HomeMy WebLinkAboutWQ0001086_Annual Performance_20230202Town of Spring Lake Wastewater Collection System System Performance Report January 1, 2022 — December 31, 2022 General Information Facility/System Name Town of Spring Lake Responsible Entity Town of Spring Lake Collection System ORC Roy L Lowder Collection Systems Contact Tim Garner, Water Resources Director Collection System Permit W CS00105 WWTP and Land Application ORC Richard Mendez WWTP Contact Tim Garner, Water Resources Director WWTP Discharge Permit NC0030970 Land Application Bio Solids Permit W 0001086 Wastewater Treatment Plant and Collection System The Town of Spring Lake owns and operates its own wastewater treatment system. The wastewater treatment system consists of two sanitary sewer lift stations and a 1.5 MGD wastewater treatment plant. Wastewater Treatment Plant is a Dual Train, Extended Aeration Plant with Secondary Clarification for the separation of liquids and solids, Post Aeration, Chlorination and De -Chlorination. Aerobic Digestion has been supplemented with Lime Stabilization to ensure that the treated Bio-solids produced after plant processing, meet EPA and NCDWQ regulations prior to disposal by land application. A monthly report of plant performance as determined by Laboratory analysis is submitted to the NCDWQ and an annual Bio-solids application report and Laboratory analysis is submitted to the EPA and NCDWQ Non -Discharge Branch. The plant is also responsible for two lift stations in the town's collection system. The Town of Spring Lake also owns and maintains approximately 46 miles of gravity sewer line and 2500 feet of force main sewer line. All aerial crossing and rights -of -way are inspected twice yearly and after large storm/flooding events to ensure compliance with the Towns collection permit. Compliance Performance The Spring Lake Wastewater Treatment plant received the following violations during the 2022 calendar year: • No violations were received during the 2022 calendar year The Spring Lake collections system did not have a reportable sanitary sewer overflow during the 2022 calendar year. t Wastewater Treatment Plant Monthly and Yearly Flow The following table summarizes the amount of raw wastewater treated and released into the Little River. Flow(gallons) AveDaily Flow GD January 2022 31,308,000 1.12 February 2022 26,619,000 0.86 March 2022 31,993,000 1.07 April 2022 27,170,000 0.88 May 2022 26,416,000 0.88 June 2022 23,440,000 0.76 July 2022 27,040,000 0.87 August 2022 26,232,000 0.87 September 2022 26,461,000 0.85 October 2022 28,562,000 0.95 November 2022 24,565,000 0.79 December 2022 26,979,000 0.87 Total 326,7859000 0.89 Notification A copy of this report has been posted on the Town of Spring Lake website (www.townofspringlake. com). Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named syst and that those users have been notified of its availability. Z 2C -z Tim Garner, Water Resources Director Date