Loading...
HomeMy WebLinkAbout20120285 Ver 1_General Correspondence_20111215Beverly Eaves Perdue Governor ���� . NCDENit North Garolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director December 15, 2011 Steve DeWitt, P.E. North Carolina Turnpike Authority 1578 Mail Service Center Raleigh, NC 27699-1578 Subject: Response to NCTA letter dated November 22, 2011 regarding Gaston East-West Connector Indirect and Cumulative Effects Water Qualiry Analysis — Draft (Atkins, August 2011). Dear Mr. DeWitt: The NC Division of Water Quality has reviewed your responses to our comments regarding the subject document. These comments in conjunction with your explanations provided at our November 22, 2011 meeting have adequately answered our questions. We find your methodologies to be reasonable and concur with your conclusions regarding water quality impacts due to indirect and cumulative effects from the Gaston East-West Connector. Furthermore, we will no longer require a letter from each Metropolitan Planning Organization (MPO) confirming that the construction of the Gaston East-West Connector was omitted from the "No-Build" analysis. If you have any further questions regarding this issue, please let me know. Sincerely, �-;= " ;i / , c�,�� � ----_ Brian Wrenn, ` Transportation Permitting Unit cc: Liz Hair, Asheville Regulatory Field Office, US Army Corps of Engineers Chris Militscher, USEPA Marla Chambers, WRC Polly Lespinasse, NCDWQ Mooresville Regional Office File Copy Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Bivd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:l/h2o.enr.state.nc.uslncwetlandsl An Equal Opportunity 1 Affrmative Action Employer Dee Freeman Secretary NorthCarolina ��iturq��l�