HomeMy WebLinkAboutNCG550573_20230207CEI_20230302DocuSign Envelope ID: 4E1 BF21 F-252B-476B-9854-2ECD27162386
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 2 u 3 I NCG550573 111 121 23/02/07 I17 18 I C I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I n, I 73 � I 74 79 I I I I I I I80
70 I I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
01:OOPM 23/02/07
19/11/06
1315 North Pine Run Road
1315 N Pine Run Rd
Exit Time/Date
Permit Expiration Date
Boone NC 28607
02:OOPM 23/02/07
20/10/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Kenneth D Bowman,1315 Pine Run Rd Boone NC 28607///
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Operations & Maintenar 0 Records/Reports 0 Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Patricia Lowery DWR/WSRO WQ/336-776-9691/
DocuSigned by: 3/2/2023
til.Cl.(A. �9V19P/wy
0
42D62165508C476...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
by:
FDocuSigned
ti T. 3/2/2023
EPA FormM?FWev F'94) Previous editions are obsolete.
Page#
DocuSign Envelope ID: 4E1 BF21 F-252B-476B-9854-2ECD27162386
NPDES yr/mo/day Inspection Type (Cont.)
NCG550573 I11 12I 23/02/07 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On February 7th, 2023, Tricia Lowery met with Kenneth Bowman to perform Single Family Residence
(SFR) Compliance Evaluation Inspection at 1315 N. Pine Run Rd, Boone NC (Permit #NCG550573).
The system consists of: 1) septic tank, 2) chlorine contact chamber, and 3) effluent outfall pipe.
Occupancy of SFR: 2 people. Due to size of household, it is a low water usage condition. The septic
tank is the primary treatment with no discharge to effluent pipe. The septic tank is maintained every
3 years. The only area of concern was improper chlorine tablets being used in system. Overall, the
system is well maintained. The attached EPA inspection form detail the areas that were evaluated
with their respective comments.
Page#
DocuSign Envelope ID: 4E1 BF21 F-252B-476B-9854-2ECD27162386
Permit: NCG550573 Owner -Facility:
1315 North Pine Run Road
Inspection Date: 02/07/2023 Inspection Type:
Compliance Evaluation
Septic Tank
Yes
No
NA NE
(If pumps are used) Is an audible and visual alarm operational?
❑
❑
❑
Is septic tank pumped on a schedule?
0
❑
❑
❑
Are pumps or syphons operating properly?
❑
❑
0
❑
Are high and low water alarms operating properly?
❑
❑
❑
Comment: The septic tank is pumped every 3 years. There are only 2
people that occupy the
residence, therefore low water usage. The septic tank is the primary treatment. No
flow has been discharged to stream.
Disinfection -Tablet
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Yes No NA NE
1
■ ❑ ❑ ❑
❑ ■ ❑ ❑
❑ ❑ ❑ ■
■ ❑ ❑ ❑
❑ ❑ ❑ ■
Comment: Mr. Bowman was usinq Tri-Chloro tabs (for swimminq pool use). Inspector emailed
information concerning proper tablets to use for system and inserted links of various
places to purchase proper tablets.
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: Effluent pipe is very well maintain and easy to inspect. No flow coming from effluent
pipe, however if a discharge were to occur, the effluent would properly be aerated
before enterina stream as effluent would casade down rock sloDe.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: No flow from discharge point, therefore samples not taken.
Page# 3