.50 25 Elevation of the temporary pool (fmsl) 412.40 417.10 26 Surface area of the main permanent pool (square feet) 21945 56230 27 Volume of the main permanent pool (cubic feet) 90710 cf 245796 cf 28 Average depth of the main pool (feet) 4.46 ft 4.61 ft 29 Average depth equation used Equation 3 Equation 3 301 If using equation 3, main pool perimeter (feet) 577.0 ft 1051.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 3.0 ft 32 Volume of the forebay (cubic feet) 14673 cf 43558 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 36 in 48 in 35 Design volume of SCM (cu ft) 43908 cf 163392 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 371 If orifice, orifice diameter (inches) 2.50 in 4.50 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 3.67 3.78 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? Yes Yes 431 Depth of forebay at entrance (inches) 48 in 60 in 44 Depth of forebay at exit (inches) 36 in 48 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 Hasa planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 10:32 AM 2/27/2023 Bowman North Carolina, Ltd. Ashley Heights, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions Drainage Area (acres): 13.55 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor Sand 2.29 17% C BaB Blaney Loamy Sand 6.36 47% C GdB Gilead Loamy Sand 4.91 36% C VaB Vaucluse Loamy Sand 0.00 0% Existing Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good Stand A 2.29 25 4.2 Wooded - Good Stand C 11.26 70 58.2 Cumulative Curve # = 62.4 Bowman North Carolina, Ltd. Ashley Heights, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions Drainage Area (acres): 13.55 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor Sand 2.29 17% C BaB Blaney Loamy Sand 6.36 47% C GdB Gilead Loamy Sand 4.91 36% C VaB Vaucluse Loamy Sand 0.00 0% Proposed Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 1.59 55 6.5 Open Space - Good Condition C 7.55 74 41.2 Wooded - Good Stand A 0.00 25 0.0 Wooded - Good Stand C 1.34 70 6.9 Impervious Area A/C 3.07 98 22.2 Cumulative Curve # = 76.8 Proposed Wet Pond Project Information Project Name: Ashley Heights Project #: 220151-01-001 Designed by: CB Date: Revised by: Date: Checked by: Date: 8/23/2022 Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 13.55 Acres 590,407 sf Impervious Area (IA) = 3.07 Acres 133,829 sf Percent Impervious (1) = 22.67 % 22.67 % Required Surface Area Permament Pool Depth: 4.46 ft SA/DA = 0.717 Min Req'd Surface Area = 4,236 sf (at Permanent Pool) Required WQv Storage Volume Design Storm = inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.254 in/in Storage Volume Required = "" cf (above Permanent Pool) Elevations Top of Pond Elevation = 415.00 ft Temporary Pool Elevation = 412.40 ft Permanent Pool Elevation = 411.00 ft Shelf Begining Elevation = 411.50 ft Forebay Weir = 410.00 ft Shelf Ending Elevation = 410.50 ft Bottom Elevation = 406.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 21,945 sf Volume of Temporary Storage = 43,908 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Volume of Storage for Design Storm = 43,908 ( 21945 > 4236) sf ( 43908 > 12497) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Name: Ashley Heights Project #: 220151-01-001 Designed by: CB Date: 8/23/2022 Checked by: Date: Water ity Orifice Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 CD - D2 (Z-D/24-Ei)^(1/2) Qz = 0.372 CD ' D'(Z-Ei)^(3i2) Q, = 0 in 0.6 411 Orifice Inv. 0.00 to 411 411 to 411.1 411.1 to 412 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 411.00 28,780 0 0.00 2.00 0.000 -- 411.50 30,970 14,938 0.50 3.00 0.103 2,415 412.00 32,320 15,823 0.50 3.00 0.155 1,700 412.40 33,415 13,147 0.40 3.00 0.187 1,175 Total -- 43,908 -- -- -- Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 43,908 of Total Time = 5,290 min Total Time = 3.67 days 9/28/2022 Prop Wet Pond- new design (Ashley Heights) - 2 1 of 1 Project: Pond #1 Date: 9/28/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 411 21,945 10,546 90,710 A2 (Perm -Pool) 410.5 20,240 9,981 80,164 Al (Bottom -Shelf) 410 19,685 19,140 70,183 409 18,595 18,060 51,043 408 17,525 17,005 32,983 407 16,485 15,978 15,978 A3 (Bottom -Pond) 406 15,470 0 0 A3 (Bottom -Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 411 6,285 6,285 3,061 14,673 410.5 5,960 5,960 2,901 11,611 410 5,645 5,645 5,338 8,710 409 5,030 5,030 3,373 3,373 408 1,715 1,715 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom -Shelf): 16.2% *Between 15% & 20% 3.96 *At least 3' average depth 90,710 577 3 20,240 Average Depth = 4.46 Proposed Wet Pond Project Information Project Name: Ashley Heights Project #: 220151-01-001 Designed by: CB Date: Revised by: Date: Checked by: Date: Site Information 8/23/2022 Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 13.55 Acres Impervious Area (IA) = 3.07 Acres Percent Impervious (I) = 22.67 % (Drainage Area) Orifice Sizing Orifice Size = 2.50 in Drawdown Time = 3.67 days less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 144.0 cf Weight: 8986 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 10,783 Ibs Volume of Concrete Req'd: 71.9 cf (Diameter) (Incremental Draw Down Method) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 101.5 cf (4'x4' riser x 4' = 64sf, 5'x5' footing x 1.5'=37.5cf) ,- MAIN POND AREA � CONCRETE � TOP OF � SEEPAGE EMBANKMENT � COLLAR ��� ELEV-41 5.0 i � / � \ � SOD AREAS ABOVE C NORMAL POOL ` � EELVATION � 24" OUTLET PIPE REFER TO GRADING PLAN FES ELEV-410.5 INLET PIPE WITH RIP -RAP APRON -- OUTLET CONTROL 110010000� �/ STRUCTURE REFER � TO DETAILS ON 1 THIS SHEET (\ INV-41 1.0 STORMWATER� MANAGEMENT \ EASEMENT LITORAL SHELF � � � Aa. AREA-3,410 SF � � � L .STORM DRAINAGE � REFER TO DETAIL �� � a -BY OTHERS FOR PLANTINGS � � � � A � � CLASS 2 RIP -RAP COVERED WITH � � � FOREBAY AREA CLASS A RIP -RAP � OVER FILTER FABRIC AT FOREBAY WEIR •d GRAPHIC SCALE sa o zs so iaa 200 PLAN VIEW ( IN FEET ) 1 inch = 50 ft. STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 411.0 28780 0 0 0.5 411.5 30970 14938 14938 1.0 412.0 32320 15823 30760 1,4 412,4 33415 13147 43907 (WQV) 2.0 413.0 35065 20544 64451 3.0 414,0 37725 36395 100846 4.0 415.0 40100 38913 139759 24" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED a1:013 l a to fforl we] ato to] rx�r" ENGINEER 2 1 3' MIN CUTOFF TRENCH APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 31'-24" HDPE @ 1.61 L'i1�111\I II mo i .'"I ' L, "I I inari 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION 6" CLAY SOIL LINER ON INSIDE FACE OF EMBANKMENT 1 6.0'x6.0' SEEPAGE COLLAR SEE DETAIL AMM, ml KEY 6FT LITTORAL SHELF 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF 3 1 INV=411.0 IawMlk1 Itl: ASTM C-923 SEAL BETWEEN BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BARREL 8"X8"X1 "X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND 2—A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL. TRASH RACK REFER TO DETAIL THIS SHEET 6 11 �a a a a a ° ° a a ° a o ° a o a a — a ° REFER TO DETAIL FOR INCREMENTAL WEIR 4'x4' PRECAST CONCRETE RISER (INSTALL STEPS AS NECESSARY) PVC ELBOW SEE DETAIL CONCRETE SHALL BE PLACED IN RISER AFTER ANGLES ARE SECURED TO BASE AND RISER. 2 TOP OF EMBANKMENT ELEVATION=415.0 100 YEAR STORM ELEVATION=414.59 10 YEAR STORM ELEVATION=413.38 2 YEAR STORM ELEVATION=412.66 1 YEAR STORM ELEVATION=412.39 1.0—INCH STORM ELEVATION=411.07 NORMAL POND ELEVATION=411.0 5'x5'x1.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. NOTE: 1.0" STORM ELEVATION IS 411.07 AND INTERMEDIATE WEIR IS ELEVATION 412.40. THERE IS ADDITIONAL STORAGE DESIGNED FROM THE 1.0" STORM ELEVATION TO THE INTERMEDIATE WEIR ELEVATION. NOTE: PUMPS SHALL BE USED TO DRAIN THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=406.0 (BOTTOM OF SEDIMENT STORAGE)=405.0 6" CLAY SOIL LINER MAIN POOL EXISTING GRADE=414.Of 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF 6FT LITTORAL SHELF 3:1 2 � CLASS 2 RIP -RAP COVERED WITH CLASS ARIP-RAP OVER FILTER FABRIC MIN. 4' WEIR AT ELEV=410.0 FOREBAY TOP ELEV= 413.0 WIDTH AT TOP = 2.0 FT BOTTOM OF SEDIMENT STORAGE/EXIT ELEV=408.0 NOTE: PUMPS SHALL BE USED TO DRAIN THE FOREBAY WHEN NECESSARY. REFER TO DETAIL SEDIMENT STORAGE THIS SHEET FOR DEWATERING REQUIREMENTS. TOP FOREBAY BOTTOM ELEV=408.0 NORMAL POND ELEVATION (� �Z/ � /_ -, 'H , , �- 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT FOREBAY ENTRANCE SHALL BE STORAGE/ENTRANCE ELEV=407.0 DEEPER THAN FOREBAY EXIT FOREBAY �op °F we�R ; 4j3 4 IAA r, _ rno OF crgU(_`TURE NOT SHOWN TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR PERM. POND ELEV.-411.0 4" PVC SCREW CAP FOR CLEANING ACCESS 12" 1` 4"x4" PVC I 219 )) DIA. HOLE DRILLE1 INTO BOTTOM CAP SCALE: N.T.S. DICCD CTDI I(`TI IDC PVC DRAIN OUTLET FOR CLARITY SCALE: N.T.S. Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Pond No. 1 - BMP Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 411.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 411.00 28,780 0 0 0.50 411.50 30,970 14,938 14,938 1.00 412.00 32,320 15,823 30,760 1.40 412.40 33,415 13,147 43,907 2.00 413.00 35,065 20,544 64,451 3.00 414.00 37,725 36,395 100,846 4.00 415.00 40,100 38,913 139,759 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 24.00 2.50 0.00 0.00 Span (in) = 24.00 2.50 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 411.00 411.00 0.00 0.00 Length (ft) = 31.00 0.50 0.00 0.00 Slope (%) = 1.61 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 4.00 Ulm RIM M 0.00 7 0.00 3.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 1.00 15.00 0.00 0.00 Crest El. (ft) = 412.40 413.40 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = Rect Broad --- --- Multi-Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 6.00 9.00 Stage / Discharge Elev (ft) 415.00 414.00 413.00 412.00 411.00 12.00 15.00 18.00 21.00 24.00 27.00 Discharge (cfs) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.827 2 732 21,336 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 25.55 2 718 51,102 ------ ------ ------ BMP Post -Developed 3 Reservoir 0.182 2 1442 41,107 2 412.39 43,699 Post Through Pond 5 SCS Runoff 0.194 2 360 2,115 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.010 2 368 1,424 5 411.07 2,070 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 2.gpw Return Period: 1 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 3.827 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 21,336 cuft Drainage area = 13.550 ac Curve number = 62.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 24.00 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre -Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 13.550 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.07 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Post -Developed Hyd. No. 2 -- 1 Year Wednesday, 09 / 28 / 2022 = 25.55 cfs = 718 min = 51,102 cuft = 76.8 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.182 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 41,107 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 412.39 ft Reservoir name = BMP Pond Max. Storage = 43,699 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 3 Hyd No. 2 Total storage used = 43,699 cult A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 5 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 0.194 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 2,115 cuft Drainage area = 13.550 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 BMP Post -Developed Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 60 120 180 240 300 360 420 — Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.010 cfs Storm frequency = 1 yrs Time to peak = 368 min Time interval = 2 min Hyd. volume = 1,424 cuft Inflow hyd. No. = 5 - BMP Post -Developed Max. Elevation = 411.07 ft Reservoir name = BMP Pond Max. Storage = 2,070 cuft Storage Indication method used. Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 n nn 0 600 1200 1800 2400 3000 3600 4200 4800 5400 — Hyd No. 6 — Hyd No. 5 Total storage used = 2,070 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 6000 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 7.688 2 730 35,610 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 36.20 2 718 72,602 ------ ------ ------ BMP Post -Developed 3 Reservoir 0.635 2 1078 60,514 2 412.66 52,822 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 411.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 2.gpw Return Period: 2 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 7.688 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 35,610 cuft Drainage area = 13.550 ac Curve number = 62.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 24.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre -Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 36.20 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 72,602 cuft Drainage area = 13.550 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post -Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.635 cfs Storm frequency = 2 yrs Time to peak = 1078 min Time interval = 2 min Hyd. volume = 60,514 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 412.66 ft Reservoir name = BMP Pond Max. Storage = 52,822 cuft Storage Indication method used Q (cfs) 40.00 20.00 10.00 0.00 0 600 — Hyd No. 3 Post Through Pond Hyd. No. 3 -- 2 Year 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 2 Total storage used = 52,822 cuft Q (cfs) 40.00 30.00 20.00 10.00 1 0.00 6000 Time (min) Hydrograph Summary Report 15 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 21.74 2 730 84,946 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 67.92 2 716 137,646 ------ ------ ------ BMP Post -Developed 3 Reservoir 3.438 2 782 124,895 2 413.38 78,264 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 411.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 2.gpw Return Period: 10 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 13.550 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs) 24.00 20.00 16.00 12.00 m 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Pre -Developed Hyd. No. 1 -- 10 Year Wednesday, 09 / 28 / 2022 = 21.74 cfs = 730 min = 84,946 cuft = 62.4 = 0 ft = 24.00 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 67.92 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 137,646 cuft Drainage area = 13.550 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post -Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 70.00 1 1 1 1 70.00 :'711II1)r.�� i ��MM11 1111 ►��I��I�1c������: ������S��I��I�I 0.00 ' f 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 3.438 cfs Storm frequency = 10 yrs Time to peak = 782 min Time interval = 2 min Hyd. volume = 124,895 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 413.38 ft Reservoir name = BMP Pond Max. Storage = 78,264 cuft Storage Indication method used. Q (cfs) 70.00 40.00 20.00 10.00 0.00 0 600 — Hyd No. 3 Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 Total storage used = 78,264 cult Hydrograph Summary Report 21 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 49.06 2 728 182,325 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 121.39 2 716 251,023 ------ ------ ------ BMP Post -Developed 3 Reservoir 23.97 2 726 237,854 2 414.59 123,812 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 411.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 2.gpw Return Period: 100 Year Wednesday, 09 / 28 / 2022 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 13.550 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Pre -Developed Hyd. No. 1 -- 100 Year Wednesday, 09 / 28 / 2022 = 49.06 cfs = 728 min = 182,325 cuft = 62.4 = 0 ft = 24.00 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 121.39 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 251,023 cuft Drainage area = 13.550 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 BMP Post -Developed Hyd. No. 2 -- 100 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' 1 1 1 1 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 09 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 23.97 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 237,854 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 414.59 ft Reservoir name = BMP Pond Max. Storage = 123,812 cuft Storage Indication method used. Q (cfs) Post Through Pond Hyd. No. 3 -- 100 Year Q (cfs) 0 240 — Hyd No. 3 480 720 Hyd No. 2 960 1200 1440 1680 1920 Time (min) Total storage used = 123,812 cult OF CONCENTRATION ng Conditions DA OPEN CHANNEL SHALLOW CONIC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT1 Manning's Equation: Tc = (0.007ml-y0.8)/(P2"0.5)(s"0.4) 2-year24-hr �SEGMENTI Tc = L / 60'V V = 1.49R21IS112/ n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's T' Length Elev2 Elev3 Slope Condition Vavg T12 Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T�, T IL Tc(minimum) Tlag Basin fl fl/fl TP-40 in fl flAt TR-55 Fig. 3-1 fl/sec Flow Area (fl-2) (fl fl fl fl/fl (fps) 10 min 0.67c hrs 1 100 437.9 435.5 0.024 3.71 0.24 12.32 1556 435.5 406 0.01896 Unpaved 2.23 11.63 23.95 23.95 0.24 1 WATER QUALITY/QUANTITY WET POND SCM #3 OWAIWO 3MOH OVOtl NOIIVA8353tl }- a ue�� w ,�" S LHDIHII JL3IHSt G 7 3Av�S OL S.LN3W3AOUJWi II"III e i SlIV13a 1N3W30VNVW 831VMWa01S W(A— •,. �' ,. �:` 1F5A.::4a +� I'}Sr:i a< ,i''► _ // I/�'�r^ /�j,�, —�—�' . � �,•IYeI`r ;� s���+,}L %•ll,�iF�! �(PZ I. ,r fir. , . `, i ;•f�--.� •-__• _ .`. ,/rf��IAA —17 le ji SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Utility Improvements to Serve Ashley Heights 2 Project Area ac 91.286 _ 3 Coastal Wetland Area ac - 4 Surface Water Area ac - 5 Is this project High or Low Density? High 6 jDoes this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is pro2osed in the setback does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this.project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 0 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 _ Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 _ _ Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 28 Name and Title: _ Organization: Street address: Carlo Pardo, PE Bowman North Carolina, Ltd. 29 4006 Barrett Drive, Suite 104 30 City, State, Zip: Raleigh, NC 27609 31 Phone number(s): Email: 919-553-6570 32 cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ,�1111flllllil"t.11 o s s ' a,y •. 4 SEAL 051571 - 1�+0 I E 1�a_ Signature of Designer Date DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so, number of drainage areas/SCMs 3 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site 1 2 3 4 T e of SCM - Infiltration Basin Wet Pond Wet Pond 5 Total draina a area s ft 3976419 sf 519352 sf 590407 sf 2729441 sf 6 Onsite draina a areas ft 519052 sf 590407 sf 2619583 sf 7 Offsite draina a area s ft 300 sf 109858 sf 8 Total BUA in project (sq ft 768212 sf 102967 sf 133829 sf 641574 sf 9permitting) New BUA on subdivided lots (subject to s ft 528000 sf 68000 sf 92000 sf 368000 sf 10permitting) New BUA not on subdivided lots (subject to s 240212 sf 34667 sf 41829 sf 163716 sf 11 10ffsite BUA (sq ft 300 sf 109858 sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 34418 sf 4896 sf 5822 sf 23700 sf Roof (sq ft Roadway s ft 205794 sf 29771 sf 36007 sf 140016 sf Future (sq ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19.32% 19.84% 22.67% 23.51% 19 Design storm inches 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 10232 cf 43908 cf 163392 cf 21 Calculation method for design volume Simple Method Simple Method Simple Method DDITIONAL INFORMATION Please use this space to provide any additional information about the r22drainage area(s): WET POND 1 11 Drainage area number 2 3 21 Minimum required treatment volume (cu ft) 12497 cf 59491 cf NERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 151 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 161 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed b an NC licensedprofessional? Yes Yes WET POND MDC FROM 02H .1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 405.00 409.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 406.00 410.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 410.50 414.50 23 Elevation of the permanent pool (fmsl) 411.00 415.00 24 Elevation of the top of the vegetated shelf (fmsl) 411.50 415.50 25 Elevation of the temporary pool (fmsl) 412.40 417.10 26 Surface area of the main permanent pool (square feet) 21945 56230 27 Volume of the main permanent pool (cubic feet) 90710 cf 245796 cf 28 Average depth of the main pool (feet) 4.46 ft 4.61 ft 29 Average depth equation used Equation 3 Equation 3 301 If using equation 3, main pool perimeter (feet) 577.0 ft 1051.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 3.0 ft 32 Volume of the forebay (cubic feet) 14673 cf 43558 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 36 in 48 in 35 Design volume of SCM (cu ft) 43908 cf 163392 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 371 If orifice, orifice diameter (inches) 2.50 in 4.50 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 3.67 3.78 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? Yes Yes 431 Depth of forebay at entrance (inches) 48 in 60 in 44 Depth of forebay at exit (inches) 36 in 48 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 Hasa planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 10:32 AM 2/27/2023 Bowman North Carolina, Ltd. Ashley Heights, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions Drainage Area (acres): 62.66 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor Sand 21.42 34% C BaB Blaney Loamy Sand 34.58 55% C GdB Gilead Loamy Sand 0.00 0% C VaB Vaucluse Loamy Sand 6.67 11% Existing Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good Stand A 21.42 25 8.5 Wooded - Good Stand C 41.24 70 46.1 Cumulative Curve # = 54.6 Bowman North Carolina, Ltd. Ashley Heights, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions Drainage Area (acres): 62.66 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor Sand 21.42 34% C BaB Blaney Loamy Sand 34.58 55% C GdB Gilead Loamy Sand 0.00 0% C VaB Vaucluse Loamy Sand 6.67 11% Proposed Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 11.09 55 9.7 Open Space - Good Condition C 26.42 74 31.2 Wooded - Good Stand A 3.76 25 1.5 Wooded - Good Stand C 6.67 70 7.4 Impervious Area A/C 14.73 98 23.0 Cumulative Curve # = 72.9 Proposed Wet Pond Project Information Project Name: Ashley Heights Project #: 220151-01-001 Designed by: CID Date: Revised by: Date: Checked by: Date: 2/27/2023 Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 62.66 Acres 2,729,441 sf Impervious Area (IA) = 14.73 Acres 641,574 sf Percent Impervious (1) = 23.51 % 23.51 % Required Surface Area Permament Pool Depth: 4.61 ft SA/DA = 0.725 Min Req'd Surface Area = 19,777 sf (at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.262 in/in Storage Volume Required = 59,491 cf (above Permanent Pool) Elevations Top of Pond Elevation = 421.00 ft Temporary Pool Elevation = 417.10 ft Permanent Pool Elevation = 415.00 ft Shelf Begining Elevation = 415.50 ft Forebay Weir = 414.00 ft Shelf Ending Elevation = 414.50 ft Bottom Elevation = 410.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 56,230 sf Volume of Temporary Storage = 163,392 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Volume of Storage for Design Storm = 163,392 ( 56230 > 19777 ) sf Yes ( 163392 > 59491 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Name: Ashley Heights Project #: 220151-01-001 Designed by: CID Date: 2/27/2023 Checked by: Date: Water Quality Orifice Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Q3 = 0.0437 CD - D2 (Z-D/24-Ei)^(1/2) Qz = 0.372 CD ' D'(Z-Ei)^(3i2) m • Orifice Diameter (D) = / ' in Cd = 0.6 Ei = 415 Orifice Inv. Zone 1 Range = 0.00 to 415 Zone 2 Range = 415 to 415.1 Zone 3 Range = 415.1 to 416 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 415.00 71,000 0 0.00 2.00 0.000 -- 415.50 75135 36,534 0.50 3.00 0.297 2,051 416.00 77720 38,214 0.50 3.00 0.479 1,331 417.00 1 82930 80,325 1.00 3.00 0.715 1,873 417.10 83455 8,319 0.10 3.00 0.734 189 Total -- 163,392 -- -- -- 5,444 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 163,392 of Total Time = 5,444 min Total Time = 3.78 days 2/27/2023 Prop Wet Pond- new design (Ashley Heights) - 3.xls 1 of 1 Project: Pond #1 Date: 9/28/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 415 56,230 27,334 245,796 A2 (Perm -Pool) 414.5 53,105 26,295 218,463 Al (Bottom -Shelf) 414 52,075 51,055 192,168 413 50,035 49,030 141,113 412 48,025 47,030 92,083 411 46,035 45,053 45,053 410 44,070 0 0 A3 (Bottom -Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 415 8,305 5,535 13,840 6,751 43,558 414.5 7,925 5,240 13,165 6,419 36,806 414 7,555 4,955 12,510 11,875 30,388 413 6,835 4,405 11,240 10,630 18,513 412 6,140 3,880 10,020 7,883 7,883 411 4,060 1,685 5,745 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) 17.7% *Between 15% & 20% 4.11 *At least 3' average depth Vpp 245,796 permeter of shelf 1051 width of shelf 3 Al (Bottom -Shelf): 53,105 Average Depth = 4.61 Proposed Wet Pond Project Information Project Name: Ashley Heights Project #: 220151-01-001 Designed by: CID Date: Revised by: Date: Checked by: Date: Site Information 2/27/2023 Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 62.66 Acres Impervious Area (IA) = 14.73 Acres Percent Impervious (I) = 23.51 % (Drainage Area) Orifice Sizing Orifice Size = 4.50 in Drawdown Time = 3.78 days less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 176.0 cf Weight: 10982 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 13,179 Ibs Volume of Concrete Req'd: 87.9 cf (Diameter) (Incremental Draw Down Method) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 133.5 cf (4'x4' riser x 6' = 96sf, 5'x5' footing x 1.5'=37.5cf) SOD AREAS ABOVE 0 10 NORMAL POOEELVATION L MAIN POND'. � AREA 24)) OUTLET PIPE� REFER TO GRADING\\� PLAN' FES E LE V_ 414.6 CONCRETE SEEPAGE COLLAR We OUTLET CONTROL STRUCTURE REFER TO DETAILS ON THIS SHEET INV_415.0 STORMWATER MANAGEMENT EASEMENT I I CLASS 2 RIP -RAP � y' COVERED WITH � CLASS A RIP -RAP OVER FILTER FABRIC AT FOREBAY WEIR " �",, � al -14 N � m � Me I � 04 TOP OF EMBANKMENT ELEV-421.0 IT60011112 a LITORAL SHELF AREA-6,255 SF REFER TO DETAIL FOR PLANTINGS 40 80 160 320 ( IN FEET ) STORM DRAINAGE � BY OTHERS 1,7 STORMWATER MANAGEMENT � EASEMENT INLET PIPE WITH RIP -RAP APRON � v CLASS 2 RIP -RAP COVERED WITH CLASS A RIP -RAP � OVER FILTER FABRIC AT FOREBAY WEIR FOREBAY AREA INLET PIPE WITH RIP —RAP APRON lo/ STORM DRAINAGE � BY OTHERS PLAN VIEW 1 inch = 80 ft. STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 415.0 71000 0 0 0.5 415.5 75135 36534 36534 1.0 416.0 77720 38214 74748 2.0 417.0 82930 80325 155073 2.1 417.1 83455 8319 163392(WQV) 3.0 418.0 87800 77065 240457 4.0 419.0 91825 89813 330269 5.0 420.0 95910 93868 424137 6.0 421.0 100055 97983 522119 STORMWATER MANAGEMENT DESIGN WET DETENTION POND #3: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC PROJECT COORDINATES: ff MAN all LUMBER QUEWHIFFLE 14-2-14 C 0304020302 35.942670N) CREEK - 79,36 6191 OW DRAINAGE AREA TO POND: 62.66 ACRES SITE IMPERVIOUS AREA TO POND: 12.21 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 2.52 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 14.73 ACRES PRE -DEVELOPED TO POND POST -DEVELOPED TO POND POST DEVELOPED THROUGH POND DRAINAGE AREA: 62.66 AC 62.66 AC CURVE NUMBER: 54.6 72.9 TIME OF CONCENTRATION: 31.9 MIN 5,0 MIN 1.0" STORM EVENT: 0.501 CFS 0.006 CFS 1-YEAR STORM EVENT: 3.507 CFS 94.73 CFS 0.704 CFS 2-YEAR STORM EVENT: 11.24 CFS 140,37 CFS 3.489 CFS 10-YEAR STORM EVENT: 51.23 CFS 277.73 CFS 21.83 CFS 100-YEAR STORM EVENT: 145.9 CFS 520.17 CFS 117.08 CFS 36" 4' MIN EMBANKMENT WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION 24" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER CUTOFF TRENCH APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 37'-24" HDPE @ 1.08% pj � 6° CLAY SOIL LINER ON INSIDE FACE OF EMBANKMENT 3' MIN 6.0'x6.0' SEEPAGE COLLAR SEE DETAIL 6FT LITTORAL SH ELF 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF N TRASH RACK REFER TO DETAIL THIS SHEET 6 �1 REFER TO DETAIL FOR INCREMENTAL WEIR 4'x4' PRECAST CONCRETE RISER (INSTALL STEPS AS NECESSARY) TOP OF EMBANKMENT ELEVATION=421.0 100 YEAR STORM ELEVATION=420.89 10 YEAR STORM ELEVATION=418.45 2 YEAR STORM ELEVATION=417.37 1 YEAR STORM ELEVATION=417.09 NOTE: 1.0" STORM ELEVATION IS 415.05 AND INTERMEDIATE WEIR IS ELEVATION 417.1. THERE IS ADDITIONAL STORAGE DESIGNED FROM THE 1.0" STORM ELEVATION TO THE INTERMEDIATE WEIR ELEVATION. 1.0—INCH STORM ELEVATION=415.05 EXISTING GRADE=422.Of INV=415.0 NORMAL POND ELEVATION=415.0 ol ° < -' ' • PVC ELBOW d. SEE DETAIL ELEV=413.0 ° 4 V ' "° = ° 2 ° : NOTE: PUMPS SHALL BE USED TO DRAIN 1 .° 1 THE POND WHEN NECESSARY. REFER TO DETAIL 1 THIS SHEET FOR DEWATERING REQUIREMENTS. 4' VIIN. ASTM C-923 SEAL KEY BETWEEN BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=410.0 BARREL CONCRETE SHALL BE 8"X8"X1"X12" LONG ANGLE(6 TOT. REQUIRED) TO ANCHOR RISER TO ANGLES ARE SECURED PLACED IN RISER AFTER (BOTTOM OF SEDIMENT STORAGE)=409.0 BASE. PROVIDE 2 3/4,A307 BOLTS FROM ANGLE TO RISER AND TO BASE AND RISER. 2—A307 J HOOKS 3/4„ DIA. X 12 LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL. 6" CLAY SOIL 5'x5'x1.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP LINER AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE MAIN POOL BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF 6FT LITTORAL SHELF 2 6: . 3:1 CLASS 2 RIP -RAP COVERED WITH CLASS A RIP -RAP OVER FILTER FABRIC MIN. 4' WEIR AT ELEV=414.0 FOREBAY TOP ELEV= 417.0 WIDTH AT TOP = 2.0 FT BOTTOM OF SEDIMENT STORAGE/EXIT ELEV=413.0 NOTE: PUMPS SHALL BE USED TO DRAIN THE FOREBAY WHEN NECESSARY. REFER TO DETAIL SEDIMENT STORAGE THIS SHEET FOR DEWATERING REQUIREMENTS. TOP FOREBAY BOTTOM ELEV=411.0 FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT NORMAL POND ELEVATION BOTTOM LITTORAL SHELF ELEV. FOREBAY 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=410.0 1A/ _ PERM. POND ELEV. rno nr crgUCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR 415.0 6" PVC SCREW CAP FOR CLEANING ACCESS 6"x6" PVC 1 41))2DIA. HOLE DRILLED INTO BOTTOM CAP SCALE: N.T.S. DICE-D OTDI 10TI IDC PVC DRAIN OUTLET SCALE: N.T.S. FLOW LONG TOP OF EMBANKMENT SPILLWAY Q(l 00) SLOPE(%) H B W SS CHANNEL LINING ELEVATION SPILLWAY ELEVATION 117.08 STRAW WITH NET NAG SPILLWAY CFS 5.00% 1.0' 30.0' 36.0' 3:1 SHOREMAX W/ P300 421.0 420.0 EXTEND LINING TO TOP OF SPILLWAY s� H MATTING SHALL BE AS NOTED OR APPROVED EQUAL. W EXTEND LINING TO TOP OF SPILLWAY CHANNEL LINING I GRASS SPILLWAY DETAIL C�D TOP OF EMBANKMENT-421.0 SPILLWAY ELEVATION-420.0 GRASS SOD ON SPILLWAY AND SIDE SLOPES Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 117.08 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,022,026 cuft Inflow hyd. No. = 2 - BMP Post-Developgdservoir name = BMP Pond Max. Elevation = 420.89 ft Max. Storage = 511,198 cuft Storage Indication method used. Hydrograph Discharge Table (Printed values>=1.00% ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.77 180.21 417.21 1.474 0.698 ----- ----- 0.744 ----- ----- ----- ----- 1.442 11.80 221.13 417.49 5.479 0.648 ----- ----- 4.793 ----- ----- ----- ----- 5.441 11.83 281.92 417.82 12.76 0.452 ----- ----- 12.31 ----- ----- ----- ----- 12.76 11.87 359.80 418.24 19.55 0.361 ----- ----- 19.19 ----- ----- ----- ----- 19.55 11.90 450.20 418.75 24.24 0.227 ----- ----- 20.97 3.035 ----- ----- ----- 24.24 11.93 520.17 << 419.35 27.45 0.126 ----- ----- 19.00 8.309 ----- ----- ----- 27.44 11.97 510.46 419.97 30.04 0.085 ----- ----- 18.51 11.42 ----- ----- ----- 30.02 12.00 404.86 420.48 31.94 0.068 ----- ----- 18.56 13.28 32.87 ----- ----- 64.78 12.03 256.43 420.78 33.02 0.060 ----- ----- 18.69 14.25 68.71 ----- ----- 101.72 12.07 141.92 420.89 << 33.40 0.058 ----- ----- 18.73 14.57 83.72 ----- ----- 117.08 12.10 88.44 420.89 33.39 0.058 ----- ----- 18.73 14.56 83.43 ----- ----- 116.78 12.13 72.87 420.85 33.25 0.059 ----- ----- 18.72 14.45 77.80 ----- ----- 111.03 12.17 69.89 420.80 33.10 0.060 ----- ----- 18.71 14.33 71.62 ----- ----- 104.72 12.20 67.05 420.76 32.95 0.061 ----- ----- 18.68 14.19 66.29 ----- ----- 99.22 12.23 64.19 420.72 32.82 0.062 ----- ----- 18.65 14.07 61.36 ----- ----- 94.13 12.27 61.31 420.69 32.69 0.062 ----- ----- 18.63 13.96 56.86 ----- ----- 89.50 12.30 58.41 420.65 32.57 0.063 ----- ----- 18.62 13.85 52.78 ----- ----- 85.32 12.33 55.49 420.62 32.46 0.064 ----- ----- 18.61 13.76 48.88 ----- ----- 81.31 12.37 52.55 420.59 32.35 0.065 ----- ----- 18.60 13.66 45.23 ----- ----- 77.55 12.40 49.60 420.56 32.24 0.066 ----- ----- 18.59 13.56 41.86 ----- ----- 74.08 Continues on next page... 12 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.43 46.63 420.53 32.13 0.066 ----- ----- 18.58 13.46 38.56 ----- ----- 70.67 12.47 43.63 420.50 32.03 0.067 ----- ----- 18.57 13.37 35.31 ----- ----- 67.32 12.50 40.63 420.47 31.92 0.068 ----- ----- 18.55 13.27 32.40 ----- ----- 64.29 12.53 37.86 420.44 31.82 0.069 ----- ----- 18.54 13.16 29.50 ----- ----- 61.27 12.57 35.78 420.41 31.71 0.069 ----- ----- 18.52 13.06 26.68 ----- ----- 58.33 12.60 34.49 420.39 31.62 0.070 ----- ----- 18.51 12.97 24.14 ----- ----- 55.69 12.63 33.66 420.36 31.52 0.071 ----- ----- 18.51 12.89 21.92 ----- ----- 53.39 12.67 33.00 420.34 31.44 0.072 ----- ----- 18.51 12.81 19.86 ----- ----- 51.25 12.70 32.33 420.32 31.36 0.072 ----- ----- 18.52 12.74 17.95 ----- ----- 49.27 12.73 31.65 420.30 31.28 0.073 ----- ----- 18.52 12.67 16.21 ----- ----- 47.47 12.77 30.98 420.28 31.21 0.074 ----- ----- 18.51 12.60 14.80 ----- ----- 45.99 12.80 30.30 420.26 31.15 0.074 ----- ----- 18.51 12.54 13.46 ----- ----- 44.58 12.83 29.62 420.24 31.08 0.075 ----- ----- 18.51 12.48 12.18 ----- ----- 43.24 12.87 28.94 420.23 31.02 0.076 ----- ----- 18.51 12.42 10.96 ----- ----- 41.96 12.90 28.26 420.21 30.96 0.076 ----- ----- 18.51 12.36 9.788 ----- ----- 40.74 12.93 27.58 420.20 30.91 0.077 ----- ----- 18.51 12.31 8.726 ----- ----- 39.62 12.97 26.89 420.18 30.85 0.077 ----- ----- 18.51 12.25 7.882 ----- ----- 38.72 13.00 26.20 420.17 30.80 0.078 ----- ----- 18.51 12.19 7.053 ----- ----- 37.83 13.03 25.54 420.15 30.74 0.078 ----- ----- 18.50 12.14 6.237 ----- ----- 36.96 13.07 24.99 420.14 30.69 0.079 ----- ----- 18.50 12.09 5.440 ----- ----- 36.11 13.10 24.53 420.13 30.64 0.079 ----- ----- 18.50 12.03 4.667 ----- ----- 35.28 13.13 24.15 420.11 30.59 0.080 ----- ----- 18.50 11.98 3.921 ----- ----- 34.48 13.17 23.78 420.10 30.54 0.080 ----- ----- 18.49 11.94 3.203 ----- ----- 33.71 13.20 23.41 420.09 30.50 0.081 ----- ----- 18.50 11.89 2.801 ----- ----- 33.27 13.23 23.04 420.08 30.45 0.081 ----- ----- 18.50 11.84 2.421 ----- ----- 32.84 13.27 22.67 420.06 30.40 0.082 ----- ----- 18.50 11.79 2.043 ----- ----- 32.42 13.30 22.30 420.05 30.36 0.082 ----- ----- 18.50 11.75 1.667 ----- ----- 32.00 13.33 21.93 420.04 30.31 0.083 ----- ----- 18.50 11.70 1.293 ----- ----- 31.58 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.37 21.56 420.03 30.27 0.083 ----- ----- 18.50 11.65 0.920 ----- ----- 31.16 13.40 21.19 420.02 30.22 0.083 ----- ----- 18.50 11.61 0.550 ----- ----- 30.74 13.43 20.82 420.01 30.18 0.084 ----- ----- 18.51 11.56 0.180 ----- ----- 30.33 13.47 20.44 419.99 30.13 0.084 ----- ----- 18.51 11.51 ----- ----- ----- 30.10 13.50 20.07 419.98 30.08 0.085 ----- ----- 18.51 11.46 ----- ----- ----- 30.06 13.53 19.70 419.97 30.03 0.086 ----- ----- 18.51 11.41 ----- ----- ----- 30.01 13.57 19.37 419.95 29.98 0.086 ----- ----- 18.52 11.35 ----- ----- ----- 29.95 13.60 19.08 419.94 29.92 0.087 ----- ----- 18.52 11.29 ----- ----- ----- 29.90 13.63 18.81 419.93 29.87 0.088 ----- ----- 18.52 11.23 ----- ----- ----- 29.85 13.67 18.54 419.91 29.81 0.088 ----- ----- 18.53 11.18 ----- ----- ----- 29.79 13.70 18.27 419.90 29.76 0.089 ----- ----- 18.53 11.11 ----- ----- ----- 29.73 13.73 18.00 419.88 29.70 0.090 ----- ----- 18.54 11.05 ----- ----- ----- 29.68 13.77 17.74 419.87 29.64 0.090 ----- ----- 18.54 10.98 ----- ----- ----- 29.62 13.80 17.47 419.85 29.58 0.091 ----- ----- 18.55 10.92 ----- ----- ----- 29.56 13.83 17.20 419.84 29.51 0.092 ----- ----- 18.56 10.85 ----- ----- ----- 29.50 13.87 16.93 419.82 29.45 0.093 ----- ----- 18.56 10.78 ----- ----- ----- 29.44 13.90 16.66 419.81 29.39 0.094 ----- ----- 18.57 10.71 ----- ----- ----- 29.37 13.93 16.39 419.79 29.32 0.094 ----- ----- 18.58 10.64 ----- ----- ----- 29.31 13.97 16.12 419.77 29.25 0.095 ----- ----- 18.59 10.56 ----- ----- ----- 29.24 14.00 15.85 419.76 29.18 0.096 ----- ----- 18.60 10.48 ----- ----- ----- 29.18 14.03 15.60 419.74 29.11 0.097 ----- ----- 18.61 10.40 ----- ----- ----- 29.11 14.07 15.40 419.72 29.04 0.098 ----- ----- 18.62 10.32 ----- ----- ----- 29.04 14.10 15.26 419.70 28.97 0.099 ----- ----- 18.63 10.24 ----- ----- ----- 28.97 14.13 15.16 419.69 28.90 0.100 ----- ----- 18.64 10.15 ----- ----- ----- 28.89 14.17 15.06 419.67 28.82 0.102 ----- ----- 18.65 10.07 ----- ----- ----- 28.82 14.20 14.97 419.65 28.75 0.103 ----- ----- 18.66 9.977 ----- ----- ----- 28.74 14.23 14.88 419.63 28.68 0.104 ----- ----- 18.67 9.889 ----- ----- ----- 28.67 14.27 14.79 419.62 28.60 0.105 ----- ----- 18.69 9.801 ----- ----- ----- 28.59 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.30 14.70 419.60 28.53 0.106 ----- ----- 18.70 9.711 ----- ----- ----- 28.52 14.33 14.60 419.58 28.46 0.107 ----- ----- 18.71 9.618 ----- ----- ----- 28.44 14.37 14.51 419.56 28.38 0.109 ----- ----- 18.73 9.524 ----- ----- ----- 28.36 14.40 14.42 419.55 28.30 0.110 ----- ----- 18.75 9.429 ----- ----- ----- 28.29 14.43 14.33 419.53 28.23 0.111 ----- ----- 18.77 9.335 ----- ----- ----- 28.21 14.47 14.23 419.51 28.15 0.112 ----- ----- 18.78 9.241 ----- ----- ----- 28.14 14.50 14.14 419.49 28.08 0.114 ----- ----- 18.80 9.143 ----- ----- ----- 28.06 14.53 14.05 419.47 28.00 0.115 ----- ----- 18.83 9.041 ----- ----- ----- 27.98 14.57 13.96 419.46 27.92 0.117 ----- ----- 18.85 8.939 ----- ----- ----- 27.90 14.60 13.86 419.44 27.84 0.118 ----- ----- 18.87 8.837 ----- ----- ----- 27.83 14.63 13.77 419.42 27.76 0.120 ----- ----- 18.89 8.735 ----- ----- ----- 27.75 14.67 13.68 419.40 27.69 0.121 ----- ----- 18.92 8.633 ----- ----- ----- 27.67 14.70 13.58 419.38 27.60 0.123 ----- ----- 18.94 8.524 ----- ----- ----- 27.59 14.73 13.49 419.37 27.52 0.125 ----- ----- 18.97 8.413 ----- ----- ----- 27.51 14.77 13.40 419.35 27.44 0.126 ----- ----- 19.00 8.302 ----- ----- ----- 27.43 14.80 13.30 419.33 27.36 0.128 ----- ----- 19.03 8.191 ----- ----- ----- 27.35 14.83 13.21 419.31 27.28 0.130 ----- ----- 19.06 8.080 ----- ----- ----- 27.27 14.87 13.11 419.29 27.20 0.132 ----- ----- 19.09 7.966 ----- ----- ----- 27.19 14.90 13.02 419.28 27.11 0.134 ----- ----- 19.13 7.844 ----- ----- ----- 27.11 14.93 12.93 419.26 27.03 0.136 ----- ----- 19.17 7.722 ----- ----- ----- 27.02 14.97 12.83 419.24 26.94 0.138 ----- ----- 19.20 7.599 ----- ----- ----- 26.94 15.00 12.74 419.22 26.86 0.140 ----- ----- 19.24 7.477 ----- ----- ----- 26.86 15.03 12.64 419.20 26.77 0.142 ----- ----- 19.27 7.354 ----- ----- ----- 26.77 15.07 12.55 419.19 26.69 0.144 ----- ----- 19.32 7.222 ----- ----- ----- 26.68 15.10 12.46 419.17 26.60 0.146 ----- ----- 19.36 7.086 ----- ----- ----- 26.59 15.13 12.36 419.15 26.51 0.149 ----- ----- 19.41 6.951 ----- ----- ----- 26.50 15.17 12.27 419.13 26.42 0.151 ----- ----- 19.45 6.815 ----- ----- ----- 26.41 15.20 12.17 419.11 26.33 0.153 ----- ----- 19.49 6.679 ----- ----- ----- 26.33 Continues on next page... 15 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.23 12.08 419.10 26.24 0.156 ----- ----- 19.54 6.540 ----- ----- ----- 26.24 15.27 11.98 419.08 26.15 0.159 ----- ----- 19.60 6.388 ----- ----- ----- 26.14 15.30 11.89 419.06 26.05 0.162 ----- ----- 19.65 6.237 ----- ----- ----- 26.05 15.33 11.79 419.04 25.96 0.164 ----- ----- 19.71 6.085 ----- ----- ----- 25.96 15.37 11.70 419.02 25.87 0.167 ----- ----- 19.76 5.934 ----- ----- ----- 25.86 15.40 11.60 419.01 25.77 0.170 ----- ----- 19.82 5.782 ----- ----- ----- 25.77 15.43 11.51 418.99 25.67 0.173 ----- ----- 19.88 5.611 ----- ----- ----- 25.67 15.47 11.41 418.97 25.56 0.177 ----- ----- 19.95 5.432 ----- ----- ----- 25.56 15.50 11.32 418.95 25.46 0.181 ----- ----- 20.03 5.252 ----- ----- ----- 25.46 15.53 11.22 418.93 25.35 0.184 ----- ----- 20.10 5.073 ----- ----- ----- 25.35 15.57 11.12 418.91 25.25 0.188 ----- ----- 20.17 4.894 ----- ----- ----- 25.25 15.60 11.03 418.89 25.14 0.192 ----- ----- 20.24 4.704 ----- ----- ----- 25.14 15.63 10.93 418.87 25.02 0.196 ----- ----- 20.33 4.498 ----- ----- ----- 25.02 15.67 10.84 418.86 24.91 0.200 ----- ----- 20.42 4.292 ----- ----- ----- 24.91 15.70 10.74 418.84 24.79 0.205 ----- ----- 20.50 4.085 ----- ----- ----- 24.79 15.73 10.65 418.82 24.68 0.209 ----- ----- 20.59 3.880 ----- ----- ----- 24.68 15.77 10.55 418.80 24.56 0.213 ----- ----- 20.68 3.671 ----- ----- ----- 24.56 15.80 10.45 418.78 24.43 0.219 ----- ----- 20.80 3.416 ----- ----- ----- 24.43 15.83 10.36 418.76 24.30 0.225 ----- ----- 20.91 3.162 ----- ----- ----- 24.30 15.87 10.26 418.74 24.17 0.230 ----- ----- 21.03 2.908 ----- ----- ----- 24.17 15.90 10.17 418.72 24.04 0.236 ----- ----- 21.15 2.655 ----- ----- ----- 24.04 15.93 10.07 418.71 23.91 0.241 ----- ----- 21.27 2.403 ----- ----- ----- 23.91 15.97 9.972 418.69 23.77 0.248 ----- ----- 21.39 2.134 ----- ----- ----- 23.77 16.00 9.876 418.67 23.62 0.254 ----- ----- 21.51 1.857 ----- ----- ----- 23.62 16.03 9.786 418.65 23.47 0.261 ----- ----- 21.62 1.582 ----- ----- ----- 23.47 16.07 9.715 418.63 23.32 0.268 ----- ----- 21.74 1.307 ----- ----- ----- 23.32 16.10 9.665 418.61 23.17 0.274 ----- ----- 21.86 1.035 ----- ----- ----- 23.17 16.13 9.627 418.60 23.02 0.281 ----- ----- 21.95 0.791 ----- ----- ----- 23.02 Continues on next page... 16 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.17 9.593 418.58 22.88 0.286 ----- ----- 21.94 0.644 ----- ----- ----- 22.87 16.20 9.560 418.56 22.73 0.292 ----- ----- 21.94 0.499 ----- ----- ----- 22.73 16.23 9.527 418.54 22.58 0.297 ----- ----- 21.93 0.355 ----- ----- ----- 22.58 16.27 9.493 418.53 22.44 0.303 ----- ----- 21.92 0.212 ----- ----- ----- 22.44 16.30 9.459 418.51 22.29 0.308 ----- ----- 21.91 0.070 ----- ----- ----- 22.29 16.33 9.426 418.49 22.15 0.312 ----- ----- 21.84 0.000 ----- ----- ----- 22.15 16.37 9.393 418.47 22.01 0.316 ----- ----- 21.70 0.000 ----- ----- ----- 22.01 16.40 9.359 418.46 21.88 0.320 ----- ----- 21.56 0.000 ----- ----- ----- 21.88 16.43 9.326 418.44 21.74 0.323 ----- ----- 21.42 0.000 ----- ----- ----- 21.74 16.47 9.292 418.42 21.61 0.326 ----- ----- 21.28 0.000 ----- ----- ----- 21.61 16.50 9.258 418.41 21.47 0.330 ----- ----- 21.14 0.000 ----- ----- ----- 21.47 16.53 9.225 418.39 21.32 0.333 ----- ----- 20.98 ----- ----- ----- ----- 21.32 16.57 9.191 418.38 21.14 0.336 ----- ----- 20.80 ----- ----- ----- ----- 21.14 16.60 9.158 418.36 20.96 0.339 ----- ----- 20.62 ----- ----- ----- ----- 20.96 16.63 9.124 418.34 20.78 0.342 ----- ----- 20.44 ----- ----- ----- ----- 20.78 16.67 9.090 418.33 20.61 0.345 ----- ----- 20.27 ----- ----- ----- ----- 20.61 16.70 9.056 418.31 20.44 0.347 ----- ----- 20.09 ----- ----- ----- ----- 20.44 16.73 9.023 418.30 20.27 0.350 ----- ----- 19.92 ----- ----- ----- ----- 20.27 16.77 8.989 418.28 20.08 0.353 ----- ----- 19.73 ----- ----- ----- ----- 20.08 16.80 8.955 418.27 19.90 0.356 ----- ----- 19.55 ----- ----- ----- ----- 19.90 16.83 8.921 418.25 19.72 0.359 ----- ----- 19.36 ----- ----- ----- ----- 19.72 16.87 8.888 418.24 19.55 0.362 ----- ----- 19.18 ----- ----- ----- ----- 19.54 16.90 8.854 418.23 19.37 0.364 ----- ----- 19.01 ----- ----- ----- ----- 19.37 16.93 8.820 418.21 19.20 0.367 ----- ----- 18.83 ----- ----- ----- ----- 19.20 16.97 8.787 418.20 19.02 0.370 ----- ----- 18.65 ----- ----- ----- ----- 19.02 17.00 8.752 418.18 18.84 0.373 ----- ----- 18.46 ----- ----- ----- ----- 18.84 17.03 8.718 418.17 18.65 0.375 ----- ----- 18.28 ----- ----- ----- ----- 18.65 17.07 8.684 418.16 18.47 0.378 ----- ----- 18.09 ----- ----- ----- ----- 18.47 Continues on next page... 17 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.10 8.651 418.14 18.29 0.381 ----- ----- 17.91 ----- ----- ----- ----- 18.29 17.13 8.617 418.13 18.12 0.383 ----- ----- 17.73 ----- ----- ----- ----- 18.12 17.17 8.582 418.12 17.94 0.386 ----- ----- 17.56 ----- ----- ----- ----- 17.94 17.20 8.548 418.11 17.77 0.389 ----- ----- 17.38 ----- ----- ----- ----- 17.77 17.23 8.514 418.09 17.60 0.391 ----- ----- 17.20 ----- ----- ----- ----- 17.59 17.27 8.480 418.08 17.41 0.394 ----- ----- 17.01 ----- ----- ----- ----- 17.41 17.30 8.446 418.07 17.22 0.396 ----- ----- 16.83 ----- ----- ----- ----- 17.22 17.33 8.412 418.06 17.04 0.399 ----- ----- 16.64 ----- ----- ----- ----- 17.04 17.37 8.378 418.05 16.87 0.401 ----- ----- 16.46 ----- ----- ----- ----- 16.87 17.40 8.344 418.04 16.69 0.404 ----- ----- 16.29 ----- ----- ----- ----- 16.69 17.43 8.310 418.03 16.52 0.406 ----- ----- 16.11 ----- ----- ----- ----- 16.52 17.47 8.276 418.01 16.35 0.409 ----- ----- 15.94 ----- ----- ----- ----- 16.35 17.50 8.241 418.00 16.19 0.411 ----- ----- 15.77 ----- ----- ----- ----- 16.18 17.53 8.207 417.99 16.00 0.413 ----- ----- 15.59 ----- ----- ----- ----- 16.00 17.57 8.173 417.98 15.81 0.416 ----- ----- 15.40 ----- ----- ----- ----- 15.81 17.60 8.139 417.97 15.63 0.418 ----- ----- 15.21 ----- ----- ----- ----- 15.63 17.63 8.105 417.96 15.44 0.420 ----- ----- 15.02 ----- ----- ----- ----- 15.44 17.67 8.071 417.95 15.26 0.423 ----- ----- 14.84 ----- ----- ----- ----- 15.26 17.70 8.036 417.94 15.09 0.425 ----- ----- 14.66 ----- ----- ----- ----- 15.09 17.73 8.001 417.93 14.91 0.427 ----- ----- 14.49 ----- ----- ----- ----- 14.91 17.77 7.967 417.92 14.75 0.429 ----- ----- 14.32 ----- ----- ----- ----- 14.75 17.80 7.933 417.91 14.58 0.431 ----- ----- 14.15 ----- ----- ----- ----- 14.58 17.83 7.899 417.90 14.40 0.433 ----- ----- 13.96 ----- ----- ----- ----- 14.40 17.87 7.865 417.89 14.21 0.435 ----- ----- 13.77 ----- ----- ----- ----- 14.21 17.90 7.830 417.89 14.03 0.438 ----- ----- 13.59 ----- ----- ----- ----- 14.03 17.93 7.795 417.88 13.85 0.440 ----- ----- 13.41 ----- ----- ----- ----- 13.85 17.97 7.761 417.87 13.67 0.442 ----- ----- 13.23 ----- ----- ----- ----- 13.67 18.00 7.727 417.86 13.50 0.444 ----- ----- 13.06 ----- ----- ----- ----- 13.50 Continues on next page... 18 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.03 7.692 417.85 13.33 0.445 ----- ----- 12.89 ----- ----- ----- ----- 13.33 18.07 7.658 417.84 13.17 0.447 ----- ----- 12.72 ----- ----- ----- ----- 13.17 18.10 7.623 417.84 13.01 0.449 ----- ----- 12.56 ----- ----- ----- ----- 13.01 18.13 7.589 417.83 12.86 0.451 ----- ----- 12.41 ----- ----- ----- ----- 12.86 18.17 7.554 417.82 12.71 0.453 ----- ----- 12.25 ----- ----- ----- ----- 12.70 18.20 7.520 417.82 12.55 0.458 ----- ----- 12.08 ----- ----- ----- ----- 12.54 18.23 7.485 417.81 12.39 0.465 ----- ----- 11.91 ----- ----- ----- ----- 12.38 18.27 7.451 417.80 12.23 0.472 ----- ----- 11.75 ----- ----- ----- ----- 12.22 18.30 7.416 417.79 12.08 0.479 ----- ----- 11.58 ----- ----- ----- ----- 12.06 18.33 7.382 417.79 11.93 0.485 ----- ----- 11.43 ----- ----- ----- ----- 11.91 18.37 7.348 417.78 11.78 0.491 ----- ----- 11.27 ----- ----- ----- ----- 11.76 18.40 7.313 417.78 11.64 0.497 ----- ----- 11.12 ----- ----- ----- ----- 11.62 18.43 7.278 417.77 11.51 0.503 ----- ----- 10.97 ----- ----- ----- ----- 11.48 18.47 7.243 417.76 11.37 0.509 ----- ----- 10.83 ----- ----- ----- ----- 11.34 18.50 7.209 417.76 11.24 0.515 ----- ----- 10.69 ----- ----- ----- ----- 11.21 18.53 7.174 417.75 11.11 0.521 ----- ----- 10.56 ----- ----- ----- ----- 11.08 18.57 7.139 417.75 10.99 0.526 ----- ----- 10.42 ----- ----- ----- ----- 10.95 18.60 7.104 417.74 10.87 0.531 ----- ----- 10.29 ----- ----- ----- ----- 10.82 18.63 7.070 417.74 10.75 0.537 ----- ----- 10.17 ----- ----- ----- ----- 10.70 18.67 7.035 417.73 10.63 0.542 ----- ----- 10.04 ----- ----- ----- ----- 10.58 18.70 7.001 417.73 10.52 0.545 ----- ----- 9.925 ----- ----- ----- ----- 10.47 18.73 6.966 417.72 10.42 0.548 ----- ----- 9.815 ----- ----- ----- ----- 10.36 18.77 6.931 417.72 10.31 0.551 ----- ----- 9.707 ----- ----- ----- ----- 10.26 18.80 6.896 417.71 10.21 0.554 ----- ----- 9.601 ----- ----- ----- ----- 10.16 18.83 6.862 417.71 10.11 0.557 ----- ----- 9.498 ----- ----- ----- ----- 10.05 18.87 6.827 417.70 10.02 0.560 ----- ----- 9.397 ----- ----- ----- ----- 9.956 18.90 6.792 417.70 9.920 0.562 ----- ----- 9.297 ----- ----- ----- ----- 9.859 18.93 6.757 417.70 9.826 0.565 ----- ----- 9.199 ----- ----- ----- ----- 9.764 Continues on next page... 19 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.97 6.722 417.69 9.734 0.568 ----- ----- 9.104 ----- ----- ----- ----- 9.671 19.00 6.687 417.69 9.644 0.570 ----- ----- 9.010 ----- ----- ----- ----- 9.580 19.03 6.652 417.68 9.556 0.573 ----- ----- 8.918 ----- ----- ----- ----- 9.491 19.07 6.618 417.68 9.469 0.575 ----- ----- 8.827 ----- ----- ----- ----- 9.403 19.10 6.583 417.68 9.384 0.578 ----- ----- 8.739 ----- ----- ----- ----- 9.317 19.13 6.547 417.67 9.300 0.580 ----- ----- 8.652 ----- ----- ----- ----- 9.232 19.17 6.512 417.67 9.219 0.582 ----- ----- 8.566 ----- ----- ----- ----- 9.149 19.20 6.478 417.66 9.138 0.585 ----- ----- 8.483 ----- ----- ----- ----- 9.067 19.23 6.443 417.66 9.059 0.587 ----- ----- 8.400 ----- ----- ----- ----- 8.987 19.27 6.408 417.66 8.981 0.589 ----- ----- 8.319 ----- ----- ----- ----- 8.908 19.30 6.373 417.65 8.905 0.591 ----- ----- 8.240 ----- ----- ----- ----- 8.831 19.33 6.338 417.65 8.830 0.593 ----- ----- 8.162 ----- ----- ----- ----- 8.755 19.37 6.303 417.65 8.756 0.595 ----- ----- 8.085 ----- ----- ----- ----- 8.680 19.40 6.268 417.64 8.682 0.597 ----- ----- 8.008 ----- ----- ----- ----- 8.606 19.43 6.233 417.64 8.611 0.599 ----- ----- 7.934 ----- ----- ----- ----- 8.534 19.47 6.198 417.64 8.543 0.601 ----- ----- 7.866 ----- ----- ----- ----- 8.467 19.50 6.163 417.63 8.475 0.602 ----- ----- 7.799 ----- ----- ----- ----- 8.402 19.53 6.128 417.63 8.409 0.603 ----- ----- 7.734 ----- ----- ----- ----- 8.337 19.57 6.093 417.63 8.343 0.604 ----- ----- 7.669 ----- ----- ----- ----- 8.273 19.60 6.058 417.62 8.279 0.606 ----- ----- 7.605 ----- ----- ----- ----- 8.211 19.63 6.023 417.62 8.215 0.607 ----- ----- 7.542 ----- ----- ----- ----- 8.149 19.67 5.987 417.62 8.152 0.608 ----- ----- 7.479 ----- ----- ----- ----- 8.087 19.70 5.952 417.62 8.090 0.609 ----- ----- 7.418 ----- ----- ----- ----- 8.027 19.73 5.918 417.61 8.028 0.610 ----- ----- 7.357 ----- ----- ----- ----- 7.967 19.77 5.883 417.61 7.967 0.611 ----- ----- 7.296 ----- ----- ----- ----- 7.908 19.80 5.847 417.61 7.907 0.612 ----- ----- 7.237 ----- ----- ----- ----- 7.850 19.83 5.811 417.60 7.847 0.613 ----- ----- 7.178 ----- ----- ----- ----- 7.792 19.87 5.776 417.60 7.789 0.615 ----- ----- 7.120 ----- ----- ----- ----- 7.735 Continues on next page... 20 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.90 5.742 417.60 7.730 0.616 ----- ----- 7.062 ----- ----- ----- ----- 7.678 19.93 5.707 417.60 7.673 0.617 ----- ----- 7.006 ----- ----- ----- ----- 7.622 19.97 5.671 417.59 7.616 0.618 ----- ----- 6.949 ----- ----- ----- ----- 7.567 20.00 5.636 417.59 7.560 0.619 ----- ----- 6.894 ----- ----- ----- ----- 7.512 20.03 5.603 417.59 7.504 0.620 ----- ----- 6.839 ----- ----- ----- ----- 7.458 20.07 5.580 417.59 7.450 0.621 ----- ----- 6.785 ----- ----- ----- ----- 7.405 20.10 5.566 417.58 7.396 0.622 ----- ----- 6.731 ----- ----- ----- ----- 7.353 20.13 5.557 417.58 7.342 0.623 ----- ----- 6.679 ----- ----- ----- ----- 7.302 20.17 5.551 417.58 7.291 0.624 ----- ----- 6.628 ----- ----- ----- ----- 7.252 20.20 5.544 417.58 7.241 0.625 ----- ----- 6.578 ----- ----- ----- ----- 7.203 20.23 5.537 417.57 7.192 0.625 ----- ----- 6.530 ----- ----- ----- ----- 7.155 20.27 5.530 417.57 7.144 0.626 ----- ----- 6.482 ----- ----- ----- ----- 7.109 20.30 5.524 417.57 7.098 0.627 ----- ----- 6.437 ----- ----- ----- ----- 7.064 20.33 5.517 417.57 7.053 0.628 ----- ----- 6.392 ----- ----- ----- ----- 7.020 20.37 5.510 417.57 7.008 0.629 ----- ----- 6.348 ----- ----- ----- ----- 6.977 20.40 5.504 417.56 6.965 0.630 ----- ----- 6.305 ----- ----- ----- ----- 6.935 20.43 5.497 417.56 6.923 0.630 ----- ----- 6.263 ----- ----- ----- ----- 6.894 20.47 5.491 417.56 6.882 0.631 ----- ----- 6.223 ----- ----- ----- ----- 6.854 20.50 5.484 417.56 6.841 0.632 ----- ----- 6.183 ----- ----- ----- ----- 6.815 20.53 5.477 417.56 6.802 0.633 ----- ----- 6.144 ----- ----- ----- ----- 6.776 20.57 5.471 417.55 6.764 0.633 ----- ----- 6.106 ----- ----- ----- ----- 6.739 20.60 5.463 417.55 6.726 0.634 ----- ----- 6.069 ----- ----- ----- ----- 6.703 20.63 5.457 417.55 6.690 0.635 ----- ----- 6.033 ----- ----- ----- ----- 6.667 20.67 5.450 417.55 6.658 0.635 ----- ----- 6.001 ----- ----- ----- ----- 6.636 20.70 5.444 417.55 6.628 0.635 ----- ----- 5.969 ----- ----- ----- ----- 6.605 20.73 5.437 417.55 6.598 0.636 ----- ----- 5.938 ----- ----- ----- ----- 6.574 20.77 5.431 417.54 6.568 0.636 ----- ----- 5.908 ----- ----- ----- ----- 6.544 20.80 5.424 417.54 6.540 0.636 ----- ----- 5.879 ----- ----- ----- ----- 6.515 Continues on next page... 21 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.83 5.417 417.54 6.511 0.637 ----- ----- 5.850 ----- ----- ----- ----- 6.487 20.87 5.410 417.54 6.484 0.637 ----- ----- 5.822 ----- ----- ----- ----- 6.459 20.90 5.403 417.54 6.457 0.637 ----- ----- 5.794 ----- ----- ----- ----- 6.431 20.93 5.397 417.54 6.430 0.637 ----- ----- 5.767 ----- ----- ----- ----- 6.404 20.97 5.390 417.53 6.404 0.638 ----- ----- 5.740 ----- ----- ----- ----- 6.378 21.00 5.383 417.53 6.378 0.638 ----- ----- 5.714 ----- ----- ----- ----- 6.352 21.03 5.377 417.53 6.353 0.638 ----- ----- 5.688 ----- ----- ----- ----- 6.327 21.07 5.370 417.53 6.329 0.639 ----- ----- 5.663 ----- ----- ----- ----- 6.302 21.10 5.363 417.53 6.305 0.639 ----- ----- 5.639 ----- ----- ----- ----- 6.278 21.13 5.357 417.53 6.281 0.639 ----- ----- 5.614 ----- ----- ----- ----- 6.254 21.17 5.350 417.53 6.258 0.639 ----- ----- 5.591 ----- ----- ----- ----- 6.230 21.20 5.344 417.53 6.235 0.640 ----- ----- 5.567 ----- ----- ----- ----- 6.207 21.23 5.336 417.52 6.213 0.640 ----- ----- 5.545 ----- ----- ----- ----- 6.184 21.27 5.329 417.52 6.191 0.640 ----- ----- 5.522 ----- ----- ----- ----- 6.162 21.30 5.323 417.52 6.170 0.640 ----- ----- 5.500 ----- ----- ----- ----- 6.140 21.33 5.316 417.52 6.148 0.640 ----- ----- 5.478 ----- ----- ----- ----- 6.119 21.37 5.309 417.52 6.128 0.641 ----- ----- 5.457 ----- ----- ----- ----- 6.098 21.40 5.303 417.52 6.107 0.641 ----- ----- 5.436 ----- ----- ----- ----- 6.077 21.43 5.296 417.52 6.087 0.641 ----- ----- 5.416 ----- ----- ----- ----- 6.057 21.47 5.289 417.52 6.067 0.641 ----- ----- 5.396 ----- ----- ----- ----- 6.037 21.50 5.283 417.52 6.048 0.642 ----- ----- 5.376 ----- ----- ----- ----- 6.017 21.53 5.276 417.51 6.029 0.642 ----- ----- 5.356 ----- ----- ----- ----- 5.998 21.57 5.268 417.51 6.011 0.642 ----- ----- 5.338 ----- ----- ----- ----- 5.979 21.60 5.262 417.51 5.992 0.642 ----- ----- 5.318 ----- ----- ----- ----- 5.961 21.63 5.255 417.51 5.974 0.642 ----- ----- 5.300 ----- ----- ----- ----- 5.942 21.67 5.249 417.51 5.956 0.643 ----- ----- 5.282 ----- ----- ----- ----- 5.924 21.70 5.242 417.51 5.938 0.643 ----- ----- 5.264 ----- ----- ----- ----- 5.907 21.73 5.235 417.51 5.921 0.643 ----- ----- 5.246 ----- ----- ----- ----- 5.889 Continues on next page... 22 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.77 5.228 417.51 5.904 0.643 ----- ----- 5.229 ----- ----- ----- ----- 5.872 21.80 5.222 417.51 5.888 0.643 ----- ----- 5.212 ----- ----- ----- ----- 5.855 21.83 5.216 417.51 5.871 0.643 ----- ----- 5.195 ----- ----- ----- ----- 5.839 21.87 5.208 417.51 5.855 0.644 ----- ----- 5.179 ----- ----- ----- ----- 5.822 21.90 5.201 417.50 5.839 0.644 ----- ----- 5.162 ----- ----- ----- ----- 5.806 21.93 5.195 417.50 5.824 0.644 ----- ----- 5.146 ----- ----- ----- ----- 5.790 21.97 5.188 417.50 5.808 0.644 ----- ----- 5.130 ----- ----- ----- ----- 5.775 22.00 5.181 417.50 5.793 0.644 ----- ----- 5.115 ----- ----- ----- ----- 5.759 22.03 5.175 417.50 5.778 0.644 ----- ----- 5.100 ----- ----- ----- ----- 5.744 22.07 5.167 417.50 5.763 0.645 ----- ----- 5.084 ----- ----- ----- ----- 5.729 22.10 5.161 417.50 5.749 0.645 ----- ----- 5.069 ----- ----- ----- ----- 5.714 22.13 5.154 417.50 5.734 0.645 ----- ----- 5.055 ----- ----- ----- ----- 5.700 22.17 5.147 417.50 5.720 0.645 ----- ----- 5.040 ----- ----- ----- ----- 5.685 22.20 5.140 417.50 5.706 0.645 ----- ----- 5.026 ----- ----- ----- ----- 5.671 22.23 5.133 417.50 5.692 0.645 ----- ----- 5.012 ----- ----- ----- ----- 5.657 22.27 5.127 417.50 5.679 0.646 ----- ----- 4.998 ----- ----- ----- ----- 5.644 22.30 5.120 417.50 5.666 0.646 ----- ----- 4.984 ----- ----- ----- ----- 5.630 22.33 5.113 417.49 5.652 0.646 ----- ----- 4.971 ----- ----- ----- ----- 5.617 22.37 5.106 417.49 5.639 0.646 ----- ----- 4.958 ----- ----- ----- ----- 5.603 22.40 5.100 417.49 5.626 0.646 ----- ----- 4.944 ----- ----- ----- ----- 5.590 22.43 5.093 417.49 5.614 0.646 ----- ----- 4.931 ----- ----- ----- ----- 5.578 22.47 5.086 417.49 5.601 0.646 ----- ----- 4.918 ----- ----- ----- ----- 5.565 22.50 5.079 417.49 5.589 0.647 ----- ----- 4.906 ----- ----- ----- ----- 5.552 22.53 5.072 417.49 5.576 0.647 ----- ----- 4.893 ----- ----- ----- ----- 5.540 22.57 5.066 417.49 5.564 0.647 ----- ----- 4.881 ----- ----- ----- ----- 5.527 22.60 5.059 417.49 5.552 0.647 ----- ----- 4.869 ----- ----- ----- ----- 5.515 22.63 5.052 417.49 5.541 0.647 ----- ----- 4.856 ----- ----- ----- ----- 5.503 22.67 5.045 417.49 5.529 0.647 ----- ----- 4.844 ----- ----- ----- ----- 5.491 Continues on next page... 23 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.70 5.038 417.49 5.517 0.647 ----- ----- 4.833 ----- ----- ----- ----- 5.480 22.73 5.032 417.49 5.506 0.647 ----- ----- 4.821 ----- ----- ----- ----- 5.468 22.77 5.025 417.49 5.494 0.648 ----- ----- 4.809 ----- ----- ----- ----- 5.457 22.80 5.018 417.49 5.483 0.648 ----- ----- 4.798 ----- ----- ----- ----- 5.445 22.83 5.011 417.48 5.472 0.648 ----- ----- 4.786 ----- ----- ----- ----- 5.434 22.87 5.004 417.48 5.461 0.648 ----- ----- 4.775 ----- ----- ----- ----- 5.423 22.90 4.997 417.48 5.450 0.648 ----- ----- 4.764 ----- ----- ----- ----- 5.412 22.93 4.990 417.48 5.439 0.648 ----- ----- 4.753 ----- ----- ----- ----- 5.401 22.97 4.983 417.48 5.429 0.648 ----- ----- 4.742 ----- ----- ----- ----- 5.390 23.00 4.977 417.48 5.418 0.648 ----- ----- 4.731 ----- ----- ----- ----- 5.379 23.03 4.970 417.48 5.408 0.648 ----- ----- 4.720 ----- ----- ----- ----- 5.369 23.07 4.963 417.48 5.397 0.649 ----- ----- 4.710 ----- ----- ----- ----- 5.358 23.10 4.956 417.48 5.387 0.649 ----- ----- 4.699 ----- ----- ----- ----- 5.348 23.13 4.949 417.48 5.377 0.649 ----- ----- 4.689 ----- ----- ----- ----- 5.338 23.17 4.942 417.48 5.367 0.649 ----- ----- 4.678 ----- ----- ----- ----- 5.327 23.20 4.936 417.48 5.357 0.649 ----- ----- 4.669 ----- ----- ----- ----- 5.317 23.23 4.929 417.48 5.347 0.649 ----- ----- 4.658 ----- ----- ----- ----- 5.307 23.27 4.922 417.48 5.337 0.649 ----- ----- 4.648 ----- ----- ----- ----- 5.297 23.30 4.915 417.48 5.327 0.649 ----- ----- 4.638 ----- ----- ----- ----- 5.287 23.33 4.908 417.48 5.318 0.649 ----- ----- 4.628 ----- ----- ----- ----- 5.278 23.37 4.901 417.48 5.308 0.650 ----- ----- 4.619 ----- ----- ----- ----- 5.268 23.40 4.895 417.48 5.298 0.650 ----- ----- 4.609 ----- ----- ----- ----- 5.258 23.43 4.888 417.47 5.289 0.650 ----- ----- 4.599 ----- ----- ----- ----- 5.249 23.47 4.881 417.47 5.280 0.650 ----- ----- 4.589 ----- ----- ----- ----- 5.239 23.50 4.874 417.47 5.270 0.650 ----- ----- 4.580 ----- ----- ----- ----- 5.230 23.53 4.867 417.47 5.261 0.650 ----- ----- 4.570 ----- ----- ----- ----- 5.220 23.57 4.861 417.47 5.252 0.650 ----- ----- 4.561 ----- ----- ----- ----- 5.211 23.60 4.853 417.47 5.243 0.650 ----- ----- 4.552 ----- ----- ----- ----- 5.202 Continues on next page... 24 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.63 4.846 417.47 5.234 0.650 ----- ----- 4.542 ----- ----- ----- ----- 5.193 23.67 4.840 417.47 5.224 0.650 ----- ----- 4.533 ----- ----- ----- ----- 5.184 23.70 4.833 417.47 5.215 0.651 ----- ----- 4.524 ----- ----- ----- ----- 5.175 23.73 4.826 417.47 5.207 0.651 ----- ----- 4.515 ----- ----- ----- ----- 5.166 23.77 4.819 417.47 5.198 0.651 ----- ----- 4.506 ----- ----- ----- ----- 5.157 23.80 4.812 417.47 5.189 0.651 ----- ----- 4.497 ----- ----- ----- ----- 5.148 23.83 4.806 417.47 5.180 0.651 ----- ----- 4.488 ----- ----- ----- ----- 5.139 23.87 4.799 417.47 5.172 0.651 ----- ----- 4.479 ----- ----- ----- ----- 5.130 23.90 4.791 417.47 5.163 0.651 ----- ----- 4.470 ----- ----- ----- ----- 5.121 23.93 4.784 417.47 5.155 0.651 ----- ----- 4.461 ----- ----- ----- ----- 5.113 23.97 4.778 417.47 5.146 0.651 ----- ----- 4.453 ----- ----- ----- ----- 5.104 24.00 4.771 417.47 5.138 0.651 ----- ----- 4.444 ----- ----- ----- ----- 5.095 24.03 3.813 417.47 5.117 0.652 ----- ----- 4.423 ----- ----- ----- ----- 5.074 24.07 1.906 417.46 5.060 0.652 ----- ----- 4.364 ----- ----- ----- ----- 5.017 24.10 0.635 417.46 4.968 0.653 ----- ----- 4.271 ----- ----- ----- ----- 4.925 24.13 0.000 417.45 4.862 0.655 ----- ----- 4.164 ----- ----- ----- ----- 4.819 24.17 0.000 417.44 4.751 0.656 ----- ----- 4.052 ----- ----- ----- ----- 4.708 24.20 0.000 417.44 4.643 0.657 ----- ----- 3.943 ----- ----- ----- ----- 4.599 24.23 0.000 417.43 4.537 0.658 ----- ----- 3.835 ----- ----- ----- ----- 4.494 24.27 0.000 417.43 4.434 0.659 ----- ----- 3.731 ----- ----- ----- ----- 4.390 24.30 0.000 417.42 4.333 0.661 ----- ----- 3.629 ----- ----- ----- ----- 4.289 24.33 0.000 417.41 4.234 0.662 ----- ----- 3.529 ----- ----- ----- ----- 4.190 24.37 0.000 417.41 4.138 0.663 ----- ----- 3.431 ----- ----- ----- ----- 4.094 24.40 0.000 417.40 4.043 0.664 ----- ----- 3.336 ----- ----- ----- ----- 4.000 24.43 0.000 417.40 3.951 0.665 ----- ----- 3.242 ----- ----- ----- ----- 3.908 24.47 0.000 417.39 3.861 0.666 ----- ----- 3.152 ----- ----- ----- ----- 3.818 24.50 0.000 417.39 3.774 0.667 ----- ----- 3.063 ----- ----- ----- ----- 3.730 24.53 0.000 417.38 3.687 0.668 ----- ----- 2.976 ----- ----- ----- ----- 3.644 Continues on next page... 25 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.57 0.000 417.38 3.604 0.669 ----- ----- 2.891 ----- ----- ----- ----- 3.560 24.60 0.000 417.37 3.522 0.670 ----- ----- 2.808 ----- ----- ----- ----- 3.478 24.63 0.000 417.37 3.454 0.671 ----- ----- 2.739 ----- ----- ----- ----- 3.410 24.67 0.000 417.36 3.389 0.672 ----- ----- 2.672 ----- ----- ----- ----- 3.343 24.70 0.000 417.36 3.325 0.672 ----- ----- 2.606 ----- ----- ----- ----- 3.278 24.73 0.000 417.35 3.263 0.673 ----- ----- 2.541 ----- ----- ----- ----- 3.215 24.77 0.000 417.35 3.201 0.674 ----- ----- 2.478 ----- ----- ----- ----- 3.152 24.80 0.000 417.34 3.141 0.675 ----- ----- 2.416 ----- ----- ----- ----- 3.091 24.83 0.000 417.34 3.082 0.676 ----- ----- 2.355 ----- ----- ----- ----- 3.031 24.87 0.000 417.33 3.024 0.676 ----- ----- 2.295 ----- ----- ----- ----- 2.972 24.90 0.000 417.33 2.968 0.677 ----- ----- 2.237 ----- ----- ----- ----- 2.914 24.93 0.000 417.33 2.912 0.678 ----- ----- 2.180 ----- ----- ----- ----- 2.857 24.97 0.000 417.32 2.858 0.678 ----- ----- 2.123 ----- ----- ----- ----- 2.802 25.00 0.000 417.32 2.804 0.679 ----- ----- 2.068 ----- ----- ----- ----- 2.747 25.03 0.000 417.31 2.751 0.680 ----- ----- 2.014 ----- ----- ----- ----- 2.694 25.07 0.000 417.31 2.700 0.680 ----- ----- 1.961 ----- ----- ----- ----- 2.641 25.10 0.000 417.31 2.650 0.681 ----- ----- 1.909 ----- ----- ----- ----- 2.590 25.13 0.000 417.30 2.600 0.682 ----- ----- 1.858 ----- ----- ----- ----- 2.539 25.17 0.000 417.30 2.551 0.682 ----- ----- 1.808 ----- ----- ----- ----- 2.490 25.20 0.000 417.30 2.504 0.683 ----- ----- 1.759 ----- ----- ----- ----- 2.442 25.23 0.000 417.29 2.457 0.683 ----- ----- 1.711 ----- ----- ----- ----- 2.394 25.27 0.000 417.29 2.412 0.684 ----- ----- 1.663 ----- ----- ----- ----- 2.348 25.30 0.000 417.29 2.367 0.685 ----- ----- 1.618 ----- ----- ----- ----- 2.302 25.33 0.000 417.28 2.323 0.685 ----- ----- 1.572 ----- ----- ----- ----- 2.257 25.37 0.000 417.28 2.280 0.686 ----- ----- 1.527 ----- ----- ----- ----- 2.213 25.40 0.000 417.28 2.245 0.686 ----- ----- 1.493 ----- ----- ----- ----- 2.180 25.43 0.000 417.27 2.211 0.687 ----- ----- 1.460 ----- ----- ----- ----- 2.147 25.47 0.000 417.27 2.177 0.687 ----- ----- 1.427 ----- ----- ----- ----- 2.115 Continues on next page... 26 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.50 0.000 417.27 2.144 0.688 ----- ----- 1.395 ----- ----- ----- ----- 2.083 25.53 0.000 417.27 2.111 0.688 ----- ----- 1.364 ----- ----- ----- ----- 2.052 25.57 0.000 417.26 2.079 0.689 ----- ----- 1.332 ----- ----- ----- ----- 2.021 25.60 0.000 417.26 2.047 0.689 ----- ----- 1.301 ----- ----- ----- ----- 1.991 25.63 0.000 417.26 2.016 0.690 ----- ----- 1.271 ----- ----- ----- ----- 1.961 25.67 0.000 417.25 1.985 0.690 ----- ----- 1.241 ----- ----- ----- ----- 1.931 25.70 0.000 417.25 1.955 0.691 ----- ----- 1.212 ----- ----- ----- ----- 1.902 25.73 0.000 417.25 1.926 0.691 ----- ----- 1.183 ----- ----- ----- ----- 1.874 25.77 0.000 417.25 1.896 0.691 ----- ----- 1.154 ----- ----- ----- ----- 1.846 25.80 0.000 417.24 1.867 0.692 ----- ----- 1.126 ----- ----- ----- ----- 1.818 25.83 0.000 417.24 1.839 0.692 ----- ----- 1.098 ----- ----- ----- ----- 1.791 25.87 0.000 417.24 1.811 0.693 ----- ----- 1.071 ----- ----- ----- ----- 1.764 25.90 0.000 417.24 1.783 0.693 ----- ----- 1.044 ----- ----- ----- ----- 1.737 25.93 0.000 417.23 1.756 0.694 ----- ----- 1.018 ----- ----- ----- ----- 1.711 25.97 0.000 417.23 1.729 0.694 ----- ----- 0.992 ----- ----- ----- ----- 1.686 26.00 0.000 417.23 1.703 0.694 ----- ----- 0.966 ----- ----- ----- ----- 1.660 26.03 0.000 417.23 1.677 0.695 ----- ----- 0.941 ----- ----- ----- ----- 1.635 26.07 0.000 417.22 1.651 0.695 ----- ----- 0.916 ----- ----- ----- ----- 1.611 26.10 0.000 417.22 1.626 0.696 ----- ----- 0.891 ----- ----- ----- ----- 1.587 26.13 0.000 417.22 1.601 0.696 ----- ----- 0.867 ----- ----- ----- ----- 1.563 26.17 0.000 417.22 1.576 0.696 ----- ----- 0.843 ----- ----- ----- ----- 1.540 26.20 0.000 417.22 1.552 0.697 ----- ----- 0.820 ----- ----- ----- ----- 1.516 26.23 0.000 417.21 1.529 0.697 ----- ----- 0.797 ----- ----- ----- ----- 1.494 26.27 0.000 417.21 1.505 0.697 ----- ----- 0.774 ----- ----- ----- ----- 1.471 26.30 0.000 417.21 1.482 0.698 ----- ----- 0.751 ----- ----- ----- ----- 1.449 26.33 0.000 417.21 1.459 0.698 ----- ----- 0.729 ----- ----- ----- ----- 1.427 26.37 0.000 417.21 1.437 0.699 ----- ----- 0.707 ----- ----- ----- ----- 1.406 26.40 0.000 417.20 1.415 0.699 ----- ----- 0.686 ----- ----- ----- ----- 1.385 Continues on next page... 27 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 26.43 0.000 417.20 1.393 0.699 ----- ----- 0.665 ----- ----- ----- ----- 1.364 26.47 0.000 417.20 1.372 0.700 ----- ----- 0.644 ----- ----- ----- ----- 1.344 26.50 0.000 417.20 1.351 0.700 ----- ----- 0.624 ----- ----- ----- ----- 1.324 26.53 0.000 417.20 1.330 0.700 ----- ----- 0.604 ----- ----- ----- ----- 1.304 26.57 0.000 417.19 1.310 0.701 ----- ----- 0.584 ----- ----- ----- ----- 1.284 26.60 0.000 417.19 1.290 0.701 ----- ----- 0.564 ----- ----- ----- ----- 1.265 26.63 0.000 417.19 1.270 0.701 ----- ----- 0.545 ----- ----- ----- ----- 1.246 26.67 0.000 417.19 1.257 0.701 ----- ----- 0.532 ----- ----- ----- ----- 1.233 26.70 0.000 417.19 1.247 0.701 ----- ----- 0.522 ----- ----- ----- ----- 1.223 26.73 0.000 417.19 1.237 0.701 ----- ----- 0.511 ----- ----- ----- ----- 1.213 26.77 0.000 417.18 1.227 0.702 ----- ----- 0.501 ----- ----- ----- ----- 1.203 26.80 0.000 417.18 1.217 0.702 ----- ----- 0.491 ----- ----- ----- ----- 1.193 26.83 0.000 417.18 1.207 0.702 ----- ----- 0.481 ----- ----- ----- ----- 1.183 26.87 0.000 417.18 1.197 0.702 ----- ----- 0.471 ----- ----- ----- ----- 1.173 End 2/27/23, 9:40 AM NORTH AMERICAN GREEN SPILLWAY ANALYSIS > > > Grass Spillway Name Grass Spillway Discharge 117.08 Peak Flow Period 2 Channel Slope 0.05 Channel Bottom Width 30 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% ECMDS 7.0 North American Green 5401 St. Wendel -Cynthia na Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECM DS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 117.08 cfs 7.49 ft/s 0.51 ft 0.028 8.5 Ibs/ft2 1.6 Ibs/ft2 5.32 STABLE F P300 Unvegetated Underlying Straight 117.08 cfs 7.49 ft/s 0.51 ft 0.028 5.68 Ibs/ft2 1.55 Ibs/ft2 3.66 STABLE F Substrate Shoremax w/ Straight 117.08 cfs 6.31 ft/s 0.61 ft 0.037 14 Ibs/ft2 1.89 Ibs/ft2 7.4 STABLE F P300 Reinforced Vegetation Underlying Straight 117.08 cfs 6.31 ft/s 0.61 ft 0.037 8.5 Ibs/ft2 1.82 Ibs/ft2 4.66 STABLE F Substrate https://ecmds.com/project/l 51829/spillway-analysis/240539/show 1 /1 Pond Report s Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Pond No. 1 - BMP Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 415.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 415.00 71,000 0 0 0.50 415.50 75,135 36,534 36,534 1.00 416.00 77,720 38,214 74,748 2.00 417.00 82,930 80,325 155,073 2.10 417.10 83,455 8,319 163,392 3.00 418.00 87,800 77,065 240,457 4.00 419.00 91,825 89,813 330,269 5.00 420.00 95,910 93,868 424,137 6.00 421.00 100,055 97,983 522,119 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 4.50 0.00 0.00 Crest Len (ft) = 6.00 10.00 30.00 0.00 Span (in) = 24.00 4.50 0.00 0.00 Crest El. (ft) = 417.10 418.50 420.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 415.00 415.00 0.00 0.00 Weir Type = Rect Broad Broad --- Length (ft) = 37.00 0.50 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 1.08 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 6.00 41111 4.00 c m ►41I17 191I11 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 421.00 419.00 418.00 CliVtell] Cy[ -mile] 0.00 ' 1 1 1 1 1 1 1 1 1 1 1 1 1' 415.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 Total Q Discharge (cfs) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.507 2 750 46,718 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 94.73 2 718 190,968 ------ ------ ------ BMP Post -Developed 3 Reservoir 0.704 2 1444 155,415 2 417.09 162,778 Post Through Pond 5 SCS Runoff 0.510 2 360 3,531 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.006 2 368 1,494 5 415.05 3,507 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 3.gpw Return Period: 1 Year Monday, 02 / 27 / 2023 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 3.507 cfs Storm frequency = 1 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 46,718 cuft Drainage area = 62.660 ac Curve number = 54.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 31.90 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre -Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 62.660 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.07 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Post -Developed Hyd. No. 2 -- 1 Year Monday, 02 / 27 / 2023 = 94.73 cfs = 718 min = 190,968 cuft = 72.9 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.704 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 155,415 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 417.09 ft Reservoir name = BMP Pond Max. Storage = 162,778 cuft Storage Indication method used. Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 20.00 Post Through Pond Hyd. No. 3 -- 1 Year 1200 1800 2400 Hyd No. 2 3000 3600 4200 4800 5400 Total storage used = 162,778 cuft 6000v vv Time (min) A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 5 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 0.510 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 3,531 cuft Drainage area = 62.660 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 BMP Post -Developed Hyd. No. 5 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0 60 120 180 240 300 360 420 — Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.006 cfs Storm frequency = 1 yrs Time to peak = 368 min Time interval = 2 min Hyd. volume = 1,494 cuft Inflow hyd. No. = 5 - BMP Post -Developed Max. Elevation = 415.05 ft Reservoir name = BMP Pond Max. Storage = 3,507 cuft Storage Indication method used. Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 n nn 0 600 1200 1800 2400 3000 3600 4200 4800 5400 — Hyd No. 6 Hyd No. 5 Total storage used = 3,507 cuft Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 6000 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 11.24 2 738 93,011 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 140.37 2 718 280,756 ------ ------ ------ BMP Post -Developed 3 Reservoir 3.489 2 948 241,678 2 417.37 186,594 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 415.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 3.gpw Return Period: 2 Year Monday, 02 / 27 / 2023 Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 62.660 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.71 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Pre -Developed Hyd. No. 1 -- 2 Year Monday, 02 / 27 / 2023 = 11.24 cfs = 738 min = 93, 011 cuft = 54.6 = 0 ft = 31.90 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 62.660 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.71 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Monday, 02 / 27 / 2023 = 140.37 cfs = 718 min = 280,756 cuft = 72.9 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 3.489 cfs Storm frequency = 2 yrs Time to peak = 948 min Time interval = 2 min Hyd. volume = 241,678 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 417.37 ft Reservoir name = BMP Pond Max. Storage = 186,594 cuft Storage Indication method used. Post Through Pond Hydrograph Summary Report 15 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 51.23 2 736 272,911 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 277.73 2 716 560,727 ------ ------ ------ BMP Post -Developed 3 Reservoir 21.83 2 752 520,615 2 418.45 281,049 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 415.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 3.gpw Return Period: 10 Year Monday, 02 / 27 / 2023 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 62.660 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs) 60.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Pre -Developed Hyd. No. 1 -- 10 Year Monday, 02 / 27 / 2023 = 51.23 cfs = 736 min = 272,911 cuft = 54.6 = 0 ft = 31.90 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1 " ' ' ' ' ' ' I% ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 62.660 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Post -Developed Hyd. No. 2 -- 10 Year Monday, 02 / 27 / 2023 = 277.73 cfs = 716 min = 560,727 cuft = 72.9 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 1 1 1W�_ ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 21.83 cfs Storm frequency = 10 yrs Time to peak = 752 min Time interval = 2 min Hyd. volume = 520,615 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 418.45 ft Reservoir name = BMP Pond Max. Storage = 281,049 cuft Storage Indication method used. Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0 600 — Hyd No. 3 Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 280.00 240.00 200.00 160.00 120.00 :M 40.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 2 Total storage used = 281,049 cult Hydrograph Summary Report 21 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 145.93 2 734 664,200 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 520.17 2 716 1,062,942 ------ ------ ------ BMP Post -Developed 3 Reservoir 117.08 2 724 1,022,026 2 420.89 511,198 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 415.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Ashley Heights) - 3.gpw Return Period: 100 Year Monday, 02 / 27 / 2023 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 62.660 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Monday, 02 / 27 / 2023 = 145.93 cfs = 734 min = 664,200 cuft = 54.6 = 0 ft = 31.90 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 520.17 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,062,942 cuft Drainage area = 62.660 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 0.00 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 2 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Monday, 02 / 27 / 2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 117.08 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 1,022,026 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 420.89 ft Reservoir name = BMP Pond Max. Storage = 511,198 cuft Storage Indication method used Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 J 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 — Hyd No. 2 Total storage used = 511,198 cult OF CONCENTRATION ng Conditions DA OPEN CHANNEL SHALLOW CONIC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT1 Manning's Equation: Tc = (0.007ml-y0.8)/(P2"0.5)(s"0.4) 2-year24-hr �SEGMENTI Tc = L / 60'V V = 1.49R21IS112/ n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's T' Length Elev2 Elev3 Slope Condition Vavg T12 Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T�, T IL Tc(minimum) Tlag Basin fl fl/fl TP-40 in fl flAt TR-55 Fig. 3-1 fl/sec Flow Area (fl-2) (fl fl fl fl/fl (fps) 10 min 0.67c hrs 1 100 463.1 459.4 0.037 3.71 0.24 10.36 2647 459.4 418 0.01564 Unpaved 2.05 21.52 31.88 31.88 0.32 1