Loading...
HomeMy WebLinkAboutWQ0004240_Annual Report_202302272022 Performance Annual Report I. General Information Facility/System Names: Wastewater Treatment Facility (WWTF) at Marine Corps Auxiliary Landing Field (MCALF) Bogue Responsible Entity: United States Marine Corps Operator in Responsible Charge/Contact: Jeffery Clayton/Richard Weaver Applicable Permit: WQ0004240 Description of Collection System or Treatment Process: MCALF Bogue: 6,570,000 gallons per year (over a 12 month consecutive period) wastewater treatment and spray irrigation with a either 60 inch or 75.34 inch per year (over a 12 month period) loading application limit on the three fields. II. Performance Text Summary of System Performance for Calendar Year (CY) 2022: MCALF Bogue operated within permit conditions throughout CY 2022. The facility treated a 12 month flow total of 1,847,090 gallons and applied a total of 2,309,400 gallons to surface application through spray irrigation at a 12 month loading total of 21.24 inches on both field 1 and field 2. Field 3 is not yet in service. The facility was last evaluated for compliance on July 21, 2021 and found to be compliant. List (by month) any violations permit conditions or other environmental regulations. Monthly lists should include discussion of any environmental impacts and corrective measures taken to address violations. No violations of the permit were reported or received during CY 2022. III. Notification The following "News Brief' is scheduled to be announced to the MCAS Cherry Point community no later than March 1, 2023. Wastewater Report The North Carolina Clean Water Act of 1999 requires owners of a wastewater treatment works to make a System Annual Performance Report available to their customers upon request. An annual performance report for calendar year 2022 has been prepared and may be obtained free Enclosure (1) of charge by contacting Richard Weaver of the MCAS Cherry Point Environmental Affairs Department at 466-5917. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report will be made available to the users or customers of the named system and that those users will be notified of its availability no later than March 1, 2023. ol February 9, 2023 Responsible Rers'on: ANTHONY A. FERENCE By direction of the Commanding Officer Title: Deputy Facilities Director Entity: MCAS Cherry Point Enclosure (1) 0